Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “commissioning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Spin Diagnostics Using Mott Polarimeter for the EIC Pre-Injector

Polarization measurement and front-end commissioning are critical steps in the EIC preinjector program. We designed a spin-diagnostics beamline at around 4 MeV for front-end commissioning. This paper describes a high-energy Mott polarimeter, including Mott scattering, the Sherman function, and extrapolation toward single elastic scattering in finite-thickness foils. We summarize the key equations used to calculate essential design parameters, including detection time, effective Sherman function, differential cross section, and Mott polarimeter figure of merit. We also present the diagnostics beamline lattice design and kicker design for continuous spin-polarization monitoring. These notes provide concepts, formulas, and methods for diagnostic-beamline design and commissioning measurements.

43 PARTICLE ACCELERATORS↗

10 Boron-film-based gas detectors at ESS

The development of detectors for the European Spallation Source is an important parallel element to the effort put into the design and construction of the neutron source and instruments. The 10Boron-film-based detector developments that started over a decade ago as basic detector concepts have now reached technical maturity after intense prototyping work and numerous testing campaigns. Several of the ESS beamlines that will soon enter the commissioning phase started welcoming the detector systems built with the 10 B-film converter technology. The real-size demonstrators evolved in the last 2–3 years into a diverse suite of gas proportional counters for use in diffraction, reflectometry and small-angle scattering studies in spite of the operational complexity posed by the requirements for large-area coverage, low material budget and robustness for operation in the high-flux and high-radiation environment of ESS. The detectors are now being shipped to ESS or undergoing the last performance and calibration tests before being handed over to the instrument teams for installation in the host beamlines. A common feature of these detector systems is the very large number of readout channels that they are instrumented with in order to fulfill the demanding requirements for sensitivity, spatial resolution and count-rate capability. Across all of the detector types that will operate at ESS, the integration, testing and commissioning of the read-out technologies and software tools for data reduction, calibration and analysis are the focus of the detector and integration teams. These will yield a wealth of knowledge about their operation as well as initial results on the in-situ performance, a very important asset to ensure rapid commissioning of the detectors when neutrons from the ESS source become available. In this paper we will give an overview of the 10 B-film-based detector technologies included in the ESS detector suite that are currently facing the transition from the production phase to installation and integration with the other beamline components, which comes with its own specific challenges of both organizational and technical nature.

47 OTHER INSTRUMENTATION↗

Lightcurves, Rotation Periods, and Colors for Vera C. Rubin Observatory’s First Asteroid Discoveries

We present lightcurves, rotation periods, and colors for the first asteroid discoveries made with the NSF-DOE Vera C. Rubin Observatory. These are the first science results derived from the 2103 asteroid discoveries released as part of the Rubin First Look (RFL) media event on 2025 June 23, in which the first LSST Camera commissioning images were released. The ∼340,000 observations in which the discoveries were made span nine nights between 2025 April 21 and May 5. With a limiting single-epoch 5σ depth of ∼23–25 mag and dense temporal sampling under an irregular, commissioning-driven cadence, the RFL observations provide an ideal test bed for determination of rotation periods, including sensitivity to rapid rotation. We model lightcurves and derive rotation periods and colors for the ∼2000 objects. We find 75 main-belt asteroids (MBAs) and one near-Earth object (NEO) with reliable rotation periods spanning 0.031–21.3 hr and a photometric precision in the range of 0.05–0.15 mag. We find 19 superfast rotators with periods shorter than the 2.2 hr spin barrier. Rubin-discovered MBA 2025 MN 45 is the fastest-rotating d > 0.5 km known asteroid with a rotation period of 1.9 minutes; along with NEO 2025 MJ 71 (1.9 minutes) and Rubin-discovered MBAs 2025 MK 41 (3.8 minutes), 2025 MV 71 (13 minutes), and 2025 MG 56 (16 minutes), these five super- to ultrafast rotators join a couple of NEOs as the fastest-spinning subkilometer asteroids known. As this study demonstrates, even in early commissioning, Rubin is successfully probing a previously sparsely sampled region of the subkilometer size−spin rate regime for MBAs.

Greenstreet, Sarah [NSF National Optical-Infrared ↗

Legacy Survey of Space and Time Data Preview 1: raw dataset type

The Legacy Survey of Space and Time Data Preview 1 (DP1) is the first release of data from the NSF-DOE Vera C. Rubin Observatory. It consists of raw and calibrated single-epoch images, co-adds, difference images, detection catalogs, and other derived data products. DP1 is based on 1792 science-grade optical/near-infrared exposures acquired over 48 distinct nights by the Rubin Commissioning Camera, LSSTComCam, on the Simonyi Survey Telescope at the Summit Facility on Cerro Pachón, Chile during the first on-sky commissioning campaign in late 2024. DP1 covers a total of approximately 15 sq. deg. over seven roughly equally-sized non-contiguous fields, each independently observed in six broad photometric bands, ugrizy, spanning a range of stellar densities and latitudes and overlapping with external reference datasets. This dataset is a subset of the full data release consisting of the raw dataset type. These are unprocessed images from the LSST Commissioning Camera. This release contains 16,125 datasets of this type.

79 ASTRONOMY AND ASTROPHYSICS↗

RTN-011: Rubin Observatory Plans for an Early Science Program

This document outlines Rubin Observatory's plans for a dedicated \emph{Early Science Program} to enable high-impact science prior to the first annual data release of the Legacy Survey of Space and Time (LSST). Components of the Early Science Program include releasing science-grade commissioning data products via a series of ``Data Previews,'' ramping up of the transient alert stream during commissioning, implementing a program of incremental template generation to augment alert production in the early phases of the survey, and the first LSST Data Release, DR1, based on the first 6 months of data from the LSST. A detailed breakdown of which data products can be expected when is provided. The Rubin Operations team is working closely with the science community to optimize the Early Science Program for the time-domain and solar system science achievable in the first year of operations. This is a living document; both it and the Early Science Program will continue to evolve over the course of commissioning and pre-operations in response to the state of the as-built system and to community guidance.

79 ASTRONOMY AND ASTROPHYSICS↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Mission Design for the Lunar Reconnaissance Orbiter

The Lunar Reconnaissance Orbiter (LRO) will be the first mission under NASA's Vision for Space Exploration. LRO will fly in a low 50 km mean altitude lunar polar orbit. LRO will utilize a direct minimum energy lunar transfer and have a launch window of three days every two weeks. The launch window is defined by lunar orbit beta angle at times of extreme lighting conditions. This paper will define the LRO launch window and the science and engineering constraints that drive it. After lunar orbit insertion, LRO will be placed into a commissioning orbit for up to 60 days. This commissioning orbit will be a low altitude quasi-frozen orbit that minimizes stationkeeping costs during commissioning phase. LRO will use a repeating stationkeeping cycle with a pair of maneuvers every lunar sidereal period. The stationkeeping algorithm will bound LRO altitude, maintain ground station contact during maneuvers, and equally distribute periselene between northern and southern hemispheres. Orbit determination for LRO will be at the 50 m level with updated lunar gravity models. This paper will address the quasi-frozen orbit design, stationkeeping algorithms and low lunar orbit determination.

Beckman, Mark↗

The Kepler Project: Mission Update

Kepler is a Discovery-class mission designed to determine the frequency of Earth-size planets in and near the habitable zone of solar-like stars. The instrument consists of a 0.95 m aperture photometer designed to obtain high precision photometric measurement of > 100,000 stars to search for patterns of transits. The focal plane of the Schmidt-telescope contains 42 CCDs with at total of 95 mega pixels that cover 116 square degrees of sky. The photometer was launched into an Earth-trailing heliocentric orbit on March 6, 2009, finished its commissioning on May 12, and is now in the science operations mode. During the commissioning of the Kepler photometer, data were obtained at a 30 minute cadence for 53,000 stars for 9.7 days. Although the data have not yet been corrected for the presence of systematic errors and artifacts, the data show the presence of hundreds of eclipsing binary stars and variable stars of amazing variety. To provide some estimate of the capability of the photometer, a quick analysis of the photometric precision was made. Analysis of the commissioning data also show transits, occultations and light emitted from the known exoplanet HAT-P7b. The data show a smooth rise and fall of light: from the planet as it orbits its star, punctuated by a drop of 130 +/- 11 ppm in flux when the planet passes behind its star. We interpret this as the phase variation of the dayside thermal emission plus reflected light from the planet as it orbits its star and is occulted. The depth of the occultation is similar in amplitude to that expected from a transiting Earth-size planet and demonstrates that the Mission has the precision necessary to detect such planets.

Borucki, William J.↗

Landsat Data Continuity Mission

The Landsat Data Continuity Mission (LDCM) is currently under development and is on schedule to launch the 8th satellite in the Landsat series in December of 2012. LDCM is a joint project between the National Aeronautics and Space Administration (NASA) and the United States Geological Survey (USGS). NASA is responsible for developing and launching the flight hardware and on-orbit commissioning and USGS is responsible for developing the ground system and operating the system onorbit after commissioning. Key components of the flight hardware are the Operational Land Imager (OLI), nearing completion by Ball Aerospace & Technologies Corp in Boulder, CO, the Thermal Infrared Sensor (TIRS), being built by NASA's Goddard Space Flight Center and the spacecraft, undergoing integration at Orbital Sciences Corp in Gilbert, Arizona. The launch vehicle will be an Atlas-5 with launch services provided by NASA's Kennedy Space Center. Key ground systems elements are the Mission Operations Element, being developed by the Hammers Corporation, and the Collection Activity Planning Element, Ground Network Element, and Data Processing and Archive System, being developed internally by the USGS Earth Resources Observations and Science (EROS) Center. The primary measurement goal of LDCM is to continue the global coverage of moderate spatial resolution imagery providing continuity with the existing Landsat record. The science goal for this imagery is to monitor land use and land cover, particularly as it relates to global climate change. Together the OLI and TIRS instruments on LDCM replace the ETM+ instrument on Landsat-7 with significant enhancements. The OLI is a pushbroom design instrument where the scanning mechanism of the ETM+ is effectively replaced by a long line of detectors. The OLI has 9 spectral bands with similar spatial resolution to ETM+: 7 of them similar to the reflective spectral bands on ETM+ and two new bands. The two new bands cover (1) the shorter wavelength blue part of the spectrum to help with coastal studies and aerosol analyses/atmospheric correction and (2) an atmospheric water absorption band, where the Earth surface is generally not visible, but Cirrus clouds are, to aid in cloud detection and screening. The radiometry of OLI benefits from improved SNR, dynamic range and quantization. OLI is undergoing system testing with a delivery scheduled for Spring 2011. The TIRS is also a pushbroom design and used QWIPS detectors that require cooling to 43K using a cryocooler. It.has two spectral bands, effectively splitting the ETM+ band 6 in half, that can be used as a split window to aid in atmospheric correction. It has nominally 100 m spatial resolution as opposed to the 60 m of Landsat-7 ETM+: TIRS has commenced integration and test, with a delivery to the spacecraft vendor scheduled for Winter 2011-2012. The Orbital spacecraft currently being integrated for LDCM will have improved capabilities for pointing over previous missions. These capabilities will allow the OLI and TIRS instruments to point off-nadir the equivalent of one WRS-2 path to increase the chances of coverage for high priority targets, particularly in the event of natural disasters. Also, the pointing capability will allow the calibration of the OLI using the sun (roughly weekly), the moon (monthly), stars (during commissioning) and the Earth (at 90 deg from normal orientation, a.k.a., side slither) quarterly. The solar calibration will be used for OLI absolute and relative calibration, the moon for trending the stability of the OLI response, the stars will be used for Line of Sight determination and the side slither will be an alternate OLI and relative gain determination methodology. The spacecraft is scheduled to begin integration with the OLI instrument in Summer 2011. The LDCM data processing and archive system (DPAS), located at USGS EROS, generates the products for distribution to users. Like Landsat-7 this includes an image assessment system for characrizing instrument performance and updating calibration parameters. Products will be generated that include the spectral bands from both instruments, terrain corrected and registered to the geoid. Also, like Landsat-7, data products will be distributed at no charge to the user. The current status and plans of the space and ground segments of the LDCM project will be presented along with performance predictions as available. More detailed information on the two instruments is intended to be presented in separate papers.

Markham, Brian↗

Chemical and Thermodynamic Properties at High Temperatures: A Symposium

This book contains the program and all available abstracts of the 90' invited and contributed papers to be presented at the TUPAC Symposium on Chemical and Thermodynamic Properties at High Temperatures. The Symposium will be held in conjunction with the XVIIIth IUPAC Congress, Montreal, August 6 - 12, 1961. It has been organized, by the Subcommissions on Condensed States and on Gaseous States of the Commission on High Temperatures and Refractories and by the Subcommission on Experimental Thermodynamics of the Commission on Chemical Thermodynamics, acting in conjunction with the Organizing Committee of the IUPAC Congress. All inquiries concerning participation In the Symposium should be directed to: Secretary, XVIIIth International Congress of Pure and Applied Chemistry, National Research Council, Ottawa, 'Canada. Owing to the limited time and facilities available for the preparation and printing of the book, it has not been possible to refer the proofs of the abstracts to the authors for checking. Furthermore, it has not been possible to subject the manuscripts to a very thorough editorial examination. Some obvious errors in the manuscripts have been corrected; other errors undoubtedly have been introduced. Figures have been redrawn only when such a step was essential for reproduction purposes. Sincere apologies are offered to authors and readers for any errors which remain; however, in the circumstances neither the IUPAC Commissions who organized the Symposium, nor the U. S. Government Agencies who assisted in the preparation of this book can accept responsibility for the errors.

Walker, Raymond F.↗

The Soil Moisture Acttive Passive Mission: Fault Protection Performance and Lessons Learned

Fault protection as a discipline involves a collection of flight software logic and operational processes for detecting unacceptable anomalous behavior, responding prior to reaching criticality, restricting the propagation of a failure beyond a fault containment region, and recovering the vehicle back to full or degraded functionality if possible. The System Fault Protection (SFP) design for the SMAP Earth orbiter was put to the test during its 90-day vehicle commissioning activities. During this time, the SFP software autonomously protected the vehicle from multiple faults to critical hardware, and the operations team successfully returned the observatory to its science state. The SFP also performed well in the presence of anomalous behavior below true safety limits by not taking unnecessary response actions, instead allowing the operations team time to monitor the behavior. Certain aspects of the SFP design were modified during operations via both parameter updates and a full flight software update in order to better match the vehicle behavior in the flight environment. An evaluation of the SMAP SFP performance during vehicle Commissioning will be provided in this paper, as well as a set of lessons learned largely focused on visibility, SFP mutability in operations, responses to peripheral device faults, and Safe Mode recovery and design. By capturing some of the knowledge gained during SMAP Commissioning, it is intended that this paper provide guidance for making future System Fault Protection designs more robust and supportive of operations.

Clark, Jessica↗

Design and Performance of the PALM-3000 3.5 kHz Upgrade

PALM-3000 (P3K), the second-generation adaptive optics (AO) instrument for the 5.1 meter Hale telescope atPalomar Observatory, was released as a facility class instrument in October 2011 and has since been used on-skyfor over 600 nights as a workhorse science instrument and testbed for coronagraph and detector development.In late 2019 P3K underwent a significant upgrade to its wavefront sensor (WFS) arm and real-time control(RTC) system to reinforce its position as a state-of-the-art AO facility and extend its faint-end capability forhigh-resolution imaging and precision radial velocity follow-up of Kepler and TESS targets. The main featuresof this upgrade include an EM-CCD WFS camera capable of 3.5 kHz framerates, and an advanced Digital SignalProcessor (DSP) based RTC system to replace the aging GPU based system. Similar to the pre-upgrade system,the Shack-Hartmann wavefront sensor supports multiple pupil sampling modes using a motorized lenslet stage.The default sampling mode with 64×64 subapertures has been re-commissioned on-sky in late 2019, witha successful return to science observations in November 2019. In 64×mode the upgraded system is alreadyachieving K-band Strehl ratios up to 85% on-sky and can lock on natural guide stars as faint as mV=16. A16×16 subaperture mode is scheduled for on-sky commissioning in Fall 2020 and will extend the system’s faintlimit even further. Here we present the design and on-sky re-commissioning results of the upgraded system,dubbed P3K-II.

Vasisht, Gautam↗

EERC Final Topical Report – Findings on Subtask 3.2 – Produced Water Management Through Geologic Homogenization, Conditions, and Reuse

The Energy & Environmental Research Center (EERC) was awarded a contract by the North Dakota Industrial Commission (NDIC) Oil and Gas Research Program (NDIC No. G-051-101) to conduct a study on the recycling of water used in oil and gas operations, also known as produced water, from oil- and gas-producing regions of North Dakota as directed by Section 19 of North Dakota House Bill 1014. This final report provides a compilation of results of the study, which include regulatory, scientific, technological, and feasibility methods and considerations associated with North Dakota produced water management. The report provides a synopsis of this project’s previously submitted produced water assessment report entitled “Produced Water Management and Recycling Options in North Dakota” (Energy & Environmental Research Center, 2020), with updated values provided as appropriate. The report provides the results from the investigation of a novel produced water management strategy, referred to as geologic homogenization, conditioning, and reuse (GHCR), which aims to use a subsurface geologic formation as a natural medium for managing produced water recycling and reuse. Water management is a significant technical and economic challenge for sustainable oil and gas production, and water volumes are intrinsically linked to oil production volumes. North Dakota oil production rose to over 1.5 million barrels (MMbbl)/day in 2019, and despite a downturn in oil price in early 2020, North Dakota oil production has recovered to 1.1 MMbbl/day as of August 2021. Bakken petroleum system development between 2008 and 2020 has resulted in a nearly fourfold increase in produced water volumes to 642 MMbbl/yr in 2020 after peaking at 740 MMbbl/yr in 2019 and a fivefold increase in saltwater disposal (SWD) volumes to 565 MMbbl/yr in 2020 after a peak of 682 MMbbl/yr in 2019. Produced water and SWD volumes are forecasted to double by 2030. SWD is the primary method of produced water management used in North Dakota, with approximately 95% of the SWD volume occurring through subsurface injection into sandstones of the Dakota Group (Dakota). Localized pressurization of the Dakota resulting from SWD and projected increases in produced water volumes could impact the economics of North Dakota oil production. As a result, there is an emerging need to pursue alternative produced water management approaches, including recycling and reuse. While produced water recycling is not yet widespread, commercial operators are making strides in overcoming the technical challenges of using high salinity produced water in completion operations (Marathon Oil, 2020). As water management continues to be a key focal point in companies’ environmental, social, and governance (ESG) initiatives, focus on water management, including recycling, will likely continue to increase. Laboratory column testing, field sample collection, geologic modeling and numerical simulation, and techno-economic analysis all indicate that GHCR could feasibly be implemented as a potential water management option. Laboratory column testing and field sample collection indicate that the Inyan Kara sandstone and native formation fluid are capable of homogenizing with the Bakken produced water to a point where the fluid composition appears to stabilize. Extracting that stabilized fluid could be considered homogeneous and capable of providing individual batches of hydraulic fracturing fluid. Numerical simulation results indicate that extraction of fluids from the Inyan Kara in a GHCR implementation scenario is capable of reducing formation pressure, which would help ease localized pressurization of the Inyan Kara and extend the available capacity for nearby existing SWD wells. Economic analysis indicates that there are scenarios where GHCR implementation can be a competitive or even lower-cost option than a conventional water management approach. Site-specific conditions will dictate the economic potential of GHCR, but potentially attractive sites for GHCR implementation will be those that are located above a pressurized zone of the Inyan Kara, need six or more Bakken infill wells, and face high costs for conventional SWD and/or freshwater. Based on the regulatory review, drilling into the Inyan Kara for SWD and to harness as a source water for industrial use have precedent in North Dakota, and a workable regulatory solution for GHCR seems likely. However, restrictions in the state regarding surface storage and transport of produced fluids may limit some activities, which will affect how GHCR could ultimately be implemented. In summary, this study reveals pursuing GHCR can be a viable approach to water management in North Dakota. The GHCR concept addresses some of the challenges that hinder the more traditional approaches to recycling in the industry. Furthermore, an assessment of the current landscape of water management within the state reveals the ongoing trend of increasing volumes of produced water and SWD. Projections reveal that the volumes of produced water that need to be managed are expected to double over the next decade (Energy & Environmental Research Center, 2020). With the continued development of the Bakken and continuing driving factors related to ESG initiatives, implementing a practice such as GHCR is a feasible approach to adding recycling of produced water to industry within the state. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission Oil and Gas Research Program. References Energy & Environmental Research Center, 2020, Produced water management and recycling options in North Dakota: Final Report for North Dakota Legislative Management Energy Development and Transmission Committee and North Dakota Industrial Commission. Marathon Oil, 2020, Sustainability report: https://cdn.sanity.io/files/ghcnw9z2/website/ 91744eb6ef8fbe59505a911c6b8d2e8dd9a537fa.pdf?dl (accessed November 2021).

02 PETROLEUM↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Recent Progress of JT-60SA Project toward Plasma Operation

Superconducting tokamak JT-60SA plays an essential role in fusion research and development by supporting and complementing ITER project, providing directions to the DEMO design activity and fostering next generation scientists and engineers. Since the incident of the Equilibrium Field coil #1 during the Integrated Commissioning (IC) in March 2021, both EU and JA Implementing agencies (IAs) have examined how to ensure safety operation of JT-60SA by mitigating the risk of possible discharge occurrence inside the cryostat. Based on the experience of the Global Paschen tests, the IAs have established a strategy of risk mitigation measures, which is a combination of (i) reinforcement of insulation, (ii) avoiding unnecessary voltage application to the coil systems and (iii) immediate de-energization of the coils when deteriorated vacuum condition is detected. Thanks to the considerable efforts of the Integrated Project Team (IPT) members, the IC restarted in May 2023. After the confirmation of superconducting state of coil systems (TF, EF and CS), the coil energization test and the plasma operation (OP-1) starts. The first plasma was successfully achieved on 23 October 2023 with a limited value of applied voltage and current to the coils. The plasma configuration control will be also confirmed with low plasma current and low auxiliary heating power conditions. Based on the IO-F4E-QST collaboration, activities of JT-60SA have been shared with the IO and provided an important lesson learned for ITER assembly and commissioning, and will provide an outstanding contribution to fusion research at large. After OP-1, Maintenance & Enhancement phase 1 (M/E-1) starts from January 2024, in which in-vessel components are installed, and heating system and diagnostic system are extensively upgraded to allow high power heating experiment planned in OP-2. In order to make the best use of JT-60SA, newly organized JT-60SA experiment team will refine the research plan in the future high heating power operation phase.

Broader Approach activities↗

The Systems of Radiological Protection for Ionizing and Non-Ionizing Radiation

This paper summarizes the presentations and panel discussion held at Plenary Session 1 of the 16th IRPA International Congress/69th Health Physics Society Annual Meeting, in Orlando, FL, in July 2024. Plenary Session 1 discussed the basics of the systems of radiological protection (RP) for ionizing radiation (IR) and non-ionizing radiation (NIR) and included five presentations and a panel discussion. Rodney Croft, Chair of the International Commission on Non-Ionizing Radiation Protection (ICNIRP), delivered the first presentation. Croft introduced the System of RP for NIR and provided an overview of ICNIRP’s coverage and current areas of work. Werner Rühm, Chair of the International Commission on Radiological Protection (ICRP), delivered the second presentation. He gave an overview of the System of RP for IR and covered the key principles of justification, optimization, and dose limitation, including the current plans of ICRP toward the envisaged revision of the System of RP. The third speaker, Sigurður Magnús Magnússon, from the International Radiation Protection Association (IRPA), provided the perspective of the RP professionals on the development of the Systems of RP for IR and NIR. Emilie van Deventer, from the World Health Organization (WHO), presented WHO’s views of both Systems of RP and discussed the relevant current activities of WHO with regard to IR and NIR. Kathryn Higley, President of the National Council on Radiation Protection and Measurements (NCRP), delivered the final presentation. Higley outlined the history of NCRP, the differences between ICRP and NCRP, and discussed the role of the NCRP in the System of RP, including NCRP’s role to analyze mechanisms of interaction of NIR with biological systems, including humans. The session concluded with a fruitful panel discussion, where the audience had the opportunity to ask the five invited speakers questions.

61 RADIATION PROTECTION AND DOSIMETRY↗

Distributed Solar Adoption in Orlando: A Household-Level Model for Distribution Resource Planning

Potential for rooftop solar in Florida is massive (47% of retail sales, 3rd overall nationally), yet adoption lags (12th nationally). A 2018 Florida Public Service Commission ruling authorizing solar third-party ownership (leasing) has substantially increased attention on distributed solar in the state. The city of Orlando has committed to a 100% clean-energy target by 2050 and deployment of solar and storage are expected to contribute significantly to reaching the goal. Deployment of customer-adopted solar, unlike utility-procured solar, is uncertain, but known to be spatially correlated with demographic factors and existing adoption. We develop a new method to adapt NREL's dGen model in order to represent building-level agents in adoption forecasts for the Orlando Utility Commission (OUC) service territory. Using the agent-based model we develop projections of solar adoption, subject to scenarios varying future solar costs and valuation, and aggregate adoption predictions by OUC distribution feeder. We find substantial spatial heterogeneity in the projected level of adoption by OUC distribution feeder. For instance, 25% of all projected adoption through 2050 would be concentrated on just 5% of feeders and 88% of projected adoption on 50% of feeders. Because of the uncertainty in adoption, bottoms-up solar adoption forecasting methods at the household-level are integral to long-term resource planning by anticipating system needs as customers increasingly adopt distributed solar, storage, electric vehicles, and other distributed energy resources.

14 SOLAR ENERGY↗

The Future of Laboratory Astrophysics

A Round Table discussion on the future of Laboratory Astrophysics and the role of IAU Commission B5 was held on the fourth day of the conference to discuss how the IAU Laboratory Astrophysics Commission (B5) can best support the astronomy community and help promote laboratory astrophysics.

Panel Discussion↗