Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “building faults”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Solid-State Fault Current Limiter Development: Design and Testing Update of a 15kV SSCL Power Stack

The Solid-State Fault Current Limiter (SSCL) is a promising technology that can be applied to utility power delivery systems to address the problem of increasing fault currents associated with load growth. As demand continues to grow, more power is added to utility system either by increasing generator capacity or by adding distributed generators, resulting in higher available fault currents, often beyond the capabilities of the present infrastructure. The SSCL is power-electronics based equipment designed to work with the present utility system to address this problem. The SSCL monitors the line current and dynamically inserts additional impedance into the line in the event of a fault being detected. The SSCL is based on a modular design and can be configured for 5kV through 69kV systems at nominal current ratings of 1000A to 4000A. Results and Findings This report provides the final test results on the development of 15kV class SSCL single phase power stack. The scope of work included the design of the modular standard building block sub-assemblies, the design and manufacture of the power stack and the testing of the power stack for the key functional tests of continuous current capability and fault current limiting action. Challenges and Objectives Solid-State Current Limiter technology impacts a wide spectrum of utility engineering and operating personnel. It addresses the problems associated with load growth both at Transmission and Distribution class networks. The design concept is pioneering in terms of developing the most efficient and compact power electronics equipment for utility use. The initial test results of the standard building blocks are promising. The independent laboratory tests of the power stack are promising. However the complete 3 phase system needs rigorous testing for performance and reliability. Applications, Values, and Use The SSCL is an intelligent power-electronics device which is modular in design and can provide current limiting or current interrupting capabilities. It can be applied to variety of applications from distribution class to transmission class power delivery grids and networks. It can also be applied to single major commercial and industrial loads and distributed generator supplies. The active switching of devices can be further utilized for protection of substation transformers. The stress on the system can be reduced substantially improving the life of the power system. It minimizes the voltage sag by speedy elimination of heavy fault currents and promises to be an important element of the utility power system. DOE Perspective This development effort is now focused on a 15kV system. This project will help mitigate the challenges of increasing available fault current. DOE has made a major contribution in providing a cost effective SSCL designed to integrate seamlessly into the Transmission and Distribution networks of today and the future. Approach SSCL development program for a 69kV SSCL was initiated which included the use of the Super GTO advanced semiconductor device which won the 2007 R&D100 Award. In the beginning, steps were identified to accomplish the economically viable design of a 69kV class Solid State Current Limiter that is extremely reliable, cost effective, and compact enough to be applied in urban transmission. The prime thrust in design and development was to encompass the 1000A and the 3000A ratings and provide a modular design to cover the wide range of applications. The focus of the project was then shifted to a 15kV class SSCL. The specifications for the 15kV power stack are reviewed. The design changes integrated into the 15kV power stack are discussed. In this Technical Update the complete project is summarized followed by a detailed test report. The power stack independent high voltage laboratory test requirements and results are presented. Keywords Solid State Current Limiter, SSCL, Fault Current Limiter, Fault Current Controller, Power electronics controller, Intelligent power-electronics Device, IED

24 POWER TRANSMISSION AND DISTRIBUTION↗

Seismic of the territory Toktogul reservoir, Kyrgyzstan

In connection with that this seismic in the territory of Naryn cascade maybe has its peculiarity in cludding in the territory Toktogul reservoir before of the building of the Toktogul dam, during of the building and after accordingly was decided to consider the seismic in this space of times. The arm of the present paper is estimation seismic of the territory Toktogul reservoir for different times: before of the building of the Toktogul dam (1960-1973), during its filling (1974-1980) and since start it's of the uninterruptedly exploitation to present time (1981-2006). The territory in that located the cascade of Naryn River is considered that seismic active in the Central part of the Tien Shan. The tectonic motions are become here intensity. The presence of the large faults is complicating significantly the seismic situation of the study region.

58 GEOSCIENCES↗

Project Pyralp: Tectonics relationships between Pyrenees and Alps (Southern France)

The author has identified the following significant results. In the Eastern Aquitaine Basin in southern France, investigations using SL 3 photographs from an S190A camera reveal a slight line joining a Paleozoic trend of the Montagne Noire massif to a more recent Pyrenean fault zone of Cretaceous to Tertiary age. According to the interpretation of this line as the superficial geomorphological trace of a deep-seated fault zone, Hercynian weakness lines appear to have played a more important part than previously thought in the building of the Pyrenean range. The Lezat line is a trend of small morphological features obvious only in the photographs having the highest resolution.

Guillemot, J.↗

Uncertainty quantification for evaluating the impacts of fracture zone on pressure build-up and ground surface uplift during geological CO₂ sequestration

A series of numerical test cases reflecting broad and realistic ranges of geological formation and preexisting fault properties was developed to systematically evaluate the impacts of preexisting faults on pressure buildup and ground surface uplift during CO₂ injection. Numerical test cases were conducted using a coupled hydro-geomechanical simulator, eSTOMP (extreme-scale Subsurface Transport over Multiple Phases). For efficient sensitivity analysis and reliable construction of a reduced-order model, a quasi-Monte Carlo sampling method was applied to effectively sample a high-dimensional input parameter space to explore uncertainties associated with hydrologic, geologic, and geomechanical properties. The uncertainty quantification results show that the impacts on geomechanical response from the pre-existing faults mainly depend on reservoir and fault permeability. When the fault permeability is two to three orders of magnitude smaller than the reservoir permeability, the fault can be considered as an impermeable block that resists fluid transport in the reservoir, which causes pressure increase near the fault. When the fault permeability is close to the reservoir permeability, or higher than 10⁻¹⁵ m² in this study, the fault can be considered as a conduit that penetrates the caprock, connecting the fluid flow between the reservoir and the upper rock.

CO₂ geological sequestration↗

Steps toward fault-tolerant quantum chemistry.

Developing quantum chemistry programs on the coming generation of exascale computers will be a difficult task. The programs will need to be fault-tolerant and minimize the use of global operations. This work explores the use a task-based model that uses a data-centric approach to allocate work to different processes as it applies to quantum chemistry. After introducing the key problems that appear when trying to parallelize a complicated quantum chemistry method such as coupled-cluster theory, we discuss the implications of that model as it pertains to the computational kernel of a coupled-cluster program - matrix multiplication. Also, we discuss the extensions that would required to build a full coupled-cluster program using the task-based model. Current programming models for high-performance computing are fault-intolerant and use global operations. Those properties are unsustainable as computers scale to millions of CPUs; instead one must recognize that these systems will be hierarchical in structure, prone to constant faults, and global operations will be infeasible. The FAST-OS HARE project is introducing a scale-free computing model to address these issues. This model is hierarchical and fault-tolerant by design, allows for the clean overlap of computation and communication, reducing the network load, does not require checkpointing, and avoids the complexity of many HPC runtimes. Development of an algorithm within this model requires a change in focus from imperative programming to a data-centric approach. Quantum chemistry (QC) algorithms, in particular electronic structure methods, are an ideal test bed for this computing model. These methods describe the distribution of electrons in a molecule, which determine the properties of the molecule. The computational cost of these methods is high, scaling quartically or higher in the size of the molecule, which is why QC applications are major users of HPC resources. The complexity of these algorithms means that MPI alone is insufficient to achieve parallel scaling; QC developers have been forced to use alternative approaches to achieve scalability and would be receptive to radical shifts in the programming paradigm. Initial work in adapting the simplest QC method, Hartree-Fock, to this the new programming model indicates that the approach is beneficial for QC applications. However, the advantages to being able to scale to exascale computers are greatest for the computationally most expensive algorithms; within QC these are the high-accuracy coupled-cluster (CC) methods. Parallel coupledcluster programs are available, however they are based on the conventional MPI paradigm. Much of the effort is spent handling the complicated data dependencies between the various processors, especially as the size of the problem becomes large. The current paradigm will not survive the move to exascale computers. Here we discuss the initial steps toward designing and implementing a CC method within this model. First, we introduce the general concepts behind a CC method, focusing on the aspects that make these methods difficult to parallelize with conventional techniques. Then we outline what is the computational core of the CC method - a matrix multiply - within the task-based approach that the FAST-OS project is designed to take advantage of. Finally we outline the general setup to implement the simplest CC method in this model, linearized CC doubles (LinCC).

99 GENERAL AND MISCELLANEOUS↗

Automated Generation of Fault Management Artifacts from a Simple System Model

Our understanding of off-nominal behavior - failure modes and fault propagation - in complex systems is often based purely on engineering intuition; specific cases are assessed in an ad hoc fashion as a (fallible) fault management engineer sees fit. This work is an attempt to provide a more rigorous approach to this understanding and assessment by automating the creation of a fault management artifact, the Failure Modes and Effects Analysis (FMEA) through querying a representation of the system in a SysML model. This work builds off the previous development of an off-nominal behavior model for the upcoming Soil Moisture Active-Passive (SMAP) mission at the Jet Propulsion Laboratory. We further developed the previous system model to more fully incorporate the ideas of State Analysis, and it was restructured in an organizational hierarchy that models the system as layers of control systems while also incorporating the concept of "design authority". We present software that was developed to traverse the elements and relationships in this model to automatically construct an FMEA spreadsheet. We further discuss extending this model to automatically generate other typical fault management artifacts, such as Fault Trees, to efficiently portray system behavior, and depend less on the intuition of fault management engineers to ensure complete examination of off-nominal behavior.

Spinup and Orient↗

Efficient and Zero Net Energy-Ready Plug Loads

Plug loads are the devices plugged into common electrical outlets. Modern buildings contain hundreds of these devices which, together, are responsible for at least 25 percent of the energy use in California buildings. Energy consumed by plug loads is increasing because the “Internet of Things” is, to a great extent, the “Internet of Plug Loads.” This project developed technologies that will reduce the energy use of plug loads. Two crosscutting strategies were investigated in detail: (1) technologies to reduce standby power use to near zero, and (2) methods to increase the use of direct current (DC) as a power source. Two new approaches to reduce standby to near zero were developed and have potential applicability to a wide range of devices. Prototype DC appliances were developed to demonstrate energy savings by bypassing power supplies and avoiding other losses. Networks of DC-powered devices can save even more energy and provide other benefits, such as resiliency during power outages. A unique category of energy-using devices was identified that provide life safety, health, and security to building occupants. Their installation or use is dictated by building codes, health providers, insurance companies, and other entities—none of whom would ordinarily prioritize energy efficiency. In the case of ground fault circuit interrupts (GFCIs), savings of 80 percent appear possible, simply by adopting the most efficient designs. Home medical equipment, particularly oxygen concentrators, are a rising category of energy use where significant savings are possible. This report also reviews the codes, standards, and other policies that affect energy use of plug loads.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Power Hardware-in-the-Loop Testing of Distribution Solid State Transformers

Savannah River National Laboratory and Resilient Power Systems have developed a utility grade solid state transformer and are planning on deploying it for testing in January 2018. The solid state transformer is the next generation solution to implementation of distributed energy resources such as solar and batteries. They can directly connect the solar and battery systems to DC ports and rout power between these DC ports and load ports. The solid state transformer can revolutionize current grid modernization initiatives by supplying grid support and building support services at the edge of the grid. These services consist of volt-VAR optimization, power factor correction, voltage regulation, frequency regulation, fault current support, demand side management, DC bus for AC/DC capable houses, and power routing between multiple ports for transactive control. For this fiscal year a test plan for testing the SST capabilities was develop. Along with the FPGA controls for the SST output ports. These controls will allow for any waveform to be produced by each port of the SST. Finally, a hybrid distribution SST was tested at the eGRID resulting in medium voltage testing experience for SRNL engineering team. DOE is currently engaged, through the Building Technology Office and Infrastructure Security and Energy Restoration in future work building from this project.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Solutions for Optimized Performance (ISOP) Final Technical Report

The goal of this project was to demonstrate technical feasibility of an integrated approach for deep energy retrofits by packaging innovative technologies with smart communicating controls that represent the next generation of energy efficiency. The integrated solutions for optimized performance (ISOP) package integrates (i) advanced lighting and plug load controls; (ii) intelligent daylight harvesting through automated self-powered shades and window films; (iii) advanced HVAC controls sequences (ASHRAE Guideline (GDL) 36); and (iv) fault detection and diagnosis (FDD) and continuous commissioning (CCx) using advanced analytics. These technologies address energy use across multiple building end uses that represent more than 60% of the energy consumption in all commercial buildings. The project was structured to be implemented over three budget periods: Budget Period 1 scope included site selection, project design, site-specific customization of technology packages, procurement of technologies, initiation of installation of technologies, the development of a measurement and verification plan and collection of pre-retrofit data collection. The first year go/no-go decision was based on securing host sites representing 250,000 sq. ft. of occupied operational spaces, savings analysis, technology procurement and initiation of installation. Budget Period 2 planned to complete technology installations and initiate data collection of post-retrofit performance data. The second year go/no-go was to be the completion of technology installations and commissioning, metering and data collecting to support the requirements laid out in site specific M&V plans. Budget Period 3 planned to collect and analyze post-retrofit performance data and provide data and reporting to support energy efficiency rebate programs. After the team completed activities planned for Budget Period 1, the team reached a Go/No-Go Decision Point. At that point, TRC recommended that DOE discontinue the project without prejudice due to challenges with securing demonstration sites to meet the full 250,000 sf of occupied operational spaces and DOE concurred. In Budget Period 1, the TRC team developed criteria to recruit and evaluate potential demonstration host sites. TRC worked with Princeton University, the project demonstration partner, to identify buildings on their campus as potential candidates for the demonstration. Following the selection of demonstration sites, the TRC team customized energy technology packages according to the needs and characteristics of each site. TRC defined technology specifications, identified vendors, and conducted analysis to estimate energy and cost savings potential. The project team then developed schedules for technology procurement processes and scheduled for installation at all selected demonstration sites. The project team worked with Princeton University and DOE to develop an approach to verify energy savings achieved through measurement and verification (M&V) 2.0 methods. Princeton University initiated open bids to procure the necessary materials and installation contractors. Bid results came back higher than estimates due to a couple of factors – lack of familiarity of the bidders with the proposed technologies and lack of local trained installers to execute the installation of these new measures. Due to the higher bids, projects no longer met the internal cost-effectiveness criteria used by Princeton to proceed with procurement of the full suite of technologies as proposed in ISOP. Princeton had already procured parts of the ISOP package as part of a campus-wide initiative for FDD and lighting retrofits, but with the higher costs for other ISOP components, Princeton could no longer commit to the full ISOP package on the selected sites. Based on this, the team reached the Go/No-Go decision point, where they decided not to proceed with the project. Princeton is separately installing portions of the ISOP package where they individually meet Princeton’s payback criteria but on a different schedule than would have been needed for the DOE ISOP project. The team has learned several lessons from project progress in the first budget period. The team will utilize these lessons in future projects, as should any team which proceeds with a project around the ISOP technology. The first lesson is that more information about the proposed sites is required earlier in the process (perhaps even at the proposal stage) in order to have a successful demonstration. Technical details not evident earlier in the process (such as the TLED limitations for ALCS) can derail project execution. The second lesson is that pricing of emerging technologies is highly variable due to lack of familiarity of local installers and distributor with the proposed technologies as well as alternate bids using products they were more familiar with, but that cost more than the ones proposed by TRC. Finally, the last major lesson is that the host site’s internal project criteria is of critical importance. Based on these higher installed costs and lack of an informed installer base for the products proposed for this project, the project does not meet Princeton’s simple payback goals of five years.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Novel Solution-Technique Applied to a Novel WAAS Architecture

The Federal Aviation Administration has embarked on an historic task of modernizing and significantly improving the national air transportation system. One system that uses the Global Positioning System (GPS) to determine aircraft navigational information is called the Wide Area Augmentation System (WAAS). This paper describes a reliability assessment of one candidate system architecture for the WAAS. A unique aspect of this study regards the modeling and solution of a candidate system that allows a novel cold sparing scheme. The cold spare is a WAAS communications satellite that is fabricated and launched after a predetermined number of orbiting satellite failures have occurred and after some stochastic fabrication time transpires. Because these satellites are complex systems with redundant components, they exhibit an increasing failure rate with a Weibull time to failure distribution. Moreover, the cold spare satellite build-time is Weibull and upon launch is considered to be a good-as-new system with an increasing failure rate and a Weibull time to failure distribution as well. The reliability model for this system is non-Markovian because three distinct system clocks are required: the time to failure of the orbiting satellites, the build time for the cold spare, and the time to failure for the launched spare satellite. A powerful dynamic fault tree modeling notation and Monte Carlo simulation technique with importance sampling are shown to arrive at a reliability prediction for a 10 year mission.

Bavuso, J.↗

Ion Thruster and Power Processor Developed for the Deep Space 1 Mission

The NASA Solar Electric Propulsion Technology Applications Readiness (NSTAR) Program has provided a single-string primary propulsion system to NASA's Deep Space 1 spacecraft. This spacecraft will carry about 81 kg of xenon propellant for the ion thruster, which can be throttled down from 2.3 to 0.5 kW as the spacecraft moves away from the Sun. The propellant load will provide about 20 months of propulsion at the one-half power throttle setpoint of 1.2 kW. This mission will validate the 2.5-kW ion propulsion system and will fly by the asteroid 1992 KD in 1999. If funding permits, Deep Space 1 also will encounter comets Wilson-Harrington and Borrelly in 2001. NASA Lewis Research Center's On-Board Propulsion Branch was responsible for the development of the 30-cm-diameter ion thruster, the 2.5-kW power processor unit (PPU), and the Digital Control and Interface Unit (DCIU) that controls the PPU/thruster/feed system and provides data and recovery from fault conditions. Lewis transferred the thruster and PPU technologies to the Hughes Electron Dynamics Division, which was selected to build two sets of flight thrusters, as well as the PPU's and DCIU's. Hughes subcontracted the DCIU development to Spectrum Astro Incorporated. The Jet Propulsion Laboratory (JPL) was primarily responsible for the NSTAR project management, thruster lifetests, the feed system, diagnostics, and the propulsion subsystem integration. A total of four engineering model thrusters and three breadboard PPU's were built, integrated, and tested. More than 50 development tests were conducted along with thruster design verification tests of 2000 and 1000 hours. In addition, an 8000-hr life demonstration test was successfully completed and demonstrated wear-rates consistent with full-power lifetimes in excess of 12,000 hours.

Sovey, James S.↗

Quantum computation of stopping power for inertial fusion target design

Stopping power is the rate at which a material absorbs the kinetic energy of a charged particle passing through it—one of many properties needed over a wide range of thermodynamic conditions in modeling inertial fusion implosions. First-principles stopping calculations are classically challenging because they involve the dynamics of large electronic systems far from equilibrium, with accuracies that are particularly difficult to constrain and assess in the warm-dense conditions preceding ignition. Here, we describe a protocol for using a fault-tolerant quantum computer to calculate stopping power from a first-quantized representation of the electrons and projectile. Our approach builds upon the electronic structure block encodings of Su et al. [ PRX Quant. 2 , 040332 (2021)], adapting and optimizing those algorithms to estimate observables of interest from the non-Born–Oppenheimer dynamics of multiple particle species at finite temperature. We also work out the constant factors associated with an implementation of a high-order Trotter approach to simulating a grid representation of these systems. Ultimately, we report logical qubit requirements and leading-order Toffoli costs for computing the stopping power of various projectile/target combinations relevant to interpreting and designing inertial fusion experiments. We estimate that scientifically interesting and classically intractable stopping power calculations can be quantum simulated with roughly the same number of logical qubits and about one hundred times more Toffoli gates than is required for state-of-the-art quantum simulations of industrially relevant molecules such as FeMoco or P450.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Geomechanical in situ testing of fault reactivation in argillite repositories

Abstract. Pressurization of natural faults as a result of repository-induced effects can lead to their reactivation and permeability generation in case such features are present near disposal tunnels. Potential driving forces for such pressurization are the temperature increase caused by heat-producing high-level radioactive waste and the generation of hydrogen and other gases due to corrosion of engineered materials. We are primarily concerned about pressurization and fault activation in host rocks and faults that have very low natural permeability for pore pressure increases to dissipate, such as the argillite rocks currently investigated in Switzerland, France and other countries. This presentation discusses a series of in situ experiments of fault activation by fluid injection conducted in the argillite rock (Opalinus clay) at the Mont Terri underground research laboratory in Switzerland. A multi-model monitoring test bed was installed at Mont Terri that includes distributed fiber optics for strain, temperature, and acoustics; local fault pore pressure and three-dimensional displacement sensors; active seismic imaging; and passive seismic monitoring. The fault experiments (and their subsequent analysis via hydromechanical modeling) provide a new fundamental understanding of the coupling between pore pressure, fault deformation and permeability generation as a function of time and allow exploring how seismic and aseismic events may impact the integrity of faulted argillite host rock. Our experimental observations demonstrate that significant flow (and transport) can occur along the initially impermeable argillite fault when rupture is activated. However, the fault permeability decreases to almost its pre-activation value when fluid injection ceases and fluid pressure drops. Dilatant slip on the fault plane alone does not explain the observed increase in fault permeability; pressure-induced fault opening also plays a role, favored by the softness of the shale along with the fact that the structure of the fault zone prevents fluids from diffusing into the adjacent damage zone. Rupture initiation and permeability generation is initially aseismic, associated only with an increase in noise level and emerging tremors. Micro-earthquakes are initiated later in the experiments and typically occur away from the fluid-pressurized area. Hydromechanical models show that stress transferred from the initial aseismic deformation can build up to stress criticality and later induce seismic rupture. After presenting the experimental results, we will close the presentation with an outlook to future experimental campaigns using the fault test bed at Mont Terri. We are currently planning a controlled thermal stimulation of the fault, where instead of fluid injection as a trigger mechanism we will heat up the nearby rock volume and measure potential effects on fault stability. Lessons learned from our past and future experiments will help inform the safety assessment of geologic disposal in argillite host rock.

Birkholzer, Jens T.↗

Curation of Ground-Truth Validated Benchmarking Datasets for Fault Detection & Diagnostics Tools

Fault detection and diagnostics (FDD) analytical tools for heating, ventilation and air conditioning (HVAC) systems represent one of the most active areas of smart building technology development. A diversity of techniques is used for FDD analytics, spanning physical models, black box, and rule-based approaches, and researchers continuously strive to develop improved algorithms. With FDD algorithm numbers now in the hundreds, there is a need for performance evaluation of these algorithms in order to assess improvements, improve costeffectiveness, and to prioritize investment in the further development of these technologies. A persistent challenge of FDD advance has been the lack of common datasets to benchmark the performance accuracy of FDD algorithms. This paper summarizes the successful curation of HVAC operational data, paired with validated ground-truth information regarding the presence and absence of faults. The current dataset, consisting of both simulation and experimental data, will evolve to include a larger set of HVAC systems with the objective of creating the largest publicly available dataset to be used by FDD developers, users, and researchers to compare and contrast performance accuracy across FDD algorithms, helping to drive improvements that will spur greater market adoption of FDD tools. Furthermore, in order to avoid previously observed issues with contributed datasets and ensure high quality and consistency of future submissions, the development of data validation and ground-truth assessment protocol is detailed in this study.

Casillas, Armando↗

Modeling Off-Nominal Behavior in SysML

Fault Management is an essential part of the system engineering process that is limited in its effectiveness by the ad hoc nature of the applied approaches and methods. Providing a rigorous way to develop and describe off-nominal behavior is a necessary step in the improvement of fault management, and as a result, will enable safe, reliable and available systems even as system complexity increases... The basic concepts described in this paper provide a foundation to build a larger set of necessary concepts and relationships for precise modeling of off-nominal behavior, and a basis for incorporating these ideas into the overall systems engineering process.. The simple FMEA example provided applies the modeling patterns we have developed and illustrates how the information in the model can be used to reason about the system and derive typical fault management artifacts.. A key insight from the FMEA work was the utility of defining failure modes as the "inverse of intent", and deriving this from the behavior models.. Additional work is planned to extend these ideas and capabilities to other types of relevant information and additional products.

Soil Moisture Active-Passive (SMAP) Mission↗

Electric Power Delivery Testing Feasibility Study (Task 6 Final Report)

This Final Report is covers the completion of the Electric Power Delivery Testing Feasibility Study. The objective of this project was to research, engineer, and demonstrate high-power laboratory testing protocols to accurately reproduce the conditions on the electric power grid representing both normal load switching and abnormalities such as short-circuit fault protection. Test circuits, equipment, and techniques were developed and proven at reduced power levels to determine the feasibility of building a large-scale high-power testing laboratory capable of testing equipment and systems at simulated high-power conditions of the U.S. power grid at distribution levels up through 38 kiloVolts (kV) and transmission levels up through 230 kV. The project delivered demonstrated testing techniques, high-voltage test equipment for load testing and synthetic short-circuit testing, and recommended designs for future implementation of a high-power testing laboratory to test equipment and systems, enabling increased reliability of the electric transmission and distribution grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Relation Inference among Sensor Time Series in Smart Buildings with Metric Learning

Smart Building Technologies hold promise for better livability for residents and lower energy footprints. Yet, the rollout of these technologies, from demand response controls to fault detection and diagnosis, significantly lags behind and is impeded by the current practice of manual identification of sensing point relationships, e.g., how equipment is connected or which sensors are co-located in the same space. This manual process is still error-prone, albeit costly and laborious.We study relation inference among sensor time series. Our key insight is that, as equipment is connected or sensors co-locate in the same physical environment, they are affected by the same real-world events, e.g., a fan turning on or a person entering the room, thus exhibiting correlated changes in their time series data. To this end, we develop a deep metric learning solution that first converts the primitive sensor time series to the frequency domain, and then optimizes a representation of sensors that encodes their relations. Built upon the learned representation, our solution pinpoints the relationships among sensors via solving a combinatorial optimization problem. Extensive experiments on real-world buildings demonstrate the effectiveness of our solution.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗