Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Water resources”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Colorado Elevation Gradient Snowmelt Manipulation Plant Phenology 2017-2018

This dataset includes observations of plant phenology at five locations along an elevation gradient in Crested Butte, Colorado. Observations occurred over the years 2017 and 2018. Observations taken in 2018 are associated with an experimental early snowmelt manipulation. The file PhenologyData_complete.txt contains raw data of phenology observations for each year, at each site, for each species within 1mX1m subplots. The file Phenology Data Package.docx contains information about sites, plots, and plant phenophases. These observations were taken to assess the temporal impact of early snowmelt perturbations on plant growth in the East River Valley. These data can be used to inform when and where plants may be using water resources throughout the season and how the phenology of plant communities in the watershed may respond to early snowmelt.

54 ENVIRONMENTAL SCIENCES↗

PFLOTRAN modeling data and scripts associated with “Refining the Hydrogeologic Framework of a Large River Corridor Model Using Waterborne Transient Electromagnetics”

NOTE: The manuscript associated with this data package is currently in review. The data may be revised based on reviewer feedback. Upon manuscript acceptance, this data package will be updated with the final dataset and additional metadata. This data package is associated with the publication “Refining the Hydrogeologic Framework of a Large River Corridor Model Using Waterborne Transient Electromagnetics” submitted to Water Resources Research (Terry et al. 2025). The data package contains the groundwater modeling dataset from PFLOTRAN software. It includes the python script for mesh generation, boundary condition setting, PFLOTRAN input deck formation and postprocessing. It couples groundwater flow and species transport for Hanford Reach river corridor and pipelines the model generation and processing. This model can be used to easily generate the model and analysis for Hanford site. It can also be adjusted to other hydrologic area with ease. For details on how to navigate data packages generated by this project, see https://data.ess-dive.lbl.gov/portals/PNNLRiverCorridorSFA/About. The data package consists of 6 folders: (1) “data” contains all necessary data as input and intermediate data for processing; (2) “mesh” contains all mesh related files to generate mesh in Hanford Reach river corridor; (3) “model_run” contains the generated script for PFLOTRAN modeling; (4) “notebooks” contains all the Python script to generate the model; (5) “output” contains all the output from the computation; (6) “postprocessing” contains the Python script to generate scientific figure for manuscript. All files are .csv (comma-separated values), .h5 (HDF5 format), .in (input files), .ipynb (Jupyter notebooks), .p (Python pickle), .png (images), .PNG (images), .py (Python scripts), .pyc (Python bytecode), .r (R scripts), .sh (shell scripts), .txt (text files), .vtu (3D mesh/visualization format), .xz (compressed archive), or .zip (compressed archive).

54 ENVIRONMENTAL SCIENCES↗

AmeriFlux FLUXNET-1F US-Tw1 Twitchell Wetland West Pond

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Tw1 Twitchell Wetland West Pond. This is the FLUXNET version of the carbon flux data for the site US-Tw1 Twitchell Wetland West Pond produced by applying the standard ONEFlux (1F) software. Site Description - The Twitchell Wetland site is a 7.4-acre restored wetland on Twitchell Island, that is managed by the California Department of Water Resources (DWR) and the U.S. Geological Survey (USGS). In the fall of 1997, the site was permanently flooded to a depth of approximately 25 cm. The wetland was almost completely covered by cattails and tules by the third growing season. A flux tower equipped to analyze energy, H2O, CO2, and CH4 fluxes was installed on May 17, 2012.

Valach, Alex↗

AmeriFlux FLUXNET-1F US-Snf Sherman Barn

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Snf Sherman Barn. This is the FLUXNET version of the carbon flux data for the site US-Snf Sherman Barn produced by applying the standard ONEFlux (1F) software. Site Description - The Sherman Barn is pasture site on Sherman Island, that is managed by the California Department of Water Resources (DWR). A flux tower equipped to analyze energy, H2O, CO2, and CH4 fluxes was installed on June, 2018

Kusak, Kuno↗

AmeriFlux FLUXNET-1F US-Tw5 East Pond Wetland

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Tw5 East Pond Wetland. This is the FLUXNET version of the carbon flux data for the site US-Tw5 East Pond Wetland produced by applying the standard ONEFlux (1F) software. Site Description - The Twitchell Wetland site is a 6.5 acre restored wetland on Twitchell Island, that is managed by the California Department of Water Resources (DWR) and the U.S. Geological Survey (USGS). In the fall of 1997, the site was permanently flooded to a depth of approximately 55 cm. The wetland remained fairly unvegetated in patches increasing in size towards the east. The site underwent a major disturbance in 2013 when the vegetation was removed to seed a nearby restored wetland. A flux tower equipped to analyze energy, H2O, CO2, and CH4 fluxes was installed on April 17, 2018.

Valach, Alex↗

AmeriFlux FLUXNET-1F US-Twt Twitchell Island

This is the AmeriFlux Management Project (AMP) created FLUXNET-1F version of the carbon flux data for the site US-Twt Twitchell Island. This is the FLUXNET version of the carbon flux data for the site US-Twt Twitchell Island produced by applying the standard ONEFlux (1F) software. Site Description - The Twitchell Island site is a rice paddy that is owned by the state and managed by the California Department of Water Resources. While Bare Peat field was leveled for rice planting, the tower was installed on April 3, 2009. The rice paddy was converted from corn in 2007. In Summer 2009, Bispyribac-sodium and Pendimethalin herbicides were applied to the fields prior to rice planting and flooding, then pesticide and fertilizer application took place. Each year after rice is planted in the spring by drilling, the field is flooded. Then, the field is drained in early fall, rice is harvested, and the field site is moved.

Knox, Sara [University of California, Berkeley]↗

Analytical methods for online data quality assessment

This chapter provides a comprehensive overview of the main steps for algorithmic sensor signal quality assessment, which can enhance the decision-making process for water resource recovery facility (WRRF) operation and optimization. It introduces the concept of redundancy as the basis for data quality assessment. It also explains the typical data processing pipeline, which consists of preliminary analysis, data pre-processing, and specific algorithmic approaches. Each of these processes is presented and discussed in three separate sections. Importantly, this chapter introduces the main approaches for data quality assessment, provides guidelines for selecting the most suitable one and the key performance indicators to evaluate them and explains how to collect metadata through such an algorithmic approach.

Aguado, Daniel↗

Factorial experiment to identify two-way interactions between temperature, harvesting period, hydraulic retention time, and light intensity that influence the biomass productivity and phosphorus removal efficiency of a microalgae–bacteria biofilm

Rotating algae biofilm reactors (RABRs) can reduce energy requirements for wastewater reclamation but require further optimization for implementation at water resource recovery facilities (WRRF). Optimizing RABR operation is challenging because conditions at WRRF change frequently, and disregarding interaction terms related to these changes can produce incorrect conclusions about RABR behavior. This study evaluated the two-way interaction and main effects of four factors on the biomass productivity and phosphorus removal efficiency of a microalgae-bacteria biofilm grown in municipal anaerobic digester centrate, with factor levels and operating conditions selected to mimic a pilot RABR at a WRRF in Utah. Two-way interactions harvesting period*light intensity (LI), harvesting period*temperature, and LI*hydraulic retention time (HRT) had significant effects on biomass productivity: at high temperature and low LI, highest biomass productivity was achieved with a 14-day harvesting period, but at medium temperature and high LI, highest biomass productivity was achieved with a 7-day harvesting period. At high HRT, highest biomass productivity occurred at low LI, but at low HRT, highest biomass productivity occurred at high LI. Phosphorus removal was strongly influenced by LI and occurred most rapidly during the first 2 days HRT, which suggests precipitation contributed significantly to phosphorus removal. These observations provide insight for further RABR optimization.

09 BIOMASS FUELS↗

Developing an Efficient Cyanobacterial Sugar Production System

Researchers at the LBNL Advanced Biofuels Process Development Unit, in collaboration with Sandia National Laboratory and HelioBioSys, Inc., demonstrated pilot scale recovery and purification of polysaccharides produced by a unique marine cyanobacterial consortium. LBNL researchers tested new methods to quantify biomass and exopolysaccharide content during cultivation, and demonstrated separation of biomass and salt from polysaccharides at the 1,000L scale. Production of marine cyanobacterial polysaccharides from the consortium requires no fresh water, added carbon dioxide, or added nutrients, enabling use of marginal land and water resources for production of these unique biopolymers.

09 BIOMASS FUELS↗

Monthly Sewer Monitoring Report for LLNL Livermore Site (Jun 2020)

Lawrence Livermore National Laboratory (LLNL) collects effluent samples from its sewer outfall at the B196 Sewer Monitoring Station (SMS). Effluent flow-proportional composite samples are collected at the SMS on a daily (midnight-to-midnight), weekly (Thursday through Wednesday), and “monthly” (composited from daily) basis; effluent grab samples are also collected each month at that same location. Certified contract laboratories analyze these compliance samples, and results are used to establish LLNL compliance with the 2019 - 2020 Wastewater Discharge Permit (Permit 1250) granted by the City of Livermore Water Resources Division (WRD). Supplemental analyses for biochemical oxygen demand (BOD) and total suspended solids (TSS) are performed onsite and reported for the calculation and assessment of sewer service charges. Quarterly, effluent is sampled for metals (24-hour composite) and cyanide (grab sample) concentrations (mg/L).

54 ENVIRONMENTAL SCIENCES↗

LLNL Semiannual Wastewater Point Source Monitoring Report (July 2020)

In accordance with the Code of Federal Regulations, Title 40, Part 403.12(e), Lawrence Livermore National Laboratory (LLNL) submits a semiannual monitoring report regarding federally regulated wastewater generating processes (categorical processes) that discharge wastewater to the sanitary sewer system. Attachments A-2 and A-3 of the 2019-2020 Wastewater Discharge Permit #1250 granted to LLNL by the City of Livermore Water Resources Division (WRD) also mandate submission of this report. The LLNL Livermore Site is required to monitor identified electrical and electronic components processes (40 CFR Part 469) and metal finishing processes (40 CFR Part 433) semiannually and to submit monitoring reports in January and July of each year. Under authority delegated to enforce compliance with these regulations, the WRD reviews this report. This report provides information on the significant metal-finishing operations and electrical and electronic component operations located at the Livermore Site during the period from December 1, 2019 through May 31, 2020 and includes descriptions of the LLNL regulated (categorical) processes that discharge to the sanitary sewer. Attachments A-2 and A-3 of the 2019-2020 Wastewater Discharge Permit #1250 provide the list of categorical processes and the required self-monitoring program for point-source discharges at LLNL. The monitoring data collected for this report documents compliance with all federal and local pretreatment limits. Compliance certification accompanies this report, as required by federal regulations.

54 ENVIRONMENTAL SCIENCES↗

Storm Water Pollution Prevention Plan for the Facility LAMP Project

A site-specific Stormwater Pollution Prevention Plan (SWPPP) is needed for most construction activities/projects that disturb one (1) acre or more of land to meet the requirements of the National Pollutant Discharge Elimination System (NPDES) General Permit for Storm Water Discharges Associated With Construction and Land Disturbance Activities (General Permit) issued by the State Water Resources Control Board (State Board). This Order No. 2009-0009- DWQ was adopted by the State Board on September 2, 2009 and became effective July 1, 2010

54 ENVIRONMENTAL SCIENCES↗

2020 Cost Analysis of Hydropower Options at Non-Powered Dams

This report provides a cost analysis of potential hydropower development for representative non-powered dam (NPD) sites in the United States. The overarching objective is to support the establishment of a basis for evaluating progress towards improving the competitiveness of new hydropower development for electricity generation. The representative sites, herein referred to as “reference sites”, were selected from sites with detailed water resource data to support the cost analysis. Facility designs, capital costs, plant generation and efficiency profiles, capacity factors, and levelized costs of energy (LCOE) are presented for the sites under baseline and near-term innovation cases. The baseline case represents facility configurations using technologies that are already widely applied in the hydropower industry, whereas near-term innovations are technologies likely to reach wide acceptance within the next 5 to 10 years. Cost savings in the near-term relative to the baseline are discussed to illustrate the potential benefits to the hydropower industry from research and development (R&D) and adoption of these innovations. Medium- to long-term innovation options expected from ongoing private and government R&D efforts are also highlighted but are not quantified in this report because of a current lack of complete information on these options. The key findings of the cost analysis in this study imply that near-term innovations could reduce the baseline costs of hydropower development at US NPD sites. Thus, if remaining R&D issues with these near-term innovations can be resolved within the next 5 to 10 years, industry-wide adoption of these technologies and improved competitiveness of NPD hydropower development can be expected. Specific key findings of the analysis include the following: 1) Potential installed capacity at the NPD sites evaluated in this study vary from 200 kW to 70 MW, representing two orders of magnitude variation across nearly 20 sites; 2) Capital costs, not including development costs, for the sites evaluated in this study vary from $2,200/kW to $34,000/kW but are below $12,000/kW for most sites; 3) Baseline LCOE estimates for lake dams are from $79/MWh to $790/MWh with most sites under $400/MWh, whereas estimates for lock dams are from $134/MWh to $289/MWh with most sites under $200/MWh; 4) Reductions in capital cost per kilowatt under the near-term innovation case are from −77% to −14% for lake dams and −21% to −2.1% for lock dams (excluding one site with a 14% increase in per-kilowatt capital costs); 5) Combined changes in capital costs and capacity factors in the near-term case relative to the baseline lead to reductions in LCOE of −71% to −14% for lake dams and −21% to −14% for lock dams; 6) Overall, LCOE reductions lead to 8 of the 18 sites under the near-term case having LCOE values below $150/MWh compared with only 2 of 18 sites in the baseline case.

13 HYDRO ENERGY↗

A Combined Water and CO2 Direct Air Capture System (CRADA 521)

The primary objective of this project is to demonstrate the outstanding technical and economic performance of a transformational Hybrid DAC (HDAC) technology that simultaneously captures CO2 and water from the air. Air is passed over a CO2 selective sorbent to remove ≥85% of the CO2 from the air stream. The atmospheric water extraction (AWE) section of the unit utilizes a novel isothermal pressure swing regeneration cycle with desiccant beds thermally coupled by heat pipes that provide a passive heat transfer mechanism to “cancel” the heat of water vapor adsorption. By proving system performance through this demonstration project, our initial technoeconomic analysis (TEA) will be validated, showing that HDAC technology: 1) is deployable in many more locations with limited water resources, 2) improves the financial returns, and 3) reduces risks from volatility in the price of CO2.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Sewer System Management Plan

The Sandia National Laboratories is a multi-mission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC (NTESS), a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy's National Nuclear Security Administration (DOE/NNSA) under contract DE-NA0003525. In 2008, a Notice of Intent (NOI) was filed for the Sandia National Laboratories, California (SNL/CA) facility to be covered under the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit) and was issued the WDID No. 2SSO11605. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. Provision D.11 of the General Permit requires the development and implementation of a written Sewer System Management Plan (SSMP). This SSMP is prepared according to the mandatory elements required by Provision D.13 and D.14, as well as the schedule for a population less than 2,500 as outlined in Provision D.15.

42 ENGINEERING↗

Evaluating the Grid Impact of Oregon Offshore Wind [Slides]

This analysis used high-resolution offshore wind data and a detailed production cost model (PCM) of the Western Interconnection to explore the value and operational impact of integrating offshore wind along Oregon's coastline. Leveraging local technical stakeholder expertise and input, we determined a set of scenarios to explore. These scenarios vary both offshore wind capacities and the Western Interconnection generation and transmission infrastructure. From the scenario modeling and analysis, we identified the following key findings. In addition, we simulated a subset of the scenarios for a range of historical weather years (2007-2013), to understand the robustness of our findings to different weather conditions. Trans-coastal transmission constraints and congestion are the key drivers to the curtailment of Oregon offshore wind. Once power can be delivered into the Willamette Valley, there are few system constraints that lead to a significant curtailment of offshore wind off the coast of Oregon. Approximately 2.6 GW of installed offshore wind capacity can be integrated into Oregon's power system without major upgrades to trans-coastal transmission while avoiding significant curtailment. The system value provided by offshore wind ranges between $\$65$ /MWh and $\$85$ /MWh across the various scenarios considered. Offshore wind heavily influences the flow of the cross Cascade transmission. Across all scenarios, we found a robust relationship of approximately 500-550 MW decrease in the hourly flow of the cross Cascade transmission for every 1,000 MW of hourly offshore wind generation. However, we also found there was not a strong relationship between the highest cross-Cascade transmission flow hours and high offshore wind generation, limiting the extent to which offshore wind can be considered a non-wires alternative to cross cascade transmission. Depending on the meteorological year, 880-1,580 MW and 1,650-3,100 MW can be counted on to serve coastal loads with 2.6 GW and 5 GW of offshore wind capacity, respectively. Offshore wind allows for more optimal daily and hourly scheduling of hydropower, while still complying with various technical and regulatory constraints on the water resource. Oregon offshore wind has the potential to contribute to the evening net load peak in California (i.e., mitigate duck curve challenges), however transmission congestion between California and Oregon limits this contribution. Co-located storage at the point of interconnection for offshore wind reduces curtailment when trans-coastal transmission is not upgraded, providing a non-wires alternative to increase offshore wind capacity beyond 2.6 GW.

17 WIND ENERGY↗

Energy Transitions: Local Water Concerns and Climate Impacts

This report summarizes important nuances in local water concerns and potential climate impacts that could influence the roll-out of technologies associated with energy transitions. Current investments in clean energy technologies are very high, which is driving a lot of investments in related manufacturing (i.e., hydrogen, solar, wind, and batteries) and mining (e.g., lithium, copper, and graphite) around the world. To understand how water and climate dynamics could be influencing these activities, we conducted a phased literature review for three countries: China, Germany, and France. China was selected due to its global dominance in manufacturing of solar panels, batteries, and electrolyzers as well as production of rare earth elements while Germany and France were selected due to their emerging leadership in energy transitions-related manufacturing within the European Union. For each of these three nations, we identified areas where manufacturing is occurring within the country and then evaluated relevant water resources and climate impacts. Multiple sources were consulted for this review, including BloombergNEF, international reports, industry sources, peer-reviewed literature, climate data, and media coverage.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗