Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Waste Isolation Pilot Plant”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Project plans for transuranic waste at small quantity sites in the Department of Energy comples-10522

Los Alamos National Laboratory, Carlsbad Office (LANL-CO), has been tasked to write Project Plans for all of the Small Quantity Sites (SQS) with defense related Transuranic (TRU) waste in the Department of Energy (DOE) complex. Transuranic Work-Off Plans were precursors to the Project Plans. LANL-CO prepared a Work-Off Plan for each small quantity site. The Work-Off Plan that identified issues, drivers, schedules, and inventory. Eight sites have been chosen to deinventory their legacy TRU waste; Bettis Atomic Power Laboratory, General Electric-Vallecitos Nuclear Center, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory-Area 300, Nevada Test Site, Nuclear Radiation Development, Sandia National Laboratory, and the Separations Process Research Unit. Each plan was written for contact and/or remote handled waste if present at the site. These project plans will assist the small quantity sites to ship legacy TRU waste offsite and de-inventory the site of legacy TRU waste. The DOE is working very diligently to reduce the nuclear foot print in the United States. Each of the eight SQSs will be de-inventoried of legacy TRU waste during a campaign that ends September 2011. The small quantity sites have a fraction of the waste that large quantity sites possess. During this campaign, the small quantity sites will package all of the legacy TRU waste and ship to Idaho or directly to the Waste Isolation Pilot Plant (WIPP) in Carlsbad, New Mexico. The sites will then be removed from the Transuranic Waste Inventory if they are de-inventoried of all waste. Each Project Plan includes the respective site inventory report, schedules, resources, drivers and any issues. These project plans have been written by the difficult waste team and will be approved by each site. Team members have been assigned to each site to write site specific project plans. Once the project plans have been written, the difficult team members will visit the sites to ensure nothing has been overlooked and to verify the inventory. After each site has approved their project plan, the site will begin writing procedures and packaging/repackaging their waste. In some cases the sites have already begun the process. The waste will be shipped after all of the waste has been characterized and approved.

54 ENVIRONMENTAL SCIENCES↗

A snapshot in time - the new TRUplanner database

A new database was developed to augment transuranic (TRU) waste inventory information already captured within the Comprehensive Inventory Database (CID). This new database, known as the TRUplanner, includes information focused on site capability for TRU waste certification and availability to ship to either the Waste Isolation Pilot Plant (WIPP) or Idaho National Laboratory for final characterization and certification before coming to WIPP. Waste stream specific data is imported from the CID to the TRUplanner, and additional data is collected and entered as a result of interviews and site visits. This data is continuously updated as sites are visited.

54 ENVIRONMENTAL SCIENCES↗

FIU Project 2: Environmental Remediation Science & Technology [Slides]

FIU’s research under this project involves conducting basic and applied science to fill knowledge gaps and validate potential remediation technologies for contaminated soil and groundwater and the assessment of the fate and transport of contaminants in the environment. The aim of FIU’s research is to reduce the potential for contaminant mobility or toxicity in the surface and subsurface through the development and application of state-of-the-art scientific and environmental remediation technologies at the Hanford Site, Savannah River Site (SRS), and the Waste Isolation Pilot Plant (WIPP), which is the Nation’s only mined geologic repository for permanent disposal of transuranic waste. FIU collaborates with scientists from Pacific Northwest National Laboratory (PNNL), Savannah River National Laboratory (SRNL), Savannah River Ecology Laboratory (SREL), Los Alamos National Laboratory (LANL) and the DOE Carlsbad Field Office (CBFO) in order to plan and execute research that is synergistic with the work being conducted at the sites, and that supports the resolution of critical science and engineering needs which leads to a better understanding of the long-term behavior of subsurface contaminants. The knowledge gained through this research will be used to transform experimental and modeling innovations into practical applications deployed at the sites to support EM’s primary goal of expediting the closure of major contaminated soil and groundwater sites and waste units. Collaborative relationships between FIU and the national laboratories have provided large benefits over the years to FIU, the national laboratories, the DOE complex, and the DOE EM mission. By working closely with the national laboratories, FIU’s research is not only closely aligned with the cleanup mission priorities at the DOE sites, but complements and supports ongoing work at the national laboratories for screening of new remedial technologies. This coordination and leveraging of research efforts results in time- and cost-savings, and will accelerate progress of the DOE EM environmental restoration mission.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

What's the big deal with TA-55's trash?

There's a beast of hazardous waste, and we're learning how to tame it. Plutonium and production activities are ongoing at TA-55, which means the beast of hazardous waste is always looming around the corner. The Laboratory must dispose of this delicate type of waste properly and swiftly. Learning from previous snags and pitfalls in an incredibly complex process, TA-55 leadership and staff have worked together to greatly improve and streamline waste processes. The result: As of the last week of fiscal year 2020, 42 shipments containing 1,275 containers of transuranic (TRU) waste were sent to the Waste Isolation Pilot Plant (WIPP) in southern New Mexico, the nation’s only repository for defense-generated TRU waste. In FY 2019, we shipped less than half that amount.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brine Availability Test in Salt (BATS) FY23 Update

This report summarizes the fiscal year 2023 (FY23) status of the second phase of a series of borehole heater tests in salt at the Waste Isolation Pilot Plant (WIPP) funded by the Disposal Research and Development (R&D) program of the Spent Fuel & Waste Science and Technology (SFWST) office at the US Department of Energy’s Office of Nuclear Energy’s (DOE-NE) Office in the Spent Fuel and Waste Disposition (SFWD) program.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basic Data Report for Well Plugging and Abandonment Activities for Fiscal Year 2009

The Waste Isolation Pilot Plant (WIPP) facility is a U.S. Department of Energy (DOE) facility for disposal of transuranic mixed waste under a permit issued by the New Mexico Environment Department. The WIPP facility is 26 miles southeast of Carlsbad, New Mexico, in eastern Eddy County. Disposal panels are mined in the Permian Salado Formation at a depth of 2,150 feet below ground surface (bgs). Field activities for this Basic Data Report were initiated in June 2009, and concluded in July 2009. The FY 2009 program included the plugging and abandonment (P&A) of two monitoring wells, which permanently removed them from the monitoring network. This Basic Data Report presents the summary of procedures followed for each well completion as documented by the Subcontract Technical Representative (STR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Practical Considerations for the Implementation of a World Information Library (WIL) - 17112

The U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) is a deep geologic repository for the permanent disposal of defense-generated transuranic waste. Title 40 Code of Federal Regulations (CFR) Part 194.43, Passive institutional controls, requires that measures be employed, '...to preserve knowledge about the location, design, and contents of the [WIPP] disposal system'. These measures include the, 'Placement of records in the archives and land record systems of local, State, and Federal governments, as well as international archives, that would likely be consulted by individuals in search of unexploited resources'. One possibility for allowing individuals to quickly and easily access information on the location, design, and contents of a disposal system and its relation to unexploited resources is the development of an electronic geographic information system (GIS) that would be used to interpret spatial data. In 2016, R. Patterson proposed such a system, known as the 'World Information Library (WIL)'. Information in this database system would be designed to be publicly accessible through a simple web-based user interface that would focus on spatial databases with categories such as; waste repositories, resources, historical sites, wildlife, infrastructure, medicine, agriculture, and technology. The conceptual WIL would be a compilation of searchable libraries and databases. A category in the WIL would consist of spatial databases created for the purpose of preserving knowledge and providing a means of communicating location information in a GIS-based Land Use Information System (LUIS) user interface. The successful implementation of the WIL would require the robust use of project controls, an effective Quality Assurance program, and the development of international standards in collaboration with industry experts. The purpose of this paper is to identify and discuss known practices and industry standards that could be utilized for the implementation of a WIL as was introduced by Patterson et al. in 'A Conceptual World Information Library (WIL) and Land Use Information System (LUIS)'. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Processing and Disposition of Remote-Handled Transuranic Liquid Waste Generated at Oak Ridge National Laboratory - 16031

Oak Ridge National Laboratory (ORNL) develops radiochemical processes for implementation in the US Department of Energy (DOE) production facilities and produces radioisotopes for medical and industrial applications. These activities result in the production of remote-handled liquid waste that is transuranic (TRU) and requires treatment for disposal at the Waste Isolation Pilot Plant (WIPP). Capabilities are needed to characterize, treat, package, and dispose of remote-handled liquid waste generated from research activities at ORNL. A project to implement these capabilities has been recently initiated, and activities are under way to support remote-handled liquid waste treatment at ORNL. Experimental data as well as model predictions are being used to support the conceptual design of the treatment facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Processes in Salt Repositories

This report presents a discussion of processes relevant in a repository for heat-generating waste in geologic salt, from the point of view of coupled process models. This report is in essentially an update of Kuhlman, in light of recent R&D in the DOE Office of Nuclear Energy (DOENE) Salt Disposal Research and Development program, including the heater test being planned at the Waste Isolation Pilot Plant (WIPP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Customer service model for waste tracking at Los Alamos National Laboratory

The goal is to transition from five legacy database systems that have reached end-of-life to a single inventory system that supports workflow, data, and reporting for all waste streams. Plutonium Processing Facility (TA-55) Waste Team provides a high quality system that insures safe, efficient and compliant management of all radioactive and hazardous wastes generated, including waste characterization and repackaging of Transuranic Waste (TRU) and TRU mixed waste for shipment to the Waste Isolation Pilot Plant (WIPP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Cleanup of the Idaho National Laboratory Status Report

This paper describes the status of the cleanup of the U.S. Department of Energy's Idaho National Laboratory site (INL). On May 1, 2005 CH2M.WG Idaho, LLC (CWI) began its 7-year, $2.4 billion cleanup of the INL. When the work is completed, 3,406,871 liters (900,000 gallons) of sodium-bearing waste will have been treated; 15 high-level waste tanks will have been grouted and Resource Conservation and Recovery Act (RCRA)- closed; more than 200 facilities will have been demolished or disposed of, including three reactors, several spent fuel basins, and hot cells; thousands of containers of buried transuranic waste will have been retrieved; more than 8,000 cubic meters (10,464 cubic yards) of contact-handled transuranic waste and more than 500 cubic meters (654 cubic yards) of remote-handled transuranic waste will have been characterized, packaged, and shipped offsite; almost 200 release sites and voluntary consent order tank systems will have been remediated; and 3,178 units of spent fuel will have been moved from wet to dry storage. In 2007, CWI began the construction of the Integrated Waste Treatment Unit that will treat the sodium-bearing waste for eventual disposal; removed and disposed the 112-ton Engineering Test Reactor vessel; demolished all significant radiological facilities at Test Area North; continued the exhumation of buried transuranic wastes from the Subsurface Disposal Area at the Radioactive Waste Management Complex; shipped the first of hundreds of containers of remote-handled transuranic waste to the Waste Isolation Pilot Plant; disposed of thousands of cubic meters of low-level and low-level mixed radioactive wastes both onsite and offsite while meeting all regulatory cleanup objectives. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Testing and Performance Assessment of a Redesigned WIPP Panel Closure - 13192

There are two primary regulatory requirements for Panel Closures at the Waste Isolation Pilot Plant (WIPP), the nation's only deep geologic repository for defense related Transuranic (TRU) and Mixed TRU waste. The Federal requirement is through 40 CFR 191 and 194, promulgated by the U.S. Environmental Protection Agency (EPA). The state requirement is regulated through the authority of the Secretary of the New Mexico Environment Department (NMED) under the New Mexico Hazardous Waste Act (HWA), New Mexico Statutes Annotated (NMSA) 1978, chap. 74-4-1 through 74-4-14, in accordance with the New Mexico Hazardous Waste Management Regulations (HWMR), 20.4.1 New Mexico Annotated Code (NMAC). The state regulations are implemented for the operational period of waste emplacement plus 30 years whereas the federal requirements are implemented from the operational period through 10,000 years. The 10,000 year federal requirement is related to the adequate representation of the panel closures in determining long-term performance of the repository. In Condition 1 of the Final Certification Rulemaking for 40 CFR Part 194, the EPA required a specific design for the panel closure system. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) has requested, through the Planned Change Request (PCR) process, that the EPA modify Condition 1 via its rulemaking process. The DOE has also requested, through the Permit Modification Request (PMR) process, that the NMED modify the approved panel closure system specified in Permit Attachment G1. The WIPP facility is carved out of a bedded salt formation 655 meters below the surface of southeast New Mexico. Condition 1 of the Final Certification Rulemaking specifies that the waste panels be closed using Option D which is a combination of a Salado mass concrete (SMC) monolith and an isolation/explosion block wall. The Option D design was also accepted as the panel closure of choice by the NMED. After twelve years of waste handling operations and a greater understanding of the waste and the behavior of the underground salt formation, the DOE has established a revised panel closure design. This revised design meets both the short-term NMED Permit requirements for the operational period, and also the Federal requirements for long-term repository performance. This new design is simpler, easier to construct and has less of an adverse impact on waste disposal operations than the originally approved Option D design. The Panel Closure Redesign is based on: (1) the results of in-situ constructability testing performed to determine run-of-mine salt reconsolidation parameters and how the characteristics of the bedded salt formation affect these parameters and, (2) the results of air flow analysis of the new design to determine that the limit for the migration of Volatile Organic Compounds (VOCs) will be met at the compliance point. Waste panel closures comprise a repository feature that has been represented in WIPP performance assessment (PA) since the original Compliance Certification Application of 1996. Panel closures are included in WIPP PA models principally because they are a part of the disposal system, not because they play a substantive role in inhibiting the release of radionuclides to the outside environment. The 1998 rulemaking that certified WIPP to receive transuranic waste placed conditions on the panel closure design to be implemented in the repository. The revised panel closure design, termed the Run-of-Mine (ROM) Panel Closure System (ROMPCS), is comprised of 30.48 meters of ROM salt with barriers at each end. The ROM salt is generated from ongoing mining operations at the WIPP and may be compacted and/or moistened as it is emplaced in a panel entry. The barriers consist of bulkheads, similar to those currently used in the panels as room closures. A WIPP performance assessment has been completed that incorporates the ROMPCS design into the representation of the repository, and compares repository performance to that achieved with the approved Option D design. Several key physical processes and rock mechanics principles are incorporated into the performance assessment. First, creep closure of the salt rock surrounding a panel entry results in consolidation of the ROM salt emplaced in the entry. Eventually, the ROM salt comprising the ROMPCS will approach a condition similar to intact salt. As the ROM salt reaches higher fractional densities during consolidation, back stress will be imposed on the surrounding rock mass leading to eventual healing of the disturbed rock zone above and below the panel closure. Healing of the disturbed rock zone above and below the ROMPCS reduces the porosity and permeability in those areas. Analysis of the new design demonstrates that: (1) the WIPP continues to meet regulatory compliance requirements when the ROMPCS design is implemented instead of Option D, and (2) there is no impact on the short-term effectiveness of the panel closure to limit the concentration of VOCs at the WIPP site boundary to a fraction of the health-based exposure limits (HBLs) during the operational period. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Advanced Mixed Waste Treatment Project: Optimizing use of This National Asset to Treat Challenging Radioactive Waste From Other Department of Energy Sites - 16064

The U.S. Department of Energy's (DOE) Advanced Mixed Waste Treatment Project (AMWTP) is a world-class radioactive waste treatment facility with a highly experienced and innovative workforce located at the Idaho National Laboratory (INL). The AMWTP's state-of-the-art capabilities include a 62-ton super-compactor, remote cutting and sorting, macro-encapsulation systems, assay units, drum repackaging, waste characterization, and payload assembly and loading. Since operations began in 2003, the facility has been the largest shipper for contact-handled (CH) transuranic (TRU) waste to the Waste Isolation Pilot Plant (WIPP). It has successfully processed over 56,000 cubic meters (m{sup 3}) of CH TRU waste and mixed low-level waste (MLLW) from the Idaho Site and approximately 700 m{sup 3} of CH TRU waste from 15 other DOE sites. While the AMWTP is nearing successful completion of its Idaho mission, other DOE environmental cleanup sites will require safe and proven capabilities to treat, package, characterize, and certify legacy radioactive waste inventories well into the next decade. In addition, DOE's national security, nuclear energy, and science programs need sustainable treatment capabilities to support ongoing and new missions. The AMWTP could continue to serve a vital role beyond its current Idaho mission to help address these larger DOE needs. To this end and in recognition that AMWTP's current priority is to complete the processing and removal of Idaho waste, DOE's Office of Environmental Management has initiated strategic planning to assess the feasibility of continued AMWTP operations to treat challenging radioactive waste from other generator sites consistent with existing regulatory agreements. This paper describes AMWTP's unique capabilities and identifies potential benefits, opportunities, and possible solutions to packaging and transportation challenges to fully use AMWTP as a national asset. A panel discussion of subject matter experts with audience participation would help to inform DOE's strategic planning on how best to use this national asset into the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Need for an Independent Monitoring of Nuclear Waste Repository: Lessons from WIPP Experience - 18130

The Waste Isolation Pilot Plant (WIPP) is the only operating deep geological repository for the permanent disposal of defense transuranic (TRU) waste in the world. The facility recently resumed waste disposal operations after recovering from a February 2014 accident involving a radiological release from a waste container in the WIPP underground. WIPP had been a DOE success story, operating nearly 15 years with no significant incidents or accidents. Many factors contributed to this success, one of the most important being the overwhelming support exhibited by the local community and the local elected officials. One component of the broad public acceptance by the citizens of Southeast New Mexico has been the concept of independent, third party monitoring of environmental effluents at the site. Independent environmental monitoring ensures a role for the local community in ongoing evaluation of the safety and performance of the site. At WIPP this has been achieved through an independent environmental monitoring program operated by the Carlsbad Environmental Monitoring and Research Center (CEMRC). The CEMRC has been conducting independent environmental monitoring activities on and around the WIPP site since 1991 and makes the results of monitoring activities available and easily accessible to members the general public. The public's free and open access to this data and their direct participation in the CEMRC's whole body counting program provides transparency, which is key to maintaining public trust and confidence. The circumstances following the 2014 radiological release event at WIPP reinforced the value of independent environmental monitoring in order to maintain the high level of transparency necessary for long term local acceptance and support for nuclear facilities. Following what was a minor radiological release event, there were understandably fearful reactions from a number of citizens residing in Carlsbad and the nearby communities of Hobbs, Loving, and Artesia. CEMRC's independent environmental monitoring program and their early public engagement proved invaluable in providing timely and accurate environmental data to local community leaders and members of the general public. The data, and open communication from CEMRC, helped reassure citizens in Carlsbad and the surrounding area that the release was extremely low and the extent was very limited. CEMRC further communicated that the probability of any environmental or health impacts from the release was extremely low. It is unlikely the local community would have placed the same level of trust in similar assurances of safety coming from DOE or other State and Federal regulators. The CEMRC's performance in the days following the release meant the local community had access to independent monitoring data and an independent voice in the dialogue with DOE and state officials that shaped the recovery and eventual re-opening of the WIPP facility. The WIPP radiological release event yielded a plethora of lessons learned that will frame the next phase of operational, oversight, and emergency planning surrounding the facility. In this presentation we will be discussing the value and viability of federally-funded, university-housed independent monitoring programs in maintaining trust of state officials and the local communities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Viability of In-Drum Treatment for Transuranic Wastes Containing Nitrates and Organics - 20406

In February of 2014, a breach in a waste drum stored at the Waste Isolation Pilot Plant resulted in the release of radioactive material into the immediate surroundings and outside of the plant. The waste drum contained a mixture of an organic absorbent and nitrate salts that pressurized the drum, eventually causing the drum lid to fail, leading to the adverse event. Other waste drums with similar contents exist posing both storage and treatment risks. These drums may successfully be treated by an in-drum treatment system. This paper considers the design and operation of an in-drum treatment system and the characteristics of waste containing organics and nitrates to evaluate the viability of treatment. A description of the system, how it is operated, and a summary of previous testing performed is provided. Treatment of both liquids and absorbed liquids comprised of organics and nitrates is addressed. Viability of treatment is demonstrated by presenting operational methods and design strategies to ensure successful treatment of the waste drums. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effect of Citrate on the Solubility of Uranium (VI) in WIPP Brine

The Waste Isolation Pilot Plant (WIPP) is the only active deep geological repository in the United States for the disposal of defense-related transuranic (TRU) waste, located in the northern part of the Delaware Basin in southeastern New Mexico, approximately 26 miles east of Carlsbad. The repository is situated 2,150 feet (about 610 meters) underground within the Salado Formation, a thick layer of stable salt deposits. This unique geological formation provides a secure and long-term environment for isolating TRU waste, ensuring its safe containment for thousands of years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Steam Reforming Technology Demonstration for Conversion of DOE Sodium-Bearing Tank Wastes at Idaho National Laboratory into a Leach-Resistant Alkali Aluminosilicate Waste Form

The patented THOR{sup R} fluidized-bed steam reforming (FBSR) technology was selected by the U.S. Department of Energy (DOE) for treatment of sodium-bearing waste (SBW) in the Integrated Waste Treatment Unit (IWTU), currently under construction at the Idaho National Laboratory (INL) Site.1 SBW is an acidic waste created primarily from cleanup of the fuel reprocessing equipment at the Idaho Nuclear Technology and Engineering Center (INTEC) at the INL. The SBW contains high concentrations of nitric acid, and alkali and aluminum nitrates, along with many other inorganic compounds, including substantial levels of radionuclides. As part of the implementation of the THOR{sup R} process at INTEC, an engineering-scale technology demonstration (ESTD) was conducted using a specially designed pilot plant located at Hazen Research, Inc. in Golden Colorado. This ESTD confirmed the efficacy of the THOR{sup R} FBSR process to convert the SBW into a granular carbonate-based waste form suitable for disposal at the Waste Isolation Pilot Plant (WIPP). DOE authorized, as a risk reduction measure, the performance of an additional ESTD to demonstrate the production of an insoluble mineralized product, in the event that an alternate disposition path is required. The additional ESTD was conducted at the Hazen Research facility using the THOR{sup R} process and the same SBW simulant employed previously. An alkali aluminosilicate mineral product was produced that exhibited excellent leach resistance and chemical durability. The demonstration established general system operating parameters for a full-scale facility; provided process off-gas data that confirmed operation within regulatory limits; determined that the mineralized product exhibits superior leach resistance and durability, compared to Environmental Assessment (EA) and Low-activity Reference Material (LRM) glasses, as indicated by the Product Consistency Test (PCT); ascertained that Cs and Re (a surrogate for Tc) were non-volatile and were retained in the mineral product; and showed that heavy metals were converted into mineral forms that were not leachable, as determined by the Toxicity Characteristic Leaching Procedure (TCLP) test. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Waste Treatment Unit (IWTU) Input Coal Analyses and Off-Gass Filter (OGF) Content Analyses

A full engineering scale Fluidized Bed Steam Reformer (FBSR) system is being used at the Idaho Nuclear Technology and Engineering Center (INTEC) to stabilize acidic Low Activity Waste (LAW) known as Sodium Bearing Waste (SBW). The INTEC facility, known as the Integrated Waste Treatment Unit (IWTU), underwent an Operational Readiness Review (ORR) and a Technology Readiness Assessment (TRA) in March 2014. The IWTU began non-radioactive simulant processing in late 2014 and by January, 2015 ; the IWTU had processed 62,000 gallons of simulant. The facility is currently in a planned outage for inspection of the equipment and will resume processing simulated waste feed before commencing to process 900,000 gallons of radioactive SBW. The SBW acidic waste will be made into a granular FBSR product (carbonate based) for disposal in the Waste Isolation Pilot Plant (WIPP). In the FBSR process calcined coal is used to create a CO2 fugacity to force the waste species to convert to carbonate species. The quality of the coal, which is a feed input, is important because the reactivity, moisture, and volatiles (C,H,N,O, and S) in the coal impact the reactions and control of the mineralizing process in the primary steam reforming vessel, the Denitration and Mineralizing Reformer (DMR). Too much moisture in the coal can require that additional coal be used. However since moisture in the coal is only a small fraction of the moisture from the fluidizing steam this can be self-correcting. If the coal reactivity or heating value is too low then the coal feed-rate needs to be adjusted to achieve the desired heat generation. Too little coal and autothermal heat generation in the DMR cannot be sustained and/or the carbon dioxide fugacity will be too low to create the desired carbonate mineral species. Too much coal and excess S and hydroxide species can form. Excess sulfur from coal that (1) is too rich in sulfur or (2) from overfeeding coal can promote wall scale and contribute to corrosion in process piping and materials, in excessive off-gas absorbent loading, and in undesired process emissions. The ash content of the coal is important as the ash adds to the DMR and other vessel products which affect the final waste product mass and composition. The amount and composition of the ash also affects the reaction kinetics. Thus ash content and composition contributes to the mass balance. In addition, sodium, potassium, calcium, sulfur, and maybe silica and alumina in the ash may contribute to wall-scale formation. Sodium, potassium, and alumina in the ash will be overwhelmed by the sodium, potassium, and alumina from the feed but the impact from the other ash components needs to be quantified. A maximum coal particle size is specified so the feed system does not plug and a minimum particle size is specified to prevent excess elutriation from the DMR to the Process Gas Filter (PGF). A vendor specification was used to procure the calcined coal for IWTU processing. While the vendor supplied a composite analysis for the 22 tons of coal (Appendix A), this study compares independent analyses of the coal performed at the Savannah River National Laboratory (SRNL) and at the National Energy Technology Laboratory (NETL). Three supersacks a were sampled at three different heights within the sack in order to determine within bag variability and between bag variability of the coal. These analyses were also compared to the vendor’s composite analyses and to the coal specification. These analyses were also compared to historic data on Bestac coal analyses that had been performed at Hazen Research Inc. (HRI) between 2004-2011.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗