Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WEC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

A Comparison of Power Take-Off Architectures for Wave-Powered Reverse Osmosis Desalination of Seawater with Co-Production of Electricity

Several power take-off (PTO) architectures for wave-powered reverse osmosis (RO) desalination of seawater are introduced and compared based on the annual average freshwater production and the size of the components, which strongly relate to the costs of the system. The set of architectures compared includes a novel series-type PTO architecture not previously considered. These seawater hydraulic PTO architectures are composed of a WEC-driven pump, an RO module, an intake charge pump driven by an electric motor, and a hydraulic motor driving an electric generator for electric power production. This study is performed using an efficient two-way coupled steady-state model for the average performance of the system in a given sea state, including freshwater permeate production, electric power production, and electric power consumption. A multi-objective design problem is formulated for the purposes of this comparative study, with the objectives of maximizing annual freshwater production, minimizing the displacement of the WEC-driven pump, and minimizing the installed RO membrane area. This establishes a framework for comparison in the absence of a mature techno-economic model. The requirement that the system produces enough electric power to meet its consumption is applied as a constraint on the operation of the system. The oscillating wave surge converter Oyster 1 is assumed as the WEC. Weights on performance of the system in a given sea state are based on historical data from Humboldt Bay, CA. This study finds that (1) architectures in a series configuration allow for a reduction in the WEC-driven pump size of 59–92% compared to prior work, (2) varying the displacement of the WEC-driven pump between sea conditions does not provide any significant advantage in performance, and (3) varying the active RO membrane area between sea condition offers improvements between 7% and 41% in each design objective.

Energy & Fuels↗

A Wave Energy Converter Design Load Case Study

This article presents an example by which design loads for a wave energy converter (WEC) might be estimated through the various stages of the WEC design process. Unlike previous studies, this study considers structural loads, for which, an accurate assessment is crucial to the optimization and survival of a WEC. Three levels of computational fidelity are considered. The first set of design load approximations are made using a potential flow frequency-domain boundary-element method with generalized body modes. The second set of design load approximations are made using a modified version of the linear-based time-domain code WEC-Sim. The final set of design load simulations are realized using computational fluid dynamics coupled with finite element analysis to evaluate the WEC’s loads in response to both regular and focused waves. This study demonstrates an efficient framework for evaluating loads through each of the design stages. In comparison with experimental and high-fidelity simulation results, the linear-based methods can roughly approximate the design loads and the sea states at which they occur. The high-fidelity simulations for regular wave responses correspond well with experimental data and appear to provide reliable design load data. The high-fidelity simulations of focused waves, however, result in highly nonlinear interactions that are not predicted by the linear-based most-likely extreme response design load method.

16 TIDAL AND WAVE POWER↗

The Wave Energy Converter Design Process: Methods Applied in Industry and Shortcomings of Current Practices

Wave energy is among the many renewable energy technologies being researched and developed to address the increasing demand for low-emissions energy. The unique design challenges for wave energy converter design—integrating complex and uncertain technological, economic, and ecological systems, overcoming the structural challenges of ocean deployment, and dealing with complex system dynamics—have lead to a disjointed progression of research and development. There is no common design practice across the wave energy industry and there is no published synthesis of the practices that are used by developers. In this paper, we summarize the methods being employed in WEC design as well as promising methods that have yet to be applied. We contextualize these methods within an overarching design process. We present results from a survey of WEC developers to identify methods that are common in industry. From the review and survey results, we conclude that the most common methods of WEC design are iterative methods in which design parameters are defined, evaluated, and then changed based on evaluation results. This leaves a significant space for improvement of methods that help designers make better-informed decisions prior to sophisticated evaluation, and methods of using the evaluation results to make better design decisions during iteration. Despite the popularity of optimization methods in academic research, they are less common in industry development. We end this paper with a summary of the areas of WEC design in which the testing and development of new methods is necessary, and where more research is required to fully understand the influence of design decisions on WEC performance.

16 TIDAL AND WAVE POWER↗

Use of a Compliant Tether to Decouple Observation Buoy Motion for Auxiliary Wave Power

With the growth of the Blue Economy, the volume of data collection within the ocean environment has been rapidly increasing. Larger numbers of oceanographic, meteorological, and floating Light Detection And Ranging (LiDAR) buoys have been collecting high fidelity measurements while pushing against power budget limits. Power limitations lead to infrequent transmission of reduced data sets or recording data to local storage that must be physically collected when the buoy is serviced. Triton Systems, Inc. and its partners are developing a retrofittable wave energy converter (WEC) to provide auxiliary power to these observation buoys to increase mission duration and power budget, improve reliability, and reduce the need for service trips. One of the greatest challenges has been developing a method to interface Triton's WEC with these buoys without impacting measurement fidelity. This is especially critical for inertial wave and LiDAR wind measurements collected with sensors that could be adversely affected by additional buoy dynamics introduced by an integrated WEC. To address this, Triton and EOM Offshore developed a compliant tether to pair an observation buoy with a floating WEC while decoupling relative motion. Based on EOM's proven stretch hose technology, this compliant tether transmits power and data between the buoy-WEC system. In conclusion, modeling shows that the system has the potential to minimally adversely affect oceanographic, meteorological, wind resource characterization, and other measurements, with future testing scheduled to validate modeling efforts.

16 TIDAL AND WAVE POWER↗

Numerical Model Development and Validation for the WECCOMP Control Competition: Preprint

This paper details the development and validation of a numerical model of the Wavestar wave energy converter (WEC) in WEC-Sim. This numerical model was developed in support of the WEC Control Competition (WECCCOMP), an open competition with the objective of maximizing WEC power production through innovative control strategies. WECCCOMP has two stages: numerical implementation of control strategies, and experimental implementation. The work presented in this paper is for support of the stage one numerical implementation, where contestants are provided a WEC-Sim model of the Wavestar device to develop their control algorithms.

16 TIDAL AND WAVE POWER↗

Numerical Modelling of a Two-Body Point Absorber Featuring Variable Geometry

This work presents a novel wave energy converter (WEC) device concept that incorporates variable geometry modules into a two-body point absorber type WEC. The variable geometry modules consist of air inflatable bags in the surface float and a water inflatable ring in the reaction body. The variable geometry floats are able to provide greater control over the device hydrodynamics; they can be inflated or deflated to emphasize either power absorption or load shedding. The device geometry is controlled in a quasi-static fashion, while the power take-off (PTO) unit is controlled on a wave-to-wave timescale. The surface float is tethered directly to the submerged reaction body through PTO tether lines. A linear time-domain analysis, conducted using open-source Wave Energy Converter (WEC-Sim) software, was used to estimate the absorbed power of the WEC in sea states defined by the Wave Energy Prize. WEC power performance was weighted against the expected capital cost of building the load bearing structure of the device, providing an estimated ACE value. The inclusion of the variable geometry modules was shown to be effective in altering the device geometry to improve power capture with a near proportional increase in expected costs, providing a nearly constant power-to-cost ratio.

cost of energy↗

Review of Wave Energy Converter Power Take-Off Systems, Testing Practices, and Evaluation Metrics: Preprint

While the field of wave energy has been the subject of numerical simulation, scale model testing, and precommercial project testing for decades, wave energy technologies remain in the early stages of development and must continuing proving themselves as a promising modern renewable energy field. One of the difficulties that wave energy systems have been struggling to overcome is the design of highly efficient energy conversion systems that can convert the mechanical power, derived from the oscillation of wave activated bodies, into another useful product. Often the power take-off (PTO) is defined as the single unit responsible for converting mechanical power into another usable form such as electricity, pressurized fluid, compressed air, and others. The PTO, and the entire power conversion chain (PCC), is of great importance as it affects not only how efficient wave power is converted into electricity, but also contributes to the mass, size, structural dynamics, and levelized cost of energy (LCOE) of the wave energy converter (WEC). Unlike wind and solar, there is no industrial standard device, or devices, for wave energy conversion and this diversity is transferred to the PTO system. The majority of current WEC PTO systems incorporate a mechanical or hydraulic drive train, power generator, and an electrical control system. The challenge of WEC PTO designs is designing a mechanical-to-electrical component that can efficiently convert irregular, bi-directional, low frequency and low alternating velocity wave motions. While gross average power levels can be predicted in advance, the variable wave elevation input has to be converted into smooth electrical output and hence usually necessitates some type of energy storage system, such as battery storage, accumulator super capacitors, etc., or other means of compensation such as an array of devices. One of the primary challenges for wave energy converter systems is the fluctuating nature of wave resources, which require WEC components to be designed to handle loads (i.e. torques, forces, and powers) that are many times greater than the average load. This approach requires a much greater PTO capacity than the average power output and indicates a higher cost. In addition, supporting mechanical coupling and or gearing can be added to the PCC to help alleviate the difficulties with transmission and control of fluctuating large loads with low frequencies (indicative of wave forcing) into smaller loads at higher frequencies (optimum for conventional electrical machine design) can quickly increase the complexity of the PCC which could result in a greater number of failure modes and increased maintenance costs. All of the previous points demonstrate how the PTO influences WEC dynamics, reliability, performance and cost which are critical design factors. This paper further explores these topics by providing a review of the state-of-the-art PTO systems currently under development, how these novel PTO systems are tested and derisked prior to precommercial deployment, and the evaluation metrics historically used to differentiate between PTO designs and how they can be improved to support control co-design focused development of wave energy systems.

laboratory testing↗

Power Take-Off Design Study for a Small-Scale Oscillating Surge Wave Energy Converter for Powering the Blue Economy Applications: Preprint

The power take-off (PTO) is an integral part of wave energy conversion, and the design process is nontrivial. Better PTOs, and better processes for selecting and designing PTO architectures for various applications, would benefit devices that assist in powering the blue economy by decreasing time and money spent on PTO design and increasing the overall energy capture performance of these devices. This paper chronicles the selection process of a PTO for a small-scale surge-type wave energy converter (WEC) for the purpose of informing future PTO selection processes. Three PTO architectures are evaluated in WEC-Sim: a hydraulic check valve PTO, a hydraulic active valving PTO, and a directly electrified PTO. Simple models of each PTO are constructed. Because a model for the small-scale device was initially unavailable, the PTOs are simulated on a large-scale device. The results are scaled down using Froude scaling and compared to results from directly simulating a small-scale model. Strong assumptions are made because this work is early in the design stages, and a coarse look at PTO options was desired. Specifically, the effectiveness of controls is investigated, along with the efficiency of energy conversion. However, energy capture is only part of the consideration; there are also logistic concerns to be considered when selecting a PTO. For example, components for large-scale WECs are so large and expensive that it may make sense to custom-build PTO components, but small- scale WECs would benefit from off-the-shelf availability because the cost of customization would be a significant portion of the total capital cost of deployment at a small scale. Submersible, off-the-shelf components are much easier to source for hydraulic PTOs. Because of highly effective controls, efficient energy conversion, and availability of marine-grade components, an active valving hydraulic PTO is selected for this small-scale surge-type WEC.

electric PTO↗

U.S. Navy Wave Energy Test Site: Update for International Marine Renewable Energy Conference.

Hawaii Natural Energy Institute (HNEI) at the University of Hawaii (UH), provides key research support to the Navy’s Wave Energy Test Site (WETS), off Marine Corps Base Hawaii. This is the nation’s first grid-connected site, supporting the nascent commercial wave energy sector by providing and supporting Wave Energy Conversion (WEC) device test infrastructure. Through DOE and Navy support, HNEI provides environmental monitoring, independent WEC device performance analysis, numerical modeling, wave forecasting and hindcasting, and critical marine logistical support for WEC device developers.

16 TIDAL AND WAVE POWER↗

Assimilation of Wave Imaging Radar Observations for Real-time Wave-by-Wave Forecasting

This project addressed Topic 3: “Wave Measurement Instrumentation for Feed Forward Controls” under the FOA number DE-FOA-0000971. The overall goal of the program was to develop a phase-resolving wave forecasting technique for application to the active control of Wave Energy Conversion (WEC) devices. We have developed an approach that couples a wave imaging marine radar with a phase-resolving linear wave model for real-time wave field reconstruction and forward propagation of the wave field in space and time. The scope of the project was to develop and assess the performance of this novel forecasting system. Specific project goals were as follows: Develop and verify a fast, GPU-based (Graphical Processing Unit) wave propagation model suitable for phase-resolved computation of nearshore wave transformation over variable bathymetry; Compare the accuracy and speed of performance of the wave model against a deep water model in their ability to predict wave field transformation in the intermediate water depths (50 to 70 m) typical of planned WEC sites; Develop and implement a variational assimilation algorithm that can ingest wave imaging radar observations and estimate the time-varying wave conditions offshore of the domain of interest such that the observed wave field is best reconstructed throughout the domain and then use this to produce model forecasts for a given WEC location; Collect wave-resolving marine radar data, along with relevant in situ wave data, at a suitable wave energy test site, apply the algorithm to the field data, assess performance, and identify any necessary improvements; and Develop a production cost estimate that addresses the affordability of the wave forecasting technology and include in the Final Report. The developed forecasting algorithm (“Wavecast”) was evaluated for both speed and accuracy against a substantial synthetic dataset. Early in the project, performance tests definitively demonstrated that the system was capable of forecasting in real-time, as the GPU-based wave model backbone was very computationally efficient. The data assimilation algorithm was developed on a polar grid domain in order to match the sampling characteristics of the observation system (wave imaging marine radar). For verification purposes, a substantial set of synthetic wave data (i.e. forward runs of the wave model) were generated to be used as ground truth for comparison to the reconstructions and forecasts produced by Wavecast. For these synthetic cases, Wavecast demonstrated very good accuracy, for example, typical forecast correlation coefficients were between 0.84-0.95 when compared to the input data. Dependencies on shadowing, observational noise, and forecast horizon were also identified. During the second year of the project, a short field deployment was conducted in order to assess forecast accuracy under field conditions. For this, a radar was installed on a fishing vessel and observations were collected at the South Energy Test Site (SETS) off the coast of Newport, OR. At the SETS site, simultaneous in situ wave observations were also available owing to an ongoing field project funded separately. Unfortunately, the position and heading information that was available for the fishing vessel were not of sufficient accuracy in order to validate the forecast in a phase-resolving sense. Instead, a spectral comparison was made between the Wavecast forecast and the data from the in situ wave buoy. Although the wave and wind conditions during the field test were complex, the comparison showed a promising reconstruction of the wave spectral shape, where both peaks in the bimodal spectrum were represented. However, the total reconstructed spectral energy (across all directions and frequencies) was limited to 44% of the observed spectrum. Overall, wave-by-wave forecasting using a data assimilation approach based on wave imaging radar observations and a physics-based wave model shows promise for short-term phase-resolved predictions. Two recommendations for future work are as follows: first, we would recommend additional focused field campaigns for algorithm validation. The field campaign should be long enough to capture a range of wave conditions relevant to the target application and WEC site. In addition, it will be crucial to make sure the vessel of choice has high accuracy position and heading instrumentation (this instrumentation is commercially available but not standard on commercial fishing vessels). The second recommendation is to expand the model physics in the wave model backbone to include some nonlinear effects. Specifically, the third-order correction to the wave speed due to amplitude dispersion would be the next step in order to more accurately represent the phase speeds of large amplitude waves.

16 TIDAL AND WAVE POWER↗

Advanced Laboratory and Field Arrays: Novel Design and Assessment Methodologies for Wave Energy Converter Design (Wave-SPARC) (Task 8)

This task focused on advancing the mission of the Wave-SPARC project by (1) establishing a user-centered Set-Based Design methodology to enable industrial partners to design higher performance WECs, (2) assessing the means through which WEC concepts and WEC design processes are evaluated by employing and potentially improving Wave-SPARC’s Technological Performance Level (TPL) metric, and (3) clarifying how the Set-Based Design approach to WEC design would be applicable for devices of different scales and/or maritime markets.

13 HYDRO ENERGY↗

Prototype and Codesign of Nascent Flexible Wave Energy Converter Concepts

Prevailing mainstream ocean wave energy converter (WEC) archetypes are often relatively large monolithic rigid bodies with singular means of power take-off (e.g., relative motion between rigid bodies) and solo prime mover mechanisms (e.g. a rotary generator, a hydraulic piston). These mainstream WEC archetypes have existed for decades with some having histories spanning more than a century of significant investments and interests. As an alternative to the domain of mainstream WEC archetypes is the domain of distributed embedded energy converter technologies (also known as DEEC-Tec). Use of DEEC-Tec to create WECs - often called flexWECs - is a nascent domain of research and development that centers itself upon the interconnection of many relatively small energy converters - very small energy transducers - that interconnect and combine to create a much larger, overall, energy converting structure. The DEEC-Tec domain enables promising possibilities such as: direct in situ ocean wave energy harvesting and conversion throughout the volume of an entire flexWEC; inherent broad-banded ocean wave energy capture and conversion arising from near semi-continuous structural degrees of freedom; an innate absence of focusing and concentrating of ocean wave energy into a single prime mover and/or transmission system; and built-in implicit redundancy. As such, the DEEC-Tec domain could revolutionize how we conceptualize ocean wave energy conversion - both in terms of ocean wave energy converter design and what we view as viable environments and circumstances for ocean wave energy conversion. The research and development opportunities for the DEEC-Tec domain, therefore, are vast compared to the prevailing mainstream ocean wave energy converter domain. Correspondingly, there are ample opportunities to invest time and money into the DEEC-Tec domain with an aim to enable a paradigm shift in how ocean waves can be utilized as a more viable form of renewable energy. To that end, two seedling efforts have been enacted providing a very cursory investigation into the DEEC-Tec domain: (1) a preliminary simple fabrication/prototyping effort and (2) a preliminary co-design effort. The prototype seedling centers upon the design of a fabrication and evaluation rig for individual DEEC-Tec transducers; e.g., dielectric elastomer generators. The co-design seedling centers upon the analysis of those methods suitable for DEEC-Tec, ocean wave energy conversion, and fluid-structure interaction co-design efforts.

50 EE - Wind and Water Power Program - Water (EE-4↗

New Report Highlights LAMP's Role as a Robust and Reliable System for Wave Energy Converter Testing

Harnessing the power of waves requires more than just putting devices in the ocean - it takes tools that can refine and accelerate innovation before the first deployment. That's where NLR's largeamplitude motion platform, or LAMP, comes in. LAMP is a six-degree-of-freedom motion system designed to replicate the response of a wave energy converter (WEC) device in realistic ocean conditions. By letting researchers evaluate WEC performance in a safe, controlled lab environment before moving offshore, LAMP helps accelerate innovation while reducing risk. An NLR report, titled Initial Characterization of the NLR LargeAmplitude Motion Platform (https://www.nrel.gov/docs/fy26osti/93733.pdf), provides a deeper understanding of LAMP's capabilities and also lays the groundwork for future advancements in WEC testing methodologies. Researchers studied LAMP's amplitude and frequency limits across different payloads and collected data from 16 test profiles. Testing demonstrated that platform accuracy remained consistent across all payloads evaluated; researchers expect similar accuracy up to LAMP's 10,000-kilogram capacity limit. The measured position limits for single degrees of freedom experienced by WECs, including surge, sway, heave, roll, pitch, and yaw, also exceeded the original manufacturer specifications, providing new insight into the true boundaries of the system.

16 TIDAL AND WAVE POWER↗

Investigation of high-speed shaft bearing loads in wind turbine gearboxes through dynamometer testing

Many wind turbine gearboxes require repair or replacement well before reaching the end of their design life. The most common failure is bearing axial cracks, commonly called white etching cracks (WECs), which typically occur in the inner raceways of the high-speed parallel-stage rolling element bearings. Although the root causes of WECs are debated, one theory is that they are related to routine dynamic operating conditions and occasional transient events prevalent in wind turbines that can result in high bearing stress and sliding of the rolling elements. Here, this paper examined wind turbine gearbox high-speed shaft bearing loads and stresses through modeling and full-scale dynamometer testing. Bearing outer race loads were directly measured and predicted using a variety of modeling tools in normal operations, misaligned conditions, and transient events particularly prone to bearing sliding. Test data and models of bearing loads were well correlated. Neither operational misalignment due to rotor moments nor static generator misalignment affected the bearing loads when compared with pure-torque conditions. Thus, it is not likely that generator misalignment is a causal factor of WECs. In contrast, during transient events, the bearings experienced alternating periods of high stress, torque reversals, and loads under the minimum requisite at high rotating speeds while showing indications of sliding, all of which could be related to the formation of WECs.

17 WIND ENERGY↗

A proposed criteria to identify wind turbine drivetrain bearing loads that induce roller slip based white-etching cracks

In this article, the type of roller slip behavior that may result in the formation of white-etching cracks (WECs) in wind turbine gearbox bearings is identified. A new hypothesis based on the inner raceway normal contact load magnitude at the time of roller slip is proposed as the probable cause of WECs. For this purpose, the maximum normal contact loads are identified when roller slip occurs in high-speed shaft bearings at different mean wind speeds. Subsequently, the annual probability of occurrence of the maximum normal loads are obtained. The probability of maximum load under slip exceeding a limit probability is hypothesized as a probable cause for WEC. In order to apply the proposed hypothesis, two different wind turbines high-speed shaft bearings are used: the cylindrical roller bearing of the General Electric 1.5 SLE turbine and the tapered roller bearing of Vestas V52 turbine. Both the chosen bearings are on the generator side of the high-speed shaft. For both turbines, measurement data together with analytical models are used for identifying the slip and the maximum normal contact loads. We propose forecasting the probability of exceedance of a threshold maximum normal contact load level during slip to identify the possibility for inducing WECs.

17 WIND ENERGY↗

Optimum power analysis of a self-reactive wave energy point absorber with mechanically-driven power take-offs

This paper studies a self-reactive ocean wave energy converter (WEC) where energy is absorbed through the relative motion between a floating buoy on the ocean surface and a submerged body. Two types of direct-drive power take off (PTO) systems are examined. One adopts a ball screw system in inverse driving mode with mechanical motion rectifier (MMR) that converts the oscillating bi-directional input heave motion into unidirectional rotation to drive an electromagnetic generator, and another one uses a ball screw system to directly drive the generator (called non-MMR). Dynamic models for both types of PTOs are established and integrated with the overall WEC system model in both the time and frequency domains. Numerical simulation is used to investigate the dynamic performance of both PTOs. The influences of the PTO inerter, which is from the rotational inertia of the flywheel and generator, and the WEC drag damping coefficient are discussed and explored. The analytical closed-form solution for the optimum condition of the non-MMR system is derived based on the criterion of maximum power absorption, and numerical simulation yields the optimum condition for the MMR system. Overall, the results under regular and irregular waves show that the PTO inerter in the MMR system can improve the power absorption for small wave periods and maintain the same performance for large wave periods. The PTO inerter in the non-MMR system shifts the peak frequency. The WEC drag damping negatively influences the power absorption in both PTO systems, especially at large wave periods.

16 TIDAL AND WAVE POWER↗

Causal control design for wave energy converters with finite stroke

Control design is of central importance in the optimization of power generation from ocean wave energy converters (WECs). The problem is made challenging by the fact that the resource is vibratory and stochastic, with a low quality factor. It has recently been shown that when constrained to causality, the optimal feedback controller for a WEC is solvable in closed-form as a sign-indefinite LQG problem, for the case in which the WEC exhibits linear dynamics and quadratic power transmission dissipation. However, most WECs exhibit stroke limits, which must be explicitly accounted for in control design to avoid end-stop collisions. This is important because such collisions lead to damage, and also because the introduction of unmodeled stroke limits can actually destabilize the otherwise-optimal closed loop. We illustrate a control design technique to address this issue, which consists of two design steps. In the first step, LMI techniques are used to optimize the mean power harvested from waves with a known power spectral density, subject to several competing objectives. In the second step, the controller is augmented via a nonlinear passivity-based outer-loop design which guarantees to prevent stroke saturation while also guaranteeing to preserve closed-loop stability. Furthermore, the technique is illustrated using a model of a simple heaving point absorber, and verified in simulation.

16 TIDAL AND WAVE POWER↗

Annual Performance of the Second-Generation Variable-Geometry Oscillating Surge Wave Energy Converter

Recent studies in wave energy have highlighted the need for a structured innovation approach in wave energy converter (WEC) design because cost-of-energy estimates have remained high. One specific innovation being investigated by the National Renewable Energy Laboratory is WEC geometry control, which uses control surfaces in combination with an oscillating surge WEC (OSWEC) to increase device availability and power generation while limiting structural costs. This study performs the first analysis of annual performance for a novel OSWEC with geometry control to understand how the geometry control affects availability, annual power generation, and structural loadings like the power-take-off (PTO) torque or surge foundation force. Device hydrodynamic coefficients are calculated using linear potential theory for six geometry configurations. A nonideal PTO system is assumed and quadratic viscous damping losses are considered. Annual performance is evaluated and compared for three U.S. wave energy sites. The WEC geometry and PTO system are controlled on a sea-state basis to optimize for power capture while remaining under limits set on motion amplitude and structural loads. Results indicate that geometry control can increase availability up to 25 days in an average year depending on design limits, increase average power generation, and significantly reduce peak structural loads.

30 DIRECT ENERGY CONVERSION↗