Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “WASHINGTON”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Program of Research in Flight Dynamics, The George Washington University at NASA Langley Research Center

The program objectives are fully defined in the original proposal entitled Program of Research in Flight Dynamics in GW at NASA Langley Research Center, which was originated March 20, 1975, and in the renewals of the research program from January 1, 2003 to September 30, 2005. The program in its present form includes three major topics: 1. the improvement of existing methods and development of new methods for wind tunnel and flight data analysis, 2. the application of these methods to wind tunnel and flight test data obtained from advanced airplanes, 3. the correlation of flight results with wind tunnel measurements, and theoretical predictions.

Murphy, Patrick C.↗

Space: Past, Present, and Future: for Presentation to the American Ordnance Association, Washington Post

It is obvious that the last decade has produced dramatic changes in our national viewpoints on the question of the exploration of space. I would like to refer back, as a starting point, to a series of tests which were performed in 1949 under the sponsorship of the Army Ordnance Department under the code name, "Bumper." This project was carried out jointly by the Jet Propulsion Laboratory, the General Electric Company, and the Douglas Aircraft Company. The object of the project was to launch a Wac Corporal upper-stage vehicle from a V-2, and demonstrate a prototype high-performance, multi-stage rocket vehicle system. As you may recall, the project was entirely successful in demonstrating the feasibility of several unproved concepts: the staging of rocket vehicles at high altitudes, the utility of ablative materials for protection from aerodynamic heating, and a method of stabilizing rocket propelled vehicles operating in the vacuum of space. One of the most significant interpretations of this test to the engineers familiar with the work was the fact that the test showed that there were no longer any purely scientific barriers to the construction of vehicles capable of space flight. The barrier was engineering.

Stewart, Homer J.↗

Air Traffic Management Demonstration II (ATD-2): Washington Center Training

This is the ATD-2 training presentation for ZDC. The original presentation was completed September 2017.The metering modes are described above. These will be updated depending on Modeset by the Ramp Manager, STBO Client will also display the Metering Mode Icon onthe right hand corner of the Toolbar.

Center training↗

Clock Synchronization Characterization of the Washington DC Metropolitan Area Quantum Network (DC-QNet)

Quantum networking protocols relying on interference and precise time-of-flight measurements require high-precision clock synchronization. This study describes the design, implementation, and characterization of two optical time transfer methods in a metropolitan-scale quantum networking research testbed. With active electronic stabilization, sub-picosecond time deviation (TDEV) was achieved at integration times between 1 s and 10 5 s over 53 km of deployed fiber. Over the same integration periods, 10-picosecond level TDEV was observed using the White Rabbit-Precision Time Protocol (WR-PTP) over 128 km. Measurement methods are described to understand the sources of environmental fluctuations on clock synchronization towards the development of in-situ compensation methods. Path delay gradients, chromatic dispersion, polarization drift, and optical power variations all contributed to clock synchronization errors. The results from this study will inform future work in the development of link noise management methods essential for enabling experimental research in developing practical quantum networking protocols.

PIKTime↗

Pore Water Extraction Test Near 241-SX Tank Farm at the Hanford Site, Washington, USA

A proof-of-principle test is underway near the Hanford Site 241-SX Tank Farm. The test will evaluate a potential remediation technology that will use tank farm-deployable equipment to remove contaminated pore water from vadose zone soils. The test system was designed and built to address the constraints of working within a tank farm. Due to radioactive soil contamination and limitations in drilling near tanks, small-diameter direct push drilling techniques applicable to tank farms are being utilized for well placement. To address space and weight limitations in working around tanks and obstacles within tank farms, the above ground portions of the test system have been constructed to allow deployment flexibility. The test system utilizes low vacuum over a sealed well screen to establish flow into an extraction well. Extracted pore water is collected in a well sump,and then pumped to the surface using a small-diameter bladder pump.If pore water extraction using this system can be successfully demonstrated, it may be possible to target local contamination in the vadose zone around underground storage tanks. It is anticipated that the results of this proof-of-principle test will support future decision making regarding interim and final actions for soil contamination within the tank farms.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Baseline Risk Assessment Supporting Closure at Waste Management Area C at the Hanford Site Washington

The Office of River Protection under the U.S. Department of Energy is pursuing closure of the Single-Shell Tank (SST) Waste Management Area (WMA) C under the requirements of the Hanford Federal Facility Agreement and Consent Order (HFFACO). A baseline risk assessment (BRA) of current conditions is based on available characterization data and information collected at WMA C. The baseline risk assessment is being developed as a part of a Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI)/Corrective Measures Study (CMS) at WMA C that is mandatory under Comprehensive Environmental Response, Compensation, and Liability Act and RCRA corrective action. The RFI/CMS is needed to identify and evaluate the hazardous chemical and radiological contamination in the vadose zone from past releases of waste from WMA C. WMA C will be under Federal ownership and control for the foreseeable future, and managed as an industrial area with restricted access and various institutional controls. The exposure scenarios evaluated under these conditions include Model Toxics Control Act (MTCA) Method C, industrial worker, maintenance and surveillance worker, construction worker, and trespasser scenarios. The BRA evaluates several unrestricted land use scenarios (residential all-pathway, MTCA Method B, and Tribal) to provide additional information for risk management. Analytical results from 13 shallow zone (0 to 15 ft. below ground surface) sampling locations were collected to evaluate human health impacts at WMA C. In addition, soil analytical data were screened against background concentrations and ecological soil screening levels to determine if soil concentrations have the potential to adversely affect ecological receptors. Analytical data from 12 groundwater monitoring wells were evaluated between 2004 and 2013. A screening of groundwater monitoring data against background concentrations and Federal maximum concentration levels was used to determine vadose zone contamination impacts on groundwater. Waste Management Area C is the first of the Hanford tank farms to begin the closure planning process. The current baseline risk assessment will provide valuable information for making corrective actions and closure decisions for WMA C, and will also support the planning for future tank farm soil investigation and baseline risk assessments.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE Zero Energy Ready Home Case Study: Montlake Modern - Seattle, Washington

This case study describes a DOE Zero Energy Ready Home in Seattle, WA, that scored HERS 42 without PV and a -1 with PV. This 3,192 ft2 custom home has 6-inch SIP walls, a 12-inch SIP roof, an R-28 ICF-insulated foundation slab edge with R-20 rigid foam under the slab; an air-to-water heat pump plus radiant floor heat; 100% LED lighting; filtered-fan-powered fresh air intake; triple-pane windows, 9.7 kWh PV for electric car charging station.

air-to-water heat pump↗

New Whole-House Solutions Case Study: Technology Solutions for New Manufactured Homes, Idaho, Oregon, and Washington

The Building America Partnership for Improved Residential Construction, the Bonneville Power Administration (BPA), and Northwest Energy Works (NEW), the current Northwest Energy Efficient Manufactured Housing Program (NEEM) administrator, have been collaborating to conduct research on new specifications that would improve on the energy requirements of a NEEM home. In its role as administrator, NEW administers the technical specs, performs research and engineering analysis, implements ongoing construction quality management procedures, and maintains a central database with home tracking. This project prototyped and assessed the performances of cost-effective high performance building assemblies and mechanical systems that are not commonly deployed in the manufacturing setting. The package of measures is able to reduce energy used for space conditioning, water heating and lighting by 50 percent over typical manufactured homes produced in the northwest.

BA-PIRC↗

Existing Whole-House Solutions Case Study: Group Home Energy Efficiency Retrofit for 30% Energy Savings, Washington, D.C.

Energy efficiency retrofits (EERs) face many challenges on the path to scalability. Limited budgets, cost effectiveness, risk factors, and accessibility impact the type and the extent of measures that can be implemented feasibly to achieve energy savings goals. Group home retrofits can face additional challenges than those in single family homes – such as reduced access (occupant-in-place restrictions) and lack of incentives for occupant behavioral change. This project studies the specification, implementation, and energy savings from an EER in a group home, with an energy savings goal of 30%. This short term test report chronicles the retrofit measures specified, their projected cost-effectiveness using building energy simulations, and the short term test results that were used to characterize pre-retrofit and post-retrofit conditions. Additionally, the final report for the project will include analysis of pre- and post-retrofit performance data on whole building energy use, and an assessment of the energy impact of occupant interface with the building (i.e., window operation). Ultimately, the study’s results will be used to identify cost effective EER measures that can be implemented in group homes, given constraints that are characteristic of these buildings. Results will also point towards opportunities for future energy savings.

BA-PIRC↗