Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Tank testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

FY25 Organic Evaporation Testing in Support of Hanford Sample-and-Send

The Hanford Waste Treatment and Immobilization Plant (WTP) is being built to treat and immobilize the approximately 56 million gallons of radioactive mixed waste stored in 156 underground storage tanks. The baseline method for immobilization of Low-Activity Waste (LAW) is vitrification, but additional immobilization capacity is needed to supplement the initial LAW melters. Additionally, efforts are being undertaken to accelerate the disposition of Pre-Treated Waste (PTW) in Hanford’s West Area. An alternative cementitious waste form is being investigated as an alternative immobilization method. However, one impediment to a cementitious waste form is the presence of Land Disposal Restricted (LDR) organic chemicals in tank waste, which are regulated on a concentration-based standard in the final waste form. Hence, if the quantity of organics in PTW and LAW is high enough, treatment may be needed to destroy or remove said organics to make a waste form compatible with disposal in a mixed low level waste landfill. This work evaluates evaporation as a potential avenue for treatment of LDR organics to eliminate the impediment and permit possible use of a cementitious waste form.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SRNL Sludge Batch 10 Qualification SRAT and SME Off-Gas Results

Savannah River National Laboratory (SRNL) completed a small-scale demonstration of the Defense Waste Processing Facility (DWPF) Chemical Process Cell (CPC) utilizing the nitric-glycolic acid (NGA) flowsheet to support Sludge Batch 10 (SB10) qualification. The demonstration utilized a Tank 51 slurry sample washed by SRNL (with added H-canyon material). The purpose of this document is to report the observed off-gas results from the demonstration. With the NGA flowsheet, DWPF has a CPC hydrogen generation limit of 2.4×10 -2 lb/h. The peak observed rate was nearly 90 times less than that limit during SRNL testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluations of the Fates of Alkali Metals, Actinides, Mercury, and Iodine During DWPF Recycle Diversion

The fates of alkali metals, actinides, mercury, and iodine in the Defense Waste Processing Facility Recycle Diversion process (as currently conceptualized) have been evaluated through paper studies based on available knowledge of the chemistry, physical properties, solubility, and volatility of the various species involved. The effect of pH in the range from 9 to 13 has been discussed. Recommendations for additional studies to close technology gaps have been provided, many of which are contingent upon the results of pending testing and sample characterization efforts. There is uncertainty in the amounts of soluble actinides passing through the process filter, though the bulk of the actinides should be captured on the filter with the Recycle Collection Tank solids and the total amounts of actinides should be relatively low. The Recycle Collection Tank pH could impact the fraction of actinides reaching the evaporator, but the primary factors determining the actinide fate are expected to be the amount of CO 2 sorption from air sparging or, for certain actinides (such as plutonium), oxidation and/or sorption to MnO 2 solids from permanganate additions to destroy the glycolate anion. Process optimization could minimize the amounts of actinides passing the filter. Depending upon the levels of mercury observed in recycle stream samples and because of the volatility of mercury, the evaporator should be designed with the capability to remove dense mercury phases from the condensate to avoid exceeding ETP WAC limits. The facility design must be adequate to transfer dense mercury phases and testing to confirm mercury transfer is needed. Simulant containing mercury is recommended for both filtration and evaporation testing. OLI Modeling of the various recycle streams is recommended to provide insight on the fate of iodine. Iodine-spiked simulants are recommended for upcoming evaporation tests. The pro) ect should consider the likelihood and impact of NAS scale formation in the evaporators. Process optimization may be needed to minimize the accumulation of NAS scale and possibly the sorption of actinides in the evaporator. Actual waste testing of the Recycle Diversion filtration and evaporation should include the analysis of actinides, mercury, and iodine to determine their partitioning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

n-Butanol or isobutanol as a value-added fuel additive to inhibit microbial degradation of stored gasoline

Biofouling of gasoline can occur during fuel storage caused by bacteria and fungi that form a biofilm at a fuel/water interface and that produce organic acids and sulfides. Fuel additives are applied to gasoline to prevent biofouling but are relatively expensive, are not always effective against biofilms, and do not contribute to the combustibility of gasoline. Bio-isobutanol is an approved, certified advanced biofuel and is added up to 16% ( v/v ) in gasoline blends “iBut16”; n-butanol blends are currently under review. Microorganisms are inhibited by n-butanol or isobutanol when the aqueous concentration reaches >2-3% (w/ v ). We determined that n-butanol partitions into the aqueous phase of a model gasoline/water system reaching concentrations of 42 g/L and up to 48 g/L from gasoline blends at 10% and 24% ( v/v ), respectively. Likewise, isobutanol blended in gasoline at 10% and 24% ( v/v ) partitioned into an aqueous phase at 45 g/L and 53 g/L, respectively. Several bacterial and fungal strains that originate from fuel storage tanks, or are known to be solvent tolerant, were evaluated for their potential growth in a range of n- and isobutanol concentrations. Growth rates for all strains tested were reduced by 40–100% relative to untreated controls in n- and isobutanol concentrations of 1.5 and 2.0% ( v/v ). No observable growth occurred for any of the microorganisms in solvent concentrations at 3.0% ( v/v ). T amphiphilic and chaotropic properties of n- or isobutanol help them inhibit microbial growth and could serve as effective biocides during fuel storage as well as being valuable fuel additives.

59 BASIC BIOLOGICAL SCIENCES↗

Polar Bear™ – Innovative Capture of Storage Tank Vapors

Polar Bear™ is a patented technology developed by the Energy & Environmental Research Center (EERC) to capture storage tank vapors and eliminate methane emissions from upstream oil- and gas-producing facilities. Sparked by early commercial investment, the EERC licensed the technology and extended the intellectual property to storage tanks. Polar Bear™ is uniquely engineered and adapted to individual lower-producing facilities where there is otherwise no economic alternative for capturing tank vapors. A high number of small producing oil and gas wells are distributed across the country. The aggregate contributes to a significant volume of emissions. Because of the lack of economy of scale, gas volumes from these facilities are typically not recovered and contribute to methane emissions. Polar Bear™ provides a fit-for-purpose compression solution that addresses cost by reducing complexity with respect to conventional vapor recovery units and eliminating oil changes. Unique to Polar Bear™ is the capability to separate oxygenated gas from storage tank vapors. Storage tanks are designed to “breathe,” allowing gas to enter and escape during internal level and temperature changes. This infiltration of air into the tank headspace imparts undesirable oxygen content with respect to pipeline gathering. Polar Bear™ separates the vapor stream, allowing oxygen-rich gas to be used as fuel on-site while recovering the liquids-rich portion of the gas where oxygen content is minimized. A prototype system was tested to verify process models, evaluate operational performance, and advance the technology readiness level from 5 to 6. Results provide a good match between experimental measurements and process models, indicating the models are useful for future scale-up and field design. Various mixtures of nitrogen and liquefied petroleum gas were tested to understand the mass balance of nitrogen and how it relates to the potential control of oxygen content. Findings indicate that less than 2000 ppm of oxygen is likely to remain in the liquid portion of the gas in field applications. The research and development prepare the technology for field implementation to eliminate routine and fugitive methane emissions from storage tanks.

02 PETROLEUM↗

Computational Fluid Dynamics Simulations of Glass Vitrification Refractory Coupon Tests

The Waste Treatment and Immobilization Plant (WTP) at the Hanford site is nearing the start of the Direct-Feed Low-Activity Waste (DFLAW) operations. DFLAW is destined to convert a pretreated low activity waste portion of the 56 million gallons of tank waste into a stable solid glass. In the subsequent decade completion of the high-level waste (HLW) facility is anticipated. Sustained operational missions of both LAW and HLW melter facilities are expected over multiple decades. In high-temperature glass melters, the refractory lining corrodes over time, which could potentially be an issue for longer term operations, this refractory corrosion is higher at the level of the glass-air interface due to surface tension driven flow. The glass viscosity, melt pool temperature, and glass chemical composition can impact the rate at which the refractory corrodes. This rate is important to quantify for the various waste glasses to be produced at the WTP since the integrity of the refractory should not be a limiting factor affecting the lifetime of the melter. To this end, a series of glasses representative of the first batches of waste glass produced by the WTP will be melted in small-scale crucibles with Monofrax® K-3 coupons inserted. The corrosion of the K-3 will be measured in the melt and at the meltline (or neckline). A model for the corrosion rate will be constructed and implemented into a previously developed framework for a computational fluid dynamics (CFD) model of the full-scale WTP. To assist with experimental design and validate the implementation of the model in the full-scale melter, CFD simulations of the small-scale crucible tests were performed. The bubbling that occurs in the small-scale crucible is initially validated here with a model that uses silicone oil at room temperature. The viscosity of the oil ranges from 1 to 100 Pa•s, which corresponds to operating glass pool temperatures near 1150 °C down to idling temperatures near 950 °C. The simulation results show good agreement with the bubble sizes that form during experiments. CFD modeling of the crucible setup was used to determine bubbling characteristics to match the range of near-wall velocities expected in the full-scale WTP. This study presents the initial CFD modeling results, corrosion testing plan, and some preliminary corrosion samples with an outline for the next steps for the development of the corrosion model.

Abboud, Alexander W. [Idaho National Lab]↗

Cost-Optimized Cold Climate Heat Pump Development and Field Test

Cold climate heat pumps (CCHPs) expand the heat pump market to climates where heating demand is dominant. They can achieve more than 70% energy savings compared with electric resistance heating and operate at lower cost than using tank-stored propane to fuel a furnace. A high-efficiency heat pump with a heating seasonal performance factor (HSPF)—as defined by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI 2008)—greater than 10.0 would be more efficient than gas heating in terms of source energy. However, developing a cost-effective CCHP involves some challenges. A typical single-speed, air-source heat pump (ASHP) with an HSPF of 7.7 Btu/Wh does not work well under cold outdoor temperature conditions typical of cold climate locations for four major reasons: 1. Discharge temperature is too high—The low suction pressure and high compression pressure ratio at low ambient temperatures causes high compressor discharge temperatures in excess of the maximum limit for many of the compressors on the market. Furthermore, system charge of a heat pump is usually optimized in the cooling mode, which leads to overcharge conditions in the heating mode, further increasing the discharge temperature. 2. Heating capacity is insufficient if sized to meet the building design cooling load— Heating capacity of a single-speed heat pump decreases with ambient temperature. The heating capacity at -13°F (-25°C) typically decreases to 20%–40% of the rated heating capacity at 47°F (8.3°C) (~equivalent to the rated cooling capacity at 95°F [35°C]). Therefore, a single-speed heat pump, typically sized to match the building design cooling load, cannot provide adequate heating capacity to match the building heating load at low ambient temperatures. The capacity deficit is filled by inefficient resistance heat, thus lowering the system efficiency and significantly increasing power demand. 3. Cyclic loss is significant if sized to meet the building design heating load—If a single-speed heat pump is sized to meet the heating load, it will be significantly oversized relative to the cooling load in many cold climates. This will cause excessive on/off cyclic loss during the cooling and heating operations at moderately low ambient temperatures. Thus, capacity modulation capability (e.g., using a variable-speed or multi-stage compressor) is necessary for a CCHP, which uses its full capacity to meet the peak heating load and partial capacity to meet the cooling and part-load heating loads. 4. Coefficient of performance (COP) is low—Heating COP degrades significantly at low ambient temperatures owing to the large temperature difference between the heat source and sink. A target CCHP should be sized to meet the building design heating load while minimizing the cyclic loss for the cooling and heating operations at moderate ambient temperatures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Determination of 2,4-Dinitrophenol (2,4-DNP) in Simulated Radioactive Waste by High Performance Liquid Chromatography

The River Protection Project (RPP) at Hanford, Washington is evaluating an alternative treatment method for low activity tank waste (LAW) disposition. Specifically, grout solidification/immobilization for LAW needs to demonstrate adequate treatment for Land Disposal Restricted (LDR) Organic chemicals. LDR organic chemical pretreatment, such as evaporations testing and oxidation decomposition, are under assessment to reduce the LDR organic chemicals concentration in the LDR waste. 2,4-dinitrophenol was spiked into LAW simulated waste and monitored in these studies using High Performance Liquid Chromatography (HPLC). The development and implementation of this HPLC method is discussed in this presentation.

Dekarske, John R. [Savannah River National Laborat↗

User Impressions and Gait Analysis of Exoskeleton Device Usage in Generalized Tank Farm Activities

Tank farm workers involved in nuclear cleanup activities perform physically demanding tasks, typically while wearing heavy personal protective equipment (PPE). Exoskeleton devices have the potential to bring considerable benefit to this industry but have not been thoroughly studied in the context of nuclear cleanup. In this paper, we examine the performance of exoskeletons during a series of tasks emulating jobs performed on tank farms while participants wore PPE commonly deployed by tank farm workers. The goal of this study was to evaluate the effects of commercially available lower-body exoskeletons on a user’s gait kinematics and user perceptions. Three participants each tested three lower-body exoskeletons in a 70-min protocol consisting of level treadmill walking, incline treadmill walking, weighted treadmill walking, a weight lifting session, and a hand tool dexterity task. Results were compared to a no exoskeleton baseline condition and evaluated as individual case studies. The three participants showed a wide spectrum of user preferences and adaptations toward the devices. Individual case studies revealed that some users quickly adapted to select devices for certain tasks while others remained hesitant to use the devices. Temporal effects on gait change and perception were also observed for select participants in device usage over the course of the device session. Here, device benefit varied between tasks, but no conclusive aggregate trends were observed across devices for all tasks. Evidence suggests that device benefits observed for specific tasks may have been overshadowed by the wide array of tasks used in the protocol.

Tank farm↗

Hydrogen Recombiner Catalyst Evaluations for Waste Storage

Radiolysis of water in nuclear waste storage generates hydrogen gas that can accumulate within sludge style waste and be rapidly released during agitation events, creating a significant flammability hazard. Engineering controls are therefore required to limit hydrogen concentrations during both quiescent storage and transient disturbances. Catalytic recombination of hydrogen in waste storage offgas is a proven mitigation strategy, maintaining hydrogen levels below flammability limits and managing sudden concentration spikes. Conventional recombiners rely on platinum and/or palladium catalysts, with development efforts focused on extending service life, increasing active surface area, and ensuring safe deployment in radioactive environments. Savannah River National Laboratory (SRNL) is evaluating a newly developed hydrogen recombiner catalyst from Canadian Nuclear Laboratories as a cost-effective and durable alternative for nuclear waste applications. Testing was conducted in SRNL’s Shielded Cells facility, which enables reduced-scale experimental modeling under radiation fields and near-use-case conditions relevant to radioactive waste storage. Catalyst performance was evaluated using a custom offgas characterization system designed for near-zero flow conditions. The experimental apparatus consisted of a gas-tight 2.7 L PTFE vessel equipped with temperature monitoring, gas flow controls, and a variable-speed mixer to simulate sludge agitation. Offgas composition was monitored using a dedicated gas chromatograph with argon carrier gas and a krypton internal standard. Measurements were obtained for an empty vessel, the vessel containing a well characterized radioactive tank waste sample, and the same configuration with the candidate catalyst installed. Results demonstrate that the new catalyst effectively reduced hydrogen concentrations in the offgas within the constraints of the experimental design. In addition to confirming catalytic activity, the testing provided valuable insights into experimental optimization and considerations for future performance evaluations. These findings support the potential scalability of the technology and highlight its applicability to broader nuclear waste management operations, offering improved safety and reduced operational costs through enhanced catalyst durability and lower replacement frequency.

Tener, Zachary P. [Savannah River National Laborat↗

Quantification of Aerosol Transmission through Stress Corrosion Crack-Like Geometries

The formation of a stress corrosion crack (SCC) in the canister wall of a dry cask storage system (DCSS) has been identified as a potential issue for the long-term storage of spent nuclear fuel. The presence of an SCC in a storage system could represent a through-wall flow path from the canister interior to the environment. Modern, vertical DCSSs are of particular interest due to the commercial practice of using more significant backfill pressures in the canister, up to approximately 800 kPa. This pressure differential offers a relatively high driving potential for blowdown of any particulates that might be present in the canister. In this study, the rates of gas flow and aerosol transmission of a spent fuel surrogate through an engineered microchannel with dimensions representative of an SCC were evaluated experimentally using coupled mass flow and aerosol analyzers. The microchannel was formed by mating two gage blocks with a linearly tapering slot orifice nominally 13 μm (0.005 in.) tall on the upstream side and 25 μm (0.0010 in.) tall on the downstream side. The orifice is 12.7 mm (0.500 in.) wide by 8.86 mm (0.349 in.) long (flow length). Surrogate aerosols of cerium oxide, CeO 2 , were seeded and mixed with either helium or air inside a pressurized tank. The aerosol characteristics were measured immediately upstream and downstream of the simulated SCC at elevated and ambient pressures, respectively. These data sets are intended to add to previous testing that characterized SCCs under well-controlled boundary conditions through the inclusion of testing improvements that establish initial conditions in a more consistent way. These ongoing testing efforts are focused on understanding the evolution in both size and quantity of a hypothetical release of aerosolized spent fuel particles from failed fuel to the canister interior and ultimately through an SCC.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Removal Performance Comparisons of Crystalline Silicotitanate Media Batches with Savannah River Site Waste Simulant

The Tank Closure Cesium Removal (TCCR) system uses ion exchange columns filled with Crystalline Silicotitanate (CST) media to process radioactive waste solutions for the removal of Cs137. TCCR currently focuses on dissolving Savannah River Site (SRS) Tank 10H waste (primarily sodium salt cake solids) within the tank followed by at-tank ion exchange column treatment. Plans are underway to prepare and install a second TCCR unit at SRS. Capacity and particle size differences exist between archived (IE-911) and more recently-prepared CST media batches (9120- B and 9140-B). Side-by-side comparison testing was performed to evaluate the cesium removal performance of each batch to aid in selecting the preferred CST batch and media characteristics to load into the second TCCR unit. Batch contact equilibrium and flow-through column tests have been conducted with three CST batches using an SRS Average Simulant. Simulant batch contact equilibrium cesium loading results for the three CST batches (including two lots of one batch) are provided in Table ES-1. The 35 °C data indicates that the archived IE-911 batch has a higher cesium capacity than recently-prepared CST media and that the minor TCCR CST 9120-B media lot (2099000035) has similar cesium removal performance to the major TCCR lot (2099000034). Tests conducted at 25 ºC for the archived IE-911 CST batch indicated lower cesium removal performance with this simulant batch than was observed recently with a different SRS Average Simulant batch. A dilution factor (DF) is typically utilized when modeling engineered CST media cesium loading performance to account for mass contributions from the binder material. In cases where CST performance is lower than expected, this factor includes corrections for the binder and for low performance. The ZAM (Zheng, Anthony, and Miller) Isotherm Model DF values are provided in Table ES-1 for each simulant batch contact result. DF values near 0.5 were determined for the 9120-B and 9140-B CST batch contact tests while DF values near 0.6 (20% higher) were determined for the tests with IE-911. These dilution factors are lower than recently observed with a different SRS Average Simulant batch (9140-B DF = 0.68; IE-911 DF = 1.0). Based on these results, it appears that some component in the simulant solution used for equilibrium testing may have resulted in reduced cesium loading on the CST media.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ion Chromatography (IC) Round Robin Analyses of Low Glycolate Concentrations in Recycle Collection Tank (RCT) Post Permanganate Treatment Simulant

This work is a demonstration of Ion Chromatography (IC) analysis of low concentrations of glycolate in chemical simulant designed to mimic the matrix in the Recycle Collection Tank (RCT) at the Defense Waste Processing Facility (DWPF) after sodium permanganate oxidation treatment. The IC method was previously developed [1] and this report covers the results of round robin testing with three analytical laboratories located at the Savannah River Site (SRS). The laboratories are termed the Sensing & Metrology (S&M) laboratory at the Savannah River National Laboratory (SRNL), the Processing Science Analytical Laboratory (PSAL) at SRNL, and the DWPF laboratory at SRS. Each laboratory received four samples: (1) 200 mL of 21.3 mg/L glycolate in RCT post permanganate strike sulfite quenched simulant, (2) 200 mL of 38.0 mg/L glycolate in RCT post permanganate strike sulfite quenched simulant, (3) 200 mL of 54.9 mg/L glycolate in RCT post permanganate strike sulfite quenched simulant, and (4) 600 mL of RCT post permanganate strike sulfite quenched simulant to use for matrix matched blanks.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Autonomous Hydrogen Fueling Station

This project “Autonomous Hydrogen Fueling Station” covered the autonomous refueling with both gaseous hydrogen and liquid hydrogen. The part on gaseous hydrogen focused on the development of an autonomous robotic fueling arm that would couple to a fuel cell engine for hydrogen refueling without guidance from the forklift operator and budget period. Research was also covered for the robotic fueling with a commercial vehicle. The second phase of the project created the baseline for an autonomous liquid hydrogen transfer system that would minimize boil off losses by operating at thermodynamically efficient state points. For the development of the robotic fueling arm, testing was conducted to establish a baseline measurement of the accuracy and repeatability of a human operator positioning a lift truck in front of a dispenser. The goal was to establish the range of motion required for an autonomous fueling mechanism to mate a hydrogen nozzle with a receptacle on a fuel cell system installed in a forklift. The final design comprised a selective compliance articulated robot arm (SCARA)-type mechanism with two arms for horizontal motion and a ball screw for vertical movement and color and LIDAR cameras were used for marker identification and proximity awareness to guide the robotic arm to its target receptacle. Initial tests resulted in 199 out of 200 successful attempts at autonomous coupling of the dispensing coupler and a fuel cell engine, without hydrogen. The dispenser prototype was modified to include tubing for both hydrogen fuel and air purge lines, but subsequent tests were confounded by the shoulder motor over current errors which limited the robot from getting to the fully inserted position to achieve a positive latch. Robotic hydrogen refueling was successfully demonstrated over 1.5 hours of testing, Plug completed 29 successful latches with an average number of 4 sequential latches before failure. However, a robot capable of placing the nozzle with more force is required for higher reliability. For budget period two, a small scale (10 kg / transfer) automated control system was designed that would operate valves to control pressure and flow of liquid nitrogen between a source and receiving tank with an aim to minimize boil off losses by operating at the most thermodynamically efficient state points. Control system logic flow and a P&ID were developed prior to system safety characterization via HAZOP. A control narrative and system state points were defined. Delays in approval for a change of project objective and procurement issues precluded the construction and test of the final prototype system.

08 HYDROGEN↗

Molten Salt Loop Operational Experience and Test Campaigns in FY24

The Facility to Alleviate Salt Technology Risks (FASTR) at the US Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) was developed to demonstrate technology for high-temperature chloride salt systems (Figure 1). FASTR is primarily constructed using alloy C-276 and is designed to operate at temperatures of up to 725°C. The facility is loaded with 250 kg of NaCl-KCl-MgCl 2 salt. This salt provides a relevant test environment for de-risking technology while avoiding the costs and hazards associated with beryllium-based or uranium-bearing salts. The facility’s major components include a centrifugal pump for salt circulation, an air-based heat exchanger to reject heat, a suite of instrumentation, and trace heating to prevent salt freezing. The salt was purified in 2020 and 2022, and the pumped loop first operated in December 2022. FASTR is a unique US capability for high-temperature molten halide salt testing. FASTR’s scale, co located purification system, and relatively large power (465 kW) differentiates it from other testing systems. Furthermore, access to the DOE-supported facility and efficient communication of results— which are generally disseminated publicly—distinguish FASTR as being broadly significant throughout the molten salt reactor community. FASTR is similar to ORNL’s Liquid Salt Test Loop (LSTL), although FASTR contains chloride-based salt instead of the fluoride-based salt (LiF-NaF-KF) found in LSTL. Furthermore, FASTR is approximately 2× larger than LSTL in terms of pipe size and length, power, salt volume, flow rate, and number of thermocouples. The LSTL first operated in 2016. At the end of FY23, there was a suspected gas leak in the LSTL that halted operation. At the start of FY24, a leak in the LSTL pump’s tank gas space was confirmed. Because the gas-space leak prevented operation of LSTL, FY24 efforts were focused on operation of FASTR. This report summarizes the progress made during FY24 in support of the DOE Office of Nuclear Energy (DOE-NE) work package, AT-24OR070202 Salt Loop and Capability for Testing Sensors and Off Gas Components.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Integration of a new Cryogenic Liquefier into the IB-1 Cryogenic Test Facility

The increase over the last years of the testing activities related to quantum systems, SRF cavities for the PIP-II and the LCLS-II projects, as well as superconducting magnets for the HL-LHC project and Fusion research activities, has required the addition of a new Helium cryogenic plant into the existing IB-1 Industrial Cryogenic Test Facility. The new cryogenic plant is composed of a cryogenic liquefier (Cold Box) able to provide up to 340 L/h, a 4 kL Dewar and two Mycom ® compressors providing up to 120 g/s. AL-AT (Air Liquide Advanced Technologies) has taken part of this project by designing and manufacturing the cryogenic liquefier. This new cryogenic plant is connected through a cryogenic distribution system to a 10 kL Dewar, which is part of the existing cryogenic test facility, itself composed of another Cold Box and a Sullair ® compressor. The new cryogenic plant has two main operating modes: one allows to transfer liquid helium at 1.7 bar between the two Dewars, the other allows to transfer supercritical Helium at 2 bar or more between the new Cold Box and the 10 kL Dewar. The entire industrial cryogenic facility is handled by a common Inventory Control System, composed of three control valves, and 9 tanks giving a total buffer volume of more than 1000 m3. This paper presents the technical features of the new Helium cryogenic plant, as well as the main results of the liquefier commissioning phase and details of the helium transfer between the two Dewars, making the connection between the cryogenic plants at the IB-1 Industrial Cryogenic Test Facility.

43 PARTICLE ACCELERATORS↗

Integration of a new Cryogenic Liquefier into the IB-1 Cryogenic Test Facility

aThe increase over the last years of the testing activities related to superconducting quantum materials, SRF cavities for the PIP-II and the LCLS-II projects, as well as superconducting magnets for the HL-LHC project and Fusion research activities, has required the addition of a new Helium cryogenic plant into the existing IB-1 Industrial Cryogenic Test Facility. The new cryogenic plant is composed of a cryogenic liquefier (Cold Box) able to provide up to 340 L/h, a 4kL Dewar and two Mycom compressors providing up to 120 g/s. AL-AT (Air Liquide Advanced Technologies) has taken part of this project by designing and manufacturing the cryogenic liquefier. This new cryogenic plant is connected through a cryogenic distribution system to a 10 kL Dewar, which is part of the existing cryogenic test facility, itself composed of another Cold Box and a Sullair compressor. The new cryogenic plant has two main operating modes: one allows to transfer liquid helium at 1.7 bar between the two Dewars, the other allows to transfer supercritical Helium at 2 bar or more between the new Cold Box and the 10 kL Dewar. The entire industrial cryogenic facility is handled by a common Inventory Control System, composed of three regulatory valves, and 9 tanks giving a total buffer volume of more than 1000 m3. This paper presents the technical features of the new Helium cryogenic plant, as well as the main results of the liquefier commissioning phase and details of the helium transfer between the two dewars, making the connection between the cryogenic plants at the IB-1 Industrial Cryogenic Test Facility.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

TEAMER - AquaHarmonics High Fidelity WEC Sim PTO and Control Model Validation, Sim Model

Collaborative effort between AquaHarmonics, Sandia National Laboratories (SNL), and the National Renewable Energy Laboratory (NREL) to revise and validate Aquaharmonics' full wave to wire model, allowing for reduced uncertainty and increased understanding of design requirements of a utility scale wave energy converter (WEC). SNL and NREL in collaboration with AquaHarmonics, will set up and run WEC Simulator (WEC-Sim) models of the AquaHarmonics WEC, building off past model developments for inclusion of custom PTO (power take-off) dynamics. The intent is to review, update, and verify or validate a new WEC-Sim model against wave tank experimental data. Furthermore, the WEC-Sim model will be coupled to an energy storage system model to better understand the wave-to-wire functionality. Project is part of the TEAMER (Testing & Expertise for Marine Energy) RFTS (request for technical support) system of WEC research projects. Testing data can be found in the associated MHKDR link below.

16 TIDAL AND WAVE POWER↗