Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Spirit”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

NASA's Software Safety Standard

NASA relies more and more on software to control, monitor, and verify its safety critical systems, facilities and operations. Since the 1960's there has hardly been a spacecraft launched that does not have a computer on board that will provide command and control services. There have been recent incidents where software has played a role in high-profile mission failures and hazardous incidents. For example, the Mars Orbiter, Mars Polar Lander, the DART (Demonstration of Autonomous Rendezvous Technology), and MER (Mars Exploration Rover) Spirit anomalies were all caused or contributed to by software. The Mission Control Centers for the Shuttle, ISS, and unmanned programs are highly dependant on software for data displays, analysis, and mission planning. Despite this growing dependence on software control and monitoring, there has been little to no consistent application of software safety practices and methodology to NASA's projects with safety critical software. Meanwhile, academia and private industry have been stepping forward with procedures and standards for safety critical systems and software, for example Dr. Nancy Leveson's book Safeware: System Safety and Computers. The NASA Software Safety Standard, originally published in 1997, was widely ignored due to its complexity and poor organization. It also focused on concepts rather than definite procedural requirements organized around a software project lifecycle. Led by NASA Headquarters Office of Safety and Mission Assurance, the NASA Software Safety Standard has recently undergone a significant update. This new standard provides the procedures and guidelines for evaluating a project for safety criticality and then lays out the minimum project lifecycle requirements to assure the software is created, operated, and maintained in the safest possible manner. This update of the standard clearly delineates the minimum set of software safety requirements for a project without detailing the implementation for those requirements. This allows the projects leeway to meet these requirements in many forms that best suit a particular project's needs and safety risk. In other words, it tells the project what to do, not how to do it. This update also incorporated advances in the state of the practice of software safety from academia and private industry. It addresses some of the more common issues now facing software developers in the NASA environment such as the use of Commercial-Off-the-Shelf Software (COTS), Modified OTS (MOTS), Government OTS (GOTS), and reused software. A team from across NASA developed the update and it has had both NASA-wide internal reviews by software engineering, quality, safety, and project management. It has also had expert external review. This presentation and paper will discuss the new NASA Software Safety Standard, its organization, and key features. It will start with a brief discussion of some NASA mission failures and incidents that had software as one of their root causes. It will then give a brief overview of the NASA Software Safety Process. This will include an overview of the key personnel responsibilities and functions that must be performed for safety-critical software.

Ramsay, Christopher M.↗

[Now, The Time for Probes and In-Situ Science]

A viewgraph explaining the need for probes and in situ measurements to understand data from extra solar planet studies is shown. The topics include: 1) To explore the universe and search for life: Probes in Context; 2) What is a probe?; 3) NASA Ames Research Center-founded 1939; 4) Past & Present: Successful Probes and Fly-by's; 5) Thermal Protection Materials and Arc-Jet Facility; 6) Mars Exploration Rovers-Spirit & Opportunity; 7) Bio/Info/Nanotechnology; 8) Technology for Exploration; 9) Award Winning NASA Research Park; 10) Where we need to go; and 11) The Future: Pico Probes

Hubbard, G. Scott↗

Lavoisier: A Low Altitude Balloon Network for Probing the Deep Atmosphere and Surface of Venus

The in-situ exploration of the low atmosphere and surface of Venus is clearly the next step of Venus exploration. Understanding the geochemistry of the low atmosphere, interacting with rocks, and the way the integrated Venus system evolved, under the combined effects of inner planet cooling and intense atmospheric greenhouse, is a major challenge of modern planetology. Due to the dense atmosphere (95 bars at the surface), balloon platforms offer an interesting means to transport and land in-situ measurement instruments. Due to the large Archimede force, a 2 cubic meter He-pressurized balloon floating at 10 km altitude may carry up to 60 kg of payload. LAVOISIER is a project submitted to ESA in 2000, in the follow up and spirit of the balloon deployed at cloud level by the Russian Vega mission in 1986. It is composed of a descent probe, for detailed noble gas and atmosphere composition analysis, and of a network of 3 balloons for geochemical and geophysical investigations at local, regional and global scales.

Chaasefiere, E.↗

Iron Mineralogy and Aqueous Alteration on Mars from the MER Moessbauer Spectrometers

The twin Mars Exploration Rovers Spirit (Gusev crater) and Opportunity (Meridiani Planum) used MIMOS II Moessbauer spectrometers to analyze martian surface materials in the first application of extraterrestrial Moessbauer spectroscopy. The instruments acquired spectra that identified the speciation of Fe according to oxidation state, coordination state, and mineralogical composition and provided quantitative information about the distribution of Fe among oxidation states, coordination states, and Fe-bearing phases. A total of 12 unique Fe-bearing phases were identified: Fe(2+) in olivine, pyroxene, and ilmenite; Fe(2+) and Fe(3+) in magnetite and chromite; Fe(3+) in nanophase ferric oxide (npOx), hematite, goethite, jarosite, an unassigned Fe3+ sulfate, and an unassigned Fe(3+) phase associated with jarosite; and Fe(0) in kamacite. Weakly altered basalts at Gusev crater (SO3 = 2.5 +/- 1.4 wt.% and Fe(3+)/Fe(sub T) = 0.24 +/- 0.11) are widespread on the Gusev plains and occur in less abundance on West Spur and Husband Hill in the Columbia Hills. Altered low-S rocks (SO3 = 5.2 +/- 2.0 wt.% and Fe(3+)/Fe(sub T) = 0.63 +/- 0.18) are the most common type of rock in the Columbia Hills. Ilm-bearing, weakly altered basalts were detected only in the Columbia Hills, as was the only occurrence of chromite in an altered low-S rock named Assemblee. Altered high-S rocks (SO3 > 14.2 wt.% and Fe(3+)/Fe(sub T) = 0.83 +/- 0.05) are the outcrop rocks of the ubiquitous Burns formation at Meridiani Planum. Two Fe(0)-bearing rocks at Meridiani Planum (Barberton and Heat Shield Rock) are meteorites. Laguna Class soil is weakly altered (SO3 = 6 +/- 2 wt.% and Fe(3+)/Fe(sub T) = 0.29 +/- 0.08) and widely distributed at both Gusev crater and Meridiani Planum, implying efficient global mixing processes or a global distribution of precursor rocks with comparable Fe mineralogical compositions. Paso Robles Class soil is heavily altered (SO3 approx. 31 wt.% and Fe(3+)/Fe(sub T) = 0.83 +/- 0.05), is relatively uncommon, and occurs as subsurface deposits in the Columbia Hills. Berry Class soil is also heavily altered (SO3 = 5 +/- 1 wt.% and Fe(3+)/Fe(sub T) = 0.60 +/- 0.13) and occurs at Meridiani Planum as lag deposits, at the crests of aeolian bedforms, and as isolated pockets on outcrop surfaces. Magnetite is identified as the strongly magnetic component in martian soil. Jarosite (in the Burns outcrop at Meridiani Planum) and goethite (in Clovis Class rocks at Gusev crater) are mineralogical markers for aqueous processes because they contain the hydroxide anion (OH(-)) as an essential part of their structure. Each yields approx.10 wt.% H2O upon dehydroxylation. The presence of Fe sulfates on opposite sides of Mars is evidence that aqueous processes under acid sulfate conditions are or were common. Except for Independence Class rocks in the Columbia Hills, the overall Fe mineralogical compositions and similar basaltic bulk chemical compositions (calculated with respect to S = Cl = 0) of the population of altered rocks analyzed by MER imply isochemical alteration of basaltic precursors at low water-to-rock ratios.

Morris, Richard V.↗

Mars Exploration Rover Pancam Multispectral Imaging of Rocks, Soils, and Dust at Gusev Crater and Meridiani Planum

Multispectral imaging from the Panoramic Camera (Pancam) instruments on the Mars Exploration Rovers Spirit and Opportunity has provided important new insights about the geology and geologic history of the rover landing sites and traverse locations in Gusev crater and Meridiani Planum. Pancam observations from near-UV to near-IR wavelengths provide limited compositional and mineralogic constraints on the presence abundance, and physical properties of ferric- and ferrous-iron bearing minerals in rocks, soils, and dust at both sites. High resolution and stereo morphologic observations have also helped to infer some aspects of the composition of these materials at both sites. Perhaps most importantly, Pancam observations were often efficiently and effectively used to discover and select the relatively small number of places where in situ measurements were performed by the rover instruments, thus supporting and enabling the much more quantitative mineralogic discoveries made using elemental chemistry and mineralogy data. This chapter summarizes the major compositionally- and mineralogically-relevant results at Gusev and Meridiani derived from Pancam observations. Classes of materials encountered in Gusev crater include outcrop rocks, float rocks, cobbles, clasts, soils, dust, rock grindings, rock coatings, windblown drift deposits, and exhumed whitish/yellowish salty soils. Materials studied in Meridiani Planum include sedimentary outcrop rocks, rock rinds, fracture fills, hematite spherules, cobbles, rock fragments, meteorites, soils, and windblown drift deposits. This chapter also previews the results of a number of coordinated observations between Pancam and other rover-based and Mars-orbital instruments that were designed to provide complementary new information and constraints on the mineralogy and physical properties of martian surface materials.

Bell, J. F., III↗

Possible Evidence for Iron Sulfates, Iron Sulfides, and Elemental Sulfur at Gusev Crater, Mars, from Mer, Crism, and Analog Data

The Mossbauer (MB) spectrometers on the Mars Exploration Rovers (MER) Spirit (Gusev crater) and Opportunity (Meridiani Planum) have detected 14 Fe-bearing phases, and mineralogical assignments have been made for all except 3. Identified Fe2+-bearing phases are olivine, pyroxene, ilmenite, and troilite. Magnetite and chromite are present as mixed Fe(2+) and Fe(3+) phases. Identified Fe(3+) phase are jarosite, hematite, goethite, and nanophase ferric oxide (npOx). Fe(sup 0) (iron metal) is present as kamacite. Nanophase ferric oxide (npOx) is a generic name for octahedrally coordinated Fe(3+) alteration products that cannot be otherwise mineralogically assigned on the basis of MER data. On the Earth, npOx would include ferrihydrite, iddingsite, schwertmannite, akaganeite, and superparamagnetic hematite and goethite. The Mars Reconnaissance Orbiter CRISM instrument, a visible, near-IR hyperspectral imager (approximately 0.35 to 4 micron) enables mineralogical examination of Mars with a tool that is sensitive to H2O and to M-OH (M = Al, Si, Fe, Mg, etc.) at spatial resolution of about 20 m/pixel. We examined a CRISM image of the MER region of Gusev crater (Columbia Hills and plains to the west), looking for spectral evidence of the aqueous process apparent from the MER analyses. We also searched for spectral constraints for the mineralogical composition of our unidentified Fe-bearing phases and the forms of npOx present on Mars. We also consider evidence from analogue samples that the precursor for the goethite detected by MB in Clovis Class rocks is an iron sulfide. We suggest that there is some indirect evidence that elemental sulfur might be present to different extents in Clovis Class rocks, the Fe3Sulfate-rich soils, and perhaps even typical (Laguna Class) surface soils.

Morris, R. V.↗

The Fourier-Kelvin Stellar Interferometer (FKSI) Nulling Testbed II: Closed-loop Path Length Metrology And Control Subsystem

The Fourier-Kelvin Stellar Interferometer (FKSI) is a mission concept for an imaging and nulling interferometer in the near to mid-infrared spectral region (3-8 microns), and will be a scientific and technological pathfinder for upcoming missions including TPF-I/DARWIN, SPECS, and SPIRIT. At NASA's Goddard Space Flight Center, we have constructed a symmetric Mach-Zehnder nulling testbed to demonstrate techniques and algorithms that can be used to establish and maintain the 10(exp 4) null depth that will be required for such a mission. Among the challenges inherent in such a system is the ability to acquire and track the null fringe to the desired depth for timescales on the order of hours in a laboratory environment. In addition, it is desirable to achieve this stability without using conventional dithering techniques. We describe recent testbed metrology and control system developments necessary to achieve these goals and present our preliminary results.

Frey, B. J.↗

An Update of the Ground Testing of the Li-ion Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration (>9 months), both Rovers are equipped with rechargeable Lithium-ion batteries, which have enabled operation for over 854 and 834 Sols of operation, respectively, to date. Given that the batteries were required to support the mission for 90 Sols of operation by design, it is significant that the batteries have demonstrated over a nine fold increase in life over mission objectives. In addition to supporting the surface operations in conjunction with a triple-junction deployable solar arrays, the batteries were designed to aid in the launch and the EDL pyros, and allow for anomalies during cruise. In summary, the requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20 C to +30 C), withstand long storage periods (e.g., cruise period), operate in an inverted orientation, and support high current pulses (e.g., firing pyro events). In order to determine the viability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit (RBAU), consisting of two 8-cell 10 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The testing includes, (a) performing initial characterization tests (discharge capacity at different temperatures), (b) simulating the launch conditions, (c) simulating the cruise phase conditions (including trajectory correction maneuvers), (d) simulating the entry, decent, and landing (EDL) pulse load profile (required to support the pyros) (e) simulating the Mars surface operation mission simulation conditions, as well as, (f) assessing capacity loss and impedance characteristics as a function of temperature and life. This paper provides further detail to previously reported results1 of the RBAU testing program, especially with regard to the life characteristics. To date, the lithium-ion batteries (fabricated by Lithion/Yardney, Inc.) have been demonstrated to far exceed the requirements defined by the mission, both on Mars and on the ground, and are projected to support an extended mission (> 4 years).

Mars Exploration Rovers (MER) Mission↗

The MER Mossbauer Spectrometers: 40 Months of Operation on the Martian Surface

The primary MER objectives have been successfully completed. The total integration time of all MB measurements exceeds the duration of the primary 90-sols-mission for Spirit's MB spectrometer, and approaches this value for Opportunity's MB spectrometer. Both MB spectrometers continue to accumulate valuable scientific data after three years of operation (data is available for download [13]) The identification of aqueous minerals such as goethite in Gusev crater and jarosite at Meridiani Planum by the MER Mossbauer spectrometers is strong evidence for past water activity at the two landing sites.

Fleischer, Iris↗

Mars Exploration Rover Operations with the Science Activity Planner

The Science Activity Planner (SAP) is the primary science operations tool for the Mars Exploration Rover mission and NASA's Software of the Year for 2004. SAP utilizes a variety of visualization and planning capabilities to enable the mission operations team to direct the activities of the Spirit and Opportunity rovers. This paper outlines some of the challenging requirements that drove the design of SAP and discusses lessons learned from the development and use of SAP in mission operations.

ground systems↗

Qualification and Reliability for MEMS and IC Packages

Advanced IC electronic packages are moving toward miniaturization from two key different approaches, front and back-end processes, each with their own challenges. Successful use of more of the back-end process front-end, e.g. microelectromechanical systems (MEMS) Wafer Level Package (WLP), enable reducing size and cost. Use of direct flip chip die is the most efficient approach if and when the issues of know good die and board/assembly are resolved. Wafer level package solve the issue of known good die by enabling package test, but it has its own limitation, e.g., the I/O limitation, additional cost, and reliability. From the back-end approach, system-in-a-package (SIAP/SIP) development is a response to an increasing demand for package and die integration of different functions into one unit to reduce size and cost and improve functionality. MEMS add another challenging dimension to electronic packaging since they include moving mechanical elements. Conventional qualification and reliability need to be modified and expanded in most cases in order to detect new unknown failures. This paper will review four standards that already released or being developed that specifically address the issues on qualification and reliability of assembled packages. Exposures to thermal cycles, monotonic bend test, mechanical shock and drop are covered in these specifications. Finally, mechanical and thermal cycle qualification data generated for MEMS accelerometer will be presented. The MEMS was an element of an inertial measurement unit (IMU) qualified for NASA Mars Exploration Rovers (MERs), Spirit and Opportunity that successfully is currently roaring the Martian surface

inertial measurement unit↗

Mars Exploration Rover Cruise Orbit Determination

The Mars Exploration Rover project consisted of two missions (MER-A: spirit rover and MER-B: opportunity rover) that launched spacecraft on June 10, 2003, and July 8, 2003, respectively. The spacecraft arrived at Mars approximately seven months later on January 4, 2004, and January 24, 2004. These spacecraft needed to be precisely navigated to a Mars atmospheric entry flight path angle of -11.5 deg +/-0.12 deg (3(sigma)) for MER-A and +/-0.14 deg (3(sigma)) for MER-B in order to satisfy the landing site delivery requirements. The orbit determination task of the navigation team needed to accurately determine the trajectory of the spacecraft, predict the trajectory to Mars atmospheric entry, and account for all possible errors sources so that the each spacecraft could be correctly targeted using five trajectory corrections along the way. This paper describes the orbit determination analysis which allowed MER-A to be targeted using only four trajectory correction maneuvers to an entry flight path angle of -11.49 deg +/-O.010 deg (3(sigma)) and MER-B to be targeted using only three trajectory correction maneuvers to an entry flight path angle of -11.47 +/-0.021 deg(3(sigma)).

navigation↗

2006 NASA Strategic Plan

On January 14, 2004, President George W. Bush announced A Renewed Spirit of Discovery: The President's Vision for U.S. Space Exploration, a new directive for the Nation's space program. The fundamental goal of this directive is "to advance U.S. scientific, security, and economic interests through a robust space exploration program." In issuing it, the President committed the Nation to a journey of exploring the solar system and beyond: returning to the Moon in the next decade, then venturing further into the solar system, ultimately sending humans to Mars and beyond. He challenged NASA to establish new and innovative programs to enhance understanding of the planets, to ask new questions, and to answer questions that are as old as humankind. NASA enthusiastically embraced the challenge of extending a human presence throughout the solar system as the Agency's Vision, and in the NASA Authorization Act of 2005, Congress endorsed the Vision for Space Exploration and provided additional guidance for implementation. NASA is committed to achieving this Vision and to making all changes necessary to ensure success and a smooth transition. These changes will include increasing internal collaboration, leveraging personnel and facilities, developing strong, healthy NASA Centers,a nd fostering a safe environment of respect and open communication for employees at all levels. NASA also will ensure clear accountability and solid program management and reporting practices. Over the next 10 years, NASA will focus on six Strategic Goals to move forward in achieving the Vision for Space Exploration. Each of the six Strategic Goals is clearly defined and supported by multi-year outcomes that will enhance NASA's ability to measure and report Agency accomplishments in this quest.

Source record↗

Navigation and EDL for the Mars Exploration Rovers

A viewgraph presentation on Deep Space Navigation, and Entry, Decent, and Landing (EDL) for Mars Exploration Rovers is shown. The contents include: 1) JPL Spacecraft Operating across the Solar System; 2) 2003 - 2004: The Busiest Period in JPL's History; 3) Deep Space Navigation Will Enable Many of the New NASA Missions; 4) What Exactly is Navigation vs. GNC for Deep Space?; 5) Cruise and Approach: Why is Deep Space Navigation So Difficult?; 6) Project Importance of GNC: Landing Site Selection; 7) Planetary Communications and Tracking; 8) Tracking Data Types; 9) Delta Differential One-Way Range (deltaDOR); 10) All Solutions Leading up to TCM-4 Design; 11) Entry Flight Path Sensitivities; 12) MER Navigation Results; 13) Atmospheric Entry Targeting and Delivery; 14) Landing Ellipse Orientation; 15) MER Landing Site Trade Example; 16) Entry, Descent and Landing: Entry Guidance or What Things Do We NOT do for MER Landings (but we will later...); 17) Entering Martian Space 8:29 p.m. PST (ERT); 18) Entry, Descent and Landing; 19) Entry, Descent and Landing: Terminal Guidance; 20) The Challenge Going from 12,000 mph to Zero in Less Than Six Minutes; 21) Spirit Landing Location; 22) Entry, Descent and Landing: The Future; 23) Powered Descent Time-Line; and 24) Updated Sky Crane Maneuver Description. A short summary is also given on planetary guidance, navigation and control as it pertains to EDL systems

Mars Exploration Rover (MER)↗

A Strategy to Integrate Probabilistic Risk Assessment into Design and Development Processes for Aerospace Based pon Mars Exploration Rover Experiences

This paper will discuss the Probabilistic Risk Assessment (PRA) effort and its involvement with related activities during the development of the Mars Exploration Rover (MER). The Rovers were launched 2003.June.10 (Spirit) and 2003.July.7 (Opportunity), and both have proven very successful. Although designed for a 90-day mission, the Rovers have been operating for over two earth years. This paper will review aspects of how the MER project integrated PRA into the design and development process. A companion paper (Development of the Mars Exploration Rover PRA) will describe the MER PRA and design changes from those results.

Probabilistic Risk Assessment (PRA)↗

A Return to Innovative Engineering Design, Critical Thinking and Systems Engineering

I believe we are facing a critical time where innovative engineering design is of paramount importance to the success of our aerospace industry. However, the very qualities and attributes necessary for enhancing, educating, and mentoring a creative spirit are in decline in important areas. The importance of creativity and innovation in this country was emphasized by a special edition of the Harvard Business Review OnPoint entitled: "The Creative Company" which compiled a series of past and present articles on the subject of creativity and innovation and stressed its importance to our national economy. There is also a recognition of a lack of engineering, critical thinking and problem-solving skills in our education systems and a trend toward trying to enhance those skills by developing K-12 educational programs such as Project Lead the Way, "Science for All Americans", Benchmarks 2061 , etc. In addition, with respect to spacecraft development, we have a growing need for young to mid-level engineers with appropriate experience and skills in spacecraft design, development, analysis, testing, and systems engineering. As the Director of Engineering at NASA's Johnson Space Center, I realized that sustaining engineering support of an operational human spacecraft such as the Space Shuttle is decidedly different than engineering design and development skills necessary for designing a new spacecraft such as the Crew Exploration Vehicle of the Constellation Program. We learned a very important lesson post Columbia in that the Space Shuttle is truly an experimental and not an operational vehicle and the strict adherence to developed rules and processes and chains of command of an inherently bureaucratic organizational structure will not protect us from a host of known unknowns let alone unknown unknowns. There are no strict rules, processes, or procedures for understanding anomalous results of an experiment, anomalies with an experimental spacecraft like Shuttle, or in the conceptual design of a spacecraft. Engineering design is as much an art as it is a science. The critical thinking skills necessary to uncover lurking problems in an experimental design and creatively develop solutions are some of the same skills necessary to design a new spacecraft. Thus, I believe engineers unfamiliar with or removed from design and development need time to transition and develop the required skill set to be effective spacecraft designers. I believe the creative process necessary in design can be enhanced and even taught as early as grades K-12 and should continue to be nurtured and developed at the university level and beyond. I am going to present a strategy for developing learning teams to address complex multidisciplinary problems and to creatively develop solutions to those problems rapidly at minimal cost. I will frame a real problem, the development of on-orbit thermal protection system repair of the Space Shuttle, and step through the series of skills necessary to enhance the creative process. The case study I will illustrate is based on a real project, the R&D Reinforced Carbon-Carbon (RCC) Repair Team's development of on-orbit repair concepts for damaged Space Shuttle RCC nose cap and/or leading edges.

Camarda, Charles J.↗

Convert Ten Foot Environmental Test Chamber into an Ion Engine Test Chamber

The 10 Foot Space Simulator at the Jet Propulsion Laboratory has been used for the last 40 years to test numerous spacecraft, including the Ranger series, several Mariner class, among many others and finally, the Spirit and Opportunity Mars Rovers. The request was made to convert this facility to an Ion Engine test facility, with a possible long term life test. The Ion engine was to propel the Prometheus spacecraft to Jupiter's moons. This paper discusses the challenges that were met, both from a procedural and physical standpoint. The converted facility must operate unattended, support a 30 Kw Ion Engine, operate economically, and be easily converted back to former operation as a spacecraft test facility.

ion engines↗

The Mars Exploration Rover Instrument Positioning System

During Mars Exploration Rover (MER) surface operations, the scientific data gathered by the in situ instrument suite has been invaluable with respect to the discovery of a significant water history at Meridiani Planum and the hint of water processes at work in Gusev Crater. Specifically, the ability to perform precision manipulation from a mobile platform (i.e., mobile manipulation) has been a critical part of the successful operation of Spirit and Opportunity rovers. As such, this paper describes the MER Instrument Positioning System that allows the in situ instruments to operate and collect their important science data using a robust, dexterous robotic arm combined with visual target selection and autonomous software functions.

in situ instruments↗