Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk analysis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

WISP: Watching grid Infrastructure Stealthily through Proxies (Final Technical Report)

The complex interdependencies of cyber systems (sensors and communications), physical grids and associated electricity market operations make protecting electric power grids a significant challenge. The energy sector is constantly under new, targeted, advanced and dangerous cyber-attacks that have the potential to result in the loss of human life. These threats are further exacerbated by our need to modernize the grid. One focus of cyber security research in smart grids is the securing of the SCADA system through advanced intrusion detection systems (IDS) and bad data detection algorithms in state estimation. These methods either require full knowledge of the system topology and parameters or fail to understand the physical behaviors under attack. WISP (Watching grid Infrastructure Stealthily through Proxies) is designed to provide additional protection to the power grid using only publicly available data. In particular, WISP exploits the spatio-temporal nature of the real time locational marginal prices (LMPs), in conjunction with other information such as bids, weather, outages and load data to analyze anomalous power pricing behaviors and then correlate those observations to localize regions of interest and identify potential cyber events. WISP is non-intrusive as the tool is deployed as a service in the Cloud or on premise and provides reliable information to system operators for enhanced situational awareness, without impeding energy delivery functions. The WISP technology comprises three modules: the data-driven anomaly detection core, the vulnerability and risk analysis and the root cause analysis. The data-driven anomaly detection core performs the tasks of feature selection, anomaly detection and attack region localization. The vulnerability and risk analysis module provides system level information of the vulnerable variables and times, assisting the operators in selecting monitoring and protection nodes. The root cause analysis module takes the detection results and identifies potential operational conditions that contribute to the detected anomalies. In Phase I, we have demonstrated the feasibility and effectiveness of WISP. We developed a realistic electricity market simulator capable of generating normal and attack market data under various operational conditions. We developed a series of cyber-attack detection and analysis algorithms and evaluated them under multiple data sources. Finally, we integrated all modules into an end-to-end software, providing functions for data management, data analytics and visualization. Specifically, we have achieved: (i) real-time data acceptance from external utility interfaces with >99% acceptance rate; (ii) high performance anomaly detection algorithms with >98% detection accuracy and <0.1% false alarm rate; and (iii) ultra-low computing delay <50 milliseconds. Additionally, our team developed algorithms to identify the vulnerable variables in electricity market operations and root cause analysis functions to identify major contributors to the price spikes. These ancillary modules are necessary when deploying WISP in real world industry environment. In Phase II, we have demonstrated the effectiveness of WISP software on realistic largescale power systems. We performed red team testing for the Phase I WISP software and identified software vulnerabilities and implemented corresponding mitigation solutions. We adapted the electricity market simulator for the Texas synthetic 2000-bus system and generated datasets for the false data injection attacks. We created database and visualization interfaces for the Texas system and the ISO New England system. We performed software optimization in terms of operation efficiency, computing speed and detection accuracy. Finally, we tested the software on the Texas system and the ISO New England system and evaluated the detection performance. Overall, we achieved above 89% detection rate, below 3% false alarm rate and below 37 seconds of end-to-end detection delay.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Risk Management for CO 2 Storage Projects

Conference poster presented at American Association of Petroleum Geologists (AAPG) Carbon Capture, Utilization, and Storage (CCUS) Conference, Houston, Texas, April 25–27, 2023. There is no one-size-fits-all risk management approach for storage projects. Instead, risk management is about having a detailed process in place, adhering to that process throughout the project life cycle, and adapting the process depending on site-specific conditions, applicable regulatory requirements, and any additional requirements imposed by pursuing one or more financial incentive programs. The Plains CO 2 Reduction (PCOR) Partnership Initiative experience has demonstrated the value of managing risk analysis in concert with storage project regulatory permit requirements, which drive the geologic exhibits and site characterization needs for the permit and the risk analysis.

01 COAL, LIGNITE, AND PEAT↗

Valuing Rigor in the Risk Management Process

NASA, as an organization, takes risk management (RM) seriously, and for most projects, the risk management process is exemplar. There can be challenges, though, with defining RM processes. For example, many different risk analysis methodologies are available, they can be applied with varying degrees of rigor, and they can have different value depending on how projects use them. In particular, risk analysis methodologies vary considerably in the level of quantitative detail, with more probabilistic techniques encouraged in some situations. We discussed these processes and methodologies with ten project managers (PM) at the NASA Goddard Space Flight Center (GSFC). Our intent was not to prove with some level of statistical significance that some are more helpful than others, but rather to obtain a general understanding of how projects are identifying, and thinking, about risks. This paper describes some of the available risk processes and methodologies, and provides some insights about the benefits that can gained from their use. We provide an in-depth discussion of one quantitative methodology, Probabilistic Risk Assessments (PRAs), and conclude with a few insights from observed best practices.

Dillon, Robin L.↗

Risk Assessment at the Edge: Applying NERC CIP to Aggregated Grid-Edge Resources

Distributed energy resources (DERs) promise to deliver benefits for both utilities and consumers by dynamically interoperating utility systems with customer-owned grid-edge technologies. These small energy-consuming devices are increasingly being aggregated for participation in grid markets, planning and operations. A cyber attack penetrating the control system of aggregated DERs could negatively impact the operation of the grid. In the worst case, the power grid could be severely damaged and physical safety compromised. In this paper we analyze cybersecurity risks associated with the aggregation of DERs and develop an approach to mitigating that risk. The approaches to both cyber risk analysis and mitigation were developed during a recent research project that serves as an example of how the approaches could be applied. However, both the risk analysis and mitigation are applicable to the broader domain of all DERs. An important conclusion is that the successful cyber compromise of aggregated DERs could have a significant impact on the bulk power system. This is the case even if each individual DER falls below the threshold of compliance with bulk-grid cybersecurity standards. For this reason, we specifically investigate how National Electricity Reliability Corporation's Critical Infrastructure Protection requirements could flow down to interactions between DER aggregators and the DERs themselves in order to protect the grid from these bulk-scale cyber attack impacts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CCSI Risk Estimation: An Application of Expert Elicitation

The Carbon Capture Simulation Initiative (CCSI) is a multi-laboratory simulation-driven effort to develop carbon capture technologies with the goal of accelerating commercialization and adoption in the near future. One of the key CCSI technical challenges is representing and quantifying the inherent uncertainty and risks associated with developing, testing, and deploying the technology in simulated and real operational settings. To address this challenge, the CCSI Element 7 team developed a holistic risk analysis and decision-making framework. The purpose of this report is to document the CCSI Element 7 structured systematic expert elicitation to identify additional risk factors. We review the significance of and established approaches to expert elicitation, describe the CCSI risk elicitation plan and implementation strategies, and conclude by discussing the next steps and highlighting the contribution of risk elicitation toward the achievement of the overarching CCSI objectives.

CCSI↗

Environmental Regulations as Drivers of Materials Obsolescence

This slide presentation reviews the operations of the Principal Center for Regulatory Risk Analysis and Communication (RRAC-PC) and the impact of environmental regulations in making some materials obsolete. The center is NASA's resource for identifying and managing risks associated with changing environmental regulations. To this end the center acts as an regulatory early warning system, to review track and analyze emerging regulations, collaborate with the technical community on regulatory risk analysis and interpretation and to represent NASA's interests to the regulatory agencies. Regulations frequently result in making some materials unavailable forcing a change to another material. Processes may also be changed due to environmental regulations. For example some items that were sprayed with a chemical may now have to be painted or dipped with the chemical. Sometimes a regulation changes the use of a certain product, which does not affect the usage on Earth, but has significant implications in space. An example of this is the use of lead-free solders of basically tin, which don't appear to have any problem on Earth, but in space applications tin whiskers have resulted in several confirmed satellite failures.

Scroggins, Sharon↗

TH-EF-BRC-00: TG-100 Workshop

This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 different clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.

60 APPLIED LIFE SCIENCES↗

TH-EF-BRC-02: FMEA

This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 different clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.

60 APPLIED LIFE SCIENCES↗

TH-EF-BRC-01: Process Mapping

This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 different clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.

60 APPLIED LIFE SCIENCES↗

TH-EF-BRC-04: Quality Management Program

This Hands-on Workshop will be focused on providing participants with experience with the principal tools of TG 100 and hence start to build both competence and confidence in the use of risk-based quality management techniques. The three principal tools forming the basis of TG 100’s risk analysis: Process mapping, Failure-Modes and Effects Analysis and fault-tree analysis will be introduced with a 5 minute refresher presentation and each presentation will be followed by a 30 minute small group exercise. An exercise on developing QM from the risk analysis follows. During the exercise periods, participants will apply the principles in 2 different clinical scenarios. At the conclusion of each exercise there will be ample time for participants to discuss with each other and the faculty their experience and any challenges encountered. Learning Objectives: To review the principles of Process Mapping, Failure Modes and Effects Analysis and Fault Tree Analysis. To gain familiarity with these three techniques in a small group setting. To share and discuss experiences with the three techniques with faculty and participants. Director, TreatSafely, LLC. Director, Center for the Assessment of Radiological Sciences. Occasional Consultant to the IAEA and Varian.

60 APPLIED LIFE SCIENCES↗

Prospective Coronary Heart Disease Screening in Asymptomatic Hodgkin Lymphoma Patients Using Coronary Computed Tomography Angiography: Results and Risk Factor Analysis

Purpose: To prospectively investigate the coronary artery status using coronary CT angiography (CCTA) in patients with Hodgkin lymphoma treated with combined modalities and mediastinal irradiation. Methods and Materials: All consecutive asymptomatic patients with Hodgkin lymphoma entered the study during follow-up, from August 2007 to May 2012. Coronary CT angiography was performed, and risk factors were recorded along with leukocyte telomere length (LTL) measurements. Results: One hundred seventy-nine patients entered the 5-year study. The median follow-up was 11.6 years (range, 2.1-40.2 years), and the median interval between treatment and the CCTA was 9.5 years (range, 0.5-40 years). Coronary artery abnormalities were demonstrated in 46 patients (26%). Coronary CT angiography abnormalities were detected in nearly 15% of the patients within the first 5 years after treatment. A significant increase (34%) occurred 10 years after treatment (P=.05). Stenoses were mostly nonostial. Severe stenoses were observed in 12 (6.7%) of the patients, entailing surgery with either angioplasty with stent placement or bypass grafting in 10 of them (5.5%). A multivariate analysis demonstrated that age at treatment, hypertension, and hypercholesterolemia, as well as radiation dose to the coronary artery origins, were prognostic factors. In the group of patients with LTL measurements, hypertension and LTL were the only independent risk factors. Conclusions: The findings suggest that CCTA can identify asymptomatic individuals at risk of acute coronary artery disease who might require either preventive or curative measures. Conventional risk factors and the radiation dose to coronary artery origins were independent prognostic factors. The prognostic value of LTL needs further investigation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Integrated Fire Probabilistic Risk Assessment (PRA) Modeling in Support of Operational Efficiency (Final Report)

To improve the realism of Fire PRA associated with fire progression and damage modeling or manual suppression, previous research by the Socio-Technical Risk Analysis (SoTeRiA) Research Laboratory at the University of Illinois at Urbana-Champaign focused on the development of an Integrated PRA (I-PRA) methodological framework for fire risk analysis in NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

IV and V Issues in Achieving High Reliability and Safety in Critical Control System Software

Risk analysis and integrated verification and validation are two important elements in a plan for ensuring the safety of critical software systems. We describe an approach we are currently developing for integrating risk analysis, and metrics analysis, and propose a fault predictor that would integrate the results of these activities. Practical difficulties associated with our approach are also discussed, as are limitations of the proposed predictor. We conclude with a discussion of what as been learned to date, and with suggestions for future work.

validation software reliability software risk asse↗

Risk and Performance Analyses Supporting Closure of WMA C at the Hanford Site in Southeast Washington

The Office of River Protection under the U.S. Department of Energy (DOE) is pursuing closure of the Single-Shell Tank (SST) Waste Management Area (WMA) C as stipulated by the Hanford Federal Facility Agreement and Consent Order (HFFACO) under federal requirements and work tasks will be done under the State-approved closure plans and permits. An initial step in meeting the regulatory requirements is to develop a baseline risk assessment representing current conditions based on available characterization data and information collected at the WMA C location. The baseline risk assessment will be supporting a Resource Conservation and Recovery Act of 1976 (RCRA) Field Investigation (RFI)/Corrective Measures Study (CMS) for WMA closure and RCRA corrective action. Complying with the HFFACO conditions also involves developing a long-term closure Performance Assessment (PA) that evaluates human health and environmental impacts resulting from radionuclide inventories in residual wastes remaining in WMA C tanks and ancillary equipment. This PA is being developed to meet the requirements necessary for closure authorization under DOE Order 435.1 and Washington State Hazardous Waste Management Act. To meet the HFFACO conditions, the long-term closure risk analysis will include an evaluation of human health and environmental impacts from hazardous chemical inventories along with other performance Comprehensive Environmental Response, Compensation, and Liability Act Appropriate and Applicable Requirements (CERCLA ARARs) in residual wastes left in WMA C facilities after retrieval and removal. This closure risk analysis is needed to needed to comply with the requirements for permitted closure. Progress to date in developing a baseline risk assessment of WMA C has involved aspects of an evaluation of soil characterization and groundwater monitoring data collected as a part of the RFI/CMS and RCRA monitoring. Developing the long-term performance assessment aspects has involved the construction of detailed numerical models of WMA C using the Subsurface Transport Over Multiple Phases (STOMP©) computer code, the development of a technical approach for abstraction of a range of representative STOMP© simulations into a system-level model based on the GoldSim© system-level model software.The STOMP©-based models will be used to evaluate local-scale impacts and closed facility performance over a sufficient range of simulations to allow for development of the system-level model of the WMA C. The GoldSim©-based system-level model will be used to evaluate overall sensitivity of modeled parameters and the estimate the uncertainty in potential future impacts from a closed WMA C facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating FRI3D for Cost Savings in Fire Hazard Analysis at DOE Sites

A fire hazard analysis, required for many U.S. Department of Energy (DOE) facilities, is a complex, cumbersome, and costly process. Fire hazard analyses may be viewed as a checkbox, but ideally and in spirit with the DOE-STD-1066, the fire hazard analysis (FHA) should be a part of the workflow and used to help in modifications, maintenance, and improving operational safety. With current FHA development processes, it is both time and cost prohibitive for true integration. A tool called Fire Risk Investigation in 3D or FRI3D was developed under the DOE Light Water Reactor Sustainability program to simplify and automate many aspects of a fire probabilistic risk analysis for existing nuclear power plants. The FRI3D tool automates fire scenarios by combining approved fire simulation codes, U.S. Nuclear Regulatory Commission fire calculations methods, 3D modeling and visualization, and probabilistic risk analysis models into a single workflow supported with a user interface. FRI3D was initially designed for used in combination with a PRA, this case study, evaluated using FRI3D for a plant modification, determined the benefits that detailed fire modeling can have for U.S. Department of Energy facilities with or without a PRA model. It also looked at what tasks from DOE requirements could be reduced using the tool and what is needed to integrate fire hazard analysis into site workflow.

97 - MATHEMATICS AND COMPUTING↗

Failure mode and effects analysis based risk profile assessment for stereotactic radiosurgery programs at three cancer centers in Brazil

Purpose: The goal of this study was to evaluate the safety and quality management program for stereotactic radiosurgery (SRS) treatment processes at three radiotherapy centers in Brazil by using three industrial engineering tools (1) process mapping, (2) failure modes and effects analysis (FMEA), and (3) fault tree analysis. Methods: The recommendations of Task Group 100 of American Association of Physicists in Medicine were followed to apply the three tools described above to create a process tree for SRS procedure for each radiotherapy center and then FMEA was performed. Failure modes were identified for all process steps and values of risk priority number (RPN) were calculated from O, S, and D (RPN = O × S × D) values assigned by a professional team responsible for patient care. Results: The subprocess treatment planning was presented with the highest number of failure modes for all centers. The total number of failure modes were 135, 104, and 131 for centers I, II, and III, respectively. The highest RPN value for each center is as follows: center I (204), center II (372), and center III (370). Failure modes with RPN ≥ 100: center I (22), center II (115), and center III (110). Failure modes characterized by S ≥ 7, represented 68% of the failure modes for center III, 62% for center II, and 45% for center I. Failure modes with RPNs values ≥100 and S ≥ 7, D ≥ 5, and O ≥ 5 were considered as high priority in this study. Conclusions: The results of the present study show that the safety risk profiles for the same stereotactic radiotherapy process are different at three radiotherapy centers in Brazil. Although this is the same treatment process, this present study showed that the risk priority is different and it will lead to implementation of different safety interventions among the centers. Therefore, the current practice of applying universal device-centric QA is not adequate to address all possible failures in clinical processes at different radiotherapy centers. Integrated approaches to device-centric and process specific quality management program specific to each radiotherapy center are the key to a safe quality management program.

61 RADIATION PROTECTION AND DOSIMETRY↗

Risk Assessment of Hydrogen Fuel Cell Electric Vehicles in Tunnels

The need to understand the risks and implications of traffic incidents involving hydrogen fuel cell electric vehicles in tunnels is increasing in importance with higher numbers of these vehicles being deployed. A risk analysis was performed to capture potential scenarios that could occur in the event of a crash and provide a quantitative calculation for the probability of each scenario occurring, with a qualitative categorization of possible consequences. The risk analysis was structured using an event sequence diagram with probability distributions on each event in the tree and random sampling was used to estimate resulting probability distributions for each end-state scenario. Here, the most likely consequence of a crash is no additional hazard from the hydrogen fuel (98.1–99.9% probability) beyond the existing hazards in a vehicle crash, although some factors need additional data and study to validate. These scenarios include minor crashes with no release or ignition of hydrogen. When the hydrogen does ignite, it is most likely a jet flame from the pressure relief device release due to a hydrocarbon fire (0.03–1.8% probability). This work represents a detailed assessment of the state-of-knowledge of the likelihood associated with various vehicle crash scenarios. This is used in an event sequence framework with uncertainty propagation to estimate uncertainty around the probability of each scenario occurring.

33 ADVANCED PROPULSION SYSTEMS↗

Bayesian Analysis for Risk Assessment of Selected Medical Events in Support of the Integrated Medical Model Effort

The Exploration Medical Capability project is creating a catalog of risk assessments using the Integrated Medical Model (IMM). The IMM is a software-based system intended to assist mission planners in preparing for spaceflight missions by helping them to make informed decisions about medical preparations and supplies needed for combating and treating various medical events using Probabilistic Risk Assessment. The objective is to use statistical analyses to inform the IMM decision tool with estimated probabilities of medical events occurring during an exploration mission. Because data regarding astronaut health are limited, Bayesian statistical analysis is used. Bayesian inference combines prior knowledge, such as data from the general U.S. population, the U.S. Submarine Force, or the analog astronaut population located at the NASA Johnson Space Center, with observed data for the medical condition of interest. The posterior results reflect the best evidence for specific medical events occurring in flight. Bayes theorem provides a formal mechanism for combining available observed data with data from similar studies to support the quantification process. The IMM team performed Bayesian updates on the following medical events: angina, appendicitis, atrial fibrillation, atrial flutter, dental abscess, dental caries, dental periodontal disease, gallstone disease, herpes zoster, renal stones, seizure, and stroke.

Gilkey, Kelly M.↗