Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Review”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

Juvenile Salmon and Their Habitats in the Columbia River Estuary: A Review and Synthesis of Knowledge Development 2000–2025

[This is a 90% discussion draft.] This is the third Synthesis Memorandum funded by the U.S. Army Corps of Engineers and developed for the Columbia Estuary Ecosystem Restoration Program (CEERP) on the topic of habitat restoration in the Columbia River Estuary (CRE) from Bonneville Dam to the river mouth. While the first two were developed by PNNL and NOAA without the benefit of stakeholder participation, for the current memo, two key activities were initiated: (1) review, by the Expert Regional Technical Group (ERTG), of status and trends monitoring and action effectiveness monitoring funded by CEERP, and (2) a workshop including representatives of the Bonneville Power Administration and the U.S. Army Corps of Engineers (the action agencies [AAs]), the National Oceanic and Atmospheric Administration (NOAA), major research agencies contributing to CEERP, and sponsors who implement CEERP restoration actions. A systematic literature review was conducted using ClarivateTM Web of ScienceTM database. The topics of interest for CRE relevant research included salmon ecology, physical processes, and wetland habitats, and therefore required the use of broad search terms. Our final search criteria included a combination of Boolean operators and an approach to combine different sets of search terms. The final search result yielded 669 records. The records were classified by groups and assigned to the relevant disciplinary expert for review. The review identified substantive advances in understanding the provision of salmon habitat functions through spatiotemporally dynamic physical and ecological processes, and the use of CRE habitats by numerous stocks of juvenile salmon. It also uncovered heretofore unincorporated historical documentation of riparian habitats across the CRE. The characterization of the structural components of floodplain habitat including plant associations and channel networks has advanced considerably, together with the understanding of seasonal changes and long-term trends. The relative influence of salmon-habitat location in the CRE as compared with temporal factors, mainly season, has been well described, which affects the prioritization of restoration. Stressors on the ecosystem and fish, and the drivers of these stressors, have been more carefully elucidated and predictive models are in various stages of development. The vision, aims, and design of restoration projects have advanced together with methods of data collection, analysis, and modeling that have seen substantial improvements. Experiments intended to inform the design of restoration projects are underway or have been completed. An important outstanding area of research that has lagged behind the advances in fundamental understanding of the ecosystem and salmon habitat functions remains the peer-reviewed documentation of the outcomes of restoration for both habitats and fish functions.

estuary↗

Design review - A tool for all seasons.

The origins of design review are considered together with questions of definitions. The main characteristics which distinguish the concept of design review discussed from the basic master-apprentice relationship include competence, objectivity, formality, and a systematic approach. Preliminary, major, and final reviews are the steps used in the management of the design and development process in each company. It is shown that the design review is generically a systems engineering milestone review with certain unique characteristics.

Liberman, D. S.↗

Apollo experience report the command and service module milestone review process

The sequence of the command and service module milestone review process is given, and the Customer Acceptance Readiness Review and Flight Readiness Review plans are presented. Contents of the System Summary Acceptance Documents for the two formal spacecraft reviews are detailed, and supplemental data required for presentation to the review boards are listed. Typical forms, correspondence, supporting documentation, and minutes of a board meeting are included.

Brendle, H. L.↗

Photovoltaic system criteria documents. Volume 4: Review criteria for photovoltaic applications

Guidelines are provided for the organization, preparation and conduct of program reviews for photovoltaic applications. These criteria apply to all photovoltaic applications. They include, but are not limited to, the following: (1) Conceptual design review; (2) Preliminary design review; (3) Critical design review; and (4) Operational readiness review. Contract goal's and objectives are met through program monitoring for cost, schedule, and performance for both managerial and technical elements for all PV applications activities.

Koenig, John C.↗

Space biology initiative program definition review. Trade study 5: Modification of existing hardware (COTS) versus new hardware build cost analysis

The JSC Life Sciences Project Division has been directly supporting NASA Headquarters, Life Sciences Division, in the preparation of data from JSC and ARC to assist in defining the Space Biology Initiative (SBI). GE Government Services and Horizon Aerospace have provided contract support for the development and integration of review data, reports, presentations, and detailed supporting data. An SBI Definition (Non-Advocate) Review at NASA Headquarters, Code B, has been scheduled for the June-July 1989 time period. In a previous NASA Headquarters review, NASA determined that additional supporting data would be beneficial to determine the potential advantages in modifying commercial off-the-shelf (COTS) hardware for some SBI hardware items. In order to meet the demands of program implementation planning with the definition review in late spring of 1989, the definition trade study analysis must be adjusted in scope and schedule to be complete for the SBI Definition (Non-Advocate) Review. The relative costs of modifying existing commercial off-the-shelf (COTS) hardware is compared to fabricating new hardware. An historical basis for new build versus modifying COTS to meet current NMI specifications for manned space flight hardware is surveyed and identified. Selected SBI hardware are identified as potential candidates for off-the-shelf modification and statistical estimates on the relative cost of modifying COTS versus new build are provided.

Jackson, L. Neal↗

Aircraft digital flight control technical review

The Aircraft Digital Flight Control Technical Review was initiated by two pilot induced oscillation (PIO) incidents in the spring and summer of 1992. Maj. Gen. Franklin (PEO) wondered why the Air Force development process for digital flight control systems was not preventing PIO problems. Consequently, a technical review team was formed to examine the development process and determine why PIO problems continued to occur. The team was also to identify the 'best practices' used in the various programs. The charter of the team was to focus on the PIO problem, assess the current development process, and document the 'best practices.' The team reviewed all major USAF aircraft programs with digital flight controls, specifically, the F-15E, F-16C/D, F-22, F-111, C-17, and B-2. The team interviewed contractor, System Program Office (SPO), and Combined Test Force (CTF) personnel on these programs. The team also went to NAS Patuxent River to interview USN personnel about the F/A-18 program. The team also reviewed experimental USAF and NASA systems with digital flight control systems: X-29, X-31, F-15 STOL and Maneuver Technology Demonstrator (SMTD), and the Variable In-Flight Stability Test Aircraft (VISTA). The team also discussed the problem with other experts in the field including Ralph Smith and personnel from Calspan. The major conclusions and recommendations from the review are presented.

Davenport, Otha B.↗

Report of Apollo 204 Review Board to the Administrator, National Aeronautics and Space Administration : Schedule of Physical Evidence - Appendix F

Immediately following the Apollo 204 accident of January 27, 1961. all associated equipment and material were impounded. Release of this equipment and material for normal use was under the close control of the Apollo 204 Review Board. Apollo Review Board Administrative Procedure No. 11, February 11, 1961, established the Apollo 204 Review Board Material Release Record (MRR). This MRR was the official form used to release material from full impoundment and was valid only after being approved by the Board and signed by a Member. The form was used as the authority to place any impounded item into one of the three Categories defined in Administrative Procedure No. 11. This appendix contains all of the authorized MRR's. Each item submitted on an MRR was given a control number; a description, including the part number and serial number; the relevance and location to the accident; any constraints before release; and the control category. The categories placed on the equipment were as follows: Category A - Items which may have a significant influence or bearing on the results or findings of the Apollo 204 Review Board; Category B - All material other than Category A which is considered relevant to the Apollo 204 Review Board investigation; Category C - Material released from Board jurisdiction. Several classes of equipment were released by special Board action prior to the establishment of the MRR system. The operating procedure for release of these classes is Enclosure F-l to this appendix.

Source record↗

Protecting Astronaut Medical Privacy: Review of Presentations and Publications for Attributability

Retrospective research and medical data collected on astronauts can be a valuable resource for researchers. This data can be requested from two separate NASA Archives. The Lifetime Surveillance of Astronaut Health (LSAH) holds astronaut medical data, and the Life Sciences Data Archive (LSDA) holds research data. One condition of use of astronaut research and medical data is the requirement that all abstracts, publications and presentations using this data must be reviewed for attributability. All final versions of abstracts, presentations, posters, and manuscripts must be reviewed by LSDA/LSAH prior to submission to a conference, journal, or other entities outside the Principal Investigator (PI) laboratory [including the NASA Export Control Document Availability Authorization (DAA) system]. If material undergoes multiple revisions (e.g., journal editor comments), the new versions must also be reviewed by LSDA/LSAH prior to re-submission to the journal. The purpose of this review is to ensure that no personally identifiable information (PII) is included in materials that are presented in a public venue or posted to the public domain. The procedures for submitting materials for review will be outlined. The process that LSAH/LSDA follows for assessing attributability will be presented. Characteristics and parameter combinations that often prompt attributability concerns will be identified. A published case report for a National Football League (NFL) player will be used to demonstrate how, in a population of public interest, a combination of information can result in inadvertent release of private or sensitive information.

Wear, M. L.↗

Experimental and Semiclassical Stark Widths and Shifts for Spectral Lines of Neutral and Ionized Atoms (A Critical Review of Experimental and Semiclassical Data for the Period 2008 through 2020)

This Review Article compares new experimental and corresponding semiclassical Stark broadened data for non-hydrogenic spectral lines of neutral atoms and positive ions. This Review covers the period 2008 until the end of 2020 and presents the continuation of previous critical reviews from 1976 (two), 1984 (two), 1990, 2002, and one from 2009. This Review reports the Stark broadening parameters of 1665 spectral lines belonging to 35 elements with 61 different atomic and ion species. The data are taken from 60 papers. Experimental data are arranged by elements and spectra, and these are reported in tables in alphabetical and numerical order, respectively. Each experimental Stark broadening parameter is followed with estimated accuracy. The experimental Stark broadening and shift data presented in the tables are compared with the corresponding semiclassical results available in the literature. In addition, for comparison experiments versus semiclassical theoretical Stark broadening parameters, a numerically improved theoretical approach developed based on Griem and co-workers’ theory is used to evaluate Stark widths and shifts of all studied lines whenever required atomic energy levels data and transition probabilities are available. At the end of the text report, for each analyzed neutral or ion species, the information about the location of the same species data in preceding reviews is given.

Plasma line broadening↗

Hanford Double-Shell Tank Extent-of-Condition Construction Review

During routine visual inspections of Hanford double-shell waste tank 241-AY-102 (AY-102), anomalies were identified on the annulus floor which resulted in further evaluations. Following a formal leak assessment in October 2012, Washington River Protection Solutions, LLC (WRPS) determined that the primary tank of AY-102 was leaking. The formal leak assessment, documented in RPP-ASMT-53793,Tank 241-AY-102 Leak Assessment Report, identified first-of-a-kind construction difficulties and trial-and-error repairs as major contributing factors to tank failure. To determine if improvements in double-shell tank (DST) construction occurred after construction of tank AY-102, a detailed review and evaluation of historical construction records were performed for the first three DST tank farms constructed, which included tanks 241-AY-101, 241-AZ-101, 241-AZ-102, 241-SY-101, 241-SY-102, and 241-SY-103. The review for these six tanks involved research and review of dozens of boxes of historical project documentation. These reviews form a basis to better understand the current condition of the three oldest Hanford DST farms. They provide a basis for changes to the current tank inspection program and also provide valuable insight into future tank use decisions. If new tanks are constructed in the future, these reviews provide valuable "lessons-learned" information about expected difficulties as well as construction practices and techniques that are likely to be successful.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A qualitative assessment of current CCF guidance based on a review of safety system digital implementation changes with evolving technology - 148

This paper is a summary of a study performed in support of the US Nuclear Regulatory Commission (NRC) to evaluate current policy on software common-cause failure (CCF). The study reported in this paper is one of several that contributed to the technical basis to inform NRC staff. The study first reviewed policies and assessment guidance as discussed in the Staff Requirements Memorandum to the Secretary of the Commission, Office of the NRC (SECY) 93-087, Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light Water Reactor (ALWR) Designs, and Branch Technical Position (BTP) 7-19, Guidance on Evaluation of Defense-in-Depth and Diversity in Digital Computer-Based Instrumentation and Control Systems, as well as Chapter 7, 'Instrumentation and Controls', in NUREG-0800, Standard Review Plan for Review of Safety Analysis Reports for Nuclear Power Plants. The study then examined instrumentation and controls (I and C) technology implementations in nuclear power plants in the light of current CCF guidance. The intent was to assess whether the current position on CCF remains appropriate given the evolutions in digital safety system implementations and, if gaps in the guidance were found, to provide recommendations as to how these gaps could be closed. The methodology adopted was to review the vendors' technology and software implementation processes for digital safety systems as technology evolved. The following three representative safety systems were selected to provide illustrative examples: - Eagle 21 was selected to represent vintage microprocessor-based technology used from the 1980's to mid-1990's, - TELEPERM XS (TXS) was selected to represent second generation microprocessor-based technology used from the mid-1990's to the 2000's, and - The advanced logic system (ALS) was selected to represent the latest trend of using technology based on field programmable gate arrays (FPGAs). Technology implementations were reviewed in light of the basic premise of the NRC in BTP 7-19 (Revision 6), that software-based or software-logic-based digital system development errors are a credible source of CCF and therefore are susceptible to CCF because identical copies of the software-based logic and architecture are present in redundant divisions of safety-related systems. BTP 7-19 categorizes firmware and logic developed from software-based development systems all under software. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Review of Modeling Approaches for Predicting Frost Growth and Defrosting on Tube-Fin Heat Exchangers: Preprint

Frost formation and growth on the evaporator surface is a common process that deteriorates the air-refrigerant heat transfer and restricts airflow. This degrades the performance of the vapor compression system by increasing temperature lift and air-side pressure drop. To accurately predict these effects during coil frosting, as well as the energy use and duration of the defrost process, there is a need to estimate the heat and mass transfer, momentum transport, and solid-liquid and liquid-vapor phase change. Therefore, in the past few decades, continuous effort has been made to model frosting and defrosting processes using approaches ranging from empirical correlations to computational fluid dynamic models. To provide a clearer overview for researchers, engineers, and manufacturers in this field, this paper provides a comprehensive literature review for frosting and defrosting models. The paper begins with theoretical background of frost formation and defrost processes, and then reviews the common modeling approaches in literature and their underlying assumptions when trying to account for various physical phenomenon. Based on the literature review, the most critical modeling effort for frost formation is the determination of frost densification rate and frost growth rate. Various methods to predict these two parameters are reviewed. Empirical correlations commonly used for frost density and thermal conductivity are presented and compared. For the defrost process, various multi-stage models have been proposed with different assumptions. Some assume the presence of air gap between the tube wall and the frost, while others consider the melted frost flow due to gravity. We also review physics-based and empirical approaches to integrate defrost models into heat pump models. We conclude by identifying research gaps and providing recommendations.

defrost↗

2013 Building Technologies Office Program Peer Review Report

The 2013 Building Technologies Office Program Peer Review Report summarizes the results of the 2013 Building Technologies Office (BTO) peer review, which was held in Washington, D.C., on April 2–4, 2013. The review was attended by over 300 participants and included presentations on 59 BTO-funded projects: 29 from BTO’s Emerging Technologies Program, 20 from the Commercial Buildings Integration Program, 6 from the Residential Buildings Integration Program, and 4 from the Building Energy Codes Program. This report summarizes the scores and comments provided by the independent reviewers for each project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A review of stereotactic body radiotherapy – is volumetric modulated arc therapy the answer?

Stereotactic body radiotherapy (SBRT) is a high precision radiotherapy technique used for the treatment of small to moderate extra-cranial tumours. Early studies utilising SBRT have shown favourable outcomes. However, major disadvantages of static field SBRT include long treatment times and toxicity complications. Volumetric modulated arc therapy (VMAT) and intensity modulated radiotherapy (IMRT) may potentially mitigate these disadvantages. This review aims to assess the feasibility of emerging VMAT and IMRT-based SBRT treatment techniques and qualify which offers the best outcome for patients, whilst identifying any emerging and advantageous SBRT planning trends. A review and synthesis of data from current literature up to September 2013 was conducted on EMBASE, Medline, PubMed, Science Direct, Proquest central, Google Scholar and the Cochrane Database of Systematic reviews. Only full text papers comparing VMAT and or IMRT and or Static SBRT were included. Ten papers were identified that evaluated the results of VMAT/IMRT SBRT. Five related to medically inoperable stage 1 and 2 non-small-cell lung cancer (NSCLC), three to spinal metastasis, one related to abdominal lymph node malignancies, with the final one looking at pancreatic adenocarcinoma. Overall treatment times with VMAT were reduced by 66–70% for lung, 46–58% for spine, 42% and 21% for lymph node and pancreatic metastasis respectively, planning constraints were met with several studies showing improved organs at risk sparing with IMRT/VMAT to static SBRT. Both IMRT and VMAT were able to meet all planning constraints in the studies reviewed, with VMAT offering the greatest treatment efficiency. Early clinical outcomes with VMAT and IMRT SBRT have demonstrated excellent local control and favourable survival outcomes.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

A comprehensive review of solar only and hybrid solar driven multigeneration systems: Classifications, benefits, design and prospective

Depending on the application and demands, different products can be generated utilizing multigeneration systems. To drive such systems, solar energy can be used as a primary energy source or in hybridization with other renewable or nonrenewable energy sources. Solar driven multigeneration systems are appealing due to the broad availability of solar energy and related technologies. Here, the objective of this study is to review, categorize and discuss different configurations, benefits, potentials, challenges, future research directions and market perspectives of solar energy-driven multigeneration systems, comprehensively. This study also reviews how solar energy systems can be used to hybridize systems for multigeneration purposes. Regardless of using fossil fuel backup sources, these systems are classified as (1) solar only-driven and (2) hybrid solar-driven, in which solar energy is used together with other renewable sources. Reviewing the literature demonstrates numerous ways to build solar energy-driven multigeneration systems by coupling a variety of different cycles and devices. Such systems offer multiple benefits such as enhancing the efficiency, reducing capital and operating costs and carbon dioxide emission. Hybridizing solar with other renewable energies enables continuous operation and dispatchability management. This review shows that for configuration selection and design, different thermodynamics, economic and environmental aspects should be considered. To advance the solar driven multigeneration systems development, further multidisciplinary research on different aspects of such systems is necessary. Particularly, investigations should focus on building different prototypes and on conducting experimental assessments. Also, new incentives and long-term purchase agreements for the products must be established.

14 SOLAR ENERGY↗

A critical review of environmental assessment tools for sustainable urban design

Cities are responsible for the depletion of natural resources and agricultural lands, and 70% of global CO{sub 2} emissions. There are significant risks to cities from the impacts of climate change in addition to existing vulnerabilities, primarily because of rapid urbanization. Urban design and development are generally considered as the instrument to shape the future of the city and they determine the pattern of a city's resource usage and resilience to change, from climate or otherwise. Cities are inherently dynamic and require the participation and engagement of their diverse stakeholders for the effective management of change, which enables wider stakeholder involvement and buy-in at various stages of the development process. Sustainability assessment of urban design and development is increasingly being seen as indispensable for informed decision-making. A sustainability assessment tool also acts as a driver for the uptake of sustainable pathways by recognizing excellence through their rating system and by creating a market demand for sustainable products and processes. This research reviews six widely used sustainability assessment tools for urban design and development: BREEAM Communities, LEED-ND, CASBEE-UD, SBTool{sup PT}–UP, Pearl Community Rating System (PCRS) and GSAS/QSAS, to identify, compare and contrast the aim, structure, assessment methodology, scoring, weighting and suitability for application in different geographical contexts. Strengths and weaknesses of each tool are critically discussed. The study highlights the disparity in local and international contexts for global sustainability assessment tools. Despite their similarities in aim on environmental aspects, differences exist in the relative importance and share of mandatory vs optional indicators in both environmental and social dimensions. PCRS and GSAS/QSAS are new incarnations, but have widely varying shares of mandatory indicators, at 45.4% and 11.36% respectively, compared to 30% in BREEAM Community. Considerations of economic and cultural aspects are only marginal in the reviewed sustainability assessment tools. However, the newly developed sustainability assessment tools such as GSAS/QSAS and PCRS diverge from their predecessors in their consideration of cultural aspects. - Highlights: • Reviews six urban sustainability assessment methods: LEED-ND, BREEAM Communities, CASBEE-UD, SBTool{sup PT}-UP, PCRS, GSAS/QSAS. • Reviewed methods are biased more towards the environmental, followed by social and economic dimensions of sustainability. • Water issues are highlighted in the Middle East but natural hazards are emphasized only in CASBEE and BREEAM Communities. • SBTool{sup PT}-UP, the most recent of the groups puts more weight (7.32%) on cultural aspects. • Share of mandatory indicators is highest (45.4%) in the Pearl Community Rating System (PCRS)

54 ENVIRONMENTAL SCIENCES↗

The Henri Mondor Procedure of Morbidity and Mortality Review Meetings: Prospective Registration of Clinical, Dosimetric, and Individual Radiosensitivity Data of Patients With Severe Radiation Toxicity

Purpose: After radiation therapy (RT), various radiation-induced toxicities can develop in about one-fourth of patients. An international interest in using morbidity and mortality rates to monitor the quality of care and integrate morbidity and mortality review (MMR) meetings into organizations' governance processes has arisen. We report the first results of patients included in our MMR procedure that included biological assays for individual intrinsic radiosensitivity (IIRS). Methods and Materials: Twenty-three patients were prospectively included in the MMR database. Twenty-two were evaluable for IIRS. Prostate (n=10) and breast (n=8) cancers were the most frequent disease types. The total dose delivered, determined according to the type of disease, ranged from 30 to 74 Gy. Our MMR procedure requires strict criteria: patients with unresolved toxicity of grade 3 or higher with availability of clinical (photographic) data, IIRS results obtained from skin biopsy assays, treatment modalities, and follow-up data. The RT technique and dosimetry were reviewed. Results: Our prospective registration of toxicities showed mainly rectitis, occurring in 7 cases, and skin toxicities, occurring in 9. Of the 7 patients with rectitis, 5 received 66 Gy of post-prostatectomy RT with V50 (rectum volume receiving 50 Gy) ranging from 45% to 75% and a mean maximal dose of 66.5 Gy. For dermatitis and cystitis, the mean maximal doses were in the range of classical constraints without any overdosage or dose heterogeneity. No errors were found in the review of treatment planning and positioning. Conversely, all the patients were considered biologically as radiosensitive with genomic instability and ATM (ataxia telangiectasia mutated)-dependent DNA double-strand break repair impairments. Conclusions: The MMR review of files allowed clear answers for patients on the relationship between clinical events and their IIRS. Our procedure has allowed education of all our staff to monitor, identify, and document clinical, physical, and biological aspects of radiation-induced toxicities. Thus we recommend the introduction of the MMR procedure in RT departments.

62 RADIOLOGY AND NUCLEAR MEDICINE↗