Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Development of Hybrid Product Breakdown Structure for NASA Ground Systems

The Product Breakdown Structure is traditionally a method of identification of the products of a project in a tree structure. It is a tool used to assess, plan, document, and display the equipment requirements for a project. It is part of a product based planning technique, and attempts to break down all components of a project in as much detail as possible, so that nothing is overlooked. The PBS for ground systems at the Kennedy Space Center is being developed to encompass the traditional requirements including the alignment of facility, systems, and components to the organizational hierarchy. The Ground Operations Product Breakdown Structure is a hybrid in nature in that some aspects of a work breakdown structure will be incorporated and merged with the Architecture Concept of Operations, Master Subsystem List, customer interface, and assigned management responsibility. The Ground Operations Product Breakdown Structure needs to be able to identify the flexibility of support differing customers (internal and external) usage of ground support equipment within the Kennedy Space Center launch and processing complex. The development of the Product Breakdown Structure is an iterative activity Initially documenting the organization hierarchy structure and relationships. The Product Breakdown Structure identifies the linkage between the customer program requirements, allocation of system resources, development of design goals, and identification logistics products. As the Product Breakdown Structure progresses the incorporation of the results of requirement planning for the customer occurs identifying facility needs and systems. The mature Product Breakdown Structure is baselined with a hierarchical drawing, the Product Breakdown Structure database, and an associated document identifying the verification of the data through the life cycle of the program/product line. This paper will document, demonstrate, and identify key aspects of the life cycle of a Hybrid Product Breakdown Structure. The purpose is to show how a project management and system engineering approach can be utilized for providing flexible customer service in an evolving manned space flight launch processing environment.

Monaghan, Mark W.↗

Evolution of International Space Station Program Safety Review Processes and Tools

The International Space Station Program at NASA is constantly seeking to improve the processes and systems that support safe space operations. To that end, the ISS Program decided to upgrade their Safety and Hazard data systems with 3 goals: make safety and hazard data more accessible; better support the interconnection of different types of safety data; and increase the efficiency (and compliance) of safety-related processes. These goals are accomplished by moving data into a web-based structured data system that includes strong process support and supports integration with other information systems. Along with the data systems, ISS is evolving its submission requirements and safety process requirements to support the improved model. In contrast to existing operations (where paper processes and electronic file repositories are used for safety data management) the web-based solution provides the program with dramatically faster access to records, the ability to search for and reference specific data within records, reduced workload for hazard updates and approval, and process support including digital signatures and controlled record workflow. In addition, integration with other key data systems provides assistance with assessments of flight readiness, more efficient review and approval of operational controls and better tracking of international safety certifications. This approach will also provide new opportunities to streamline the sharing of data with ISS international partners while maintaining compliance with applicable laws and respecting restrictions on proprietary data. One goal of this paper is to outline the approach taken by the ISS Progrm to determine requirements for the new system and to devise a practical and efficient implementation strategy. From conception through implementation, ISS and NASA partners utilized a user-centered software development approach focused on user research and iterative design methods. The user-centered approach used on the new ISS hazard system utilized focused user research and iterative design methods employed by the Human Computer Interaction Group at NASA Ames Research Center. Particularly, the approach emphasized the reduction of workload associated with document and data management activities so more resources can be allocated to the operational use of data in problem solving, safety analysis, and recurrence control. The methods and techniques used to understand existing processes and systems, to recognize opportunities for improvement, and to design and review improvements are described with the intent that similar techniques can be employed elsewhere in safety operations. A second goal of this paper is to provide and overview of the web-based data system implemented by ISS. The software selected for the ISS hazard systemMission Assurance System (MAS)is a NASA-customized vairant of the open source software project Bugzilla. The origin and history of MAS as a NASA software project and the rationale for (and advantages of) using open-source software are documented elsewhere (Green, et al., 2009).

Ratterman, Christian D.↗

Development of Hybrid Product Breakdown Structure for NASA Ground Systems

The Product Breakdown Structure is traditionally a method of identification of the products of a project in a tree structure. It is a tool used to assess, plan, document, and display the equipment requirements for a project. It is part of a product based planning technique, and attempts to break down all components of a project in as much detail as possible, so that nothing is overlooked. The PBS for ground systems at the Kennedy Space Center is being developed to encompass the traditional requirements including the alignment of facility, systems, and components to the organizational hierarchy. The Ground Operations Product Breakdown Structure is a hybrid in nature in that some aspects of a work breakdown structure will be incorporated and merged with the Architecture Concept of Operations, Master Subsystem List, customer interface, and assigned management responsibility. The Ground Operations Product Breakdown Structure needs to be able to identify the flexibility of support differing customers (internal and external) usage of ground support equipment within the Kennedy Space Center launch and processing complex. The development of the Product Breakdown Structure is an iterative activity Initially documenting the organization hierarchy structure and relationships. The Product Breakdown Structure identifies the linkage between the customer program requirements, allocation of system resources, development of design goals, and identification logistics products. As the Product Breakdown Structure progresses the incorporation of the results of requirement planning for the customer occurs identifying facility needs and systems. The mature Product Breakdown Structure is baselined with a hierarchical drawing, the Product Breakdown Structure database, and an associated document identifying the verification of the data through the life cycle of the program/product line. This paper will document, demonstrate, and identify key aspects of the life cycle of a Hybrid Product Breakdown Structure. The purpose is to show how a project management and system engineering approach can be utilized for providing flexible customer service in an evolving manned space flight launch processing environment.

Monaghan, Mark W.↗

Comparing the Earth Impact Flux from Comets and Near-Earth Asteroids

Long-period comets (LPC), defined here as those active comets with orbital periods greater than 200 years, are the most difficult objects to mitigate should one be found on an Earth threatening trajectory. The arrival of these objects from the distant Oort cloud cannot be predicted and the impact warning time would be measured in a few months - not years. At the distance of Jupiter, an inactive cometary nucleus with a diameter of one kilometer and a geometric albedo equal to 0.04 would have an apparent magnitude fainter than 25 near opposition and, hence would be well outside the detection capability of current NEO search telescopes. In general LPCs do not become active, and hence discoverable, until inside the orbit of Jupiter and it takes but nine months for a LPC to travel the distance from Jupiter's orbit to that of the Earth.Estimating the impact energy for long-period comets is particularly difficult because the sizes and masses of these objects are not well known. Their solid nuclei are hidden from ground-based telescopes by their gas and dust atmospheres and even when nearby spacecraft observations can determine a size and shape for a cometary nucleus, there are no direct determinations of any cometary mass or bulk density to date. However, a variety of indirect bulk density determinations consistently provide values below one gram per cubic centimeter, the value for water. From measurements made by the Deep Impact spacecraft during its encounter with comet Tempel 1 in July 2005, the bulk density was estimated to be 0.6 grams per cubic centimeter. The mean impact velocity of a LPC is about 51 km/s, three times the 17 km/s value for a typical near-Earth asteroid (NEA) so the impact energy for an LPC would be 9 times that of a NEA of similar mass. However, the bulk density of a comet (approx. 0.6 g/cu cm) is several times less than the density of a stony NEA (approx. 2.6 g/ cu cm) so for a LPC and a stony NEA of the same size, the LPC's impact energy would be about twice that of the NEA.To properly allocate the limited resources available for NEO surveys and physical characterization, it is important to understand the relative threat from long-period comets versus the threat posed by near-Earth asteroids.

near Earth objects↗

POIWG 46 Space Acceleration Measurement System (SAMS) Splinter Session

This splinter session presentation will provide users with an overview of the Space Acceleration Measurement System (SAMS) capabilities and services. It will depict the current configuration of SAMS on the International Space Station (ISS) and show current and future planned allocation of SAMS resources on the ISS. This presentation has a items seeking feedback or resolution for the first wireless deployment of SAMS sensors on the space station.

Hrovat, Ken↗

Synergistic Allocation of Flight Expertise on the Flight Deck (SAFEdeck): A Design Concept to Combat Mode Confusion, Complacency, and Skill Loss in the Flight Deck

This paper presents a new design and function allocation philosophy between pilots and automation that seeks to support the human in mitigating innate weaknesses (e.g., memory, vigilance) while enhancing their strengths (e.g., adaptability, resourcefulness). In this new allocation strategy, called Synergistic Allocation of Flight Expertise in the Flight Deck (SAFEdeck), the automation and the human provide complementary support and backup for each other. Automation is designed to be compliant with the practices of Crew Resource Management. The human takes a more active role in the normal operation of the aircraft without adversely increasing workload over the current automation paradigm. This designed involvement encourages the pilot to be engaged and ready to respond to unexpected situations. As such, the human may be less prone to error than the current automation paradigm.

Schutte, Paul↗

Performance of the CELSS Antarctic Analog Project (CAAP) crop production system

Regenerative life support systems potentially offer a level of self-sufficiency and a decrease in logistics and associated costs in support of space exploration and habitation missions. Current state-of-the-art in plant-based, regenerative life support requires resources in excess of allocation proposed for candidate mission scenarios. Feasibility thresholds have been identified for candidate exploration missions. The goal of this paper is to review recent advances in performance achieved in the CELSS Antarctic Analog Project (CAAP) in light of the likely resource constraints. A prototype CAAP crop production chamber has been constructed and operated at the Ames Research Center. The chamber includes a number of unique hardware and software components focused on attempts to increase production efficiency, increase energy efficiency, and control the flow of energy and mass through the system. Both single crop, batch production and continuous cultivation of mixed crops production studies have been completed. The crop productivity as well as engineering performance of the chamber are described. For each scenario, energy required and partitioned for lighting, cooling, pumping, fans, etc. is quantified. Crop production and the resulting lighting efficiency and energy conversion efficiencies are presented. In the mixed-crop scenario, with 27 different crops under cultivation, 17 m2 of crop area provided a mean of 515 g edible biomass per day (85% of the approximate 620 g required for one person). Enhanced engineering and crop production performance achieved with the CAAP chamber, compared with current state-of-the-art, places plant-based life support systems at the threshold of feasibility. c2002 Published by Elsevier Science Ltd on behalf of COSPAR.

Lettuce/growth & development↗

Statistical Evaluation of Utilization of the ISS

PayLoad Utilization Modeler (PLUM) is a statistical-modeling computer program used to evaluate the effectiveness of utilization of the International Space Station (ISS) in terms of the number of research facilities that can be operated within a specified interval of time. PLUM is designed to balance the requirements of research facilities aboard the ISS against the resources available on the ISS. PLUM comprises three parts: an interface for the entry of data on constraints and on required and available resources, a database that stores these data as well as the program output, and a modeler. The modeler comprises two subparts: one that generates tens of thousands of random combinations of research facilities and another that calculates the usage of resources for each of those combinations. The results of these calculations are used to generate graphical and tabular reports to determine which facilities are most likely to be operable on the ISS, to identify which ISS resources are inadequate to satisfy the demands upon them, and to generate other data useful in allocation of and planning of resources.

Andrews, Ross↗

Interaction between workload and training - Converging evidence from psychophysiology and performance measurement

Traditionally, the domains of mental workload and training have been studied in isolation even though they share many common characteristics. The present paper integrates findings from psychophysiological and performance-based studies which address both of these issues. By augmenting traditional indices of skill acquisition such as RMS error scores, reaction times, and accuracy measures with psychophysiological measures such as the event-related brain potential, it is shown that workload effects can be assessed throughout the training process. More specifically, it is argued that the development of skill and the effects of workload on the human operator can be modeled within the framework of resource theories of attentional allocation. Also described is how converging evidence from psychophysiological and behavioral studies can be used to examine subtle changes in operator strategies during training.

Kramer, Arthur F.↗

An integrated decision support system for TRAC: A proposal

Optimal allocation and usage of resources is a key to effective management. Resources of concern to TRAC are: Manpower (PSY), Money (Travel, contracts), Computing, Data, Models, etc. Management activities of TRAC include: Planning, Programming, Tasking, Monitoring, Updating, and Coordinating. Existing systems are insufficient, not completely automated, manpower intensive, and has the potential for data inconsistency exists. A system is proposed which suggests a means to integrate all project management activities of TRAC through the development of a sophisticated software and by utilizing the existing computing systems and network resources. The systems integration proposal is examined in detail.

Mukkamala, Ravi↗

NASA Discovery Program Workshop

The purpose of the workshop was to review concepts for Discover-class missions that would follow the first two missions (MESUR-Pathfinder and NEAR) of this new program. The concepts had been generated by scientists involved in NASA's Solar System Exploration Program to carry out scientifically important investigations within strict guidelines -- $150 million cap on development cost and 3 year cap on development schedule. Like the Astrophysics Small Explorers (SMEX), such 'faster and cheaper' missions could provide vitality to solar system exploration research by returning high quality data more frequently and regularly and by involving many more young researchers than normally participate directly in larger missions. An announcement of opportunity (AO) to propose a Discovery mission to NASA is expected to be released in about two years time. One purpose of the workshop was to assist Code SL in deciding how to allocate its advanced programs resources. A second, complimentary purpose was to provide the concept proposers with feedback to allow them to better prepare for the AO.

Source record↗

Columbus system support for telescience operations

With the given constraints of the space environment, the telescience concept aims at providing a space mission user with optimum flexibility and responsiveness for spaceborne investigations. The concept includes automated system management functions, which allocate and monitor planned resources and time windows, within which the investigator can perform his science interactively responding 'on-line' to experimental data. During the telescience operation, the user is given the capability to send telecommands to the payload from the User Home Base with transparency to the rest of the system. Any violation of the 'booked' time and resources will be detected by the system and reported back to the user for appropriate action. Ultimately, the system will react to maintain the integrity of the system and its payload. Upon completion of the telescience session, the system management function reverses the system configuration and deallocates resources automatically.

Lytton, David W.↗

A volatile organic analyzer for Space Station: Description and evaluation of a gas chromatography/ ion mobility

A Volatile Organic Analyzer (VOA) is being developed as an essential component of the Space Station's Environmental Health System (EHS) air quality monitoring strategy to provide warning to the crew and ground personnel if volatile organic compounds exceed established exposure limits. The short duration of most Shuttle flights and the relative simplicity of the contaminant removal mechanism have lessened the concern about crew exposure to air contaminants on the Shuttle. However, the longer missions associated with the Space Station, the complex air revitalization system and the proposed number of experiments have led to a desire for real-time monitoring of the contaminants in the Space Station atmosphere. Achieving the performance requirements established for the VOA within the Space Station resource (e.g., power, weight) allocations led to a novel approach that joined a gas chromatograph (GC) to an ion mobility spectrometer (IMS). The authors of this paper will discuss the rational for selecting the GC/IMS technology as opposed to the more established gas chromatography/mass spectrometry (GC/MS) for the foundation of the VOA. The data presented from preliminary evaluations will demonstrate the versatile capability of the GC/IMS to analyze the major contaminants expected in the Space Station atmosphere. The favorable GC/IMS characteristics illustrated in this paper included excellent sensitivity, dual-mode operation for selective detection, and mobility drift times to distinguish co-eluting GC peaks. Preliminary studies have shown that the GC/IMS technology can meet surpass the performance requirements of the Space Station VOA.

Limero, Thomas F.↗

Airport Financing and User Charge Systems in the USA

This paper examines the financing of U.S. public airports in a turbulent era of change, and projects toward the future. It begins by briefly outlining historical patterns that have changed the industry, and airport facilities in particular. It then develops basic principles of public finance as applied to public infrastructure, followed by the applicable principles of management. Following that, the current airport financing system is analyzed and contrasted with a socially optimal financing system. A concluding section suggests policy reforms and their likely benefits. The principles of finance and management discussed here are elementary. However, their implications are radical for U.S. airport policy. There is a great deal of room to improve the allocation of aviation infrastructure resources. The application of these basic principles makes it evident that in many cases, current practice is wasteful, environmentally unsound, overly costly, and inequitable. Future investments in public aviation capital will continue to be wasteful until more efficient pricing systems are instituted. Thus, problem in the U.S. is not one of insufficient investment in airport infrastructure, but investment in the wrong types of infrastructure. In the U.S., the vast majority of publically-owned airports are owned by local governments. Thus, while the federal government bad a great deal of influence in financing airports, ultimately these are local decisions. The same is true with many other public infrastructure issues. Katz and Herman (1997) report that in 1995, U.S. net public capital stock equaled almost $4.6 trillion, 72% of which ($3.9 trillion) was owned by state and local governments, most of it in buildings, highways, Streets, sewer systems, and water supply facilities. Thus, public infrastructure finance is fundamentally a local government issue, with implications for federal and state governments in the design of their aid programs.

Bartle, John R.↗

Design Rules for Life Support Systems

This paper considers some of the common assumptions and engineering rules of thumb used in life support system design. One general design rule is that the longer the mission, the more the life support system should use recycling and regenerable technologies. A more specific rule is that, if the system grows more than half the food, the food plants will supply all the oxygen needed for the crew life support. There are many such design rules that help in planning the analysis of life support systems and in checking results. These rules are typically if-then statements describing the results of steady-state, "back of the envelope," mass flow calculations. They are useful in identifying plausible candidate life support system designs and in rough allocations between resupply and resource recovery. Life support system designers should always review the design rules and make quick steady state calculations before doing detailed design and dynamic simulation. This paper develops the basis for the different assumptions and design rules and discusses how they should be used. We start top-down, with the highest level requirement to sustain human beings in a closed environment off Earth. We consider the crew needs for air, water, and food. We then discuss atmosphere leakage and recycling losses. The needs to support the crew and to make up losses define the fundamental life support system requirements. We consider the trade-offs between resupplying and recycling oxygen, water, and food. The specific choices between resupply and recycling are determined by mission duration, presence of in-situ resources, etc., and are defining parameters of life support system design.

Jones, Harry↗

CCSDS Time-Critical Onboard Networking Service

The Consultative Committee for Space Data Systems (CCSDS) is developing recommendations for communication services onboard spacecraft. Today many different communication buses are used on spacecraft requiring software with the same basic functionality to be rewritten for each type of bus. This impacts on the application software resulting in custom software for almost every new mission. The Spacecraft Onboard Interface Services (SOIS) working group aims to provide a consistent interface to various onboard buses and sub-networks, enabling a common interface to the application software. The eventual goal is reusable software that can be easily ported to new missions and run on a range of onboard buses without substantial modification. The system engineer will then be able to select a bus based on its performance, power, etc and be confident that a particular choice of bus will not place excessive demands on software development. This paper describes the SOIS Intra-Networking Service which is designed to enable data transfer and multiplexing of a variety of internetworking protocols with a range of quality of service support, over underlying heterogeneous data links. The Intra-network service interface provides users with a common Quality of Service interface when transporting data across a variety of underlying data links. Supported Quality of Service (QoS) elements include: Priority, Resource Reservation and Retry/Redundancy. These three QoS elements combine and map into four TCONS services for onboard data communications: Best Effort, Assured, Reserved, and Guaranteed. Data to be transported is passed to the Intra-network service with a requested QoS. The requested QoS includes the type of service, priority and where appropriate, a channel identifier. The data is de-multiplexed, prioritized, and the required resources for transport are allocated. The data is then passed to the appropriate data link for transfer across the bus. The SOIS supported data links may inherently provide the quality of service support requested by the intra-network layer. In the case where the data link does not have the required level of support, the missing functionality is added by SOIS. As a result of this architecture, re-usable software applications can be designed and used across missions thereby promoting common mission operations. In addition, the protocol multiplexing function enables the blending of multiple onboard networks. This paper starts by giving an overview of the SOIS architecture in section 11, illustrating where the TCONS services fit into the overall architecture. It then describes the quality of service approach adopted, in section III. The prototyping efforts that have been going on are introduced in section JY. Finally, in section V the current status of the CCSDS recommendations is summarized.

Parkes, Steve↗

Optimizing technology investments: a broad mission model approach

A long-standing problem in NASA is how to allocate scarce technology development resources across advanced technologies in order to best support a large set of future potential missions. Within NASA, two orthogonal paradigms have received attention in recent years: the real-options approach and the broad mission model approach. This paper focuses on the latter.

NASA technology portfolio real-options risk-based ↗