Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Research, Development and Demonstration of Advanced Vehicle Technologies in Clean Motor Fuels (CRADA Final Report)

NREL/DOE has been funding research, development, and demonstration (RD&D) projects to facilitate the deployment of alternative fuels into the marketplace in order to achieve three objectives: 1) enhance the reduction of mobile source emissions in California and the U.S.; 2) increase U.S. competitiveness and economic prosperity; and 3) preserve the environment through the reduction of emissions and toxins from the motor vehicle population. The Lewis-Presley Air Quality Management Act requires the South Coast Air Quality Management District to establish a program to encourage participation in projects to increase the utilization of clean-burning fuels. The parties seek to collaborate on a joint RD&D project to perform a field test on a small vehicle fleet operating on Fischer-Tropsch synthetic diesel fuel. Recently the 106th U.S. Congress designated "gas-to-liquid" (GTL) transportation fuels that are produced from domestic products as alternative fuels under the Energy Policy Act of 1992 (EPACT). Niche markets could develop quickly for these fuel products, perhaps especially for the use of Fischer-Tropsch synthetic fuels in centrally fueled vehicle fleets in California. NREL and its project partners from the U.S. Department of Energy and West Virginia University have recently conducted what we believe to be the first-ever controlled tests of Fischer-Tropsch synthetic fuels in heavy vehicles. These tests have shown that Fischer-Tropsch fuels can be substituted in unmodified trucks and buses without any detectable loss in drivability and performance. Compared to a California diesel fuel baseline, neat Shell Fischer-Tropsch fuel emitted about 12% lower NOx and 24% lower particulate matter over a five-mile driving route while maintaining the same fuel economy on an energy equivalent basis. Whereas these exhaust emissions reductions from these previous studies have been impressive, far greater exhaust emissions reductions can be achieved if the vehicles are retrofitted with emissions control technologies that are enabled by Fischer-Tropsch fuels. For this program, a test fleet would be selected and retrofitted with continuously regenerating traps (CRT’s) or diesel particulate filters (DPF's). The University of West Virginia, under a separate subcontract to SCAQMD will have the responsibility to test and measure the emissions from the test fleet of vehicles.

33 ADVANCED PROPULSION SYSTEMS↗

The Viking project safety program

The safety requirements and the management of these requirements for the Viking Project are given. Potential hazards are identified and ways of reducing or providing a sound confidence limit are analyzed.

Donald H. Ward↗

Strategies for Revitalizing Organizations: Regaining the Competitive Edge

During the last decade, the United States has lost competitive stature in the world. Challenged daily by a technically sophisticated and vitalized global economy, industry and Government are examining quality and productivity initiatives with which to meet the foreign competitive challenge. At stake are our quality of life and our standard of living for the remainder of this century and beyond. Being competitive is an ongoing process, tuned to an awareness and understanding of the dynamics of the world marketplace and to the changing nature of the work environment. Solutions to America's quality and productivity problems do not exist independently within any organization or industry or at any given level of society. Success depends on commitment, partnership, meshing of goals and responsibilities, mutual respect and understanding, and a desire to be first. A change in organizational management culture is required. Traditional authoritarian management practices must give way to enlightened leadership initiatives that stress employee involvement and participation. There must be a lessening of adversarial relationships between management and labor and between industry and Government. Quality and productivity are understood to be the end result of an integrated process which begins with vigorous, committed leadership and ends with a satisfied customer. The essential elements in the revitalization process are organized in this report into seven strategies which represent the major findings of the Second NASA Symposium on Quality and Productivity. Each strategy is then broken down into its principal themes which are presented as recommendations. No one strategy can stand apart from any other; all are interrelated and work together.

Nysmith, C. Robert↗

Software Safety Risk in Legacy Safety-Critical Computer Systems

Safety Standards contain technical and process-oriented safety requirements. Technical requirements are those such as "must work" and "must not work" functions in the system. Process-Oriented requirements are software engineering and safety management process requirements. Address the system perspective and some cover just software in the system > NASA-STD-8719.13B Software Safety Standard is the current standard of interest. NASA programs/projects will have their own set of safety requirements derived from the standard. Safety Cases: a) Documented demonstration that a system complies with the specified safety requirements. b) Evidence is gathered on the integrity of the system and put forward as an argued case. [Gardener (ed.)] c) Problems occur when trying to meet safety standards, and thus make retrospective safety cases, in legacy safety-critical computer systems.

Hill, Janice L.↗

San Juan National Forest Land Management Planning Support System (LMPSS) requirements definition

The role of remote sensing data as it relates to a three-component land management planning system (geographic information, data base management, and planning model) can be understood only when user requirements are known. Personnel at the San Juan National Forest in southwestern Colorado were interviewed to determine data needs for managing and monitoring timber, rangelands, wildlife, fisheries, soils, water, geology and recreation facilities. While all the information required for land management planning cannot be obtained using remote sensing techniques, valuable information can be provided for the geographic information system. A wide range of sensors such as small and large format cameras, synthetic aperture radar, and LANDSAT data should be utilized. Because of the detail and accuracy required, high altitude color infrared photography should serve as the baseline data base and be supplemented and updated with data from the other sensors.

Werth, L. F.↗

Software Requirements for ATDM On-Node Resource Management

This report outlines the software requirements for on-node resource management in the Advanced Simulation and Computing (ASC) Advanced Technology Development and Mitigation (ATDM) project at Sandia National Laboratories (SNL). The need for on-node resource management has arisen from the componentization of the software stack. Componentization aids in managing complexity and making software more composable and reusable. However, components must compete for limited on-node resources for execution (e.g., cores and hardware threads) and memory. The requirements documented in this report support an effort to manage this contention, avoiding oversubscription of resources and enabling their efficient deployment for application execution.

97 MATHEMATICS AND COMPUTING↗

Detailed requirements document for the Interactive Financial Management System (IFMS), volume 1

The detailed requirements for phase 1 (online fund control, subauthorization accounting, and accounts receivable functional capabilities) of the Interactive Financial Management System (IFMS) are described. This includes information on the following: systems requirements, performance requirements, test requirements, and production implementation. Most of the work is centered on systems requirements, and includes discussions on the following processes: resources authority, allotment, primary work authorization, reimbursable order acceptance, purchase request, obligation, cost accrual, cost distribution, disbursement, subauthorization performance, travel, accounts receivable, payroll, property, edit table maintenance, end-of-year, backup input. Other subjects covered include: external systems interfaces, general inquiries, general report requirements, communication requirements, and miscellaneous. Subjects covered under performance requirements include: response time, processing volumes, system reliability, and accuracy. Under test requirements come test data sources, general test approach, and acceptance criteria. Under production implementation come data base establishment, operational stages, and operational requirements.

Dodson, D. B.↗

Updated Waste Management System Analysis Tool Requirements and Enhancements

Draft presentation for presentation to Nuclear Waste Technical Review Board Winter/Spring Meeting March 2nd NOTE: FYI this presentation is almost the same as the presentation that will be uploaded soon entitled 'Next Generation System Analysis Model: Recently Added Features and Future Plans' for the Waste Management 2022 conference.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Requirements, Resource Planning and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44P on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the ISS ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment replanning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28S, the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority, with the Increment pairs 29 and 30, and 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗

Requirements, Resource Planning, and Management for Decrewing/Recrewing Scenarios of the International Space Station

Following the failure of 44 Progress (44P) on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the International Space Station (ISS) ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment re-planning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28 Soyuz (28S), the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority; both Increment pairs 29 and 30, and Increment 31 and 32 reaching the milestone of at least 35 hours per week average utilization.

Bach, David A.↗

Measurement of Nuclear Power Plant Construction Performance Using EVMS Model

The Earned Value Management System (EVMS) method integrates three critical elements of project management: scope, cost and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments and allows calculation of cost and schedule variances along with performance indices. It allows forecasting of project cost and schedule at completion and highlights the possible need for corrective action. Application of earned value management techniques is scalable to individual projects as determined by their size and complexity. Effective management of quality, cost, and time is the utmost objective for any type of construction project. An EVMS model provides an advanced systematic method of controlling these three performance measures in an integrated way. However, the additional management effort required to develop and maintain an effective Work Breakdown Structure (WBS) has been highlighted as a major barrier to application of this concept. This paper examines the influencing attributes that would facilitate effective EVMS implementation including a restructuring of the WBS for nuclear power plant construction.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Getting brighter: Impacts of improved day-ahead solar forecasts in high-solar, high-storage electricity systems

This paper analyzes the impacts of improved day-ahead solar forecasts on costs and dispatch in the solar-rich Southeast U.S. It uses an optimized high-solar, high-storage resource portfolio in which solar generation capacity accounts for 45 % of total installed capacity (34 %–36 % of generation) and energy storage capacity (43 GW) is equivalent to 33 % of peak demand. In a base scenario, improved day-ahead solar forecasts reduce production costs by $\$87$ million per year ($\$0.13$ per MWh load, $2023$$). This level of savings is within the range or lower than earlier studies of solar forecast improvements at lower levels of solar generation (<25 % of total generation). In this study, solar expansion was accompanied by two important sources of flexibility for managing solar forecast error: energy storage and day-ahead solar curtailment. Furthermore, the analysis finds that regional coordination complements day-ahead solar forecast improvements while natural gas commitment flexibility is a substitute for forecast improvements, as the improved solar forecast leads to sub-optimal commitment of thermal units. Day-ahead solar forecast improvements reduce reserves required to manage forecast error by 30 %. Fewer reserves to manage large, infrequent solar forecast errors could be an important benefit of improved solar forecasts.

14 SOLAR ENERGY↗

Data Storage and sharing for the long tail of science

Research data infrastructure such as storage must now accommodate new requirements resulting from trends in research data management that require researchers to store their data for the long term and make it available to other researchers. We propose Data Depot, a system and service that provides capabilities for shared space within a group, shared applications, flexible access patterns and ease of transfer at Purdue University. We evaluate Depot as a solution for storing and sharing multiterabytes of data produced in the long tail of science with a use case in soundscape ecology studies from the Human- Environment Modeling and Analysis Laboratory. We observe that with the capabilities enabled by Data Depot, researchers can easily deploy fine-grained data access control, manage data transfer and sharing, as well as integrate their workflows into a High Performance Computing environment.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Enabling Command-and-Control in Advanced In Situ Workflows

Scientific discovery is progressing towards autonomous science with the combination of scientific instruments, high-performance computing, and artificial intelligence in complex workflows. This evolution introduces new requirements for managing scientific workflows, including feedback loops, near real-time constraints, and the ability to dynamically control workflow execution. In situ workflows that analyze and visualize data as it is generated are well-suited to satisfy stringent time constraints and their iterative nature offers greater opportunities for command-and-control. However, only a few of the many workflow management systems available have been specifically designed to manage in situ workflows and often lack support for automated feedback loops that allow analysis and visualization components to interact with the main scientific data producer. To address this need, we present in this paper how to add command-and-control capabilities to a workflow management system. We identify the functional design requirements of such a command-and-control system, detail its architecture, interface, and core mechanisms, and illustrate how advanced in situ workflows can leverage command-and-control in three use cases: graceful termination with checkpoint, dynamic and adaptive data reduction, and event-triggered analysis.

Mehta, Kshitij [ORNL] (ORCID:0000000297149981)↗

Package Testing Program Process for Validation and Verification of Software

The purpose of this document is to define the process for validation and verification (V&V) of software used to test the thermal data acquisition equipment in the Oak Ridge National Laboratory (ORNL) Package Testing Program (PTP) as part of the testing configuration(s). This process adheres to all applicable ORNL Standards Based Management System requirements and correlates with the PTP Quality Management System and the Software Quality Assurance Plan.

97 MATHEMATICS AND COMPUTING↗

Engineering study for the functional design of a multiprocessor system

The results are presented of a study to generate a functional system design of a multiprocessing computer system capable of satisfying the computational requirements of a space station. These data management system requirements were specified to include: (1) real time control, (2) data processing and storage, (3) data retrieval, and (4) remote terminal servicing.

Miller, J. S.↗

Investigation into Cloud Computing for More Robust Automated Bulk Image Geoprocessing

Geospatial resource assessments frequently require timely geospatial data processing that involves large multivariate remote sensing data sets. In particular, for disasters, response requires rapid access to large data volumes, substantial storage space and high performance processing capability. The processing and distribution of this data into usable information products requires a processing pipeline that can efficiently manage the required storage, computing utilities, and data handling requirements. In recent years, with the availability of cloud computing technology, cloud processing platforms have made available a powerful new computing infrastructure resource that can meet this need. To assess the utility of this resource, this project investigates cloud computing platforms for bulk, automated geoprocessing capabilities with respect to data handling and application development requirements. This presentation is of work being conducted by Applied Sciences Program Office at NASA-Stennis Space Center. A prototypical set of image manipulation and transformation processes that incorporate sample Unmanned Airborne System data were developed to create value-added products and tested for implementation on the "cloud". This project outlines the steps involved in creating and testing of open source software developed process code on a local prototype platform, and then transitioning this code with associated environment requirements into an analogous, but memory and processor enhanced cloud platform. A data processing cloud was used to store both standard digital camera panchromatic and multi-band image data, which were subsequently subjected to standard image processing functions such as NDVI (Normalized Difference Vegetation Index), NDMI (Normalized Difference Moisture Index), band stacking, reprojection, and other similar type data processes. Cloud infrastructure service providers were evaluated by taking these locally tested processing functions, and then applying them to a given cloud-enabled infrastructure to assesses and compare environment setup options and enabled technologies. This project reviews findings that were observed when cloud platforms were evaluated for bulk geoprocessing capabilities based on data handling and application development requirements.

Brown, Richard B.↗

My-Star: A Methodology and System for Tracing and Analyzing Requirements

This paper describes a methodology developed at the Jet Propulsion Laboratory (JPL), and designed for the process of requirements engineering and management. MY-STAR provides techniques for specifying, refining, allocating, baselining,sharing, changing, storing, and reporting on requirements and requirements metrics.

MY-STAR requirements engineering requirements mana↗