Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Reliability Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Correct CMOS IC defect models for quality testing

Leading edge, high reliability, and low escape CMOS IC test practices have now virtually removed the stuck-at fault model and replaced it with more defect-orientated models. Quiescent power supply current testing (I(sub DDQ)) combined with strategic use of high speed test patterns is the recommended approach to zero defect and high reliability testing goals. This paper reviews the reasons for the change in CMOS IC test practices and outlines an improved CMOS IC test methodology.

Soden, Jerry M.↗

Comparison of Knee and Ankle Dynamometry between NASA's X1 Exoskeleton and Biodex System 4

Pre- and post-flight dynamometry is performed on International Space Station crewmembers to characterize microgravity-induced strength changes. Strength is not assessed in flight due to hardware limitations and there is poor understanding of the time course of in-flight changes. PURPOSE: To assess the reliability of a prototype dynamometer, the X1 Exoskeleton (EXO) and its agreement with a Biodex System 4 (BIO). METHODS: Eight subjects (4 M/4 F) completed 2 counterbalanced testing sessions of knee extension/flexion (KE/KF), 1 with BIO and 1 with EXO, with repeated measures within each session in normal gravity. Test-retest reliability (test 1 and 2) and device agreement (BIO vs. EXO) were evaluated. Later, to assess device agreement for ankle plantarflexion (PF), 10 subjects (4 M/6 F) completed 3 test conditions (BIO, EXO, and BIOEXO); BIOEXO was a hybrid condition comprised of the Biodex dynamometer motor and the X1 footplate and ankle frame. Ankle comparisons were: BIO vs. BIOEXO (footplate differences), BIOEXO vs. EXO (motor differences), and BIO vs. EXO (all differences). Reliability for KE/KF was determined by intraclass correlation (ICC). Device agreement was assessed with: 1) repeated measures ANOVA, 2) a measure of concordance (rho), and 3) average difference. RESULTS: ICCs for KE/KF were 0.99 for BIO and 0.96 to 0.99 for EXO. Agreement was high for KE (concordance: 0.86 to 0.95; average differences: -7 to +9 Nm) and low to moderate for KF (concordance: 0.64 to 0.78; average differences: -4 to -29 Nm, P<0.05). BIO vs. BIOEXO PF concordance ranged from 0.89 to 0.92 and mean differences ranged from -9 to +3 Nm (BIO < BIOEXO). BIOEXO vs. EXO PF concordance ranged from 0.73 to 0.80 while mean differences were -18 to -36 Nm (BIOEXO < EXO, P<0.05). PF concordance for BIO vs. EXO was slightly lower (0.61 to 0.84) and mean differences were greater (-27 to -33 Nm; BIO < EXO, P<0.05). CONCLUSION: BIO and EXO were similarly reliable for KE and KF. KE measures produced high agreement between devices; KF did not. For ankle PF, torque differences due to the two footplates were small. However, the X1 motor reports greater torques than the Biodex motor during PF. This first prototype provides proof of concept for a reliable, robotic-based exoskeleton to perform portable dynamometry for large muscle groups of the lower body.

English, K. L.↗

Developing Ultra Reliable Life Support for the Moon and Mars

Recycling life support systems can achieve ultra reliability by using spares to replace failed components. The added mass for spares is approximately equal to the original system mass, provided the original system reliability is not very low. Acceptable reliability can be achieved for the space shuttle and space station by preventive maintenance and by replacing failed units, However, this maintenance and repair depends on a logistics supply chain that provides the needed spares. The Mars mission must take all the needed spares at launch. The Mars mission also must achieve ultra reliability, a very low failure rate per hour, since it requires years rather than weeks and cannot be cut short if a failure occurs. Also, the Mars mission has a much higher mass launch cost per kilogram than shuttle or station. Achieving ultra reliable space life support with acceptable mass will require a well-planned and extensive development effort. Analysis must define the reliability requirement and allocate it to subsystems and components. Technologies, components, and materials must be designed and selected for high reliability. Extensive testing is needed to ascertain very low failure rates. Systems design should segregate the failure causes in the smallest, most easily replaceable parts. The systems must be designed, produced, integrated, and tested without impairing system reliability. Maintenance and failed unit replacement should not introduce any additional probability of failure. The overall system must be tested sufficiently to identify any design errors. A program to develop ultra reliable space life support systems with acceptable mass must start soon if it is to produce timely results for the moon and Mars.

Jones, Harry W.↗

Test Results for Checking Reliability of Selected ENDF/B-VIII.0 Evaluated Uncertainties

This report summarizes error messages obtained from counter-checking whether 1 H, 9 Be, 12 C, 27 Al, 235,238 U and 238–242 Pu relative uncertainties of ENDF/B-VIII.0 are realistic. Large parts of this report were generated automatically by the code CovVal. This code allows to test the reliability of relative uncertainties of any isotope. It gives generic error and warning messages if evaluated relative uncertainties of a particular reaction are likely under- or over-estimated. In addition to these error and warning messages, I added comments whether the flagged uncertainties are truly under- or overestimated. I call out these uncertainties that should be further investigated and corrected by an evaluator for an upcoming release of ENDF/B-VIII.1.

07 ISOTOPE AND RADIATION SOURCES↗

Photovoltaic Manufacturing Consortium (PVMC) – Enabling America’s Solar Revolution

The U.S. Photovoltaic Manufacturing Consortium (US-PVMC) is an industry-led consortium which was created with the mission to accelerate the research, development, manufacturing, field testing, commercialization, and deployment of next-generation solar photovoltaic technologies. Formed as part of the U.S. Department of Energy's (DOE) SunShot initiative, and headquartered in New York State, PVMC is managed by the State University of New York Polytechnic Institute (SUNY Poly) at the Colleges of Nanoscale Science and Engineering. PVMC is a hybrid of industry-led consortium and manufacturing development facility, with capabilities for collaborative and proprietary industry engagement. Through its technology development programs, advanced manufacturing development facilities, system demonstrations, and reliability and testing capabilities, PVMC has demonstrated itself to be a recognized proving ground for innovative solar technologies and system designs. PVMC comprises multiple locations, with the core manufacturing and deployment support activities conducted at the Solar Energy Development Center (SEDC), and the core Si wafering and metrology technologies being headed out of the University of Central Florida. The SEDC provides a pilot line for proof-of-concept prototyping, offering critical opportunities to demonstrate emerging concepts in PV manufacturing, such as evaluations of innovative materials, system components, and PV system designs. The facility, located in Halfmoon NY, encompasses 40,000 square feet of dedicated PV development space. The infrastructure and capabilities housed at PVMC includes PV system level testing at the Prototype Demonstration Facility (PDF), manufacturing scale cell & module fabrication at the Manufacturing Development Facility (MDF), cell and module testing, reliability equipment on its PV pilot line, all integrated with a PV performance database and analytical characterizations for PVMC and its partners test and commercial arrays. Additional development and deployment support are also housed at the SEDC, such as cost modeling and cost model based development activities for PV and thin film modules, components, and system level designs for reduced LCOE through lower installation hardware costs, labor reductions, soft costs and reduced operations and maintenance costs. The progression of the consortium activities started with infrastructure and capabilities build out focused on CIGS thin film photovoltaics, with a particular focus on flexible cell and module production. As marketplace changes and partners objectives shifted, the consortium shifted heavily towards deployment and market pull activities including Balance of System, cost modeling, and installation cost reduction efforts along with impacts to performance and DER operational costs. The consortium consisted of a wide array of PV supply chain companies from equipment and component suppliers through national developers and installers with a particular focus on commercial scale deployments (typically 25 to 2MW installations). With DOE funding ending after the fifth budget period, the advantages and disadvantages of such a consortium is detailed along with potential avenues for self-sustainability is reviewed.

14 SOLAR ENERGY↗

Statistical Modeling of Photovoltaic Reliability Using Accelerated Degradation Techniques (Poster)

We introduce a cutting-edge life-testing technique, accelerated degradation testing (ADT), for PV reliability testing. The ADT technique is a cost-effective and flexible reliability testing method with multiple (MADT) and Step-Stress (SSADT) variants. In an environment with limited resources, including equipment (chambers), test units, and testing time, these techniques can provide statisticallyrigorous prediction of lifetime and other interesting parameters, such as failure rate, warranty time, mean time to failure, degradation rate, activation energy, acceleration factor, and upper limit level of stress. J-V characterization can be used for degradation data and the generalized Eyring model can be used for the thermal-humidity stress condition. The SSADT model can be constructed basedon the cumulative damage model (CEM), which assumes that the remaining test united are failed according to cumulative density function of current stress level regardless of the history on previous stress levels.

14 SOLAR ENERGY↗

Structural Testing of the Blade Reliability Collaborative Effect of Defect Wind Turbine Blades

Two 8.3-meter (m) wind turbine blades intentionally constructed with manufacturing flaws were tested to failure at the National Wind Technology Center (NWTC) at the National Renewable Energy Laboratory (NREL) south of Boulder, Colorado. Two blades were tested; one blade was manufactured with a fiberglass spar cap and the second blade was manufactured with a carbon fiber spar cap. Test loading primarily consisted of flap fatigue loading of the blades, with one quasi-static ultimate load case applied to the carbon fiber spar cap blade. Results of the test program were intended to provide the full-scale test data needed for validation of model and coupon test results of the effect of defects in wind turbine blade composite materials. Testing was part of the Blade Reliability Collaborative (BRC) led by Sandia National Laboratories (SNL). The BRC seeks to develop a deeper understanding of the causes of unexpected blade failures (Paquette 2012), and to develop methods to enable blades to survive to their expected operational lifetime. Recent work in the BRC includes examining and characterizing flaws and defects known to exist in wind turbine blades from manufacturing processes (Riddle et al. 2011). Recent results from reliability databases show that wind turbine rotor blades continue to be a leading contributor to turbine downtime (Paquette 2012).

17 WIND ENERGY↗

Reliability analysis of structures under periodic proof tests in service

A reliability analysis of structures subjected to random service loads and periodic proof tests treats gust loads and maneuver loads as random processes. Crack initiation, crack propagation, and strength degradation are treated as the fatigue process. The time to fatigue crack initiation and ultimate strength are random variables. Residual strength decreases during crack propagation, so that failure rate increases with time. When a structure fails under periodic proof testing, a new structure is built and proof-tested. The probability of structural failure in service is derived from treatment of all the random variables, strength degradations, service loads, proof tests, and the renewal of failed structures. Some numerical examples are worked out.

Yang, J.-N.↗

Gearbox Reliability Collaborative Phase 3 Gearbox 2 Test

The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) was established by the U.S. Department of Energy in 2006; its key goal is to understand the root causes of premature gearbox failures and improve their reliability. The GRC uses a combined gearbox testing, modeling, and analysis approach disseminating data and results to the industry and facilitating improvement of gearbox reliability. This test data describes the tests of GRC gearbox 2 in the National Wind Technology Center dynamometer and documents any modifications to the original test plan. It serves as a guide to interpret the publicly released data sets with brief analyses to illustrate the data. TDMS viewer and Solidworks software required to view data files.

17 WIND ENERGY↗

Assessment of NDE reliability data

Twenty sets of relevant nondestructive test (NDT) reliability data were identified, collected, compiled, and categorized. A criterion for the selection of data for statistical analysis considerations was formulated, and a model to grade the quality and validity of the data sets was developed. Data input formats, which record the pertinent parameters of the defect/specimen and inspection procedures, were formulated for each NDE method. A comprehensive computer program was written and debugged to calculate the probability of flaw detection at several confidence limits by the binomial distribution. This program also selects the desired data sets for pooling and tests the statistical pooling criteria before calculating the composite detection reliability. An example of the calculated reliability of crack detection in bolt holes by an automatic eddy current method is presented.

Yee, B. G. W.↗

Reliability growth models for NASA applications

The objective of any reliability growth study is prediction of reliability at some future instant. Another objective is statistical inference, estimation of reliability for reliability demonstration. A cause of concern for the development engineer and management is that reliability demands an excessive number of tests for reliability demonstration. For example, the Space Transportation Main Engine (STME) program requirements call for .99 reliability at 90 pct. confidence for demonstration. This requires running 230 tests with zero failure if a classical binomial model is used. It is therefore also an objective to explore the reliability growth models for reliability demonstration and tracking and their applicability to NASA programs. A reliability growth model is an analytical tool used to monitor the reliability progress during the development program and to establish a test plan to demonstrate an acceptable system reliability.

Taneja, Vidya S.↗

A Statistical Testing Approach for Quantifying Software Reliability; Application to an Example System

The U.S. Nuclear Regulatory Commission (NRC) encourages the use of probabilistic risk assessment (PRA) technology in all regulatory matters, to the extent supported by the state-of-the-art in PRA methods and data. Although much has been accomplished in the area of risk-informed regulation, risk assessment for digital systems has not been fully developed. The NRC established a plan for research on digital systems to identify and develop methods, analytical tools, and regulatory guidance for (1) including models of digital systems in the PRAs of nuclear power plants (NPPs), and (2) incorporating digital systems in the NRC's risk-informed licensing and oversight activities. Under NRC's sponsorship, Brookhaven National Laboratory (BNL) explored approaches for addressing the failures of digital instrumentation and control (I and C) systems in the current NPP PRA framework. Specific areas investigated included PRA modeling digital hardware, development of a philosophical basis for defining software failure, and identification of desirable attributes of quantitative software reliability methods. Based on the earlier research, statistical testing is considered a promising method for quantifying software reliability. This paper describes a statistical software testing approach for quantifying software reliability and applies it to the loop-operating control system (LOCS) of an experimental loop of the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗

Design for Reliability (DfR) in Space Life Support

The engineering process of Design for Reliability (DfR) is well established in the automotive and aerospace industries. DfR should be useful in the future development of space life support systems. DfR is a sequence of tasks that develop system requirements and plan reliability analysis and testing. First and fundamentally, the reliability requirement is defined. Next the system reliability model is developed, often using a reliability block diagram. The overall system reliability requirement is allocated to the subsystems and an estimate of the attainable reliability is made. This expected reliability can be improved by simplifying the design by removing components or by replacing less reliable components. Improving reliability can require difficult compromises, such as reducing performance requirements, increasing budget, or extending testing. The actual system reliability can be determined only by testing, which should continue long enough to provide the required confidence in the measured value. New systems often have unexpected design errors that cause failures in early testing. The usual reliability improvement process of testing, finding the failure modes, and redesigning to remove them reduces the failure rate and is referred to as “reliability growth.” After redesign has been completed, the system should be further tested to determine the actual achieved reliability more accurately. If the final system failure rate is too high, redundant systems can be used to improve overall operational reliability. Adding redundancy simply to increase the one- or two-fault tolerance metric may sometimes reduce reliability. Reliability can be improved in three ways: redesigning the system to include more reliable subsystems and components, reliability growth testing and failure mode removal, and by using parallel redundant systems. DfR should combine these approaches to achieve the required reliability while managing performance, cost, and schedule.

Reliability↗