Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Kirigami Photopiezo Catalysts for Self-Sustainable Environment Remediation

Photo(electro)-piezo catalysis has emerged as one of the most effective strategies for sustainable environmental remediation. While various (nano)materials have been investigated for enhancing the intrinsic properties related to the interfacial band structure, increasing the efficiency by integration of materials with rational design for stress–strain applications has not yet been considered. Herein, we introduce kirigami strain engineering to photopiezo catalysts for enhancing efficiency by increasing the magnitude of applied strain and density of bends. Macroscale stretching motion is converted into localized bending by a pliable kirigami structure using similar or even lower input energy, which can be easily modulated by natural waves. The kirigami structure leads to a significant enhancement (~250%) in the degradation of dyes, and we discovered the significant contribution of the oxygen reduction pathway in the charge-transfer mechanism, which corresponds to the observed enhancement. In conclusion, the photopiezo catalytic effects of kirigami were further highlighted by the small water reservoir test, showing its feasibility in nature for self-sustainable environmental remediation that can be modulated using motions of winds, waves, and life vibrations.

14 SOLAR ENERGY↗

Spatial and temporal variation of freely dissolved polycyclic aromatic hydrocarbons in an urban river undergoing Superfund remediation

Urban rivers with a history of industrial use can exhibit spatial and temporal variations in contaminant concentrations that may significantly affect risk evaluations and even the assessment of remediation efforts. Concentrations of 15 biologically available priority pollutant polycyclic aromatic hydrocarbons (PAHs) were measured over five years along 18.5 miles of the lower Willamette River using passive sampling devices and HPLC. The study area includes the Portland Harbor Superfund megasite with several PAH sources including remediation operations for coal tar at RM 6.3 west and an additional Superfund site, McCormick and Baxter, at RM 7 east consisting largely of creosote contamination. Study results show that organoclay capping at the McCormick and Baxter Superfund Site reduced PAHs from a precap average of 440 {+-} 422 ng/L to 8 {+-} 3 ng/L postcapping. Results also reveal that dredging of submerged coal tar nearly tripled nearby freely dissolved PAH concentrations. For apportioning sources, fluoranthene/pyrene and phenanthrene/anthracene diagnostic ratios from passive sampling devices were established for creosote and coal tar contamination and compared to published sediment values. 29 refs., 3 figs., 3 tabs.

01 COAL, LIGNITE, AND PEAT↗

A system to investigate the remediation of organic vapors using microwave-induced plasma with fluidized carbon granules

This article describes a system to investigate the parameters for the remediation of organic vapors using microwave-induced plasma on fluidized carbon granules. The system is based on a single mode microwave apparatus with a variable power (2.45 GHz) generator. Carbon granules are fluidized in a silica tube situated in the sample section of a waveguide incorporating two additional ports to allow plasma intensity monitoring using a light sensor and imaging with a digital camera. A fluoroptic probe is used for in situ measurement of the carbon granule temperature, while the effluent gas temperature is measured with a thermocouple situated in the silica tube outside the cavity. Data acquisition and control software allow experiments using a variety of microwave power regimes while simultaneously recording the light intensity of any plasma generated within the carbon bed, together with its temperature. Evaluation using two different granular activated carbons and ethyl acetate, introduced as a vapor into the fluidizing air stream at a concentration of 1 ppm, yielded results which indicated that significant destruction of ethyl acetate, as monitored using a mass spectrometer, was achieved only with the carbon granules showing high plasma activity under pulsed microwave conditions. The system is therefore suitable for comparison of the relative microwave activities of various activated carbon granules and their performance in microwave remediation and regeneration.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Decision Tree Based Anomaly Detection for Remedial Action Scheme in Smart Grid using PMU Data

The advanced and persistent cyber threats facing the critical infrastructure such as the smart grid are exponentially rising which require sophisticated defense strategy. Remedial Action Scheme (RAS), also known as Special Protection Scheme (SPS), relies on the interconnected cyber physical system for automated protection which is exposed to the multitude of vulnerabilities. In this paper, we propose an innovative approach to develop an Intelligent Remedial Action Scheme (IRAS) which can detect and distinguish cyber attacks from the physical disturbances in smart grid and later take smart corrective actions as required to minimize the impact on system reliability and economy. Specifically, we have proposed the decision tree based anomaly detection methodology which can distinguish between the normal tripping during power line faults and malicious tripping attack on the physical relays in the context of RAS. The classification model is developed using differential features of voltage and current phasors. Next, as a proof of concept, we have implemented and validated the proposed methodology in cyber physical environment at Iowa State's PowerCyber testbed. Finally, the proposed methodology is tested on modified IEEE 39 bus system in offline and real-time mode. Our experimental results show that the proposed method is efficient in detecting attacks and performing corrective actions within an acceptable time frame.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Experiences with new neutralization technologies for remediation after ISL mining of uranium in Straz Pod Ralskem

A big affection of the rock environment and groundwaters occurred during the chemical mining of uranium in the years 1966 to 1996 in the neighbourhood of the town Straz pod Ralskem in the Czech Republic. It is necessary to clean the residual technological solutions (RTS) from the underground. The pH of the solutions in some places is still less than 2 and the concentration of sulphates reaches up to 65 g/l. The remedial activities consist of pumping of the RTS from the ground and reprocessing of the RTS in the surface technologies. The implementation of the new neutralization technologies NDS ML and NDS 10 help us with increasing of the efficiency of the remedial process. The NDS ML technology ('Mother liquor reprocessing station') started its operation in 2009 and it processes the concentrated technological solution from the evaporation station after the alum crystallization (mother liquor) with the concentration of total dissolved solids up to 250 g/l. The principle is the neutralization of the acid solutions with the aid of the lime milk. The suspension is then filtrated in the filter press, the filter cake is deposited in the tailings pond and the filtrate is injected back into the underground rock environment. The NDS 10 technology ('Neutralization and Decontamination Station NDS 10') started its operation in 2012 and it works on the same technological principle as the NDS ML station. The difference is that the NDS 10 station can process higher volume (4.4 m{sup 3}/min) of the RTS with lower concentration of total dissolved solids 20 - 25 g/l. This poster describes the experiences of the state enterprise DIAMO with putting of these two neutralization technologies into operation and with using of the lime milk neutralization in such a large scale. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Prioritization of remedial actions for radioactive waste burials in the Chernobyl exclusion zone

Large volumes of radioactive waste were urgently buried in the Chernobyl Exclusion Zone (ChEZ) in the aftermath of the 1986 accident. Twenty-six years later, decisions must be taken about whether and how to remediate these sites. An attempt to resolve two key issues is described here: 1. How to assess the hazards posed by these facilities, recognizing that, for the foreseeable future, the Chernobyl Exclusion Zone will remain under institutional control? and 2. What standards to apply in deciding the extent of remediation? This paper presents an examination of the issues and proposes a simple decision-making process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Initial Results from the Third Round of Remediated Nitrate Salt Surrogate Formulation and Testing

High explosives science and technology (M-7) is currently working on the third round of formulation and testing of Remediated nitrate salt (RNS) surrogates. This report summarizes the calorimetry results from the 15% sWheat mixtures. All formulation and testing was carried out according to PLAN-TA9-2443 Rev B, "Remediated Nitrate Salt (RNS) surrogate formulation and testing standard procedure", released February 16, 2016. Results from the first and second rounds of formulation and testing were documented in memoranda M7-16-6042 and M7-16-6053.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Biota Modeling in EPA’s Preliminary Remediation Goal and Dose Compliance Concentration Calculators for Use in EPA Superfund Risk Assessment: Explanation of Intake Rate Derivation, Transfer Factor Compilation, and Mass Loading Factor Sources

The Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) calculators are screening level tools that set forth Environmental Protection Agency’s (EPA) recommended approaches, based upon currently available information with respect to risk assessment, for response actions at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites, commonly known as Superfund. The screening levels derived by the PRG and DCC calculators are used to identify isotopes contributing the highest risk and dose as well as establish preliminary remediation goals. Each calculator has a residential gardening scenario and subsistence farmer exposure scenarios that require modeling of the transfer of contaminants from soil and water into various types of biota (crops and animal products). New publications of human intake rates of biota; farm animal intakes of water, soil, and fodder; and soil to plant interactions require updates be implemented into the PRG and DCC exposure scenarios. Recent improvements have been made in the biota modeling for these calculators, including newly derived biota intake rates, more comprehensive soil mass loading factors (MLFs), and more comprehensive soil to tissue transfer factors (TFs) for animals and soil to plant transfer factors (BV’s). New biota have been added in both the produce and animal products categories that greatly improve the accuracy and utility of the PRG and DCC calculators and encompass greater geographic diversity on a national and international scale.

54 ENVIRONMENTAL SCIENCES↗

Characterizing the Influence of Organic Polymers on the Specific Reactivity of Particulate Remedial Amendments

Commercially available particulate amendments demonstrate high reactivity for effective treatment of water soluble organic and inorganic contaminants in laboratory studies; however, transport of these particles is constrained in the subsurface. In many field applications, particulate amendments are mixed with organic polymers to enhance mobility for direct push applications or stabilize suspensions for high mass loadings. As such, the interactions between particulate amendments, organic polymers and contaminant species need to be systematically investigated to properly understand mechanistic processes that facilitate predictive performance metrics for specific applications in situ . In this study, batch experiments were conducted to quantify the effects of organic polymers (xanthan gum, guar gum, and sodium alginate), polymer concentration (800 and 4,000 mg/L), and aging (up to 28 days) on chromate treatment rate and capacity by two classes of amendments: reductants [granular zero-valent iron (gZVI), micron-ZVI (mZVI), sulfur modified iron (SMI)], and an adsorbent (bismuth sub-nitrate). When particulate amendments were suspended in polymer solutions, reductants retained between 84–100% of the amendment treatment capacity. Conversely, the adsorbent maintained 63–97% relative treatment capacity of the no-polymer control. Polymer solutions had a more pronounced impact on the rate of chromate removal; first order rates of chemical reduction decreased by as much as 70% and adsorption by up to 81% relative to the no-polymer controls. Polymer–amendment aging experiments also showed decreased Cr(VI) treatment capacity; reductants decreased by as much as 24% and adsorption decreased by as much as 44% after 28 days of incubation. While polymer suspensions are needed to aid the injection of particulate amendments into the subsurface, the results from this study indicate potential losses of treatment capacity and a decrease in the rate of remedial performance due to the physical and chemical interactions between polymer suspensions and reactive particulate amendments. Simple batch systems provide baseline characterization of tripartite interactions for the removal of Cr(VI). Additional work is needed to quantify the full impact of polymers on remedial outcomes under site relevant conditions at field scale.

54 ENVIRONMENTAL SCIENCES↗

Technical and Policy Challenges in Deep Vadose Zone Remediation of Metals and Radionuclides

Deep vadose zone contamination is a significant issue facing the U.S. Department of Energy’s (DOE) Office of Environmental Management (EM). Contamination in the deep vadose zone is isolated from exposure such that direct contact is not a factor in risk to human health and the environment; rather, movement of contamination from the deep vadose zone to the groundwater creates the potential for exposure and risk to receptors. Transport of deep vadose zone contamination and discharge to the groundwater creates the potential for exposure and risk to receptors, so limiting flux to groundwater is key for protection of groundwater resources. Remediation approaches for the deep vadose zone need to be considered within the regulatory context, targeted at mitigating the source of contamination and reduce contaminant flux to groundwater. This paper reviews the processes for deep vadose zone metal and radionuclide remediation as well as challenges and opportunities for implementation.

contamination↗

Using the Conceptual Site Model to Remediate Two Sites in New England and Reach License Termination and Site Reuse

The Conceptual Site Model (CSM) is a powerful tool for understanding the link between contamination sources, cleanup objectives, and ultimate site reuse. The CSM describes the site setting, geology, hydrogeology, potential sources, release mechanisms and migration pathways of contaminants. The CSM is needed to understand the extent of contamination and how receptors may be exposed to both radiological and chemical constituents. A key component of the CSM that is often overlooked concerns how the regulatory requirements drive remediation and how each has to be integrated into the CSM to ensure that all stakeholder requirements are understood and addressed. This paper describes how the use of the CSM helped reach closure and reuse at two facilities in Connecticut that are pursuing termination of their Nuclear Regulatory Commission (NRC) license. The two facilities are the Combustion Engineering Site, located in Windsor, Connecticut, (CE Windsor Site) and the Connecticut Yankee Atomic Power Company, located in Haddam Neck, Connecticut (CYAPCO). The closure of each of these facilities is regulated by four agencies: - Nuclear Regulatory Commission (NRC) - which requires cleanup levels for radionuclides to be protective of public health; - US Environmental Protection Agency (USEPA) - which requires cleanup levels for chemicals to be protective of public health and the environment; - Connecticut Department of Environmental Protection (CTDEP) Bureau of Air Management, Radiation Division - which requires cleanup levels for radionuclides to be protective of public health; and - Connecticut Department of Environmental Protection (CTDEP) Bureau of Water Protection and Land Reuse - which requires cleanup levels for chemicals to be protective of public health and the environment. Some of the radionuclides at the CE Windsor Site are also regulated under the Formerly Utilized Site Remedial Action Program (FUSRAP) under the Army Corps of Engineers. The remainder of this paper presents the similarities and differences between the CSMs for these two sites and how each site used the CSM to reach closure. Although each of these site have unique histories and physical features, the CSM approach was used to understand the geology, hydrogeology, migration and exposure pathways, and regulatory requirements to successfully characterize and plan closure of the sites. A summary of how these attributes affected site closure is provided.

54 ENVIRONMENTAL SCIENCES↗

Formerly Used Sites Remedial Action Program (FUSRAP) W. R. Grace Feasibility Study (FS) Alternative Development Process Challenges And Successes

Monazite sand processing was conducted at the W. R. Grace Curtis Bay Facility (Baltimore, Maryland) in the mid 1950's under contract to the Atomic Energy Commission (AEC), for the extraction of source material in the form of thorium, as well as rare earth elements. The processing was conducted in the southwest quadrant of a five-story building (Building 23) in the active manufacturing portion of the facility. Building components and equipment in the southwest quadrant of Building 23 exhibit residual radiological activity remaining from the monazite sand processing. Waste materials from the processing operations (termed gangue) were disposed in the non-manufacturing portion of the facility, in the area referred to the Radioactive Waste Disposal Area (RWDA). Approximately 19,880 cubic meters (m{sup 3}) of radioactive gangue was buried within the RWDA. Waste was believed to be buried at various depths up to 2.7 meters (m), and possibly as deep as 7.6 m. The RI and a supplemental investigation have been completed for the RWDA and adjacent boundary areas. A Feasibility Study (FS) to address residual radioactivity in soils at the RWDA is in the process of being finalized. The chemical-specific Applicable, Relevant, and Appropriate Requirement (ARAR) was selected for the FUSRAP contaminants, and Remedial Goals (RGs) were calculated for the cleanup. The RGs were developed based upon guidance provided in the selected ARAR, 10 Code of Federal Regulations (CFR) 40, Appendix A, Criterion 6(6). This standard is designed to provide an acceptable level of protection to the average member of a critical group who may be exposed to radium in soil for a given scenario. Scenarios, critical group members, and RGs were established in consultation with stakeholders. Dose assessment calculations were performed in accordance with the ARAR to establish derived concentration guideline levels (DCGLs) for each radionuclide in the 232-Thorium ({sup 232}Th) and 238-Uranium ({sup 238}U) chain for both surface and subsurface soils. A sum of the ratios calculation (also called the unity rule) will be utilized (with the DCGLs) to assure compliance with the benchmark doses associated with the radium standards. Six alternatives (including no action) were considered in the FS and included the following technologies: soil washing, segregation, capping/covering, excavation/disposal, and site restrictions. A bench scale study was conducted by USACE to assess the efficacy of soil washing at the site. Results of the study showed reduction of radiological activity in soil. Segregation can be implemented using traditional sampling/analytical routines or automated (gate) segregation and it is likely to reduce the waste stream by at least 30%, while providing a more complete characterization of the soil with a particularly high level of confidence. Challenges for the FS phase of the project included: managing stakeholder input and expectations, defining separate and distinct alternatives for the FS in accordance with the CERCLA process, and selecting the most appropriate ARARs. The challenges were handled successfully, and USACE is finalizing a robust document acceptable to the stakeholders, which will allow USACE to meet the program milestone. In summary: Conducting the W.R. Grace FUSRAP site FUSRAP process has been challenging from a project management perspective, due in part to the nature and extent of impact at the site (residual radioactivity; active processing building and disposal area) and incorporating site owner involvement in the process. Through the use of mediation and mutual commitment to the project by both parties, USACE and the site owner were able to find agreement on fundamental issues and set a firm foundation for achieving successful remedial action and site closure using a 'forward thinking' approach. Currently, USACE is finalizing the RWDA FS to address contamination in soils at the RWDA. ARARs have been identified and selected as per CERCLA guidance. Although obstacles were encountered, the challenges were handled successfully, and USACE is finalizing a robust document acceptable to the site owner, the regulators, and the public, which will allow USACE to move forward successfully in the FUSRAP program. (authors)

54 ENVIRONMENTAL SCIENCES↗

Remediation of the Melton Valley Watershed at Oak Ridge National Lab: An Accelerated Closure Success Story

The Melton Valley (MV) Watershed at the U. S. Department of Energy's (DOE's) Oak Ridge National Laboratory (ORNL) encompasses approximately 430 hectares (1062 acres). Historic operations at ORNL produced a diverse legacy of contaminated facilities and waste disposal areas in the valley. In addition, from 1955 to 1963, ORNL served as a major disposal site for wastes from over 50 off-site government-sponsored installations, research institutions, and other isotope users. Contaminated areas in the watershed included burial grounds, landfills, underground tanks, surface impoundments, liquid disposal pits/trenches, hydro-fracture wells, leak and spill sites, inactive surface structures, and contaminated soil and sediment. Remediation of the watershed in accordance with the requirements specified in the Melton Valley Record of Decision (ROD) for Interim Actions in Melton Valley, which estimated that remedial actions specified in the ROD would occur over a period of 14 years, with completion by FY 2014. Under the terms of the Accelerated Closure Contract between DOE and its contractor, Bechtel Jacobs Company, LLC, the work was subdivided into 14 separate sub-projects which were completed between August 2001 and September 2006, 8 years ahead of the original schedule. (authors)

54 ENVIRONMENTAL SCIENCES↗

Land Use Manager Application Ensures Protectiveness Following Remediation on the Oak Ridge Reservation - 13355

Long-term stewardship is the set of activities necessary to return contaminated land to safe and beneficial use. The activities include physical and legal controls to prevent inappropriate exposure to contamination left in place at a site. It is the longest phase of the Department of Energy's Environmental Management Program and ensures the protection of human health and the environment for varied end uses. At the Department of Energy's Oak Ridge Reservation an automated program has been developed and implemented that tracks the multitude of long-term stewardship activities. The Oak Ridge Reservation is a large site that currently has over 50 actions requiring long-term stewardship activities. The Oak Ridge Reservation consists primarily of three plant sites, and long-term stewardship will enable these sites to be leased to private entities (East Tennessee Technology Park), modernized for an evolving national security mission (Y-12 National Security Complex), and revitalized to continue multi-disciplinary research (Oak Ridge National Laboratory). The varied site end uses of the individual plant sites coupled with the multitude of controls required by leaving waste in place presents challenges. A single remedial action may include surveillance and maintenance activities, media monitoring, property record notices as well as physical controls such as fences and signs. Thus, the array of long-term stewardship activities is complex and intermingled (over 200 inspections each year at various frequencies are required currently) and requires an effective tracking program, termed the Land Use Manager. The Land Use Manager is a web-based data management application for use by personnel responsible for implementing, maintaining, and verifying engineering and land use controls on the Oak Ridge Reservation. The program is a data entry and tracking tool, as well as a notification tool. The status and performance of engineering and land use controls are checked annually for evaluation in the required Remediation Effectiveness Report, and the automated Land Use Manager collects, maintains, tracks, notifies, monitors, and manages the information necessary to perform this evaluation. Land Use Manager tracks site information including type of contamination, regulatory requirements, locates land use controls; provides information on inspections, certification, and reporting; and provides reports. Most data access features, e.g., view, print, query, and download, are available to all users; however, data input, updating, and editing are restricted to the personnel directly responsible for monitoring and inspection. The Land Use Manager application was developed for the Department of Energy Oak Ridge Office by URS - CH2M Oak Ridge LLC, Restoration Services Incorporated, and MIJARA Corporation to meet the specific needs of long-term stewardship tracking on the Oak Ridge Reservation. The successful implementation of long-term stewardship enables the future government and private activities being planned on the Oak Ridge Reservation to proceed. (authors)

54 ENVIRONMENTAL SCIENCES↗

Unique Construction and Social Experiences in Residential Remediation Sites - 13423

Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work there were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)

54 ENVIRONMENTAL SCIENCES↗

The Challenges Of Investigating And Remediating Port Hope's Small-Scale Urban Properties - 13115

An important component of the Port Hope Project, the larger of the two projects comprising the Port Hope Area Initiative (PHAI), is the investigation of all 4,800 properties in the Municipality of Port Hope for low level radioactive waste (LLRW) and the remediation of approximately 10% of these. Although the majority of the individual properties are not expected to involve technically sophisticated remediation programs, the large number of property owners and individually unique properties are expected to present significant logistic challenges that will require a high degree of planning, organization and communication. The protocol and lessons learned described will be of interest to those considering similar programs. Information presented herein is part of a series of papers presented by the PHAI Management Office (PHAI MO) at WM Symposium '13 describing the history of the Port Hope Project and current project status. Other papers prepared for WM Symposium '13 address the large-scale site cleanup and the construction of the long-term waste management facility (LTWMF) where all of the LLRW will be consolidated and managed within an engineered, above-ground mound. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lower Three Runs Remediation Safety Preparation Strategy - 13318

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy (US DOE) nuclear facility located along the Savannah River near Aiken, South Carolina that contains six primary stream/river systems. The Lower Three Runs Stream (LTR) is one of the primary streams within the site that is located in the southeast portion of the Savannah River Site. It is a large blackwater stream system that originates in the northeast portion of SRS and follows a southerly direction before it enters the Savannah River. During reactor operations, secondary reactor cooling water, storm sewer discharges, and miscellaneous wastewater was discharged and contaminated a 20 mile stretch of Lower Three Runs Stream that narrows and provides a limited buffer of US DOE property along the stream and flood-plain. Based on data collected during the years 2009 and 2010 under American Recovery and Re-investment Act funding, the stream was determined to be contaminated with cesium-137 at levels that exceeded acceptable risk based limits. In agreement with the Environmental Protection Agency and the South Carolina Department of Health and Environmental Control, three areas were identified for remediation [1] (SRNS April 2012). A comprehensive safety preparation strategy was developed for safe execution of the LTR remediation project. Contract incentives for safety encouraged the contractor to perform a complete evaluation of the work and develop an implementation plan to perform the work. The safety coverage was controlled to ensure all work was observed and assessed by one person per work area within the project. This was necessary due to the distances between the fence work and three transects being worked, approximately 20 miles. Contractor Management field observations were performed along with DOE assessments to ensure contractor focus on safe performance of the work. Dedicated ambulance coverage for remote worker work activities was provided. This effort was augmented with access to medical evacuation services. The areas where the work was performed were remote and difficult to get emergency vehicles to in a timely manner in case of an accident. Satellite phones were utilized due to intermittent phone coverage. High visibility vests were utilized to enable any hunters in the area to see the workers; due to the limited buffer areas along the stream route. An innovative approach to providing the necessary protection for workers during periods of extreme heat and humidity was also employed, which included the use of 'heat islands' with fans and crew trailers and ice vests for workers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗