Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RADIOACTIVE WASTE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Automated Store Management For Drum Storage Facility

This paper describes advanced system technology developed for a new Drum Storage Facility to be operated by Taiwan Power Company (TPC). A logistics management concept is applied for the storage of solid rad-wastes in terms of automated handling, transportation and storing as well as in terms of data management. The individual equipments, such as automated Bridge Cranes, Automatic Guided Vehicles and auxiliary systems are introduced in this paper and the store management process is outlined. The authors report furthermore on challenges during the design and engineering phase and review the project implementation from the equipment supplier's end. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Phenix Power Plant Decommissioning Project - Removal of Core and Neutron Blanket Components

Phenix is a sodium-cooled fast neutron reactor located at the CEA's Rhone Valley Center where it was commissioned in 1974. It has an electric power rating of 250 MW and is operated jointly by the CEA and EDF. Its primary role today is to investigate the transmutation of long-lived radioactive waste into shorter-lived wasteform. Its final shutdown is scheduled for the beginning of 2009 in accordance with the reactor operating program with a mean availability of 80%. In this context the Phenix Power Plant Decommissioning Project was initiated in 2003. It covers the definitive cessation of plant operation and the dismantling (D and D) operations together with the final shutdown preparatory phase. The final shutdown phase corresponds to the initial operations undertaken to remove the maximum of hazardous materials. During this phase, subject to the standard operating methodological procedures, all the fuel in the plant will be removed and most of the other reactor core elements and other removable components (primary pumps, intermediate heat exchangers, control rod mechanisms, etc.) will be also dismantled and packaged in accordance with the available disposition routes. The core elements include fissile and fertile subassemblies, steel reflectors, and lateral neutron shielding rods. About half the lateral neutron shielding rods are accessible using the existing handling equipment; specific development work will be necessary to remove the others. Multiple engineering studies are in progress concerning the removal of the core elements. They address safety concerns taking into account thermal and seismic stresses, waste management including radiological characterization of the objects to be removed and the specification of suitable disposal routes (interim storage or disposal facilities), and scenario studies with the definition of each stage of the waste removal process. All these aspects are discussed in this paper. The feasibility of removing the core elements has been demonstrated with regard to handling and safety. A new handling arm is now being developed to remove the inaccessible core elements. The new earthquake safety calculations completed in 2006 did not reveal any insurmountable difficulties. Major work remains to characterize the core elements and determine the capacity of the disposition routes. The characterization program now in progress will validate the core element activation levels, but must be supplemented by a program to characterize the surface contamination from the primary sodium system. Concerning the disposition routes, several specific containers and shipping casks must be developed; engineering studies are now in progress to obtain the necessary approvals.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Waste Management Strategy for Dismantling Waste to Reduce Costs for Power Plant Decommissioning - 13543

Decommissioning of nuclear power plants generates large volumes of radioactive or potentially radioactive waste. The proper management of the dismantling waste plays an important role for the time needed for the dismantling phase and thus is critical to the decommissioning cost. An efficient and thorough process for inventorying, characterization and categorization of the waste provides a sound basis for the planning process. As part of comprehensive decommissioning studies for Nordic NPPs, Westinghouse has developed the decommissioning inventories that have been used for estimations of the duration of specific work packages and the corresponding costs. As part of creating the design basis for a national repository for decommissioning waste, the total production of different categories of waste packages has also been predicted. Studsvik has developed a risk based concept for categorization and handling of the generated waste using six different categories with a span from extremely small risk for radiological contamination to high level waste. The two companies have recently joined their skills in the area of decommissioning on selected market in a consortium named 'ndcon' to further strengthen the proposed process. Depending on the risk for radiological contamination or the radiological properties and other properties of importance for waste management, treatment routes are proposed with well-defined and proven methods for on-site or off-site treatment, activity determination and conditioning. The system is based on a graded approach philosophy aiming for high confidence and sustainability, aiming for re-use and recycling where found applicable. The objective is to establish a process where all dismantled material has a pre-determined treatment route. These routes should through measurements, categorization, treatment, conditioning, intermediate storage and final disposal be designed to provide a steady, un-disturbed flow of material to avoid interruptions. Bottle-necks in the process causes increased space requirements and will have negative impact on the project schedule, which increases not only the cost but also the dose exposure to personnel. For these reasons it is critical to create a process that transfers material into conditioned waste ready for disposal as quickly as possible. To a certain extent the decommissioning program should be led by the waste management process. With the objective to reduce time for handling of dismantled material at site and to efficiently and environmental-friendly use waste management methods (clearance for re-use followed by clearance for recycling), the costs for the plant decommissioning could be reduced as well as time needed for performing the decommissioning project. Also, risks for delays would be reduced with a well-defined handling scheme which limits surprises. Delays are a major cost driver for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Aging Tests of Vendor-Produced Blended Feed Simulant

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is procuring through Pacific Northwest National Laboratory (PNNL) a minimum of five 3,500 gallon batches of waste simulant for Phase 1 testing in the Pretreatment Engineering Platform (PEP). To make sure that the quality of the simulant is acceptable, the production method was scaled up starting from laboratory-prepared simulant through 15-gallon vendor prepared simulant and 250-gallon vendor prepared simulant before embarking on the production of the 3500-gallon simulant batch by the vendor. The 3500-gallon PEP simulant batches were packaged in 250-gallon high molecular weight polyethylene totes at NOAH Technologies. The simulant was stored in an environmentally controlled environment at NOAH Technologies within their warehouse before blending or shipping. For the 15-gallon, 250-gallon, and 3500-gallon batch 0, the simulant was shipped in ambient temperature trucks with shipment requiring nominally 3 days. The 3500-gallon batch 1 traveled in a 70-75°F temperature controlled truck. Typically the simulant was uploaded in a PEP receiving tank within 24-hours of receipt. The first uploading required longer with it stored outside. Physical and chemical characterization of the 250-gallon batch was necessary to determine the effect of aging on the simulant in transit from the vendor and in storage before its use in the PEP. Therefore, aging tests were conducted on the 250-gallon batch of the vendor-produced PEP blended feed simulant to identify and determine any changes to the physical characteristics of the simulant when in storage. The supernate was also chemically characterized. Four aging scenarios for the vendor-produced blended simulant were studied: 1) stored outside in a 250-gallon tote, 2) stored inside in a gallon plastic bottle, 3) stored inside in a well mixed 5-L tank, and 4) subject to extended temperature cycling under summer temperature conditions in a gallon plastic bottle. The following series of aging tests were conducted to accomplish these objectives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

From passive storage to daily waste retrieval; changing the working culture at Sellafield's pile fuel storage pond

The Pile Fuel Storage Pond (PFSP) was built in 1948/50 to treat materials from the Windscale Piles. Multiple operational regimes over the intervening 60 years have resulted in a complex inventory of spent nuclear fuels, solid and liquid intermediate level wastes. A coordinated programme of work, designed to retrieve and safely dispose of the pond contents, has been implemented to enable the decommissioning of the facility. The long period of passive storage operations which preceded the implementation of the programme meant that the operator was faced with a dual challenge of providing new technical capability and changing a working culture that was inappropriate for the dynamic environment required to successfully deliver the programme. It was recognised that the nature of the programme meant that implementing a standard manufacturing approach to operations would not be appropriate. In order to create a dynamic retrievals focussed working culture, the operator has vigorously embraced change programmes aimed at improving a number of working practices including encouraging innovation, managing integrated but flexible production schedules, and encouraging work-face problem solving. The combined impact of beginning to resolve the technical challenges and focussing on the delivery culture has resulted in the facility making a step change towards becoming fully retrievals operations focussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimisation of the Management of Higher Activity Waste in the UK - 13537

The Upstream Optioneering project was created in the Nuclear Decommissioning Authority (UK) to support the development and implementation of significant opportunities to optimise activities across all the phases of the Higher Activity Waste management life cycle (i.e. retrieval, characterisation, conditioning, packaging, storage, transport and disposal). The objective of the Upstream Optioneering project is to work in conjunction with other functions within NDA and the waste producers to identify and deliver solutions to optimise the management of higher activity waste. Historically, optimisation may have occurred on aspects of the waste life cycle (considered here to include retrieval, conditioning, treatment, packaging, interim storage, transport to final end state, which may be geological disposal). By considering the waste life cycle as a whole, critical analysis of assumed constraints may lead to cost savings for the UK Tax Payer. For example, it may be possible to challenge the requirements for packaging wastes for disposal to deliver an optimised waste life cycle. It is likely that the challenges faced in the UK are shared in other countries. It is therefore likely that the opportunities identified may also apply elsewhere, with the potential for sharing information to enable value to be shared. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Content Addition and Testing for 2017 NRC Amendment for the Versa-Pac Type A Fissile Packaging - 18120

The Versa-Pac is a certified Type A, fissile packaging (USA NRC Certificate no. USA/9342/AF-96), often used as a waste package for one time use. Continuous content additions have improved the versatility of the package resulting in expanded uses for the nuclear industry. Principal design of the Versa-Pac packaging maintains the use of an inner liner positioned inside a 55-gallon (VP-55) or 110-gallon drum (VP-110), as used for decades in the transport and disposal of Type A fissile materials. The Versa-Pac is used directly or in conjunction with pails, pipe containers, poly bottles, and a variety of smaller containers, inserts and vessels. The Versa-Pac content developments assist the industry with site shutdown, decommissioning, and cleanup operations, allowing for removal, transport, and storage options for the residual waste materials. A 2017 NRC license amendment application adds new capabilities to the Versa-Pac that include a low 1.25 wt% {sup 235}U enriched uranium loading, small quantities of UF{sub 6} in the form of 1S and 2S cylinders, and a payload mass increase from 250 to 350 pounds for the Versa-Pac 55-gallon version (VP-55). The lower uranium enrichment loading of 1.25 wt% {sup 235}U allows for a higher uranium mass limit. The inclusion of 1S and 2S UF{sub 6} cylinders fills an industry need to remove and dispose of long-stored material during site cleanup activities. The content payload mass limit is increased for low contaminated or radioactive heavy metal contents, such as cut plant components and ingots. Regulatory certification of new contents is demonstrated by test, analysis, and a combination of these techniques to show that the design function of the Versa-Pac as a Type A fissile package remains unchanged. Specific UF{sub 6} criticality and thermal analysis upgrades are added to the design documentation to accommodate 1S and 2S UF{sub 6} cylinders. The parameters for criticality analyses are simplified, ensuring no credit for cylinder containment is required for HAC thus reducing the reliance on a single specific shoring device. An upgrade of the Versa-Pac thermal analysis demonstrates compliance with ANSI N14.1 UF{sub 6} cylinder thermal limits. A new drop test sequence for the VP-55 was performed, documenting the addition of the 350-pound payload and demonstrating the VP-55 maintains structural integrity during the NCT and HAC drop, crush and puncture events as defined by 10 CFR 71. The testing and analyses show no loss of the material occurs and the package maintains the material in a subcritical state. This paper traces the engineering and licensing efforts involved in expanding the Versa-Pac's versatility for the 2017 NRC amendment application; summarizing the new testing and results for the payload increase, the content addition criticality and thermal evaluations, and content description for the Versa-Pac Safety Analysis Report. The NRC license amendment is scheduled for Winter 2017. Testing and supporting analyses reported in the Versa-Pac Safety Analysis Report demonstrates the content developments met the performance requirements of 10 CFR 71 for a Type A fissile package. A revision of the NRC Certificate of Compliance is expected in Spring 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successful Deployment of System for the Storage and Retrieval of Spent/Used Nuclear Fuel from Hanford K-West Fuel Storage Basin-13051

In 2012, a system was deployed to remove, transport, and interim store chemically reactive and highly radioactive sludge material from the Hanford Site's 105-K West Fuel Storage Basin that will be managed as spent/used nuclear fuel. The Knockout Pot (KOP) sludge in the 105-K West Basin was a legacy issue resulting from the spent nuclear fuel (SNF) washing process applied to 2200 metric tons of highly degraded fuel elements following long-term underwater storage. The washing process removed uranium metal and other non-uranium constituents that could pass through a screen with 0.25-inch openings; larger pieces are, by definition, SNF or fuel scrap. When originally retrieved, KOP sludge contained pieces of degraded uranium fuel ranging from 600 microns (μm) to 6350 μm mixed with inert material such as aluminum hydroxide, aluminum wire, and graphite in the same size range. In 2011, a system was developed, tested, successfully deployed and operated to pre-treat KOP sludge as part of 105-K West Basin cleanup. The pretreatment process successfully removed the vast majority of inert material from the KOP sludge stream and reduced the remaining volume of material by approximately 65 percent, down to approximately 50 liters of material requiring management as used fuel. The removal of inert material resulted in significant waste minimization and project cost savings because of the reduced number of transportation/storage containers and improvement in worker safety. The improvement in worker safety is a result of shorter operating times and reduced number of remote handled shipments to the site fuel storage facility. Additionally in 2011, technology development, final design, and cold testing was completed on the system to be used in processing and packaging the remaining KOP material for removal from the basin in much the same manner spent fuel was removed. This system was deployed and successfully operated from June through September 2012, to remove and package the last of the SNF fragments from the 105-K West Basin, ending the long and complex history of the KOP sludge materials. The planning and execution of this project demonstrated how the graded application of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets[1], DOE-STD-1189-2008, Integration of Safety into the Design Process[2], and DOE G 413.3-4, U.S. Department of Energy Technology Readiness Assessment Guide[3], can positively affect the outcome of project implementation in the DOE Complex. Provided herein are relevant information, ideas, and tools for use by other projects facing similar issues in managing high risk waste streams in a complex regulatory environment. Positive aspects are also provided of appropriate time spent in detailed planning, design, and testing in non-hazardous environments to reduce project risks in both cost and safety performance, as well as improving confidence in meeting project goals through predictable and reliable performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Geophysical Logging at the Hanford Single-Shell Tank Farms: Maintaining Efficiency and Reducing Personnel Hazards - 16190

Vadose zone characterization around groups of underground waste storage tanks (known as tank farms) at the US DOE Hanford Site in Washington State is conducted to assess the presence and extent of manmade gamma-ray emitting radionuclides. Boreholes around the tanks are characterized using a high-resolution spectral gamma logging system (SGLS). In the past, logging operations required workers to remain inside the tank farm boundary during data acquisition. This approach was effective; however, personnel were at risk of exposure to potential radiological hazards, chemical hazards, and/or vapor releases that can be associated with the tank farm environment. Limitations associated with this work environment necessitated a new approach in order to decrease the amount of time personnel spent in the farm without affecting work productivity and efficiency. In order to accomplish this, a new remote logging cable support (RLCS) was developed and implemented which effectively removed workers from the hazards associated with the tank farm environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Polymer Lifetime in Plutonium Storage Containers - 18508

The plutonium facility at Los Alamos National Laboratory utilizes stainless steel containers for interim storage of plutonium compounds, metals, alloys, and process residues. Various polymer materials are used in these containers, including neoprene rubber gaskets, Viton O-rings, polytetrafluoroethylene membranes, and polyvinyl chloride bags. The DOE Manual, M441.1-1, requires storage containers to have a technically justified design life, and these polymer components play a key role in the determination of the overall design life for the containers. The capabilities at Los Alamos for monitoring degradation and estimating the design life of polymer materials used in plutonium storage containers will be described, along with the results of the lifetime determination studies for the polymer components used in SAVY-4000 and Hagan containers and some proposed alternatives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of Material Recycling During the Decommissioning Process of Nuclear Power Plants - 16123

The German Government decided in 2011 to phase out nuclear power. Therefore, in the near future there will be several nuclear power plants queued up, in parallel, for dismantling. In nuclear decommissioning there is no standardized procedure available, so that a high level of optimization potential can be assumed. We present the results of a preliminary study, in which the optimization potential of metal recycling during the dismantling process should be estimated. The project can be roughly divided into four sections: - Determination of the metal inventory of an exemplarily selected plant; - Analysis of the recycling routes of scrap metal fractions and assessment of the potential for optimization of each process step during the dismantling; - Conduction of activation calculations to uncover the potential of interim storage allowing for radioactive decay; - In collaboration with the Institute of Process Metallurgy and Metal Recycling at the RWTH Aachen, appropriate process steps and process chains of an optimized metal recycling for each of the resulting scrap metal fractions are identified. The paper and the presentation summarize the status and the results of the project implementation and will address for the optimization potentials for decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada Higher Education Benefits from US Department of Energy (DOE) Environmental Management (EM) Nevada Program's Transfer of Geologic Samples - 20442

The Nevada National Security Site (NNSS), formerly the Nevada Test Site, was the location of 100 historic atmospheric and 828 historic underground nuclear tests from 1951 to 1992. Related to this historic nuclear testing, geologic and hydrologic studies of the site were conducted utilizing the skills and the expertise of the U.S. Geological Survey (USGS) and national laboratories (Los Alamos National Laboratory, Lawrence Livermore National Laboratory), who were principal in leading the development of weapons and were responsible for specific underground testing programs. The subsurface samples and technical/scientific data associated with NNSS geologic studies (past and present) are preserved and stored at the USGS Mercury Core Library and Data Center located at the NNSS. Currently, the facility stores over 2,000,000 linear feet of cores and cuttings from more than 2,600 drill holes that can be accessed for study. Most of the samples and historic geologic work was focused directly on subsurface geologic settings that relate directly to historic underground nuclear testing. Since 1992, the United States has observed a unilateral moratorium on full-scale nuclear testing, and the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program is now responsible for hydrogeologic characterization of the potential impacts to the natural groundwater systems that may have resulted from historic underground nuclear tests. As part of this effort, the EM Nevada Program Underground Test Area (UGTA) Activity has drilled and completed over 58 deep (2,000 - 7,000 ft.) characterization wells, totaling in excess of 170,000 linear feet of cuttings and core samples. Cutting samples were collected as triplicate samples for each respective depth interval, to account for potential later nondestructive/destructive analysis and to preserve samples for regulatory purposes. Recently, it was recognized by the EM Nevada Program that opportunities may exist to reduce the cost and floor space required for the storage of geologic samples at the Mercury Core Library without impacting the integrity and representative nature of the samples necessary for project execution. An initiative was sponsored by EM Nevada Program to evaluate several options: 1) disposal of a portion of cuttings and cores in a land fill setting; 2) reduction in sample volume through skeletonizing core and cuttings from wells to a representative but much smaller number of samples; and 3) solicit potential interest in the academic community where other geoscientists could freely access the samples for studies. The Nevada state university system through the Nevada Bureau of Mines and Geology responded positively to the opportunity to receive these NNSS samples from the EM Nevada Program. In June 2019, approximately 17,000 geologic samples, representing greater than 170,000 linear feet of drilling and weighing over 20,000 pounds, were shipped from the NNSS to the Great Basin Science Sample and Records Library located in Reno, Nevada. The benefits resulting from this transfer were realized by the EM Nevada Program in terms of cost and space savings for geologic sample storage at the NNSS. The transfer did not impact the EM Nevada Program mission as access to representative geologic samples for regulatory and scientific purposes was preserved. Moreover, the Nevada Bureau of Mines and Geology acquired a significant resource of subsurface geologic samples and supporting technical data to support academic and scientific studies in a complex volcanic setting in southwest Nevada. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenging Engineering Demographics and the READY Program - 18528

The mission of the Liquid Waste Organization at the Savannah River Site involves the safe storage of nuclear waste, closure of waste tanks, and immobilization of the waste into grout (low-level waste) or glass (high-level waste). With much of the mission left to complete and a significant percentage of the engineering organization eligible for retirement within the next 5 years, focus has been on recruiting and retaining new hires and early career engineers. Over the past two years, enhancements have been made to current programs and new programs have been created with the goal of improving the retention rate for engineering. These programs include the Reaching Engineers at the Development Years, the Early Career Professional Technology Exchange, the Shift Technical Engineer Pipeline, and Technical Staff Training. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The SAVY 4000 Container Storage Program at Los Alamos National Laboratory - 17313

Incidents involving release of nuclear materials stored in containers of convenience such as food pack cans, slip lid taped cans, paint cans, etc. has resulted in the U.S. Defense Nuclear Safety Board concerns over the lack of prescriptive performance requirements for interim storage of nuclear materials. Los Alamos National Laboratory (LANL) has shared in these incidents and in response proactively moved into developing a performance based storage container design, the SAVY-4000{sup R}. The SAVY-4000{sup R} is the first vented general use nuclear material container demonstrated to meet the requirements of DOE M 441.1-1, Nuclear Material Packaging Manual. The SAVY-4000{sup R} is an innovative and creative design demonstrated by the fact that it can be opened and closed in a few seconds without torque wrenches or other tools; has a built-in, fire-rated filter that prevents the build-up of hydrogen gas, yet retains 99.97% of plutonium particulates, and prevents release of material even in a 12 foot drop. Finally, it has been fire then drop tested and will reduce the risk to the public in the event of an earthquake/fire scenario. This will allow major nuclear facilities to credit the container towards source term Material at Risk (MAR) reduction. The container was approved for nuclear material storage in the TA-55 Plutonium Facility on March 15, 2011, and there are currently over 2000 SAVY-4000{sup R} containers available for use within the facility. A Safety Analysis Report was developed to demonstrate Manual 441.1-1 compliance and was approved April, 2014. The first four SAVY-4000{sup R} containers were packaged with plutonium on August 2, 2011. Key aspects of the SAVY-4000{sup R} vented storage container design will be discussed which include design description, qualification and testing, surveillance strategy, and the design life extension program as enhanced by surveillance activities with the intent to extend well beyond the current five year design life. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Drying Model for Fukushima Fuel Debris - 17489

The FATE{sup TM} code is a well-established software tool for simulation of processing, shipping, and interim storage of damaged spent nuclear fuel (SNF) that was used for process design and safety analysis for the Hanford Spent Nuclear Fuel Program (SNFP). This paper describes new model developments that allow FATE to be used for simulation of drying of damaged LWR fuel and, in particular, for simulation of processing, shipping, and interim storage of Fukushima fuel debris. The model is capable of quantifying important tradeoffs in the debris chunk size, process conditions such as temperature and pressure, container size, etc. to optimize process design. The model is also capable of demonstrating proof-of-dryness and to demonstrate the link between observed quantities such as pressure and the amount of residual water. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Situ Stabilization of Inactive Low Level Waste Pipelines in the Melton Valley Watershed at Oak Ridge National Laboratory

The Melton Valley watershed at Oak Ridge National Laboratory (ORNL) contained an inactive waste pipeline system consisting of approximately 12 kilometers of buried waste pipelines and over 142 m{sup 3} in surface/subsurface appurtenances (e.g., vents, valve pits, pump vaults, etc.). Historically, the system was used to transport liquid low level and process waste between generator facilities in Melton Valley, storage and disposal sites in Melton Valley, and storage/treatment facilities in Bethel Valley. The selected remedy in the Melton Valley Record of Decision (ROD) for inactive pipelines was isolation, removal, or stabilization. Pipeline remediation activities began in the summer of 2005 and were completed in the spring of 2006. The task entailed an iterative process of selecting pipeline access points, excavating and exposing pipelines, performing tapping, draining and cutting activities, either installing fittings for grouting or plugging and capping the lines. Grouting was accomplished using paired access points, with one location serving as the grout injection point and the other as vent/drain and grout confirmation point. Grouting was conducted by pumping a cement-bentonite grout into the specially installed fittings and typically proceeded from a low point to a high point to ensure complete filling of the pipeline (i.e., no void space). The project successfully grouted a total of 8,454 meters (linear distance) of pipeline; another 3,573 meters of pipeline was stabilized through isolation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Going the Distance? NRC's Response to the National Academy of Science's Transportation Study

In February 2006, the National Academy of Sciences (NAS) published the results of a 3 1/2-year study, titled Going the Distance, that examined the safety of transporting spent nuclear fuel (SNF) and high level waste (HLW) in the United States. NAS initiated this study to address what it perceived to be a national need for an independent, objective, and authoritative analysis of SNF and HLW transport in the United States. The study was co-sponsored by the U.S. Nuclear Regulatory Commission (NRC), the U.S. Department of Energy (DOE), the U.S. Department of Transportation (DOT), the Electric Power Research Institute and the National Cooperative Highway Research Program. This paper addresses some of the recommendations made in the NAS study related to the performance of SNF transportation casks in long duration fires, the use of full-scale package testing, and the need for an independent review of transportation security prior to the commencement of large scale shipping campaigns to an interim storage site or geologic repository. In conclusion: The NRC believes that the current regulations in 10 CFR Part 71 for the design of SNF and HLW transportation packages provide a very high level of protection to the public for very severe accidents and credible threat scenarios. As recommended by the NAS study, additional studies of accidents involving severe fires have been completed. These studies have confirmed that spent fuel casks would be expected to withstand very severe fires without the release of any fission products from the spent fuel. Additionally, changes in rail operating procedures such as the use of dedicated trains and prohibition on the co-location of SNF and flammable liquids in rail tunnels can further reduce the already low probability of severe rail accident fires involving SNF and HLW. (authors)

42 ENGINEERING↗

Novel Approach for Considering Ecosystem Services at Industrial Sites near Agricultural Lands - 19482

Natural resource damages from industrial operations have been studied for years at legacy sites, including the U.S. Department of Energy Hanford site in southeastern Washington State. Encompassing nearly 1,500 km{sup 2} (600 mi{sup 2}), this site represents one of the world's largest cleanup projects with an estimated cost exceeding $320 billion and perhaps double that. The site includes an extensive buffer zone beyond the relatively limited portion (15%) used for nuclear materials production and associated waste storage and disposal. Before Hanford existed, most of the local lands were used for agriculture, and that use has continued nearby. Historical data relevant to the natural resource damage assessment process include location-specific irrigation practices, rates of groundwater withdrawal, and sustainable yields. The potential for considering the benefit of an ecosystem service is also being explored. Undeveloped areas of the site have long provided natural habitat for a wide variety of species, including pollinators. Thus, adjacent agricultural lands have benefited from pollinator services for years. This study describes a novel approach for considering the benefit of increased crop value due to this pollinator service. The approach combines spatial data for local pollinator-dependent crops with pollinator abundance data. A production function is then applied to estimate the agro-economic value resulting from crop pollination. A preliminary analysis indicates that the increased value for apple crops alone near Hanford could be on the order of $80 million a year. The benefits from this ecosystem service could offer practical context as a complement to the assessment of natural resource damages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗