Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Qualification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Qualification of niobium materials for superconducting radio frequency cavity applications: View of a condensed matter physicist

We address the issue of qualifications of the niobium materials to be used for superconducting radio frequency (SCRF) cavity fabrications, from the point of view of a condensed matter physicist/materials scientist. We focus on the particular materials properties of niobium required for the functioning a SCRF cavity, and how to optimize the same properties for the best SCRF cavity performance in a reproducible manner. In this way the niobium materials will not necessarily be characterized by their purity alone, but in terms of those materials properties, which will define the limit of the SCRF cavity performance and also other related material properties, which will help to sustain this best SCRF cavity performance. Furthermore we point out the need of standardization of the post fabrication processing of the niobium-SCRF cavities, which does not impair the optimized superconducting and thermal properties of the starting niobium-materials required for the reproducible performance of the SCRF cavities according to the design values.

43 PARTICLE ACCELERATORS↗

Qualification of a sublimation tool applied to the case of metalorganic chemical vapor deposition of In{sub 2}O{sub 3} from In(tmhd){sub 3} as a solid precursor

A solid delivery system consisting of a source canister, a gas management, and temperature controlled enclosure designed and manufactured by Air Liquide Electronics Systems was tested in the context of gas-phase delivery of the In(tmhd){sub 3} solid precursor. The precursor stream was delivered to a thermal metalorganic chemical vapor deposition reactor to quantify deposition yield under various conditions of carrier gas flow and sublimation temperature. The data collected allowed the determination of characteristic parameters such as the maximum precursor flow rate (18.2 mg min{sup −1} in specified conditions) and the critical mass (defined as the minimum amount of precursor able to attain the maximum flow rate) found to be about 2.4 g, as well as an understanding of the influence of powder distribution inside the canister. Furthermore, this qualification enabled the determination of optimal delivery conditions which allowed for stable and reproducible precursor flow rates over long deposition times (equivalent to more than 47 h of experiment). The resulting In{sub 2}O{sub 3} layers was compared with those elaborated via pulsed liquid injection obtained in the same chemical vapor deposition chamber and under the same deposition conditions.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Plasma–wall interaction studies within the EUROfusion consortium: progress on plasma-facing components development and qualification

The provision of a particle and power exhaust solution which is compatible with first-wall components and edge-plasma conditions is a key area of present-day fusion research and mandatory for a successful operation of ITER and DEMO. The work package plasma-facing components (WP PFC) within the European fusion programme complements with laboratory experiments, i.e. in linear plasma devices, electron and ion beam loading facilities, the studies performed in toroidally confined magnetic devices, such as JET, ASDEX Upgrade, WEST etc. The connection of both groups is done via common physics and engineering studies, including the qualification and specification of plasma-facing components, and by modelling codes that simulate edge-plasma conditions and the plasma–material interaction as well as the study of fundamental processes. WP PFC addresses these critical points in order to ensure reliable and efficient use of conventional, solid PFCs in ITER (Be and W) and DEMO (W and steel) with respect to heat-load capabilities (transient and steady-state heat and particle loads), lifetime estimates (erosion, material mixing and surface morphology), and safety aspects (fuel retention, fuel removal, material migration and dust formation) particularly for quasi-steady-state conditions. Alternative scenarios and concepts (liquid Sn or Li as PFCs) for DEMO are developed and tested in the event that the conventional solution turns out to not be functional. Here, we present an overview of the activities with an emphasis on a few key results: (i) the observed synergistic effects in particle and heat loading of ITER-grade W with the available set of exposition devices on material properties such as roughness, ductility and microstructure; (ii) the progress in understanding of fuel retention, diffusion and outgassing in different W-based materials, including the impact of damage and impurities like N; and (iii), the preferential sputtering of Fe in EUROFER steel providing an in situ W surface and a potential first-wall solution for DEMO.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

RF cavity design and qualification for proton accelerator

Alvarez type Drift Tube Linac (DTL) is used for acceleration of proton beam in low energy section of beta ranging from 0.04 to 0.40. DTL is cylindrical RF cavity resonating in TM010 mode at 352.21 MHz frequency. It consists of array of drift tubes arranged ensuring that DTL centre and Drift Tube centre are concentric. The Drift Tubes also houses Permanent Magnet Quadrupole for transverse focusing of proton beam. A twelve cell prototype of DTL section is designed, developed and fabricated at Bhabha Atomic Research Centre, Trombay. Complete DTL accelerator consists of eight such DTL sections. High frequency microwave simulations are carried out in SOPRANO, vector fields and COMSOL simulation software. This prototype DTL is 1640.56 mm long cavity with 520 mm ID, 600 mm OD and consists of eleven Drift Tubes, two RF end flanges, three slug tuners, six post couplers, three RF field monitors, one RF waveguide coupler, two DN100 vacuum flanges and DTL tank platform with alignment features. Girder based Drift tube mounting arrangement utilizing uncompressing energy of disc springs for optimum combo RF-vacuum seal compression is worked out and implemented. This paper discusses design of this RF vacuum cavity operating at high accelerating field gradient in ultra-high vacuum. Detailed vacuum design and results of RF and vacuum qualifications are discussed. Results on mechanical accuracy achieved on scaled pre-prototype are also presented. Paper summarizes the engineering developments carried out for this RF cavity and brings out the future activities proposed in indigenous development of high gradient RF cavities for ion accelerators. (author)

43 PARTICLE ACCELERATORS↗

Electromagnetic design, engineering development and magnetic qualification of a horizontal layered scaled magnet for physics experiments

Neutrino detectors around the world have shown evidence that these weakly interacting, little-understood particles are not really mass less, as was thought so far. Not only do they have non-zero masses, different species (or flavors) of neutrinos seem to mix and oscillate into one another as they traverse through the cosmos. If this is true, this is not only one of the first pieces of evidence for physics beyond the so-called Standard Model of Particle Physics, but would also have great impact on diverse fields such as nuclear and particle physics, astrophysics and cosmology. It is thus imperative to study the details of the interactions of these particles. These will be detected by means of an iron calorimeter (ICAL), comprising detectors sandwiched in alternate layers of soft magnetic iron. The iron core is magnetized to allow bending of the charged particles. The direction and the energy of the original incoming neutrino, that caused the interaction, can then be accurately determined. Racetrack coils through slots cut in the iron core create a uniform magnetic field in the iron core. A highly uniform magnetic field in the soft iron core is required to accurately determine the mass and energy of incident particle. The charged particles bend in this magnetic field; oppositely charged particles bending in opposite directions. The charge, energy and momentum of the emitted particle is thus determined. An electromagnet was designed as a laboratory facility for conducting experimental studies in particle physics. This paper discusses the electromagnetic design, development, fabrication, magnetic qualification and magnetic measurement issues of an electromagnet developed for physics studies. (author)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Qualification High Voltage Testing of Short Triax HTS Cables in the Laboratory

In order to qualify the electrical insulation design of future HTS cables installed in the electric grid, a number of high voltage qualification tests are generally performed in the laboratory on either single-phase model cables and/or actual three-phase cable samples. Prior to installation of the 200-m Triax HTS cable at the American Electric Power Bixby substation near Columbus, Ohio, in September, 2006, such tests were conducted on both single-phase model cables made at ORNL and tri-axial cable sections cut off from cable made on a production run. The three-phase tri-axial design provides some specific testing challenges since the ground shield and three phases are concentric about a central former with each phase separated by dielectric tape insulation immersed in liquid nitrogen. The samples were successfully tested and qualified for partial discharge inception, AC withstand, and lightning impulse where voltage is applied to one phase with the other phases grounded. In addition one of the phase pairs was tested for dc withstand as a ldquoworst caserdquo scenario to simulate the effect of VLF (Very Low Frequency) tests on the actual cable installed at the Bixby site. The model and prototype cables will be described and the high voltage test results summarized.

36 MATERIALS SCIENCE↗

Mechanical qualification of the support structure for MQXF, the Nb 3 Sn low-β quadrupole for the high luminosity LHC

Within the scope of the High Luminosity LHC project, the collaboration between CERN and U.S. LARP is developing new low-β quadrupoles using the Nb 3 Sn superconducting technology for the upgrade of the LHC interaction regions. The magnet support structure of the first short model was designed and two units were fabricated and tested at CERN and at LBNL. The structure provides the preload to the collars-coils subassembly by an arrangement of outer aluminum shells pre-tensioned with water-pressurized bladders. For the mechanical qualification of the structure and the assembly procedure, superconducting coils were replaced with solid aluminum “dummy coils”, the structure was preloaded at room temperature, and then cooled-down to 77 K. Mechanical behavior of the magnet structure was monitored with the use of strain gauges installed on the aluminum shells, the dummy coils and the axial preload system. As a result, this paper reports on the outcome of the assembly and the cool-down tests with dummy coils, which were performed at CERN and at LBNL, and presents the strain gauge measurements compared to the 3D finite element model predictions.

43 PARTICLE ACCELERATORS↗

Superconducting Magnet Qualification Methodology for the Material Plasma Exposure Experiment

The Material Plasma Exposure eXperiment (MPEX), currently under design, is a new linear plasma device to advance the understanding of plasma-material interactions through the generation and delivery of plasmas as they are expected in future fusion reactor divertors. MPEX will be a steady-state device to study high-fluence exposures of plasma-facing materials and components. The requirements for the magnetic field at the target and the heating stages make the application of superconducting coils necessary. Conceptual designs for the superconducting magnets have been developed, and multiple cryostats with warm bore diameters of either 65 cm or 156 cm are envisioned to facilitate their integrated and timely assembly with other systems such as vacuum, water cooling, and RF power. Although design, fabrication, and testing for the magnets as stand-alone units are straightforward, challenges will arise during the integration of the system. Two different field profiles will be used during operation. The magnetic field where the electron cyclotron heating occurs needs to operate at both 1.25 and 2.5 T. It is critical that the magnets all share the same magnetic axis and alignment. The mutual inductance between cryostats will affect the quench behavior of the system. Also, cryostat-to-cryostat forces can be as large as 700 kN, and the magnitude and direction will change depending on which coils are energized. The design of the system must take those characteristics into account along with the quench scenarios. This paper describes the qualification approach that will be used to determine whether stand-alone tests can be used to ensure the success of the integrated system. Fiducials will be used to define the location of the magnetic axis for each cryostat to ensure proper alignment. Quench tests of a single magnet will be performed at a current above the normal operating current to account for additional stored energy from the mutual inductance to adjacent cryostats. Also, a 1018 steel plate will be mounted on either end of a cryostat to simulate the cryostat-to-cryostat forces. Requirements for the size and location of the steel plates are described.

Burkhardt, Earle↗

DESIGN ISSUES AND QUALIFICATION OF HYDROFORMED DOUBLE WALLED EXPANSION JOINTS IN VACUUM SERVICE

The Vacuum Auxiliary System for ITER is devoted to pumping out, venting, and purging the vacuum volumes of the tokamak. Over 5000 clients including the cryostat and vacuum vessel, at 8500 m3 and 1400 m3 respectively, are serviced by approximately 150 pumping stations through 6 km of pipework. The piping and functions provided to the clients include component operation, routing of potentially tritiated gases, and timely leak localization. Expansion joints are used to reduce loadings on pumps and piping stresses but also to qualify in-line components having low allowable design loads. The ITER project utilizes vacuum valves that are not designed to withstand typical piping system loadings and require detailed design and evaluation. Loading scenarios prescribed by governing system specifications must be considered. To maintain allowable design loads for components and to keep piping stresses below code requirements, double walled hydroformed expansion joints have been employed in the design. These are not standard items and require custom fabrication. Installation space constraints and adjacent pipe support attachment location availability at ITER limit standard expansion joint installation guidelines provided by the Expasion Joint Manufacturers Association (EJMA). Careful consideration must be given to the analysis model to ensure proper function and life expectancy of the component. These considerations include accurate accounting of thrust forces, thermal movements, seismic accelerations, equipment and building differential displacements. In addition to displacements, the process internal, external, and interspace pressures affect the qualification and selection of the double walled expansion joints. The calculation results shall confirm that deflections, forces, and moments are reasonable for the size and type required for the system’s demands as evaluated against the manufacturer’s design.

Clark, Forrest [ORNL] (ORCID:0009000678106843)↗

Design and qualification of an UHV system for operation on sounding rockets

The sounding rocket mission MAIUS-1 has the objective to create the first Bose–Einstein condensate in space; therefore, its scientific payload is a complete cold atom experiment built to be launched on a VSB-30 sounding rocket. An essential part of the setup is an ultrahigh vacuum system needed in order to sufficiently suppress interactions of the cooled atoms with the residual background gas. Contrary to vacuum systems on missions aboard satellites or the international space station, the required vacuum environment has to be reached within 47 s after motor burn-out. This paper contains a detailed description of the MAIUS-1 vacuum system, as well as a description of its qualification process for the operation under vibrational loads of up to 8.1 g{sub RMS} (where RMS is root mean square). Even though a pressure rise dependent on the level of vibration was observed, the design presented herein is capable of regaining a pressure of below 5 × 10{sup −10} mbar in less than 40 s when tested at 5.4 g{sub RMS}. To the authors' best knowledge, it is the first UHV system qualified for operation on a sounding rocket.

42 ENGINEERING↗

TH-A-207B-02: QIBA Ultrasound Elasticity Imaging System Biomarker Qualification and User Testing of Systems

Imaging of tissue elastic properties is a relatively new and powerful approach to one of the oldest and most important diagnostic tools. Imaging of shear wave speed with ultrasound is has been added to most high-end ultrasound systems. Understanding this exciting imaging mode aiding its most effective use in medicine can be a rewarding effort for medical physicists and other medical imaging and treatment professionals. Assuring consistent, quantitative measurements across the many ultrasound systems in a typical imaging department will constitute a major step toward realizing the great potential of this technique and other quantitative imaging. This session will target these two goals with two presentations. A. Basics and Current Implementations of Ultrasound Imaging of Shear Wave Speed and Elasticity - Shigao Chen, Ph.D. Learning objectives-To understand: Introduction: Importance of tissue elasticity measurement Strain vs. shear wave elastography (SWE), beneficial features of SWE The link between shear wave speed and material properties, influence of viscosity Generation of shear waves External vibration (Fibroscan) ultrasound radiation force Point push Supersonic push (Aixplorer) Comb push (GE Logiq E9) Detection of shear waves Motion detection from pulse-echo ultrasound Importance of frame rate for shear wave imaging Plane wave imaging detection How to achieve high effective frame rate using line-by-line scanners Shear wave speed calculation Time to peak Random sample consensus (RANSAC) Cross correlation Sources of bias and variation in SWE Tissue viscosity Transducer compression or internal pressure of organ Reflection of shear waves at boundaries B. Elasticity Imaging System Biomarker Qualification and User Testing of Systems – Brian Garra, M.D. Learning objectives-To understand: Goals Review the need for quantitative medical imaging Provide examples of quantitative imaging biomarkers Acquaint the participant with the purpose of the RSNA Quantitative Imaging Biomarker Alliance and the need for such an organization Review the QIBA process for creating a quantitative biomarker Summarize steps needed to verify adherence of site, operators, and imaging systems to a QIBA profile Underlying Premise and Assumptions Objective, quantifiable results are needed to enhance the value of diagnostic imaging in clinical practice Reasons for quantification Evidence based medicine requires objective, not subjective observer data Computerized decision support tools (eg CAD) generally require quantitative input. Quantitative, reproducible measures are more easily used to develop personalized molecular medical diagnostic and treatment systems What is quantitative imaging? Definition from Imaging Metrology Workshop The Quantitative Imaging Biomarker Alliance Formation 2008 Mission Structure Example Imaging Biomarkers Being Explored Biomarker Selection Groundwork Draft Protocol for imaging and data evaluation QIBA Profile Drafting Equipment and Site Validation Technical Clinical Site and Equipment QA and Compliance Checking Ultrasound Elasticity Estimation Biomarker US Elasticity Estimation Background Current Status and Problems Biomarker Selection-process and outcome US SWS for Liver Fibrosis Biomarker Work Groundwork Literature search and analysis results Phase I phantom testing-Elastic phantoms Phase II phantom testing-Viscoelastic phantoms Digital Simulated Data Protocol and Profile Drafting Protocol: based on UPICT and existing literature and standards bodies protocols Profile-Current claims, Manufacturer specific appendices What comes after the profile Profile Validation Technical validation Clinical validation QA and Compliance Possible approaches Site Operator testing Site protocol re-evaluation Imaging system Manufacturer testing and attestation User acceptance testing and periodic QA Phantom Tests Digital Phantom Based Testing Standard QA Testing Remediation Schemes Profile Evolution Towards additional applications Towards higher accuracy and precision Supported in part by NIH contract HHSN268201300071C from NIBIB. Collaboration with GE Global Research, no personal support.; S. Chen, Some technologies described in this presentation have been licensed. Mayo Clinic and Dr. Chen have financial interests these technologies.

60 APPLIED LIFE SCIENCES↗

Preparation and Qualification of Jacketed SSR1 Cavities for String Assembly at Fermilab

The qualification of dressed 325 MHz Single Spoke Resonators type 1 (SSR1) to meet technical requirements is an important milestone in the development of the SSR1 cryomodule for the PIP-II Project at Fermilab. This paper reports the procedures and lessons learned in processing and preparing these cavities for horizontal cold testing prior to integration into a cavity string assembly.

43 PARTICLE ACCELERATORS↗

Copper plating qualification process for the fundamental power coupler waveguides for CEBAF cryomodules

To provide sufficient energy for CEBAF operation, cryomodules and components are being refurbished yearly as necessary. Copper plated fundamental power coupler waveguides are important components of the cryomodules. The integrity and quality of copper plating is critical to reduce the heat load from the waveguides into the He bath at 2.07 K. A search of copper plating resources is underway for plating or re-plating CEBAF-style waveguides. This effort ensures a continuous capability of copper plating on cryomodule components, especially on waveguides. To qualify plating vendors, the waveguide copper plating specifications were revisited, and a thorough plating evaluation process is being developed. The evaluation process ranges from coupon testing to sample waveguide qualification. Recent results are summarized and future work is planned.

Zhao, Liang↗

VERIFICATION OF THE DEFENSE WASTE PROCESSING FACILITY'S (DWPF) PROCESS DIGESTION METHOD FOR THE SLUDGE BATCH 7A QUALIFICATION SAMPLE

For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) performs confirmation of the applicability of the digestion method to be used by the DWPF lab for elemental analysis of Sludge Receipt and Adjustment Tank (SRAT) receipt samples and SRAT product process control samples. DWPF SRAT samples are typically dissolved using a room temperature HF-HNO{sub 3} acid dissolution (i.e., DWPF Cold Chem Method, see DWPF Procedure SW4-15.201) and then analyzed by inductively coupled plasma - atomic emission spectroscopy (ICP-AES). This report contains the results and comparison of data generated from performing the Aqua Regia (AR), Sodium peroxide/Hydroxide Fusion (PF) and DWPF Cold Chem (CC) method digestions of Sludge Batch 7a (SB7a) SRAT Receipt and SB7a SRAT Product samples. The SB7a SRAT Receipt and SB7a SRAT Product samples were prepared in the SRNL Shielded Cells, and the SRAT Receipt material is representative of the sludge that constituates the SB7a Batch or qualification composition. This is the sludge in Tank 51 that is to be transferred into Tank 40, which will contain the heel of Sludge Batch 6 (SB6), to form the Sb7a Blend composition.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SAMPLE RESULTS FROM THE INTEGRATED SALT DISPOSITION PROGRAM MACROBATCH 4 TANK 21H QUALIFICATION SAMPLES

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H to qualify them for use in the Integrated Salt Disposition Program (ISDP) Batch 4 processing. All sample results agree with expectations based on prior analyses where available. No issues with the projected Salt Batch 4 strategy are identified. This revision includes additional data points that were not available in the original issue of the document, such as additional plutonium results, the results of the monosodium titanate (MST) sorption test and the extraction, scrub strip (ESS) test. This report covers the revision to the Tank 21H qualification sample results for Macrobatch (Salt Batch) 4 of the Integrated Salt Disposition Program (ISDP). A previous document covers initial characterization which includes results for a number of non-radiological analytes. These results were used to perform aluminum solubility modeling to determine the hydroxide needs for Salt Batch 4 to prevent the precipitation of solids. Sodium hydroxide was then added to Tank 21 and additional samples were pulled for the analyses discussed in this report. This work was specified by Task Technical Request and by Task Technical and Quality Assurance Plan (TTQAP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Qualification of a Carbon Analyzer to Support the Defense Waste Processing Facility

The I-O Model 1030 carbon analyzer has been qualified for use at the Defense Waste Processing Facility (DWPF). The qualification was a side-by-side comparison of the Model 1030 system with the currently used Model 1010 Analyzer. This recommendation is based on side-by-side comparisons of the new unit to the currently used Model 1010 analyzer that are presented in this report. The side-by-side testing included standards and process samples. The standards, which were used for instrument calibration verifications in the measurement of total inorganic carbon (TIC) and of total organic carbon (TOC), were traceable back to the National Institute of Standards and Technology. The process samples included TIC analyses of Sludge Receipt and Adjustment Tank samples and TOC analyses for Slurry Mix Evaporator (SME) samples. After the Model 1030 has been used for production reporting, DWPF should consider an investigation into the uncertainties associated with the TOC measurements to determine how far below the 18,916 ppm limit DWPF must control the average of the measurements for a set of SME samples to account for the uncertainties of the measurements from this new analyzer. Based upon the results presented in this report, it is recommended that the Model 1030 carbon analyzer is qualified for use. This recommendation is based on side-by-side comparisons of the new unit to the currently used Model 1010 analyzer that are presented in this report. The side-by-side testing included standards for instrument calibration verifications for TIC and TOC, and process samples. The standards were traceable back to NIST. The process samples included TIC analyses of SRAT Receipt samples and TOC analyses for SME samples. At some point in the future, after the Model 1030 has been used for production reporting, DWPF should consider an investigation into the uncertainties associated with the TOC measurements to determine how far below the 18,916 ppm limit DWPF must control the average of the measurements for a set of SME samples to account for the uncertainties of the measurements from this new analyzer.

54 ENVIRONMENTAL SCIENCES↗

Reactor Testing and Qualification: Prioritized High-level Criticality Testing Needs

Researchers at the Idaho National Laboratory (INL) were tasked with reviewing possible criticality testing needs to support development of the fission surface power system reactor design. Reactor physics testing can provide significant information to aid in development of technologies associated with small, fast spectrum reactors that could be applied for non-terrestrial power systems, leading to eventual system qualification. Several studies have been conducted in recent years to assess the data and analyses required to design and build a space fission power system with high confidence that the system will perform as designed [Marcille, 2004a, 2004b; Weaver, 2007; Parry et al., 2008]. This report will provide a summary of previous critical tests and physics measurements that are potentially applicable to the current reactor design (both those that have been benchmarked and those not yet benchmarked), summarize recent studies of potential nuclear testing needs for space reactor development and their applicability to the current baseline fission surface power (FSP) system design, and provide an overview of a suite of tests (separate effects, sub-critical or critical) that could fill in the information database to improve the accuracy of physics modeling efforts as the FSP design is refined. Some recommendations for tasks that could be completed in the near term are also included. Specific recommendations on critical test configurations will be reserved until after the sensitivity analyses being conducted by Los Alamos National Laboratory (LANL) are completed (due August 2011).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Results of Initial Analyses of the Macrobatch 5 Tank 21H Qualification Samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Salt (Macro)Batch 5 for the Integrated Salt Disposition Project (ISDP). This document reports the initial results of the analyses of samples of Tank 21H. No issues with the projected Salt Batch 5 strategy are identified. This report describes the laboratory results of Salt (Macro)Batch 5 preliminary samples from Tank 21H. These results will be used by Tank Farm Engineering for their blend calculations. This work was specified by Technical Task Request (TTR) and by Task Technical and Quality Assurance Plan (TTQAP).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗