Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

VTOL as it applies to resource development in the Canadian north

It is pointed out that, for many of the natural resource development projects planned in Canada between now and the end of the century, it may be necessary for the work force to commute to the site by air. Examples of successful operations, including those involving VTOL, are given. A computer program developed for determining the least expensive type of aircraft for commuting to remote projects is described. It is noted that the program can select both fixed-wing and helicopter aircraft types for a specific project, employing such variables as the size and shift schedules of the work force and the commuting distance. Capital and operating costs of existing and proposed aircraft types, as well as groundside infrastructure operations and maintenance costs, are compared for competing aircraft.

Lightfoot, R. N.↗

HLW Return from France to Germany - 15 Years of Experience in Public Acceptance and Technical Aspects - 12149

Since in 1984 the national reprocessing concept was abandoned the reprocessing abroad was the only existing disposal route until 1994. With the amendment of the Atomic Energy Act in 2001 spent fuel management changed completely since from 1 June 2005 any delivery of spent fuel to reprocessing plants was prohibited and the direct disposal of spent fuel became mandatory. Until 2005 the total amount of spent fuel to be reprocessed abroad added up to 6080 t HM, 5309 t HM thereof in France. The waste generated from reprocessing - alternatively an equivalent amount of radioactive material - has to be returned to the country of origin according to the commercial contracts signed between the German utilities and COGEMA, now AREVA NC, in France and BNFL, now INS in UK. In addition the German and the French government exchanged notes with the obligation of both sides to enable and support the return of reprocessing residues or equivalents to Germany. The return of high active vitrified waste from La Hague to the interim storage facility at Gorleben was demanding from the technical view i. e. the cask design and the transport. Unfortunately the Gorleben area served as a target for nuclear opponents from the first transport in 1996 to the latest one in 2011. The protection against sabotage of the railway lines and mass protests needed highly improved security measures. In France and Germany special working forces and projects have been set up to cope with this extraordinary situation. A complex transport organization was established to involve all parties in line with the German and French requirements during transport. The last transport of vitrified residues from France has been completed successfully so far thus confirming the efficiency of the applied measures. Over 15 years there was and still is worldwide no comparable situation it is still unique. Summing up, the exceptional project handling challenge that resulted from the continuous anti-nuclear civil disobedience in Germany over the whole 15-year long project running time could be faced efficiently. It has to be concluded that despite of all problems the anti-nuclear activities have caused so far, all transports of vitrified HLW have always been completed successfully by adapting the commonly established safety, security and public acceptance measures to the special conditions and needs in Germany and coordinating the activities of all parties involved but at the expense of high costs for industry and government and a challenging operational complexity. Apart from an anticipatory project planning a good communication between all involved industrial parties and the French and the German government was the key to the effective management of such shipments and to minimize the radiological, economic, environmental, public and political impact. The future will show how efficiently the gained experience can be used for further return projects which are to be realized since no reprocessed waste has yet been returned from UK and neither the medium-level nor the low-level radioactive waste has been transferred from France to Germany. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Double-Shell tank Integrity program - 15533

Waste at Hanford is stored in 149 single-shell tanks and 28 double-shell tanks (DSTs). Concerns related to aging radioactive waste storage facilities throughout the US DOE complex led to Brookhaven National Laboratory (BNL) developing guidelines for structural integrity programs for tank systems (BNL-52527, Guidelines for Development of Structural Integrity Programs for DOE High-Level Waste Storage Tanks). The committee of experts who developed these guidelines is commonly known as the Tank Structural Integrity Panel (TSIP). The US DOE has subsequently adopted these guidelines, and requires site operators to have a program consistent with them (DOE M 435.1, Radioactive Waste Management Manual). The Washington River Protection Solutions, LLC (WRPS) manages the tanks for the US DOE Office of River Protection (ORP) under the Tank Operations Contract (TOC). The US DOE-ORP contractual agreement with the TOC (11-NSD-010) includes a requirement to 'maintain the tank structural integrity program as described in RPP-7574, Double-Shell tank Integrity Project Plan'. The DST integrity is maintained with a variety of activities such as ultrasonic and visual inspections, chemistry controls, corrosion monitoring and structural analyses methods. The recent loss of tank 241-AY-102 has led to the formation of the High-Level Waste Integrity Assessment Panel to evaluate the DST integrity project (DSTIP) and to recommend improvements to the DSTIP. This panel continues the DOE practice of seeking expert advice to guide the formulation and continuous assessment of tank integrity activities. The panel has concluded its work and WRPS has developed a series of tasks to implement their recommendations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salt Heater Test (FY19), Rev. 2

This report summarizes the 2019 fiscal year (FY19) status of the borehole heater test in salt funded by the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Science & Technology (SFWST) campaign. This report satisfies SFWST level-three milestone report M3SF-19SN010303033. This report is an update of the April 2019 level-two milestone report M2SF-19SNO10303031 to reflect the nearly complete as-built status of the borehole heater test. This report discusses the fiscal year 2019 (FY19) design, implementation, and preliminary data interpretation plan for a set of borehole heater tests call the brine availability tests in salt (BATS), which is funded by the DOE Office of Nuclear Energy (DOE-NE) at the Waste Isolation Pilot Plant (WIPP), a DOE Office of Environmental Management (DOE-EM) site. The organization of BATS is outlined in Project Plan: Salt In-Situ Heater Test (SNL, 2018). An early design of the field test is laid out in Kuhlman et al. (2017), including extensive references to previous field tests, which illustrates aspects of the present test. The previous test plan by Stauffer et al. (2015) places BATS in the context of a multi-year testing strategy, which involves tests of multiple scales and processes, eventually culminating in a drift-scale disposal demonstration. This level-3 milestone report is an update of a level-2 milestone report from April 2019 by the same name. The update adds as-built details of the heater test, which at the time of writing (August 2019) is near complete implementation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Climate impacts on hydropower in Colombia: A multi-model assessment of power sector adaptation pathways

There is uncertainty as to how climate change will affect hydropower generation in different regions of the world. In drying regions, impaired hydropower production could result in significant changes to the power sector implying new plants to be installed to make up for lost hydropower generation. In this article we apply two partial equilibrium models (TIAM-ECN and GCAM) and two general equilibrium models (Phoenix and MEG4C) to identify possible pathways of power sector adaptation for Colombia under climate change scenarios that reflect altered water inflow to hydropower reservoirs. Each model is run for two emissions policy scenarios and for a dry and moderate climate projection. Planned hydropower expansion for Colombia is insufficient to meet increased power demands as the country's economy grows; the contribution of hydropower to Colombia's power supply drops from ~65% currently to 30 - 50 % by 2050 depending on energy model and scenario. Climate change reduces this by a further 5 - 10 % under the dry climate projection. Climate-driven losses in hydropower will be compensated by an expansion of alternative technologies, which vary significantly across models. When climate policy is implemented, three distinct pathways emerge: expanding the electricity production from solar and wind energy (TIAM-ECN); reducing overall power demand hence exploiting savings and efficiencies (Phoenix and MEG4C); and expanding the use of fossil resources—primarily natural gas— complemented with carbon dioxide capture and storage (GCAM).

Arango, Santiago↗

Utilizing Additive Manufacturing to Create Prototype and Functional Beamline Instrumentation and Support Components

The world of beamline science is often fast-paced and dynamic. One of the major challenges in this environment is to be able to design, manufacture and then implement new items for use on the beamlines in a fast and accurate manner. Many times, this involves iterating the design to address unknown or new variables which were not pre- sent at the beginning of the project planning task. Through the use of additive manufacturing, I have been able to support the user programs of various (APS) Ad- vanced Photon Source beamlines* across multiple scien- tific disciplines. I will provide a few detailed examples of Items that were created for specific beamline applications and discuss what benefits they provided to the pertinent project. I will also talk about why choosing consumer- level printer options to produce the parts has been the direction I went and the pros and cons of this decision. Pri marily, this choice allowed for quicker turnaround times and the ability to make more frequent changes in an efficient manner. Currently, we are utilizing only the fused deposition modelling (FDM) type printers but I am exploring the addition of UV-activated resin printing, exotic materials that can be utilized using the current toolset, and the possibility of commercial metal printing systems. This technology has been a game-changer for the implementation of new support items and instrumentation over the last couple of years for the different disciplines I am sup- porting. I will discuss how the roadmap ahead and what the evolving technologies could potentially allow us to do.

Jensen, D.↗

Soils Activity Quality Assurance Plan, Revision 1

This Quality Assurance Plan (QAP) provides the overall Quality Assurance (QA) program requirements, technical planning, and general quality practices to be applied to the U.S. Department of Energy (DOE) Environmental Management (EM) Nevada Program Soils Activity. The QAP requirements are consistent with the Quality Systems for Environmental Data and Technology Programs–Requirements with Guidance for Use (ANSI/ASQ, 2004); the Intergovernmental Data Quality Task Force Uniform Federal Policy for Quality Assurance Project Plans (IDQTF, 2005); and 10 Code of Federal Regulations (CFR) 830.120, Quality Assurance (CFR, 2017a), which apply to specific activities performed under the Soils Activity. The EM Nevada Program owns and is responsible for maintaining this QAP. Individual participants are responsible for implementing the requirements of this QAP in accordance with their own approved programs, processes, plans, and procedures. If a participant’s requirement document differs from this QAP, the stricter requirement will take precedence.

54 ENVIRONMENTAL SCIENCES↗

Structural considerations for a software life cycle dynamic simulation model

This paper presents the results of a preliminary study into the prospects for simulating the software implementation and maintenance life cycle process, with the aim of producing a computerized tool for use by management and software engineering personnel in project planning, tradeoff studies involving product, environmental, situational, and technological factors, and training. The approach taken is the modular application of a 'flow of resource' concept to the systems dynamics simulation modeling technique. The software life cycle process is represented as a number of stochastic, time-varying, interacting work tasks that each achieves one of the project milestones. Each task is characterized by the item produced, the personnel applied, and the budgetary profile.

Tausworthe, R. C.↗

Dryden Flight Research Center Critical Chain Project Management Implementation

In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

Hines, Dennis O.↗

Improving Effectiveness of Waste Management Processes with Information and Communications Technology (ICT) - 19524

Improving the effectiveness of waste estimation, tracking, management and disposal processes is a key objective for Waste Management. Project Teams face common challenges producing waste estimates that are accurately accounted for in the project plan, tracking and reporting waste record actuals against the estimate, and communicating the status of waste through the organization. These challenges impact the effectiveness of waste management from a cost and schedule perspective, which can have a significant impact on the bottom line and on future business. By leveraging information and communications technology (ICT) waste management project teams can create a mobile workforce that closes the gaps between creating estimates and tracking actuals against estimates by gathering real time data at each step in the process. This results in significant gains on schedule and cost, improved communication and visibility across the project team, and an improvement in the overall effectiveness of waste processing and disposal procedures. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The BREKTRIA 500 – A Breakthrough in Technology and Power Density for an Advanced 500kW Utility-Scale String Inverter (Final Technical Report)

The primary goal of this development project, planned to be 36 months in duration, was to create a 500kW utility-scale string inverter, demonstrating an advanced hybrid architecture that would achieve unprecedented high power density, and bring the inverter to the stage of production readiness. Specific key objectives for the 500kW utility-scale string inverter were: Create a 500kW 3-phase 600Vac inverter that was similar in overall size to the existing 250kW string inverters in the market, thereby demonstrating dramatically increased power density; Achieve a cost of goods, including all manufacturing-related costs and overheads, at or below 2.5¢/Wac ($12,500); Demonstrate full-power operation at a 45-50C ambient temperature with no power de-rating; Accommodate a PV array DC input of up to 1MWdc, aka a DC/AC Ratio of 2.0; Demonstrate peak efficiency greater than 99% at any operating dc voltage, and a CEC weighted average efficiency greater than or equal to 98.5%. The motivation for this project was to leapfrog the competition by creating the world’s most powerful string inverter, utilizing an innovative topology and achieving a step change increase in power density. Achieving the goals of the project would have enabled Yaskawa Solectria Solar to demonstrate its technology leadership, manufacture the utility-scale string inverter in the company’s facilities in Illinois, and bring to the market a highly-differentiated and compelling product to help the company grow its share in the large and growing utility market segment. During the course of this project, BREK Electronics’ hybrid architecture inverter was taken from an early-stage 125kW prototype, to a more mature and successfully demonstrated power stage at twice the power. Two 250kW power stages were planned to build the 500kW inverter. Significant progress was made in the inverter controls, achieving a clean AC sinewave and closed-loop operation into the grid, and improved efficiency by control of the high-speed switching. Further, the updated 250kW power stage was on track to achieve full power operation at an ambient temperature of 50C. At the time of the project’s closure in September 2022, global semiconductor supply remained limited, with shortages creating dramatic swings in both availability and price. Given this situation, our ability to predict cost-of-goods two years out with any accuracy or confidence was limited. As a result, the probability of attaining the target cost of 2.5¢/Wac for the 500kW inverter remained uncertain at the closure of the project. This project successfully demonstrated the potential for the advanced hybrid architecture inverter that emerged from a decade of university research on Si IGBTs and SiC mosfets, leading to this unique inverter topology. The team has taken the first steps toward an evolutionary advancement in inverter technology that remains to be fully realized.

14 SOLAR ENERGY↗

Computing and combustion

Coming into the Combustion Branch of the Turbomachinery and Propulsion Systems Division, there was not any set project planned out for me to work on. This was understandable, considering I am only at my sophmore year in college. Also, my mentor was a division chief and it was expected that I would be passed down the line. It took about a week for me to be placed with somebody who could use me. My first project was to write a macro for TecPlot. Commonly, a person would have a 3D contour volume modeling something such as a combustion engine. This 3D volume needed to have slices extracted from it and made into 2D scientific plots with all of the appropriate axis and titles. This was very tedious to do by hand. My macro needed to automate the process. There was some education I needed before I could start, however. First, TecPlot ran on Unix and Linux, like a growing majority of scientific applications. I knew a little about Linux, but I would need to know more to use the software at hand. I took two classes at the Learning Center on Unix and am now comfortable with Linux and Unix. I already had taken Computer Science I and II, and had undergone the transformation from Computer Programmer to Procedural Epistemologist. I knew how to design efficient algorithms, I just needed to learn the macro language. After a little less than a week, I had learned the basics of the language. Like most languages, the best way to learn more of it was by using it. It was decided that it was best that I do the macro in layers, starting simple and adding features as I went. The macro started out slicing with respect to only one axis, and did not make 2D plots out of the slices. Instead, it lined them up inside the solid. Next, I allowed for more than one axis and placed each slice in a separate frame. After this, I added code that transformed each individual slice-frame into a scientific plot. I also made frames for composite volumes, which showed all of the slices in the same XYZ space. I then designed an addition companion macro that exported each frame into its own image file. I then distributed the macros to a test group, and am awaiting feedback. In the meantime, a am researching the possible applications of distributed computing on the National Combustor Code. Many of our Linux boxes were idle for most of the day. The department thinks that it would be wonderful if we could get all of these idle processors to work on a problem under the NCC code. The client software would have to be easily distributed, such as in screensaver format or as a program that only ran when the computer was not in use. This project proves to be an interesting challenge.

Thompson, Daniel↗

A Simplified Method to Evaluate Energy Life Cycle Cost Effectiveness for Electron Ion Collider Infrastructure Design

The new DOE Order 436.1A approved on April 25 th provides instructions to incorporate principles of sustainability early in the project planning and design process. Integral to the principles of sustainability is life cycle cost effectiveness Life Cycle Cost (LCC) Analysis is vital to the sustainable energy efficient design and construction of the Electron Ion Collider (EIC). Reducing energy consumption has a direct impact on reducing life cycle operating costs with benefits to the environment. The early stages of the project are the most influential where design decisions and so life-cycle considerations during this stage can result in significant impacts to the energy footprint of the design. For example, when comparing between various options, it is necessary to compare the energy savings in $\frac{US$}{kWh}$ to the capital cost in US$. And although uncertain by nature, it is important to factor in the expected inflation and discount of future spendings to compare with the cost of immediate capital investment. This tech note presents a tool that engineers can readily use to analyze energy operating costs using an incremental life cycle cost method when comparing different design alternative.

43 PARTICLE ACCELERATORS↗

An assessment of PERT as a technique for schedule planning and control

The PERT technique including the types of reports which can be computer generated using the NASA/LaRC PPARS System is described. An assessment is made of the effectiveness of PERT on various types of efforts as well as for specific purposes, namely, schedule planning, schedule analysis, schedule control, monitoring contractor schedule performance, and management reporting. This assessment is based primarily on the author's knowledge of the usage of PERT by NASA/LaRC personnel since the early 1960's. Both strengths and weaknesses of the technique for various applications are discussed. It is intended to serve as a reference guide for personnel performing project planning and control functions and technical personnel whose responsibilities either include schedule planning and control or require a general knowledge of the subject.

Sibbers, C. W.↗

The Autonomous Precision Landing and Hazard Detection and Avoidance Technology (ALHAT)

As NASA plans to send humans back to the Moon and develop a lunar outpost, technologies must be developed to place humans and cargo safely, precisely, repeatedly, on the lunar surface with the capability to avoid surface hazards. Exploration Space Architecture Study requirements include the need for global lunar surface access with safe, precise landing without lighting constraints on terrain that may have landing hazards for human scale landing vehicles. Landing accuracies of perhaps 1,000 meters for sortie crew missions to 10 s of meters for Outpost class missions are required. The Autonomous precision Landing Hazard Avoidance Technology (ALHAT) project will develop the new and unique descent and landing Guidance, Navigation and Control (GNC) hardware and software technologies necessary for these capabilities. The ALHAT project will qualify a lunar descent and landing GNC system to a Technology Readiness Level (TRL) of 6 capable of supporting lunar crewed, cargo, and robotic missions. The (ALHAT) development project was chartered by NASA Headquarters in October 2006. The initial effort to write a project plan and define an ALHAT Team was followed by a fairly aggressive research and analysis effort to determine what technologies existed that could be developed and applied to the lunar landing problems indicated above. This paper describes the project development, research, analysis and concept evolution that has occurred since the assignment of the project. This includes the areas of systems engineering, GNC, sensors, sensor algorithms, simulations, fielding testing, laboratory testing, Hardware-In-The-Loop testing, system avionics and system certification concepts.

Epp, Chirold D.↗

Building and Leading the Next Generation of Exploration Launch Vehicles

NASA s Constellation Program is depending on the Ares Projects to deliver the crew and cargo launch capabilities needed to send human explorers to the Moon and beyond. Ares I and V will provide the core space launch capabilities needed to continue providing crew and cargo access to the International Space Station (ISS), and to build upon the U.S. history of human spaceflight to the Moon and beyond. Since 2005, Ares has made substantial progress on designing, developing, and testing the Ares I crew launch vehicle and has continued its in-depth studies of the Ares V cargo launch vehicle. In 2009, the Ares Projects plan to: conduct the first flight test of Ares I, test-fire the Ares I first stage solid rocket motor; build the first integrated Ares I upper stage; continue testing hardware for the J-2X upper stage engine, and continue refining the design of the Ares V cargo launch vehicle. These efforts come with serious challenges for the project leadership team as it continues to foster a culture of ownership and accountability, operate with limited funding, and works to maintain effective internal and external communications under intense external scrutiny.

Cook, Stephen A.↗

XML technology planning database : lessons learned

A hierarchical Extensible Markup Language(XML) database called XCALIBR (XML Analysis LIBRary) has been developed by Millennium Program to assist in technology investment (ROI) analysis and technology Language Capability the New return on portfolio optimization. The database contains mission requirements and technology capabilities, which are related by use of an XML dictionary. The XML dictionary codifies a standardized taxonomy for space missions, systems, subsystems and technologies. In addition to being used for ROI analysis, the database is being examined for use in project planning, tracking and documentation. During the past year, the database has moved from development into alpha testing. This paper describes the lessons learned during construction and testing of the prototype database and the motivation for moving from an XML taxonomy to a standard XML-based ontology.

prototype databases↗

Underground Test Area Activity Quality Assurance Plan Nevada National Security Site, Nevada. Revision 1

This Quality Assurance Plan (QAP) provides the overall quality assurance (QA) requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) activities. The requirements in this QAP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). NNSA/NSO, or designee, must review this QAP every two years. Changes that do not affect the overall scope or requirements will not require an immediate QAP revision but will be incorporated into the next revision cycle after identification. Section 1.0 describes UGTA objectives, participant responsibilities, and administrative and management quality requirements (i.e., training, records, procurement). Section 1.0 also details data management and computer software requirements. Section 2.0 establishes the requirements to ensure newly collected data are valid, existing data uses are appropriate, and environmental-modeling methods are reliable. Section 3.0 provides feedback loops through assessments and reports to management. Section 4.0 provides the framework for corrective actions. Section 5.0 provides references for this document.

54 ENVIRONMENTAL SCIENCES↗