DOE OSTI2020
Infrastructure for nuclear waste storage and processing (e.g., waste tanks, transfer pipelines, evaporators) at the U.S. Department of Energy (DOE) Hanford Site has been in service well beyond its original design life. Past corrosion control methods at Hanford for waste tanks have not been fully successful, as evidenced by leaks forming in tank AY-102, the first double-shell tank (DST) constructed, and significant degradation detected in the primary tanks of AP-102 and AY-101. Failure of infrastructure components can pose a significant risk to the environment, worker safety, and project schedules. Therefore, remotely deployable methods for repairing and extending the service life of the existing tank waste infrastructure are needed. Cold spray has been identified as a potential technique for performing in situ repairs and material buildup for life extension of waste storage and processing infrastructure. Cold-spray repair methods and technology are well-established and are used extensively by industry and the military for making repairs using dissimilar materials. Pacific Northwest National Laboratory is evaluating the process of making repairs using mild-steel powder applied to a mild-steel substrate to minimize the galvanic corrosion potential. This paper presents the initial results for a feasibility ('go/no-go') assessment as to whether low-density deposits with sound metallurgic bonds, to build-back steel plate material, can be achieved using existing commercial cold-spray equipment. An assessment of steel-on-steel deposit is necessary to determine if cold spray is a viable candidate for DST carbon steel plate restoration/repair and thus DST service life extension. Powder properties and preparation requirements have been investigated and operating conditions and parameters for depositing a cold-spray buildup of mild steel on a mild-steel substrate have been determined. Soundness of metallurgic bonding as a function of the operating parameters exercised and results from applying cold spray to lay a deposit over simulated small-diameter flaws in 1/2-inch mild-steel plate are presented. Application of in situ cold-spray repair to the DOE complex has the potential to reduce cost and schedule impacts associated with component failures and the need to procure and construct replacement infrastructure. (authors)
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗