Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Downhole Microseismic Mapping of More Than 400 Fracturing Stages on a Multiwell Pad at the Hydraulic Fracturing Test Site (HFTS): Discussion of Operational Challenges and Analytic Results

The United States Department of Energy co-funded a joint industry project (JIP) in the Midland basin of Texas. The project was conducted in the Wolfcamp formation to better understand the relationships among horizontal lateral placement, production interference between laterals, effectiveness of completion sequences, and hydraulic fracture geometry in unconventional reservoirs. Downhole microseismic data was acquired from more than 400 fracturing stages during the completion project to better understand the generated hydraulic fracture geometries. Eleven horizontal wells were drilled in the upper Wolfcamp (UW) and middle Wolfcamp (MW) formation in the Permian Basin. The 10,000-ft laterals were drilled in a chevron pattern to help improve inter-well fracture communication and maximize hydrocarbon recovery. The completions sequences were planned to restrain fracture height growth upward into a lower-pressure zone using a combination of zipper fracturing and simultaneous fracturing operations. Downhole microseismic monitoring was used to record more than 95% of the planned fracture stages. Downhole tiltmeters were also used to validate upward fracture height growth. Multiple geophone arrays, both vertical and horizontal, were used during this completion; this paper discusses coordination between maintaining completion efficiency and obtaining microseismic data. Additionally, this paper highlights the completion challenges associated with collecting diagnostic data along with results and findings.

Stegent, Neil A.↗

The Impacts of Developing a Port Network for Floating Offshore Wind Energy on the West Coast of the United States

Floating offshore wind is a pre-commercial industry with the potential for significant market growth on the U.S. West Coast in the near future; however, significant investment in port infrastructure will be required to enable the industry to progress from demonstration projects to efficient and cost effective commercial deployment. Developing a system of ports that can enable commercial-scale floating wind development on the West Coast of the United States will require significant levels of funding and coordination between governments, industry, ports, and local communities. A critical first step to strategically planning these resources is understanding the number of ports (and associated investment) that would be required to support different phases of offshore wind projects, including manufacturing, installation, and operation. But simply tallying up these costs is not sufficient to understand how a robust network of ports could impact local communities, the environment, workforce development, the offshore wind industry, and the West Coast region as a whole. In this report, the authors present analyses and perspectives related to port development in California, Oregon, and Washington. We describe the requirements for floating offshore wind ports that conduct manufacturing, installation, and/or service activities, and estimate the investment and time frames required to construct these ports at suitable locations in West Coast states. We develop indicators for the vulnerability and workforce accessibility of coastal communities and consider the potential risks and benefits associated with port development in these locations. We model how the proximity of an offshore wind project to installation and operations ports can impact the levelized cost of energy of the project, and then consider how these costs could be affected by local or foreign supply chains. We build upon these analyses to develop scenarios with increasing levels of offshore wind deployment and port assets on the West Coast and show how these ports could enable deployment goals to be achieved. Finally, we draw upon outreach with key floating wind stakeholders to summarize five key challenges that will need to be overcome to develop a comprehensive port network, and present potential approaches that could help to address these obstacles.

17 WIND ENERGY↗

EXODUS: Integrating intelligent systems for launch operations support

Kennedy Space Center (KSC) is developing knowledge-based systems to automate critical operations functions for the space shuttle fleet. Intelligent systems will monitor vehicle and ground support subsystems for anomalies, assist in isolating and managing faults, and plan and schedule shuttle operations activities. These applications are being developed independently of one another, using different representation schemes, reasoning and control models, and hardware platforms. KSC has recently initiated the EXODUS project to integrate these stand alone applications into a unified, coordinated intelligent operations support system. EXODUS will be constructed using SOCIAL, a tool for developing distributed intelligent systems. EXODUS, SOCIAL, and initial prototyping efforts using SOCIAL to integrate and coordinate selected EXODUS applications are described.

Adler, Richard M.↗

The Dynamic Planner: The Sequencer, Scheduler, and Runway Allocator for Air Traffic Control Automation

The Dynamic Planner (DP) has been designed, implemented, and integrated into the Center-TRACON Automation System (CTAS) to assist Traffic Management Coordinators (TMCs), in real time, with the task of planning and scheduling arrival traffic approximately 35 to 200 nautical miles from the destination airport. The TMC may input to the DP a series of current and future scheduling constraints that reflect the operation and environmental conditions of the airspace. Under these constraints, the DP uses flight plans, track updates, and Estimated Time of Arrival (ETA) predictions to calculate optimal runway assignments and arrival schedules that help ensure an orderly, efficient, and conflict-free flow of traffic into the terminal area. These runway assignments and schedules can be shown directly to controllers or they can be used by other CTAS tools to generate advisories to the controllers. Additionally, the TMC and controllers may override the decisions made by the DP for tactical considerations. The DP will adapt to computations to accommodate these manual inputs.

Wong, Gregory L.↗

Hierarchical Management of Distributed Energy Resources Using Chance-Constrained OPF and Extremum Seeking Control

Distributed energy resources (DERs) are becoming an important part of distribution systems, because of their economic and environmental benefits. Although their inherent intermittency and volatility introduce uncertainties into the electric power system, they have the potential to provide controllability to the system under proper coordination. In this paper, we propose a hierarchical control algorithm for distribution systems with DERs so that they have controllability similar to a generator bus. The upper level scheduler solves a chance-constrained optimal power flow (OPF) problem to plan the operation of the DERs based on forecasts, and the lower level distributed DER controllers leverage the extremum seeking approach to deliver the planned power at the feeder head. The proposed algorithm is tested on a modified IEEE 13-node feeder, demonstrating its effectiveness.

24 POWER TRANSMISSION AND DISTRIBUTION↗

One System Integrated Project Team: Retrieval and Delivery of Hanford Tank Wastes for Vitrification in the Waste Treatment Plant - 13234

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety-conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction of WTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration and Controls, Front-End Design and Project Definition, Commissioning, Nuclear Safety and Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH and QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant{sup R} Foundation-Configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Computer network environment planning and analysis

The GSFC Computer Network Environment provides a broadband RF cable between campus buildings and ethernet spines in buildings for the interlinking of Local Area Networks (LANs). This system provides terminal and computer linkage among host and user systems thereby providing E-mail services, file exchange capability, and certain distributed computing opportunities. The Environment is designed to be transparent and supports multiple protocols. Networking at Goddard has a short history and has been under coordinated control of a Network Steering Committee for slightly more than two years; network growth has been rapid with more than 1500 nodes currently addressed and greater expansion expected. A new RF cable system with a different topology is being installed during summer 1989; consideration of a fiber optics system for the future will begin soon. Summmer study was directed toward Network Steering Committee operation and planning plus consideration of Center Network Environment analysis and modeling. Biweekly Steering Committee meetings were attended to learn the background of the network and the concerns of those managing it. Suggestions for historical data gathering have been made to support future planning and modeling. Data Systems Dynamic Simulator, a simulation package developed at NASA and maintained at GSFC was studied as a possible modeling tool for the network environment. A modeling concept based on a hierarchical model was hypothesized for further development. Such a model would allow input of newly updated parameters and would provide an estimation of the behavior of the network.

Dalphin, John F.↗

Initial Design Guidelines for Onboard Automation of Flight Path Management

Achieving the National Academy of Science’s vision of advanced aerial mobility will depend on significant developments in automation to achieve safe and efficient operations. Flight path management (FPM), a major category of automation functionality needed to achieve this vision, will provide dynamic management of an aircraft’s flight path, ensuring that it remains feasible to fly to mission completion, deconflicted from hazards, coordinated with other traffic, flexible to accommodate future disturbances, and optimized to meet business objectives. While efforts are underway to advance FPM technology for the Urban Air Mobility application, initial design guidelines are presented for FPM automation capabilities to achieve each of these objectives based on 15+ years of prior FPM automation research and development. Methods to efficiently account for uncertainty in the prediction of trajectories are described, as are additional considerations for prioritizing safety in the design of FPM automation capabilities and interactions between aircraft. Recommendations are supported by extensive experience gained via previous work with the FPM reference automation system, Autonomous Operations Planner, developed by NASA. By employing capable FPM automation supported by cooperative operational flight rules and information sharing, future aircraft operators will benefit from an increased ability to plan and execute safe and efficient flights and to achieve mission success in a dynamic airspace.

Flight Path Management, FPM, AOP, UAM, deconflicti↗

Laboratory Guide for Residual Stress Sample Alignment and Experiment Planning-October 2011 Version

The December 2010 version of the guide, ORNL/TM-2008/159, by Jeff Bunn, Josh Schmidlin, Camden Hubbard, and Paris Cornwell, has been further revised due to a major change in the GeoMagic Studio software for constructing a surface model. The Studio software update also includes a plug-in module to operate the FARO Scan Arm. Other revisions for clarity were also made. The purpose of this revision document is to guide the reader through the process of laser alignment used by NRSF2 at HFIR and VULCAN at SNS. This system was created to increase the spatial accuracy of the measurement points in a sample, reduce the use of neutron time used for alignment, improve experiment planning, and reduce operator error. The need for spatial resolution has been driven by the reduction in gauge volumes to the sub-millimeter level, steep strain gradients in some samples, and requests to mount multiple samples within a few days for relating data from each sample to a common sample coordinate system. The first step in this process involves mounting the sample on an indexer table in a laboratory set up for offline sample mounting and alignment in the same manner it would be mounted at either instrument. In the shared laboratory, a FARO ScanArm is used to measure the coordinates of points on the sample surface ('point cloud'), specific features and fiducial points. A Sample Coordinate System (SCS) needs to be established first. This is an advantage of the technique because the SCS can be defined in such a way to facilitate simple definition of measurement points within the sample. Next, samples are typically mounted to a frame of 80/20 and fiducial points are attached to the sample or frame then measured in the established sample coordinate system. The laser scan probe on the ScanArm can then be used to scan in an 'as-is' model of the sample as well as mounting hardware. GeoMagic Studio 12 is the software package used to construct the model from the point cloud the scan arm creates. Once a model, fiducial, and measurement files are created, a special program, called SScanSS combines the information and by simulation of the sample on the diffractometer can help plan the experiment before using neutron time. Finally, the sample is mounted on the relevant stress measurement instrument and the fiducial points are measured again. In the HFIR beam room, a laser tracker is used in conjunction with a program called CAM2 to measure the fiducial points in the NRSF2 instrument's sample positioner coordinate system. SScanSS is then used again to perform a coordinate system transformation of the measurement file locations to the sample positioner coordinate system. A procedure file is then written with the coordinates in the sample positioner coordinate system for the desired measurement locations. This file is often called a script or command file and can be further modified using excel. It is very important to note that this process is not a linear one, but rather, it often is iterative. Many of the steps in this guide are interdependent on one another. It is very important to discuss the process as it pertains to the specific sample being measured. What works with one sample may not necessarily work for another. This guide attempts to provide a typical work flow that has been successful in most cases.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Grid-Enhanced, Mobility-Integrated Network Infrastructures for Extreme Fast Charging (GEMINI-XFC)

Increasing vehicle electrification will require extensive use of extreme fast charging (XFC), especially for larger vehicles. Uncoordinated XFC can create grid challenges, particularly at the distribution level. Two strategies can support widespread XFC: gold-plate the grid (i.e., upgrade all systems to enable worst-case, fully coincident loads) or use integrated planning to codesign a smart system based on advanced controls that leverage load flexibility and distributed energy resources. With the right design and control, XFC can simultaneously support both mobility and grid operations. Fully realizing the potential of XFC, however, will require unprecedented coordination among the charging infrastructure, grid, and vehicles. GEMINI-XFC combines high-fidelity grid and transport modeling at an unprecedented level of resolution and codesigns a smart system based on advanced controls that leverage load flexibility and distributed energy resources to optimize the integration of extreme fast charging (XFC) across a full regional scale with individual customer resolution.

ADVANCED PROPULSION SYSTEMS↗

Accelerating Resilience of the Community through Holistic Engagement and use of Renewables (ARCHER) Planning Framework

The primary objective of the Accelerating Resilience of the Community through Holistic Engagement and Use of Renewables (ARCHER) initiative was to identify and incorporate the unique variations in energy burden, social vulnerability, living conditions, and access to essential services that differ across communities. By accounting for these localized factors—down to the neighborhood level—the project supports more targeted and effective investments in community resilience. The framework seeks to establish practical planning guidance, methods, and performance measures for community energy resilience, integrate community-level and electric utility system resilience planning, and assess its effectiveness through comparison with conventional and operational planning approaches. A key component of the project was its data exchange platform, which is used to evaluate and demonstrate the tools, methodologies, and planning approaches developed through ARCHER. This open-source platform enables developers and vendors of distribution and outage management systems to build upon the research by incorporating its concepts into their own tools and workflows. This capability is enabled by the transparent availability of data, functional requirements, and the underlying information model. The project yielded several important insights. First, meaningful engagement with communities is essential to achieving comprehensive resilience outcomes. Second, resilience planning is most effective when electric grid considerations and broader community needs are addressed in a coordinated manner. Third, the use of platforms that allow for real-time input from communities can enhance utility responsiveness during restoration activities. Fourth, a structured and systematic planning approach can successfully translate ARCHER concepts into practice. Fifth, the development of an integrated metric that reflects both grid performance and community impacts provides a more holistic basis for evaluating resilience. Finally, incorporating community engagement and equity considerations into grid operations is critical, particularly during severe weather events that result in extended outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Significance of Dynamic and Transient Analysis in the Design and Operation of Hybrid Energy Systems

Energy systems were historically designed and operated with a specific energy conversion objective, while managing loads and resources. In the recent years, the increased utilization of non-dispatchable renewable sources such as wind and solar has played a role in power quality and the reliability of power systems. In order to mitigate the risk associated with the non-dispatchable resources an integrated approach, such as Hybrid Energy Systems (HES), has to be taken, integrating the loads and resource management between the traditional thermal power plants and the non-dispatchable resources. As our electric energy becomes more diverse in its generation resources, the HES with its operational control system, its real-time view and its dynamic decisions making will become an essential part of the integrated energy systems and improve the overall grid reliability. The operational constraints of the energy sources on both the thermal power plants and the non-dispatchable resources in HES, plays a vital role in the planning and design stage. It is an established fact that the choice of energy source depends on the available natural resources and possible infrastructure. A critical component of decision-making depends on the complementary nature and controllability of the energy sources to supply the load demands with high reliability. Controllability of complex HES to achieve desired performance and flexibility is implemented via coordinated control systems while simultaneously generating electricity and other useful products such as useful heat or hydrogen. These systems are based on instrumentation, signal processing, control theory, and engineering system design. The entire HES along with the control systems are characterized by widely varying time constants. Hence, for a well-coordinated control and operation, we propose physics based modeling of the subsystems to assist in a dynamic and transient analysis. Dynamic and transient analysis in real and non-real time domain of the potential sources is capable of providing satisfactory results at the feasibility analysis stage. A simplified HES consisting of complementary energy sources is used to demonstrate the proposed approach. Suitable real time simulations to perform dynamic and transient analysis will be performed to verify results from the non-real time analysis. The role of such analyses, especially the real time dynamic and transient analysis for manual controls is elaborated. It is also discussed that faster than real time simulation will pave the future for controller rooms and hence manual control procedures. Multiple tools such as Real Time Simulator, Matlab®, Simulink®, PSCAD®, MOOSE, etc. are expected to be used for the HES analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Initial Design Guidelines for Onboard Automation of Flight Path Management

Achieving the National Academy of Science’s vision of advanced aerial mobility will depend on significant developments in automation to achieve safe and efficient operations. Flight path management (FPM), a major category of automation functionality needed to achieve this vision, will provide dynamic management of an aircraft’s flight path, ensuring that it remains feasible to fly to mission completion, deconflicted from hazards, coordinated with other traffic, flexible to accommodate future disturbances, and optimized to meet business objectives. While efforts are underway to advance FPM technology for the Urban Air Mobility application, initial design guidelines are presented for FPM automation capabilities to achieve each of these objectives based on 15+ years of prior FPM automation research and development. Methods to efficiently account for uncertainty in the prediction of trajectories are described, as are additional considerations for prioritizing safety in the design of FPM automation capabilities and interactions between aircraft. Recommendations are supported by extensive experience gained via previous work with the FPM reference automation system, Autonomous Operations Planner, developed by NASA. By employing capable FPM automation supported by cooperative operational flight rules and information sharing, future aircraft operators will benefit from an increased ability to plan and execute safe and efficient flights and to achieve mission success in a dynamic airspace.

Flight Path Management↗

MegaWatt Mayhem: Grid Operator Challenges Center Loads

This report provides a summary of the challenges faced by United States electricity grid operators in accommodating and anticipating the rapid deployment of large loads, particularly data centers, based on academic literature and industry working groups. The report highlights the unique requirements and operational characteristics of data centers, which differ significantly from traditional industrial loads. Key issues addressed utility planning considerations, with emphasis on the implications for grid operators, impacts to normal operations for grid operators, reliability considerations during periods of grid stress, and resilience considerations for the changing operational paradigms based on data centers. Real-world examples are used to highlight these challenges and the changes that grid operators must address. The findings underscore the necessity for coordinated efforts and innovative solutions from both grid operators and regulatory bodies to ensure the stable integration of large loads into the grid. This report is the first in a series that will explore the challenges of data center deployments based on several key power system perspectives.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Balancing Area Coordination: Efficiently Integrating Renewable Energy Into the Grid, Greening the Grid

Greening the Grid provides technical assistance to energy system planners, regulators, and grid operators to overcome challenges associated with integrating variable renewable energy into the grid. Coordinating balancing area operation can promote more cost and resource efficient integration of variable renewable energy, such as wind and solar, into power systems. This efficiency is achieved by sharing or coordinating balancing resources and operating reserves across larger geographic boundaries.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Momentary Cessation: Improving Dynamic Performance and Modeling of Utility-Scale Inverter Based Resources During Grid Disturbances

Sandia National Laboratories worked with NERC staff to provide stakeholder guidance in responding to a May 2018 NERC alert regarding dynamic performance and modeling issues for utility-scale inverter-based resources. The NERC alert resulted from event analyses for grid disturbances that occurred in southern California in August 2016 and October 2017. Those disturbances revealed the use of momentary cessation of transmission connected inverter-based generation- a short time period when they ceased to inject current into the grid, counter to desired transmission operation. The event analyses concluded that, in many cases, the Western Interconnection system models used to determine planning and operating criteria do not reflect the actual behavior of solar plants, resulting in overly optimistic planning assessments and substandard operational responses. This technical report summarizes the gaps between the models and actual performance that were observed at those times, and the guidance that Sandia and NERC provided to owners of solar PV power plants, transmission planners, transmission operators and planning/reliability coordinators to modify existing models to reflect that actual performance

24 POWER TRANSMISSION AND DISTRIBUTION↗

Validation of AV-8B V/STOL characteristics by full scale static and wind tunnel tests

The background which led to the requirement for the full scale powered wind tunnel tests of an AV-8B model, and the formulation of specific objectives for the test, are outlined. The detailed planning, analysis, and coordination with NASA, NAVAIR, and other industry participants is described. The modification of an AV-8A Harrier into an AV-8B configuration suitable for full scale testing at Ames is described. In addition, instrumentation and data systems are explained. Operations during the 40 ft x 80 ft wind tunnel testing and the resulting propulsion, aerodynamic, performance, stability and control data are presented and suggestions offered for future V/STOL testing.

Hollingsworth, E. G.↗