Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear Reactor Infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Methods for quantifying uncertainty in fast reactor analyses.

Liquid-metal-cooled fast reactors in the form of sodium-cooled fast reactors have been successfully built and tested in the U.S. and throughout the world. However, no fast reactor has operated in the U.S. for nearly fourteen years. More importantly, the U.S. has not constructed a fast reactor in nearly 30 years. In addition to reestablishing the necessary industrial infrastructure, the development, testing, and licensing of a new, advanced fast reactor concept will likely require a significant base technology program that will rely more heavily on modeling and simulation than has been done in the past. The ability to quantify uncertainty in modeling and simulations will be an important part of any experimental program and can provide added confidence that established design limits and safety margins are appropriate. In addition, there is an increasing demand from the nuclear industry for best-estimate analysis methods to provide confidence bounds along with their results. The ability to quantify uncertainty will be an important component of modeling that is used to support design, testing, and experimental programs. Three avenues of UQ investigation are proposed. Two relatively new approaches are described which can be directly coupled to simulation codes currently being developed under the Advanced Simulation and Modeling program within the Reactor Campaign. A third approach, based on robust Monte Carlo methods, can be used in conjunction with existing reactor analysis codes as a means of verification and validation of the more detailed approaches.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

2022 Annual Report Laboratory Directed Research & Development

Idaho National Laboratory’s (INL’s) mission is “to discover, demonstrate and secure innovative nuclear energy solutions, other clean energy options and critical infrastructure.” INL executes this mission through research and development across the continuum from basic science to applied science to engineering demonstration and then deployment. The Department of Energy (DOE) Laboratory Directed Research and Development (LDRD) program enables INL to conduct high-risk, impactful research that enriches the laboratory capabilities in order to further its missions. INL’s LDRD portfolio specifically advances the core capabilities of the laboratory aligned with its five science and technology initiatives: 1) nuclear reactor sustainment and expanded deployment, 2) integrated fuel cycle solutions, 3) integrated energy systems, 4) advanced design and manufacturing for extreme environments, and 5) secure and resilient cyber-physical systems. The 45 projects that ended in fiscal year 2022 and highlighted in this report are just a small sample of the impressive breadth and depth of cutting-edge science, technology, and engineering ongoing at INL.

99 GENERAL AND MISCELLANEOUS↗

Initial Coupling of the RELAP-7 and PRONGHORN Applications

Modern nuclear reactor safety codes require the ability to solve detailed coupled neutronic- thermal fluids problems. For larger cores, this implies fully coupled higher dimensionality spatial dynamics with appropriate feedback models that can provide enough resolution to accurately compute core heat generation and removal during steady and unsteady conditions. The reactor analysis code PRONGHORN is being coupled to RELAP-7 as a first step to extend RELAP’s current capabilities. This report details the mathematical models, the type of coupling, and the testing results from the integrated system. RELAP-7 is a MOOSE-based application that solves the continuity, momentum, and energy equations in 1-D for a compressible fluid. The pipe and joint capabilities enable it to model parts of the power conversion unit. The PRONGHORN application, also developed on the MOOSE infrastructure, solves the coupled equations that define the neutron diffusion, fluid flow, and heat transfer in a full core model. The two systems are loosely coupled to simplify the transition towards a more complex infrastructure. The integration is tested on a simplified version of the OECD/NEA MHTGR-350 Coupled Neutronics-Thermal Fluids benchmark model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

National Postirradiation Examination Workshop Report

A National Post-Irradiation-Examination (PIE) Workshop was held March 29-30, 2011, in Washington D.C., stimulated by the DOE Acting Assistant Secretary for Nuclear Energy approval on January 31, 2011 of the “Mission Need Statement for Advanced Post-Irradiation Examination Capability”. As stated in the Mission Need, “A better understanding of nuclear fuels and material performance in the nuclear environment, at the nanoscale and lower, is critical to the development of innovative fuels and materials required for tomorrow’s nuclear energy systems.” (2011) Developing an advanced post-irradiation capability is the most important thing we can do to advance nuclear energy as an option to meeting national energy goals. Understanding the behavior of fuels and materials in a nuclear reactor irradiation environment is the limiting factor in nuclear plant safety, longevity, efficiency, and economics. The National PIE Workshop is part of fulfilling or addressing Department of Energy (DOE) missions in safe and publically acceptable nuclear energy. Several presentations were given during the opening of the workshop. Generally speaking, these presentations established that we cannot continue to rely on others in the world to provide the capabilities we need to move forward with nuclear energy technology. These presentations also generally identified the need for increased microstructural understanding of fuels and materials to be coupled with modeling and simulation, and increased accessibility and infrastructure to facilitate the interaction between national laboratories and participating organizations. The overall results of the work of the presenters and panels was distilled into four primary needs 1. Understanding material changes in the extreme nuclear environment at the nanoscale. Nanoscale studies have significant importance due to the mechanisms that cause materials to degrade, which actually occur on the nanoscale. 2. Enabling additional proficiency in experimentation and analysis through robust modeling coupled with advanced characterization. 3. Advancing the infrastructure and accessibility of physical and administrative systems needed to meet the needs of participating organizations that are subject to different time cycles and constraints that make working and collaborating the national laboratories challenging. 4. Pursuing in-situ analysis and instrumentation to support the examination of dynamic changes to materials’ microstructure, deformation, and surface effects as they occur with time scales rather than the static comparison offered by current PIE methods. This Workshop Report responds to the research challenges for advanced/future PIE needs for nuclear materials development outlined by Energy Secretary Chu and the DOE-NE Research and Development Roadmap report, which was delivered to Congress in April 2010, (DOE-NE, 2010) by identifying the technial needs for fuel and material development specifically related to PIE. The information from the panels address these research challenges by identifying specific needs related to each of the topical areas. The focus of the Workshop was to identify gaps in the enabling capabilities for nuclear energy research and to identify high-priority fundamental capabilities to enable research to be completed that would likely have high impact on enabling nuclear energy as a significant contributor to energy production portfolios.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Management of historical waste from research reactors: the Dutch experience

Most radioactive waste emerges as well-defined waste streams from operating power reactors. The management of this is an on-going practice, based on comprehensive (IAEA) guidelines. A special waste category however consists of the historical waste from research reactors, mostly originating from various experiments in the early years of the nuclear era. Removal of the waste from the research site, often required by law, raises challenges: the waste packages must fulfill the acceptance criteria from the receiving storage site as well as the criteria for nuclear transports. Often the aged waste containers do not fulfill today's requirements anymore, and their contents are not well documented. Therefore removal of historical waste requires advanced characterization, sorting, sustainable repackaging and sometimes conditioning of the waste. This paper describes the Dutch experience of a historical waste removal campaign from the Petten High Flux research reactor. The reactor is still in operation, but Dutch legislation asks for central storage of all radioactive waste at the COVRA site in Vlissingen since the availability of the high- and intermediate-level waste storage facility HABOG in 2004. In order to comply with COVRA's acceptance criteria, the complex and mixed inventory of intermediate and low level waste must be characterized and conditioned, identifying the relevant nuclides and their activities. Sorting and segregation of the waste in a Hot Cell offers the possibility to reduce the environmental footprint of the historical waste, by repackaging it into different classes of intermediate and low level waste. In this way, most of the waste volume can be separated into lower level categories not needing to be stored in the HABOG, but in the less demanding LOG facility for low-level waste instead. The characterization and sorting is done on the basis of a combination of gamma scanning with high energy resolution of the closed waste canister and low-resolution localized gamma scanning inside a hot cell. A complicating factor is that the conditioning of the waste, consisting of compacting and cementing, would require such an extensive infrastructure at the Petten site, that it appeared to be more practical to have it executed by a foreign service provider. Therefore the waste packages have to comply with cross-border transport and waste acceptance criteria, and the national legislation of this service provider too. This paper describes this historical waste project, focusing on the fast and precise characterization approach, the expert system behind it, and the sorting and repackaging effort at the Petten site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Instellar Exploration: Propulsion Options for Precursors and Beyond

NASA is considering a mission to explore near-interstellar space early in the next decade as the first step toward a vigorous interstellar exploration program. A key enabling technology for such an ambitious science and exploration effort is the development of propulsion systems capable of providing fast trip times; mission duration should not exceed the professional lifetime of the investigative team. Advanced propulsion technologies that might support an interstellar precursor mission early in the next century include some combination of solar sails, nuclear electric propulsion systems, and aerogravity assists. Follow-on missions to far beyond the heliopause will require the development of propulsion technologies that are only at the conceptual stage today. These include 1) matter-antimatter annihilation, 2) beamed-energy sails, and 3) fusion systems. For years, the scientific community has been interested in the development of solar sail technology to support exploration of the inner and outer planets. Progress in thin-film technology and the development of technologies that may enable the remote assembly of large sails in space are only now maturing to the point where ambitious interstellar precursor missions can be considered. Electric propulsion is now being demonstrated for planetary exploration by the Deep Space 1 mission. The primary issues for it's adaptation to interstellar precursor applications include the nuclear reactor that would be required and the engine lifetime. For further term interstellar missions, matter-antimatter annihilation propulsion system concepts have the highest energy density of any propulsion systems using onboard propellants. However, there are numerous challenges to production and storage of antimatter that must be overcome before it can be seriously considered for interstellar flight. Off-board energy systems (laser sails) are candidates for long-distance interstellar flight but development of component technologies and necessary infrastructure have not begun.. Fusion propulsion has been studied extensively. However, fusion technology is still considered immature, even after many decades of well-funded research. Furthermore, fusion alone does not offer high enough energy density to make it a viable candidate for interstellar propulsion unless propellant can be collected in situ, as was considered by R. Bussard for his interstellar ramjet concept. The current research in investigating these propulsion systems will be described, and the range of application of each technology will be explored.

Johnson, Charles Les↗

LWRS 2019 Accomplishments Report

Nuclear energy is an important part of supplying our nation’s energy—safely, dependably, and economically—with reduced carbon dioxide emissions. The United States (U.S.) Department of Energy-Office of Nuclear Energy (DOE-NE) supports a strong and viable domestic nuclear industry. In collaboration with industry programs, the Light Water Reactor Sustainability (LWRS) Program supports the continued operation of the commercial fleet of nuclear power plants. DOE’s role in this program focuses on enhancing the safe, efficient, and economical performance of the nation’s nuclear fleet. This report describes the accomplishments of the LWRS Program during Fiscal Year 2019. DOE-NE’s0F primary mission is to advance nuclear power as a resource capable of making major contributions in meeting the nation’s energy supply, environmental, and energy security needs. Under the guidance of three research objectives, NE resolves barriers to technical, cost, safety, security, and proliferation resistance through early stage research, development, and demonstration (RD&D) to: • Enhance the long-term viability and competitiveness of the existing U.S. reactor fleet • Develop an advanced reactor pipeline • Implement and maintain national strategic fuel-cycle and supply-chain infrastructures.

42 ENGINEERING↗

Domestic and International Nuclear Energy Voluntary Consensus Standards Needs

This report introduces the reader to the domestic and international standards development organizations (SDOs) and their structures and operations. It also identifies some of the support and subject matter needs for the development of standards on the subject of nuclear energy. The support needs are described with regard to organizational structure and subject-matter-expert (SME) participation that is required for producing voluntary consensus standards. The subject matter needs are described with regard to growing technologies and objectives that approach the boundaries of existing standards; implementation of knowledge; and safety of people, facilities, and the environment. The development of voluntary consensus standards has been initiated by a group of multiple stakeholders that broadly recognizes the need for one or more standards. Voluntary consensus SDOs have professional participation by individuals who generally receive limited or no financial or infrastructural support, which is in contrast to the approach for nonconsensus or limited-consensus industry, agency, and government guidance, standards, regulations, or laws. Generally, nonconsensus standards exist as the result of an industry- or government-focused infrastructural and financial support system that addresses a specific subject matter need (e.g., the compatibility of discharge hoses on a specific brand of clothes washing machines; the content and format of the US Department of Energy [DOE]/Nuclear Regulatory Commission [NRC] Form 741, “Nuclear Material Transaction Reports”).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Decommissioning Characterisation Through Compressive Gamma-Ray Imaging - 19308

We present the imaging results from two novel single pixel gamma-ray imaging systems, developed at ANSTO, in order to support the characterisation phase of decommissioning activities. The ability to remotely locate, identify, and quantify gamma emitting radionuclides can provide crucial information for the development of an efficient decommissioning plan. The imaging systems have been designed around the theory of compressed sensing and make use of a single spectroscopic detector and a set of dual, rotating, nested tungsten masks. The imaging system designs provide a large field of view and cover an energy range of 40 keV to 1.5 MeV. The first system has been specifically developed to image the High Flux Australian Reactor (HIFAR) reactor vessel with a hemispherical 2π field of view and provided quantitative information on the location of the gamma-ray emitting radionuclides present, whilst operating in a ∼10 Sv/h dose rate environment. The second system is a portable, high sensitivity imager with a cylindrical 360 deg. x 90 deg. field of view used for localising and identifying low to medium dose rate sources in the remaining facility infrastructure. Gamma-ray images were then accurately overlaid on optical images to allow for easy visualisation of the location of gamma emitting radionuclides. The spectroscopic gamma-ray imaging of point sources has been demonstrated with only 1/10. of the measurements normally required by traditional aperture based imaging techniques. The compressive gamma-ray imaging technique provides a novel and highly configurable spectroscopic imaging capability for applications in the nuclear industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Artificial Intelligence a D and D Enabler - 20552

The paper addresses the development of a specific search engine dedicated to Decommissioning and Dismantling (D and D) projects. The solution combines advanced model based system engineering methodologies and a data centric approach. It is based on an appropriate use of the last Natural Language processing techniques, the most innovative artificial intelligence algorithms and open source framework to handle large volume and diversity of data met in the case of a nuclear infrastructure we have to dismantle. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Securing Future Energy Supplies: From Renewables to Microreactors

This session will provide insight into how future energy deployments, critical to national-level programs focused on reducing carbon emissions, can be secured-by-design using lessons learned from current energy infrastructure. It will begin with an overview of current threats and risks associated with renewable energy assets and systems, primarily wind and solar, focusing on their control architecture and key system functions for both efficient and safe operations. This talk will then translate the key takeaways from current renewable infrastructure into applications for securing future energy systems, including microreactors and small modular reactors (SMRs), based on planned concepts of operations and control. Microreactors and SMRs are intended to be factory-assembled with commercially available components and deployed in more remote or distributed environments, necessitating centralized control centers, remote monitoring, and offsite maintenance and technical support. All of these factors lead these assets to a security posture and controls more similar to today's renewable energy assets than today's nuclear reactors, which represents a significant shift in mindset for the nuclear industry. This talk will provide justification for this shift as well as a path forward to motivate securing these groundbreaking technologies from the outset of their design and deployment.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

PRELIMINARY EVALUATION OF REMOVING SNF FROM SHUTDOWN SITES – 2016 UPDATE

An updated evaluation of removing spent nuclear fuel (SNF) from 13 shutdown nuclear power reactor sites was conducted during 2016. At these shutdown sites the nuclear power reactors have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The shutdown sites included in the evaluation were Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, and Vermont Yankee. This paper provides summary information on the 13 shutdown sites as well detailed information gathered from site visits to San Onofre and Vermont Yankee. The evaluation was divided into four components: (1) characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory, (2) a description of the on-site infrastructure, (3) an evaluation of the near-site transportation infrastructure and transportation experience, and (4) an evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. Updates to the evaluation since 2015 include incorporating SNF data from the GC-859 database; updating of Google Earth imagery; incorporating revisions to transportation certificates of compliance; adding information obtained from site visits to the Pacific Sun Railroad and Camp Pendleton, California; adding rail assessments for Kewaunee, Crystal River, and San Onofre to the evaluation; and adding information obtained from the site visit to Vermont Yankee. As additional sites such as Fort Calhoun, Palisades, Clinton, Quad Cities, Pilgrim, Oyster Creek, and Diablo Canyon shut down, these sites will be included in updates to the evaluation.

gtcc waste, unf, used nuclear fuel, transportation↗

High-level fuel fabrication facility designs from discrete-event simulation

Like other industrial processes, the production of metallic nuclear fuels (MNF) requires that fabrication facilities be able to reliably meet production demands, operate efficiently, and adhere to federal and local safety regulations. In turn, the set of design variables employed by such a facility, such as operations policies, infrastructure and machinery purchased, and the type and number of staff hired, directly impact a facility’s ability to satisfy these goals. Therefore, facility designers must carefully determine which set of design variable values optimally satisfies these constraints. In this paper, we explore how values for these high-level design variables, namely hiring requirements, can be determined in the context of nuclear fuel manufacturing through the coupling of physics-based and discrete-event simulation technologies. Using the Versatile Test Reactor (VTR) program as a case study, we demonstrate how SCALE and MCNP nuclear physics model outputs can be integrated into ExtendSim discrete-event simulation (DES) models of the fuel fabrication process to determine the optimal number of staff hired to ensure fuel production goals are met, operations comply with effective dose limit regulations, and overall project costs are reduced.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Challenges for Lithuania: Ignalina NPP Early Closure

As a condition of accession into the European Union (EU), Lithuania is committed to the closure and decommissioning of Ignalina NPP comprising two RBMK-1500 reactor units (Fig. 1). It was agreed in a special protocol to the Accession Treaty that, in return for adequate EU financial assistance, Unit 1 would be closed before 2005 and Unit 2 by the end of 2009. The first unit was duly shut down on December 31, 2004. Lithuania, which has borders with Russia (Kaliningrad territory), Poland, Latvia and Belarus, spent fifty years as part of the Soviet Union and was deeply integrated into its economy and electrical infrastructure. At the break-up of the USSR, Lithuania inherited electricity generating capacity designed to supply the north-west region including ownership of Ignalina NPP located in the north-east of the country. Ignalina NPP Unit 1 was commissioned in 1983, Unit 2 in 1987; the planned lifespan of each unit was 30 years. Construction of a third unit was started but never completed. Since Lithuania became independent in 1990, Ignalina NPP has typically contributed more than 70% of national power supply. The town of Visaginas (population approx. 30,000) was purpose built to serve the plant and staff were brought in from throughout the USSR. With 3200 direct employees, Ignalina NPP remains by far the largest employer. Although there are pockets of Russian-language speakers in communities throughout Lithuania, Visaginas is the only example on a whole-town scale. Thus closure of Ignalina NPP within the restricted timescale required by the EU Accession Treaty commitment set an exceptional challenge to Lithuania. However, since the preparatory phase of decommissioning started in 2000, notable progress has been made, experience gained and lessons learnt. At present Unit 1 remains partially fueled in a state of care and maintenance. Partly burnt fuel is being transferred from Unit 1 to Unit 2 for further irradiation in order to minimize the commitment of new fuel thereby reducing operating costs and the final quantity of spent fuel. Design and construction of the facilities for spent fuel storage, waste processing and free-release is ongoing. The siting of the Near Surface Repository is now in the final stages of approval and construction of the landfill facility is under tendering. In order to facilitate the approval process and minimize the transport of waste, both disposal facilities will be within the boundary of the NPP site. Approximately 450 staff are employed at the shutdown Unit 1 for the safe maintenance of essential systems. The total staffing level at the plant is currently being reduced by around 200 each year, with a larger release to take place at the closure of Unit 2. It is envisaged that 2000 staff will be required for the dismantling operations. Although Ignalina NPP is still in the early stages of closure and decommissioning, some important lessons have already been learnt: Firstly, the importance considering social and financial issues as well as technical factors in deciding the decommissioning strategy. This should be done before the preparation is started of the FDP. The same broad consideration should also be given to the economic restructuring of the local area. Consultation is necessary with local and national authorities, and other stakeholders up to ensure a common vision. At Ignalina NPP it was considered essential to staff morale and the maintenance of a strong safety culture to guarantee the special social and employment benefits to dismissed staff in law [9]. At the same time, measures were also adopted to encourage certain key personnel to remain at the plant until closure. The case of Lithuania, which at independence had no legislative framework or management infrastructure for radioactive waste, may be exceptional; however, for all decommissioning projects it is necessary to have, from the outset, a clear strategy on waste storage and disposal. Finally, coordination at all levels must be assured, especially with the involvement of the nuclear regulators and other regulatory authorities, to achieve a smooth progression from operation into decommissioning.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Uncertainty Analyses of Advanced Fuel Cycles

The Department of Energy is developing technology, experimental protocols, computational methods, systems analysis software, and many other capabilities in order to advance the nuclear power infrastructure through the Advanced Fuel Cycle Initiative (AFDI). Our project, is intended to facilitate will-informed decision making for the selection of fuel cycle options and facilities for development.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Plan for Scaling Up Hydrogen Production with Nuclear Power Plants

The United States (U.S.) Department of Energy’s (DOE’s) Light Water Reactor Sustainability (LWRS) Program Flexible Plant Operations and Generation (FPOG) Pathway is developing options to help U.S. nuclear power plants (NPPs) better integrate with intermittent wind and solar capacity and the recent surge of natural gas power generation. Research is focusing on improving NPP flexibility through hybrid production of electricity and other products, such as hydrogen (H 2 ) and energy storage for the purpose of shifting power production to a later time. In the case of H 2 production, the clean electrical and thermal power from an NPP can be used to split water using electrolysis. This report outlines the opportunity for NPPs to participate in a first-of-akind (FOAK) commercial nuclear H 2 project intended to bring industry partners together to create regional clean H 2 hubs. The Bipartisan Infrastructure Law (BIL) will fund at least one hub up to $1.25 billion as federal cost share totally no less than 50% to execute a nuclear H 2 project. The report discusses the set of activities that are now underway or that are planned for completion by the FPOG Pathway to reduce the economic, technical, regulatory, and safety risks of these projects. DOE cross-program activities are being coordinated to ensure success in the timeframe allowed by the BIL. Figure ES-1 shows the approximate schedule of coordinated research and development (R&D) and pilot demonstration projects leading up to the first commercial nuclear H 2 production project. Execution of this plan requires DOE and industry collaboration. DOE research accomplishments are being provided to the electric utilities or industries looking to participate in the H 2 hub proposal and project execution process.

08 HYDROGEN↗

Optimization and parallelization of the thermal–hydraulic subchannel code CTF for high-fidelity multi-physics applications

This study describes major improvements to the computational infrastructure of the CTF subchannel code so that full-core, pincell-resolved (i.e., one computational subchannel per real bundle flow channel) simulations can now be performed in much shorter run-times, either in stand-alone mode or as part of coupled-code multi-physics calculations. These improvements support the goals of the Department Of Energy Consortium for Advanced Simulation of Light Water Reactors (CASL) Energy Innovation Hub to develop high fidelity multi-physics simulation tools for nuclear energy design and analysis.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

International scientific collaboration: the Gulf Nuclear Energy Infrastructure Institute.

The Gulf Nuclear Energy Infrastructure Institute (GNEII) was established collaboratively by Sandia National Laboratories, Texas A&M University, and the United Arab Emirates’ (UAE’s) Khalifa University of Science, Technology and Research in 2011 to provide a regional mechanism for developing responsible nuclear energy infrastructure. By combining education and research, GNEII helps increase knowledge and expertise about nuclear energy infrastructure—including safety, safeguards, and security—among Gulf and Middle East professionals working in regional nuclear-power programs. GNEII has been recognized by the White House as a major achievement in enhanced science and technology partnerships with the developing world.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗