Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mars Rovers”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Mars Exploration Rovers Entry, Descent, and Landing Trajectory Analysis

The Mars Exploration Rover mission successfully landed two rovers "Spirit" and "Opportunity" on Mars on January 4th and 25th of 2004, respectively. The trajectory analysis performed to define the entry, descent, and landing (EDL) scenario is described. The entry requirements and constraints are presented, as well as uncertainties used in a Monte Carlo dispersion analysis to statistically assess the robustness of the entry design to off-nominal conditions. In the analysis, six-degree-of-freedom and three-degree-of-freedom trajectory results are compared to assess the entry characteristics of the capsule. Comparison of the preentry results to preliminary post-landing reconstruction data shows that all EDL parameters were within the requirements. In addition, the final landing position for both "Spirit" and "Opportunity" were within 15 km of the predicted landing location.

Desai, Prasun N.↗

Mars Exploration Rover - a new standard for interplanetary navigation

The twin Mars Exploration Rovers, Spirit and Opportunity, arrived at Mars for landings respectively at Gusev Crater (on January 4, 2004) and Meridiani Planum (on January 25, 2004). During the development of the mission, the capability of the navigation system to deliver the landers within a particular accuracy played a major role in landing site selection. This process ultimately resulted in commitments to deliver each lander within a specified landing ellipse (about 70 km x 5 km) determined to be safe for landing and also judged to be scientifically interesting. Achieving atmospheric entry delivery accuracies consistent with this landing requirement necessitated significant improvements to the interplanetary navigation system used for MER. These improvements included new processes and software for orbit determination, aggressive, mission-critical use of interferometric ADOR tracking data, propulsive maneuver design, and entry, descent, and landing (EDL) trajectory simulation. Because these advances pressed the state -of -the art, innovative methods to verify the assumptions in the pre-launch covariance analyses were also developed. The actual achieved atmospheric entry accuracies for Spirit and Opportunity significantly bettered the requirements.

navigation↗

Dynamic testing and simulation of the Mars Exploration Rover

In January of 2004, NASA landed two mobile robotic spacecraft on the surface of Mars as part of the Mars Exploration Rover (MER) project. The results and lessons learned of the test and dynamic simulation of the MER vehicles is provided in this paper.

rovers↗

Near-surface temperatures at proposed Mars Exploration Rover land sites

Minimum nighttime temperature at the Mars Exploration Rover (MER) landing sites may limit power available for science activities and thus mission lifetime. Here, 1 m air temperature at the end of the nominal 90 sol primary mission are derived for the four primary and three previously considered MER landing sites based on Mars Global Surveyor Thermal Emmision Spectrometer thermal inertia and albedo, estimated opacity, and predictions of air temperature from a one-dimensional atmospheric model.

Mars atmosphere Mars Exploration Rover (MER) surfa↗

Preliminary Assessment of Mars Exploration Rover Landing Site Predictions

Selection of the Mars Exploration Rover (MER) landing sites took place over a three year period in which engineering constraints were identified, 155 possible sites were downselected to the final two, surface environments and safety considerations were developed, and the potential science return at the sites was considered. Landing sites in Gusev crater and Meridiani Planum were selected because they appeared acceptably safe for MER landing and roving and had strong morphologic and mineralogical indicators of liquid water in their past and thus appeared capable of addressing the science objectives of the MER missions, which are to determine the aqueous, climatic, and geologic history of sites on Mars where conditions may have been favorable to the preservation of evidence of possible pre-biotic or biotic processes. Engineering constraints important to the selection included: latitude (10 N-15 S) for maximum solar power; elevation (<-1.3 km) for sufficient atmosphere to slow the lander; low horizontal winds, shear and turbulence in the last few kilometers to minimize horizontal velocity; low 10-m scale slopes to reduce airbag spinup and bounce; moderate rock abundance to reduce abrasion or stroke-out of the airbags; and a radar-reflective, load-bearing and trafficable surface safe for landing and roving that is not dominated by fine-grained dust. In selecting the MER landing sites these engineering constraints were addressed via comprehensive evaluation of surface and atmospheric characteristics from existing remote sensing data and models as well as targeted orbital information acquired from Mars Global Surveyor and Mars Odyssey. This evaluation resulted in a number of predictions of the surface characteristics of the sites, which are tested in this abstract. Relating remote sensing signatures to surface characteristics at landing sites allows these sites to be used as ground truth for the orbital data, is essential for selecting and validating landing sites for future missions, and is required for correctly interpreting the surfaces and materials globally present on Mars.

Golombek, M.↗

Mars Exploration Rover Mission

This viewgraph presentation reviews the Mars Exploration Rover Mission. The design of the Rover along with the Athena science payload is also described. Photographs of the Gusev Crater and Meridiani rocks are also shown.

Cohen, Barbara A.↗

Mars Exploration Rover Six-Degree-Of-Freedom Entry Trajectory Analysis

The Mars Exploration Rover mission will be the next opportunity for surface exploration of Mars in January 2004. Two rovers will be delivered to the surface of Mars using the same entry, descent, and landing scenario that was developed and successfully implemented by Mars Pathfinder. This investigation describes the trajectory analysis that was performed for the hypersonic portion of the MER entry. In this analysis, a six-degree-of-freedom trajectory simulation of the entry is performed to determine the entry characteristics of the capsules. In addition, a Monte Carlo analysis is also performed to statistically assess the robustness of the entry design to off-nominal conditions to assure that all entry requirements are satisfied. The results show that the attitude at peak heating and parachute deployment are well within entry limits. In addition, the parachute deployment dynamics pressure and Mach number are also well within the design requirements.

Desai, Prasun N.↗

Slip Validation and Prediction for Mars Exploration Rovers

This paper presents a novel technique to validate and predict the rover slips on Martian surface for NASA's Mars Exploration Rovers. Different from the traditional approach, the proposed method uses the actual velocity profile of the wheels and the digital elevation map (DEM) from the stereo images of the terrain to formulate simplified equations of motion of the rovers. A weighted factor to the wheel-ground speed from the empirical data comprises the velocity equations of the simplified differential-algebraic system of the rover motion. Applying the discretization operator to these equations, the full kinematics state of the rover is then resolved by the configuration kinematics solution in the Robot Sequencing and Visualization Program (RSVP). This method produced accurate simulation of the rover movements compared with these of the earth testing vehicle. Using the telemetry from the onboard Visual Odometry, the simulated rover path also compares well with the actual track of the vehicle. Preliminary results indicated that the proposed computational method is very effective in planning the path of the rovers on the high-slope areas.

Mars Rovers↗

Radio science receiver support of the Mars Exploration Rover Landings

The low power levels of the communication signals during the Entry Descent and Landing (EDL) sequences of the Mars rovers prevented the transmission of telemetry at X-band signal to inform the mission operations center of the health and progress of the spacecraft. As an altemative, a series of tones were sent to indicate basic spacecraft conditions and execution of critical events. An open-loop receiver designed for Radio Science experiments was used to acquire the signal during this time. The receiver recorded over a 100 Khz bandwidth to identify the presence of the carrier and tones. The data were fed in real-time to a processing unit which detected the carrier and the frequency separation of the tones from the carrier, in order to determine which event has occurred. Up to 256 different tones were possible. During the actual events, all tones were identified, and the carrier was tracked down to the surface, and for the second rover, through the bouncing which followed, and finally, while stopped on the surface, found the carrier and tones which indicated the spacecraft was alive. In order to identify the tones, the ground receivers had to be able to respond to the bevy of events occurring in the relatively short timespan of EDL.

Deep Space Network (DSN)↗

Conceptual studies on the integration of a nuclear reactor system to a manned rover for Mars missions

Multiyear civilian manned missions to explore the surface of Mars are thought by NASA to be possible early in the next century. Expeditions to Mars, as well as permanent bases, are envisioned to require enhanced piloted vehicles to conduct science and exploration activities. Piloted rovers, with 30 kWe user net power (for drilling, sampling and sample analysis, onboard computer and computer instrumentation, vehicle thermal management, and astronaut life support systems) in addition to mobility are being considered. The rover design, for this study, included a four car train type vehicle complete with a hybrid solar photovoltaic/regenerative fuel cell auxiliary power system (APS). This system was designed to power the primary control vehicle. The APS supplies life support power for four astronauts and a limited degree of mobility allowing the primary control vehicle to limp back to either a permanent base or an accent vehicle. The results showed that the APS described above, with a mass of 667 kg, was sufficient to provide live support power and a top speed of five km/h for 6 hours per day. It was also seen that the factors that had the largest effect on the APS mass were the life support power, the number of astronauts, and the PV cell efficiency. The topics covered include: (1) power system options; (2) rover layout and design; (3) parametric analysis of total mass and power requirements for a manned Mars rover; (4) radiation shield design; and (5) energy conversion systems.

El-Genk, Mohamed S.↗

Mars Exploration Rover Landing Site Selection

Selection of the landing sites for the Mars Exploration Rovers has involved over 2 years of research and analysis effort that has included the participation of broad sections of the planetary sciences community through a series of open landing site workshops. The effort has included the definition of the engineering constraints based on the landing system, mapping those engineering constraints into acceptable regions and prospective sites, the acquisition of new information from Mars Global Surveyor and Mars Odyssey orbiters, the evaluation of science and safety criteria for the sites, and the downselection and final site selection based on the sites science potential and safety. The final landing sites (Meridiani Planum and Gusev crater) were selected by NASA Headquarters on April 11, 2003, prior to launch in June. This paper presents engineering requirements, and potential landing sites for Mars Exploration Rovers.

M Golombek↗

How to Build a Rover: An Overview of the Mars 2020 Mission’s Vehicle System Testbed

While NASA’s Mars rover Perseverance continues to make groundbreaking achievements on the Red Planet, its twin is hard at work here on Earth. The Operational Perseverance Twin for the Integration of Mechanisms and Instruments Sent to Mars, or OPTIMISM, is the Mars 2020 Vehicle System Testbed (VSTB) rover operated by NASA Jet Propulsion Laboratory (JPL) in Pasadena, California. OPTIMISM’s home is the JPL Mars Yard; an outdoor field with red soil that simulates the terrain encountered by Perseverance. The VSTB is a full-scale engineering model of the flight rover, serving a number of functions to ensure mission operations can continue smoothly and on schedule. The VSTB possesses instrumentation, computers, mechanisms, cameras, and a Mobility subsystem that are nearly identical to its extraterrestrial twin. Its high fidelity allows the rover to be a highly effective tool to fully test system functionality and performance prior to commanding the flight rover. The early stages of building OPTIMISM began a few months prior to Perseverance departing JPL for Cape Canaveral, FL in early 2020. Electrical integration of the flight system avionics, and compatibility checkouts of the electrical ground support equipment ensured that the foundation of the electrical system was operational and in place. Next, the internal harnessing was installed and compatibility checks of the rover instrumentation and mechanisms were performed to confirm the system was prepared for full buildup. Finally, mechanical assembly of the rover chassis with its external components completed the integration of the system before it was moved to the Mars Yard for its initial phase of testing to perform verification & validation (V&V) of the Mobility subsystem requirements. By the time Perseverance landed at Jezero Crater in February 2021, the first phase of VSTB operations was underway. Surface guidance, navigation, and control (SGNC) testing for the Mobility subsystem ensured functionality and performance requirements were met for various capabilities such as visual odometry (VO), mapping, and automatic navigation (AutoNav). Subsequent integration of the robotic arm (RA) onto the VSTB enabled the V&V campaign for surface sampling operations (SSO) to commence. As the mission’s engineering operations (EO) have gotten underway, the VSTB has been utilized for an array of purposes including troubleshooting software anomalies, and performing dry-runs for first time activities (FTAs) prior to sending the commands to Perseverance. OPTIMISM will continue to serve mission critical functions as long as Perseverance is roving the Red Planet.

Rojas, Jose Trujillo↗

Ground-based Automated Scheduling for Operations of the Mars 2020 Rover Mission

The National Aeronautics and Space Administration’s (NASA) Mars 2020 Rover, named Perseverance, landed on the surface of Mars in Jezero Crater on February 18, 2021. Since the landing, the rover’s activities have been planned with the aid of a ground-based automated scheduling system called Copilot. Automated scheduling is very rare for planetary rover missions. Historically humans have created a schedule manually and ensured that the schedule satisfied all constraints. Higher levels of automation in the system allows science planners to produce schedules for the rover more quickly. In addition to scheduling user-provided activities, Copilot generates and schedules two types of support activities: sleep activities and heating activities. Some activities require the CPU to be on as they execute, so Copilot schedules wakeups and shutdowns of the CPU at the appropriate times. Some activities require areas of the rover to be heated before they can execute, and that heating must be maintained throughout the duration of the activity. Copilot schedules the preheat and maintenance heating activities for the user-provided activities that require them. To facilitate Copilot usage, the Crosscheck tool shows the science planners how Copilot constructed a schedule. For activities that fail to be scheduled, Crosscheck gives information on the constraints that the activity would have violated. This gives the users insight into how to change the input activities and constraints in order to achieve a schedule that satisfies their goals.

Towey, Shannon↗

Static Aerodynamics of the Mars Exploration Rover Entry Capsule

The static aerodynamics for the Mars Exploration Rover (MER) aeroshell are presented. This aerodynamic database was an integral part of the end-to-end simulation used in pre- entry analysis for determining the MER entry design requirements for development of the MER entry system, as well as targeting the MER landing sites. The database was constructed using the same approach used for Mars Pathfinder (MPF). However, the MER aerodynamic database is of much higher fidelity and tailored to the MER entry trajectories. This set of data includes direct simulation Monte Carlo calculations covering the transitional regime of the entry trajectory and computational fluid dynamics calculations describing the aerodynamics in the hypersonic and supersonic continuum regimes. An overview of the methodology used to generate the data is given along with comparisons to important features in the MPF aerodynamics and related heritage data. The MER and MPF comparison indicates that trajectory specific data is required to properly model the flight characteristics of a.blunt entry capsule at Mars.

Schoenenberger, Mark↗