Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MONITOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

September 2008 monitoring results for Centralia, Kansas.

In September 2005, periodic sampling of groundwater was initiated by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) in the vicinity of a grain storage facility formerly operated by the CCC/USDA at Centralia, Kansas. The sampling at Centralia is being performed on behalf of the CCC/USDA by Argonne National Laboratory, in accord with a monitoring program approved by the Kansas Department of Health and Environment (KDHE). The objective is to monitor levels of carbon tetrachloride contamination identified in the groundwater at Centralia (Argonne 2003, 2004, 2005a). Under a KDHE-approved monitoring plan (Argonne 2005b), the groundwater was sampled twice yearly (for a recommended period of two years) for analyses for volatile organic compounds (VOCs), as well as measurement of selected geochemical parameters to aid in the evaluation of possible natural contaminant degradation (reductive dechlorination) processes in the subsurface environment. The sampling in September 2007 represented the fifth and final monitoring event performed under the two-year twice yearly monitoring program (Argonne 2006a,b, 2007a, 2008a). The results from the two-year monitoring program demonstrated the presence of carbon tetrachloride contamination at levels exceeding the KDHE Tier 2 Risk-Based Screening Level of 5 {micro}g/L for this compound in a broad groundwater plume that has shown little movement. The relative concentrations of chloroform, the primary degradation product of carbon tetrachloride, suggested that some degree of reductive dechlorination or natural biodegradation was taking place in situ at the former CCC/USDA facility on a localized scale. The CCC/USDA subsequently developed an Interim Measure Conceptual Design (Argonne 2007b), proposing a pilot test of the Adventus EHC in situ chemical reduction technology, that was approved by the KDHE in November 2007 (KDHE 2007). Implementation of the proposed interim measure occurred in December 2007. The objective was to create highly reducing conditions that would enhance both chemical and biological reductive dechlorination in the injection test area (Argonne 2009). The KDHE has requested that sitewide monitoring continue at Centralia until a final remedy has been implemented and a comprehensive program of performance and compliance monitoring has been established for this site (KDHE 2008a). The groundwater sampling events at Centralia in March 2008 (Argonne 2008b) and September 2008 were performed in response to this request. The present report documents the results of groundwater sampling conducted in September 2008, in the network of 10 monitoring wells and 6 piezometers (Figure 1.1) previously approved by the KDHE for extended monitoring of the groundwater contamination at Centralia (KDHE 2005a,b). Sampling of additional piezometers specifically installed to monitor the progress of the interim measure pilot test (PMP1-PMP9; Figure 1.2) was also performed in September 2008; the results of these analyses are reported and discussed separately (Argonne 2009).

54 ENVIRONMENTAL SCIENCES↗

Development of a CO 2 Chemical Sensor for Downhole CO 2 Monitoring in Carbon Sequestration

Geologic storage of carbon dioxide (CO 2 ) has been proposed as a viable means for reducing anthropogenic CO 2 emissions. The means for geological sequestration of CO 2 is injection of supercritical CO 2 underground, which requires the CO 2 to remain either supercritical, or in solution in the water/brine present in the underground formation. However, there are aspects of geologic sequestration that need further study, particularly in regards to safety. To date, none of the geologic sequestration locations have been tested for storage integrity under the changing stress conditions that apply to the sequestration of very large amounts of CO 2 . Establishing environmental safety and addressing public concerns require widespread monitoring of the process in the deep subsurface. In addition, studies of subsurface carbon sequestration such as flow simulations, models of underground reactions and transports require a comprehensive monitoring process to accurately characterize and understand the storage process. Real-time information about underground CO 2 movement and concentration change is highly helpful for: (1) better understanding the uncertainties present in CO 2 geologic storage; (2) improvement of simulation models; and (3) evaluation of the feasibility of geologic CO 2 storage. Current methods to monitor underground CO 2 storage include seismic, geoelectric, isotope and tracer methods, and fluid sampling analysis. However, these methods commonly resulted low resolution, high cost, and the inability to monitor continuously over the long time scales of the CO 2 storage process. A preferred way of monitoring in-situ underground CO 2 migration is to continuous measure CO 2 concentration change in brine during the carbon storage process. An approach to obtain the real time information on CO 2 concentration change in formation solution is highly demanded in carbon storage to understand the CO 2 migration subsurface and to answer the public safety problem. The objective of the study is to develop a downhole CO 2 sensor that can in-situ, continuously monitor CO 2 concentration change in deep saline. The sensor is a Severinghaus-type CO 2 sensor with small size, which renders it can be embedded in monitoring well casing or integrated with pressure/temperature transducers, enabling the development of “smart” wells. The studies included: (1) prepare and characterize metal-oxide electrodes. Test the electrodes response to pH change. Investigate different ions and brine concentration effects on the electrode’s performance. Study the stability of the electrode in brine solution; (2) fabricate a downhole CO 2 sensor with the metal-oxide electrodes prepared in the laboratory. Test the performance of the CO 2 sensor in brine solutions. Study high pressure effects on the performance of the sensor; (3) design and conduct CO 2 /brine coreflooding experiments with the CO2 sensor. Monitor CO 2 movement along the core and test the performance of the sensor in coreflooding tests. Develop a data acquisition system that can digitize the sensor’s output voltage. Our completed research has resulted in deep understanding of downhole CO 2 sensor development and CO 2 monitoring in CO 2 storage process. The developed downhole CO 2 sensor included a metal-oxide electrode, a gas-permeable membrane, a porous steel cup, and a bicarbonate-based internal electrolyte solution. Iridium oxide-based electrode was prepared and used for preparation the CO 2 sensor. The prepared iridium oxide-based electrode displayed a linearly response to pH change. Different factors such as different ions and ions concentration, temperature, and pressure effects on the electrode performance on pH response were investigated. The results indicated that the electrode exhibited a good performance even in high salt concentration of produced water. To improve the electrode performance under high pressure, IrO 2 nanoparticles with the particle size in the range of 1-2 nm were prepared and electrodeposited on stainless steel substrate by cyclic voltammetry. It was observed that the thin film of iridium oxide was formed on the substrate surface and such iridium oxide-based electrode displayed excellent performance under high pressure for longer term. A downhole CO 2 sensor with the iridium oxide-based electrode was prepared. The working principle of the CO 2 sensor is based on the measurement of the pH change of the internal electrolyte solution caused by the hydrolysis of CO 2 and then determination of the CO 2 concentration in water. The prepared downhole CO 2 sensor had the size of diameter of 0.7 in. and length of 1.5 in. The sensor was tested under the pressures of 500 psi, 2,000 psi, and 3,000 psi. A linear correlation was observed between the sensor potential change and dissolved CO 2 concentration in water. The response time of the CO 2 sensor was in the range of 60-100 minutes. Further tests indicated that the CO 2 sensor exhibited good reproducibility under high pressure. A CO 2 /brine coreflooding system was constructed to simulate the real-world CO 2 storage process. The prepared downhole CO 2 sensor was loaded in the system to monitor CO 2 movement during CO 2 /brine coreflooding test. The results indicated that the sensor could detect CO 2 movement in the tests. Further studies showed that the sensor could be recovered by brine flooding after CO 2 /brine flushed the core. The results of the coreflooding tests demonstrated that the sensor had potential application for CO 2 monitoring in carbon sequestration. A data acquisition system for the downhoe CO 2 sensor was developed and coded. The system converted the sensor output signal into digital data and transported the data from downhole to wellhead surface. The data acquisition system was tested and evaluated in the laboratory with the prepared sensor for data collection.

36 MATERIALS SCIENCE↗

Rock Physics-Based Data Assimilation of Integrated Continuous Active-Source Seismic and Pressure Monitoring Data during Geological Carbon Storage

Summary There has been substantial controversy concerning the role of geological carbon storage (GCS) in sequestering anthropogenic carbon emissions to mitigate climate change and global warming. Arguments center on the inability to monitor a geological storage site precisely and continuously, especially highlighting the associated costs and spatiotemporal trade-offs when using conventional subsurface monitoring techniques (well logs, core samples, chemical tracers, and 4D seismics). Active surveillance of GCS sites is essential for managing and mitigating potential leaks but is also required by regulation. With the goal of enhancing the monitoring capability at GCS sites, we present a rock physics-based joint data assimilation model to study a popular GCS site at Cranfield, Mississippi, USA. Synthetic continuous active-source seismic monitoring (CASSM) data (in the form of Vp and Qp measurements) and wellbore pressure monitoring data are assimilated with an ensemble of reservoir realizations to monitor gas saturation and reservoir pressure changes over a period of 100 years. Synthetic seismic attributes are generated using rock physics models (RPMs) and wellbore pressure monitoring data are extracted from the ground truth. Two assimilation methods, ensemble Kalman filter (EnKF) and ensemble Kalman smoother (EnKS), are tested in an observation system simulation experiment (OSSE) environment to assess the prediction accuracy of the individual and composite observation systems. The joint monitoring system achieves more accurate estimates of gas saturation and pressure, across the time span from start of injection to end of forecast, as compared to a single type of monitoring tool and irrespective of data assimilation algorithm choice. These results indicate that jointly assimilated data from two types of sensors (in this case, crosswell seismic and downhole pressure) may lead to a more risk-reducing monitoring design. One would expect that more data, vis-à-vis inclusion of a new sensor type, will improve the accuracy of any GCS monitoring system. However, from a practical standpoint, one important question is whether such a gain in accuracy is worth the additional cost associated with the new sensor. This paper focuses on quantifying the gain in accuracy, such that a practitioner can answer this question.

Engineering↗

Intelligent Monitoring Systems and Advanced Well Integrity and Mitigation

Long-term seismic monitoring of carbon capture and storage projects is needed to verify that the injected gas is safely stored in the subsurface until permanence can be assured. Conventional surface seismic monitoring techniques are usually expensive, require highly invasive surface operations, and need significant time investments on the part of personnel for both the field effort and processing the acquired data. For these reasons, permanent reservoir monitoring technologies are preferred, as they can offer a cost-effective solution for long-term monitoring. As part of the monitoring program of the Archer Daniels Midland’s large-scale injection of CO 2 in Decatur, Illinois, USA, a continuous seismic monitoring array was installed using a combination of surface orbital vibrator (SOV) sources and fiber-optic cables for distributed acoustic sensing (DAS) acquisition with the objective to build a continuous monitoring array. The aim of the presented project was to build a monitoring array and platform that integrates real-time seismic data with conventional data streams and provides continuous data analysis using dynamic computational models to deliver a comprehensive real-time assessment of subsurface conditions. It is in this context that the Intelligent Monitoring Systems and Advanced Well Integrity and Mitigation project was proposed with the objective to develop an integrated architecture that utilizes a permanent seismic monitoring network, combines the real-time geophysical and process data with reservoir flow and geomechanical models to create a comprehensive monitoring, visualization, and control system that delivers critical information for process surveillance and optimization.

54 ENVIRONMENTAL SCIENCES↗

Southeast Carbon Sequestration Partnership (SECARB) Phase III Anthropogenic Test at Citronelle Field, Mobile Co., AL Surface and Shallow Subsurface Monitoring

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is one of the United States’ largest demonstrations of CO 2 capture, transportation, injection, storage and monitoring using CO 2 derived from a coal-fired electric generating unit. This report summarizes the background and initial injection phase groundwater and soil flux monitoring results. The purpose of the groundwater monitoring program, as prescribed in the Underground Injection Control (UIC) permits is to assure that the project’s activities do not harm Underground Sources of Drinking Water (USDWs). In particular, the objective of the program is to monitor for the release of injected CO2 into groundwater aquifers at the project site. Three shallow USDW monitoring wells were installed as part of the groundwater monitoring program. In addition, a water supply well located near the project’s deep characterization well was utilized for monitoring. Seventeen metals, general chemistry and field parameters (e.g. pH, specific conductance, turbidity) were sampled three times prior to injection and quarterly during the injection period to date. Changes in groundwater geochemistry potentially attributable to a release of carbon dioxide into the USDW from the injection activities are decreasing pH and increasing TIC. The change in pH may also accompany the mobilization of certain metals within the groundwater, but the changes are likely site-specific, based on the natural aquifer mineralogy (Wilkin and Diguilio, 2010). At this time, no downward trends for pH and increasing trends for TIC have been statistically determined in the monitor wells. Valid detections exceeding both the UIC discharge limit and the range of background concentrations observed as of the N=11 event include: Exceedance of the UIC permit discharge limit of manganese at D-9-7 MW-2S and D-9-9 MW-1, and exceedance of the UIC permit discharge limit of iron at D-9-9 MW-1. In addition, a statistically significant increase of barium and manganese has been observed at D-9-9 MW-1. However, Additional lines of evidence (namely, expected shifts in TIC or pH, per the research cited above) to interpret the cause (e.g., potential carbon dioxide influence) of the statistically determined exceedances and/or increases are absent at this time. Quarterly groundwater sampling and analysis will continue throughout the project. The UIC permit requires that soil CO 2 flux shall be monitored at the land surface at the injection site and at nearby locations. Twelve locations were chosen for surveys including a mix of near wellbore and offset locations. To date, 24 surveys have taken place with 12 occurring prior to the onset of injection operations in August 2012. Soil CO 2 flux appears to positively covary with soil temperature. A notably high soil CO 2 flux value (21 µmol/m 2 /sec) was observed from the D-9-9 #2 chamber location during sampling event #24 (9/24/2014). As a result of this finding, the frequency of soil CO 2 flux monitoring events will be increased to twice-monthly until this anomaly can be confirmed or determined to be an outlier. Soil CO 2 flux monitoring will continue for the duration of the project.

01 COAL, LIGNITE, AND PEAT↗

SECARB Annual Report on In-Situ Monitoring Program

The Southeast Carbon Sequestration Partnership Phase III Anthropogenic Test at Citronelle Field is the United States’ largest prototype of commercial CO 2 capture from a coal-fired power station and transportation, injection, storage and monitoring. This report details the results of the background and first year of injection monitoring results for the Anthropogenic Test. Monitoring methods include both direct and indirect measurements. The Class V Experimental Permit requires extensive monitoring of injected CO 2 at the surface and at deep and shallow depths. The safety, integrity and information objectives of the CO 2 monitoring plan are in place to: (1) create and sustain wellbore integrity; (2) assure safe CO 2 injection operations; 3) verify the location and migration of the injected CO 2 plume; and (4) monitor for any CO 2 leakage. A robust suite of monitoring approaches are utilized for the in-situ monitoring and include, pressure monitoring, various seismic surveys, pulsed neutron logging, reservoir fluid sampling and injection surveys. Data and observations collected using these monitoring methods will be used in the numerical model to inform the post-injection site care monitoring plan.

01 COAL, LIGNITE, AND PEAT↗

Integrated Modeling and Monitoring Technologies for Environmental Resiliency in Nuclear Energy

Environmental concerns pose the biggest challenge for the development of the nuclear energy industry, often preventing or limiting the construction of new plants and radioactive waste disposal facilities. There are currently numerous sites in the world at which surface and groundwater are contaminated by nuclear weapon production and testing, as well as due to nuclear power plant accidents. Many of those sites remain unused or inhabited primarily due to public concern. Improving scientific and technical capabilities to develop environmental resiliency is critical not only to address existing contamination, but also to build public confidence and support for nuclear energy. One of the obstacles in remediation is to tackle a large volume of contaminated soil and groundwater with relatively low concentrations. Although many contaminant removal technologies have developed (e.g., pump-and-treat systems), they are often expensive and not cost-effective for low-concentration radionuclide contamination. Although soil removal is often the most effective, it produces a large amount of waste that has to be stored securely for a long period of time or treated at the special treatment facilities. Transporting a large amount of waste may also produce greenhouse gases and disrupt local communities. Recently, the concept of 'sustainable remediation' has been proposed to improve a remediation system as a whole, including the consideration of cost effectiveness, reduction of greenhouse emission, waste production and energy usage. Rather than just focusing on removing contaminants, the sustainable remediation highlights the use of passive remediation technologies to immobilize radionuclides along with the application of monitored natural attenuation and longer institutional control. However, such passive technologies and monitored natural attenuation require the increased burden of proof to ensure that those immobilized contaminants would not compromise the long-term public health. Although contaminant transport modeling and risk assessments are always performed, they sometimes fail due to the lack of understanding the contaminant transport proposes at the time of the risk assessment or due to some unexpected processes. Monitoring technologies are critical to ensure the long-term stability of such remediated sites, and also to address the public concerns. Recent advances in in situ sensor technologies and spatially-extensive mapping technologies (such as unmanned aerial vehicles, airborne mapping, geophysics) have improved monitoring of contamination over space and time. In addition to new sensing devices, data management and data analytics technologies have been expanded to manage and process large spatial and temporal datasets. Such technologies can be used to reduce monitoring cost significantly, and to facilitate long-term monitoring. In this study, we demonstrate our data analytics technologies for two nuclear-related contaminated sites: (1) air dose rate monitoring in Fukushima prefecture, and (2) groundwater monitoring at the Savannah River Site F-Area. We are developing the spatial and temporal data integration methodologies to integrate various spatially extensive data and time-series data for improving long-term monitoring. Such monitoring technologies and experiences at the existing contaminated sites can be transferred to build a better monitoring system for nuclear facilities, such as nuclear power plants or nuclear waste storages.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

TU-CD-304-09: Feasibility Study for Thermoplastic Mask Set Up Monitoring Using Force Sensing Resistor (FSR) Sensor

Purpose: To improve the setup accuracy of thermoplastic mask, we developed a new monitoring method based on force sensing technology and evaluated its feasibility. Methods: The thermoplastic mask setup monitoring system consists of a force sensing resistor sensor unit, a signal transport device, a control PC and an in-house software. The system is designed to monitor pressure variation between the mask and patient in real time. It also provides a warning to the user when there is a possibility of movement. A preliminary study was performed to evaluate the reliability of the sensor unit and developed monitoring system with a head phantom. Then, a simulation study with volunteers was conducted to evaluate the feasibility of the monitoring system. Note that the sensor unit can have multiple end-sensors and every end-sensor was confirmed to be within 2% reliability in pressure reading through a screening test. Results: To evaluate the reproducibility of the proposed monitoring system in practice, we simulated a mask setup with the head phantom. FRS sensors were attached on the face of the head phantom and pressure was monitored. For 3 repeated mask setups on the phantom, the variation of the pressure was less than 3% (only 1% larger than 2% potential uncertainty confirmed in the screening test). In the volunteer study, we intended to verify that the system could detect patient movements within the mask. Thus, volunteers were asked to turn their head or lift their chin. The system was able to detect movements effectively, confirming the clinical feasibility of the monitoring system developed. Conclusion: Through the proposed setup monitoring method, it is possible to monitor patient motion inside a mask in real time, which has never been possible with most commonly used systems using non-radiographic technology such as infrared camera system and surface imaging system. This work was supported by the Radiation Technology R&D program (No. 2013M2A2A7043498) and the Mid-career Researcher Program (2014R1A2A1A10050270) through the National Research Foundation of Korea funded by the Ministry of Science, ICT&Future Planning.

60 APPLIED LIFE SCIENCES↗

Integrated systems-based approach to monitoring environmental remediation

The U.S. Department of Energy is responsible for risk reduction and cleanup of its nuclear weapons complex. Remediation strategies for some of the contamination may include techniques that mitigate risk, but leave contaminants in place. Monitoring to verify remedy performance and long-term mitigation of risk is key to implementing these strategies and can be a large portion of the total cost of remedy implementation. Especially in these situations, there is a need for innovative monitoring approaches that move away from the cost- and labor-intensive point-source monitoring. In this paper, alternative approaches for monitoring are presented for vadose zone, groundwater, groundwater/surface water interface, and surface water. To illustrate integrated, systems-based monitoring, this paper focuses on vadose zone contaminant remediation to mitigate impact to groundwater. In this context, vadose zone contamination is a source, or potential source, to groundwater plumes. The monitoring design uses a systems-based approach focused on developing a conceptual site model that highlights key features that control contaminant flux to groundwater. These features are derived considering the unsaturated flow and contaminant transport processes in the vadose zone and the nature of the waste discharge. Diagnostic properties and/or parameters related to both short- and long-term contaminant flux to groundwater can be identified and targeted for monitoring. The resolution of monitoring data needed to correspond to a functionally useful indicator of flux to groundwater can be estimated using quantitative analyses and the associated unsaturated flow properties relevant to the targeted site and vadose zone features. This monitoring design approach follows the process of developing a quantitative conceptual model suitable for supporting projections of future flux to groundwater. Support for such projections is important because it is likely that, in many cases, remediation decisions for the vadose zone will need to be made based all or in part on projected impacts to groundwater, and monitoring will then be applied to verify that remedy goals are being met. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Idaho National Laboratory Site Environmental Monitoring Plan (Rev. 2)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

54 ENVIRONMENTAL SCIENCES↗

Idaho National Laboratory Site Environmental Monitoring Plan (Rev. 3)

This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

54 ENVIRONMENTAL SCIENCES↗

Developing Load Cell Monitoring on the Mock UF 6 Feed and Withdrawal System

A proof-of-concept load cell monitoring system has been developed for the Mock Feed and Withdrawal (F&W) System at Oak Ridge National Laboratory (ORNL). This system leverages industry-standard commercial off-the-shelf (COTS) hardware and software in a modular and scalable design. The Mock F&W System was designed to simulate operations at a uranium hexafluoride (UF 6 ) gas centrifuge enrichment plant F&W area. It provides a test bed for process-monitoring technologies. Water, used as a surrogate for UF 6 , is pumped from three feed tanks, through a process surge tank, and is then cut between two tails tanks and three product tanks. The weight of the each tank is continuously monitored using a load cell monitoring system. In addition to the F&W stations, large and small accountancy stations are monitored. The Mock F&W System allows ORNL to test and evaluate capabilities of industry-standard process monitoring hardware and software. A variety of commonly used weighing indicators are connected to the load cells to monitor the weight at each station. These weighing indicators are representative of the types likely found in operating facilities. A data center modeled after those currently used for international safeguards was installed to collect and manage the weight data. This data center provides a robust and flexible test bed for testing and developing software solutions. COTS software packages that leverage industry-standard communication protocols provide a data flow architecture that is modular, interoperable, and scalable. One software package provides communication drivers to collect the raw weight data from the weighing indicators. A data historian is used to store the raw data. Custom in-house algorithms have been developed using MATLAB to analyze the raw historical data and to automatically identify process information. This information includes the number of cycles completed and the mass of material transferred from stations to the process. The process information identified by the analysis is stored in a Microsoft SQL Server database. Visualization concepts have been developed that display the analyzed process information alongside visually compelling plots and animations of the raw data. The load cell monitoring system developed on the Mock F&W System was designed as a proof of concept that could be scaled to a field trial at an operating facility. This system, built with industry standard hardware and software, has allowed ORNL to develop capabilities that provide confidence in the ability to leverage existing operator load cell monitoring equipment with minimal impact on operations. The international safeguards community is evaluating the use of load cell monitoring as an additional safeguards measure; this system demonstrates a practical solution to collect, store, analyze, and visualize load cell weight data.

commercial off the shelf↗

Y-12 Groundwater Protection Program Monitoring Well Inspection and Maintenance Plan

This plan describes the systematic approach for: inspecting the physical condition of monitoring wells at Y-12, determining maintenance needs that extend the life of a well, and identifying those wells that no longer meet acceptable monitoring well design or well construction standards and require plugging and abandonment. The inspection and maintenance of groundwater monitoring wells is one of the primary management strategies of the Y-12 Groundwater Protection Program (GWPP) Management Plan, that is, the “proactive stewardship of the extensive monitoring well network at Y-12" (Consolidated Nuclear Security, L.L.C. [CNS], 2018). Effective stewardship, and a program of routine inspections of the physical condition of each monitoring well, ensures that representative water-quality samples and hydrologic data are obtained from the well network and protects the subsurface environment. In accordance with the Y-12 GWPP Monitoring Optimization Plan (MOP) for Groundwater Monitoring Wells at the Y-12 National Security Complex, Oak Ridge, Tennessee (CNS, 2017), the status designation (active or inactive) for each well determines the scope and extent of well inspections and maintenance activities. This plan, in conjunction with the above document, formalizes the GWPP approach to focus available resources on monitoring wells which provide the most useful data, and for that reason the GWPP inspects and performs maintenance on the wells sampled by the GWPP. This plan applies to groundwater monitoring wells installed at Y-12 and the related waste management facilities located within the three hydrogeologic regimes: (1) the Bear Creek Hydrogeologic Regime (Bear Creek Regime), (2) the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and (3) the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses the section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV west of Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bounded to the west by a surface drainage feature (Dunaway Branch, located immediately west of Industrial Landfill II) and by Scarboro Road to the east. The GWPP maintains an extensive database of geographic and construction details and related information for the monitoring wells in each hydrogeologic regime in the Updated Subsurface Database for Bear Creek Valley, Chestnut Ridge, and Parts of Bethel Valley on the U.S. DOE Oak Ridge Reservation (CNS, 2019). A detailed description of the hydrogeologic framework at Y-12 can be found in the GWPP Management Plan (CNS, 2018).

54 ENVIRONMENTAL SCIENCES↗

Distributed Wind Monitoring Best Practices

Accessible performance and operational data have been identified as a key enabler for distributed wind energy industry advancement. While utility-scale wind turbines benefit from reliable and continuous supervisory control and data acquisition (SCADA)-based monitoring platforms, monitoring of the U.S. fleet of distributed wind (DW) turbines has been more inconsistent, unreliable, and sometime difficult to access. Without fleet monitoring data, the industry will never understand and thus work to improve turbine under-performance and reliability issues. For the DW industry to scale up, attract investors, and boost credibility, fleetwide monitoring must be robust and reliable, select data must be made accessible to stakeholders, and the data must be in a format useful to users. To help move the industry toward a more standardized, accessible stream of monitoring data, this distributed wind monitoring best practices report attempts to cover topics including key monitoring channels, hardware, communication strategies, and accessibility. Strategic engagement with DW original equipment manufacturers (OEMs), service providers, lab and university researchers, testing organization, certification bodies, end users and solar photovoltaic (PV) monitoring experts has enabled a better understanding of the current state-of-the-art of monitoring and aided in articulating this set of best practices that will guide OEMs toward harmonized monitoring strategies, aimed at a future goal of achieving accessible performance and operational data for the entire fleet of U.S. distributed wind turbines.

17 WIND ENERGY↗

Assessment of Condition Monitoring Methods and Technologies for Inservice Inspection and Testing of Nuclear Power Plant Components

This report was prepared for the U.S. Nuclear Regulatory Commission (NRC) to explore the application of advanced technologies toward meeting the current and future regulatory requirements for maintenance and condition monitoring of structures, systems, and components. The advanced technologies considered in this work are advanced sensors and instrumentation, data analytics, machine learning and artificial intelligence (ML/AI), physics-based models, and digital twins (DT). The interest in the application of advanced technologies for condition monitoring in nuclear power plants continues to grow, and current and future licensees are expected to implement advanced technologies as part of their inservice inspection (ISI) and inservice testing (IST) programs. This report delineates the outcomes of an exploratory investigation into the implementation of advanced condition monitoring technologies to address ISI and IST requirements. A thorough review was conducted of the existing regulatory requirements for ISI and IST, along with an analysis of associated industry practices. Additionally, a state-of-the-art assessment was performed on advanced condition monitoring technologies frequently employed in non-nuclear sectors. This research incorporated two nuclear-specific case studies to illustrate the application of these technologies within the current nuclear fleet. The report provides an exhaustive discussion on the technical challenges, considerations, and opportunities associated with the deployment of advanced condition monitoring technologies. The following are key considerations in the application of advanced technologies for the ISI and IST of nuclear power plant components: • Developing adequate verification and validation procedures to confirm the functional and non-functional requirements, • Developing technical capabilities to conduct real-time asset condition monitoring, • Establishing guidance and protocol for modeling and simulation tools to continuously meet regulatory requirements, • Addressing trustworthiness, explainability, and interpretability of ML/AI methods, • Evaluating maintenance activities to maintain an adequate safety margin and avoid undesirable conditions, • Establishing cybersecure condition monitoring programs associated with a computer-based software system, and • Establishing standardized evaluation metrics for advanced condition monitoring programs. Interest in the use of advanced technologies for condition monitoring in ISI and IST programs continues to grow, and the technology is expected to experience rapid and wide industry adoption in the near future. Adoption of advanced technologies for condition monitoring could have novel and unique impacts on regulatory activities associated with ISI and IST programs. The NRC is continuing to explore the regulatory aspects of advanced technologies as part of ISI and IST programs by pursuing additional research in this technical area.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Calendar Year 2008 Groundwater Monitoring Report, U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This report contains the groundwater and surface water monitoring data that were obtained during calendar year (CY) 2008 at the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) on the DOE Oak Ridge Reservation (ORR) in Oak Ridge, Tennessee. The CY 2008 monitoring data were obtained from wells, springs, and surface water sampling locations in three hydrogeologic regimes at Y-12 (Figure A.1). The Bear Creek Hydrogeologic Regime (Bear Creek Regime) encompasses a section of Bear Creek Valley (BCV) between the west end of Y-12 and the west end of the Bear Creek Watershed (directions are in reference to the Y-12 grid system). The Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime) encompasses the Y-12 industrial facilities and support structures in BCV. The Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime) encompasses a section of Chestnut Ridge directly south of Y-12. Section 2 of this report provides background information pertinent to groundwater and surface water quality monitoring in each hydrogeologic regime, including the topography and bedrock geology, surface water drainage, groundwater system, and extent of groundwater contamination. The CY 2008 groundwater and surface water monitoring data in this report were obtained from sampling and analysis activities implemented under the Y-12 Groundwater Protection Program (GWPP) managed by Babcock & Wilcox Technical Services Y-12, LLC (B&W Y-12) and from sampling and analysis activities implemented under several monitoring programs managed by Bechtel Jacobs Company LLC (BJC). Cooperative implementation of the monitoring programs directed by the Y-12 GWPP and BJC (i.e., coordinating sample collection and sharing data) ensures that the CY 2008 monitoring results fulfill requirements of all the applicable monitoring drivers with no duplication of sampling and analysis efforts. Section 3 of this report contains a summary of information regarding the groundwater and surface water sampling and analysis activities implemented under the Y-12 GWPP including sampling locations and frequency; quality assurance (QA)/quality control (QC) sampling; sample collection and handling; field measurements and laboratory analytes; data management and data quality objective (DQO) evaluation; and groundwater elevation monitoring. However, this report does not include equivalent QA/QC or DQO evaluation information regarding the groundwater and surface water sampling and analysis activities associated with the monitoring programs implemented by BJC. Such details are deferred to the respective programmatic plans and reports issued by BJC (see Section 3.0).

54 ENVIRONMENTAL SCIENCES↗

Maintaining the Health of Software Monitors

Software health management (SWHM) techniques complement the rigorous verification and validation processes that are applied to safety-critical systems prior to their deployment. These techniques are used to monitor deployed software in its execution environment, serving as the last line of defense against the effects of a critical fault. SWHM monitors use information from the specification and implementation of the monitored software to detect violations, predict possible failures, and help the system recover from faults. Changes to the monitored software, such as adding new functionality or fixing defects, therefore, have the potential to impact the correctness of both the monitored software and the SWHM monitor. In this work, we describe how the results of a software change impact analysis technique, Directed Incremental Symbolic Execution (DiSE), can be applied to monitored software to identify the potential impact of the changes on the SWHM monitor software. The results of DiSE can then be used by other analysis techniques, e.g., testing, debugging, to help preserve and improve the integrity of the SWHM monitor as the monitored software evolves.

Runtime Monitor↗

Achieving groundwater monitoring optimization at SRS: a core team process based on rigorous technical assessment - 15273

The optimization of groundwater monitoring at Savannah River Site (SRS) was achieved through a core team process based on the application of a comprehensive, technical evaluation of individual regulated groundwater units. Groundwater monitoring at SRS is required at dozens of waste sites and includes about 4,000 samples annually. The expected longevity of groundwater contamination and associated groundwater monitoring and reporting constitutes a significant long-term cost to the environmental management budget. The core team, consisting of representatives from the Department of Energy (DOE); U.S. Environmental Protection Agency (USEPA); and the South Carolina Department of Health and Environmental Control (SCDHEC), recognized that monitoring needs for individual plumes evolve as remediation work progresses. The technical evaluation plan was generally based on the availability of many years of monitoring data. In addition, it was recognized that the well network, sampling frequency, and analytical suite had been the same for years and warranted evaluation to determine if the existing monitoring was meeting the current objectives. In order to systematically evaluate monitoring at eighteen different groundwater units, SRS developed a decision-logic analysis using flow sheets to address five areas of optimization identified with core team agreement, including: (1) current monitoring vs regulatory requirements, (2) spatial optimization, (3) temporal assessment, (4) analyte assessment, and (5) reporting assessment. The evaluation resulted in SRS proposing changes in the spatial, temporal, analyte, and reporting aspects of groundwater monitoring for fifteen of the eighteen individual groundwater units evaluated. Overall, these changes have resulted in annual savings of $370 K to date, with an additional $200 K in annual savings pending. Early and frequent core team deliberations helped ensure the success of this optimization effort. The technical evaluation was conducted after receiving core team buy-in for the goals and methods of the project. Technical evaluations for each unit were proposed to the regulators in unit-specific regulatory submittals. The technical justifications and core team decisions were all documented and implemented in accordance within the framework of the SRS Federal Facility Agreement or Resource Conservation and Recovery Act (RCRA) Permit process. This optimization approach can be expected to be highly successful for sites with rich historical data sets and where the requirements in regulatory monitoring plans can be negotiated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗