Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Pastures to Prairies to Pools: An Update on Natural Resource Damages Settlement Projects at the Fernald Preserve - 13198

The DOE Office of Legacy Management oversees implementation and monitoring of two ecological restoration projects at the Fernald Preserve, Fernald, Ohio, that are funded through a CERCLA natural resource damage settlement. Planning and implementation of on-property ecological restoration projects is one component of compensation for natural resource injury. The Paddys Run Tributary Project involves creation of vernal pool wetland habitat with adjacent forest restoration. The Triangle Area Project is a mesic tall-grass prairie establishment, similar to other efforts at the Fernald Preserve. The goal of the Fernald Natural Resource Trustees is to establish habitat for Ambystomatid salamander species, as well as grassland birds. Field implementation of these projects was completed in May 2012. Herbaceous cover and woody vegetation survival was determined in August and September 2012. Results show successful establishment of native vegetation. Additional monitoring will be needed to determine whether project goals have been met. As with the rest of the Fernald Preserve, ecological restoration has helped turn a DOE liability into a community asset. (authors)

54 ENVIRONMENTAL SCIENCES↗

Rulison Monitoring Plan

The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile radionuclides created by the test are unlikely to migrate appreciable distances (hundreds of feet) from the detonation zone (Cooper et al. 2007, 2009). The Monitoring Plan was developed to provide a cautious and comprehensive approach for detecting any potential contaminant migration from the Rulison test site. It also provides an independent confirmation of results from the industry sampling and analysis plan while effectively increasing the sampling frequency of wells near the site.

54 ENVIRONMENTAL SCIENCES↗

Overcoming Technical Challenges During Demolition of the West Valley Vitrification Facility - 19387

In February 2019, CH2M Hill BWXT West Valley, LLC will complete demolition and waste disposal of the first vitrification facility in the history of the United States. This project marked the largest and most complex radiological demolition project undertaken at the U.S. Department of Energy-led West Valley Demonstration Project (WVDP) to date. Provisions put in place during demolition monitored for and mitigated contamination migration during demolition. The work was carried out in a well-planned manner to address specific areas where higher levels of radiological activity were known to exist and where difficult and oversized equipment removal or sensitive items required special handling. Inaccessible contamination on ceiling mounted equipment, controlled removal of two massive steel shield doors, intact removal of lead glass shield windows and a confined demolition boundary area were some of the limiting factors that required special consideration during demolition. This paper contains a discussion of planning and implementation of special handling techniques utilized during some of the more difficult evolutions encountered during open-air demolition of the Vitrification Facility. The work techniques, provisions to mitigate inclement weather and lessons learned have been incorporated into the planning for follow-on radiological demolition work at the WVDP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measure Guideline. Five Steps to Implement the Public Housing Authority Energy-Efficient Unit Turnover Checklist

Five Steps to Implementing the PHA Energy Efficient Unit Turnover Package (ARIES, 2014) is a guide to prepare for the installation of energy efficient measures during a typical public housing authority unit turnover. While a PHA is cleaning, painting and readying a unit for a new resident, there is an opportunity to incorporate energy efficiency measures to further improve the unit's performance. The measures on the list are simple enough to be implemented by in-house maintenance personnel, inexpensive enough to be folded into operating expenses without needing capital budget, and fast enough to implement without substantially changing the number of days between occupancies, a critical factor for organizations where the demand for dwelling units far outweighs the supply. The following guide lays out a five step plan to implement the EE Unit Turnover Package in your PHA, from an initial Self-Assessment through to Package Implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Estimating Power System Interruption Costs: A Guidebook for Electric Utilities

Utilities are constantly making improvements to their infrastructure and operating protocols to maintain or enhance the reliability and resilience of the electric grid. Customer interruption cost (CIC) estimates are useful in assessing and monetizing the economic benefits customers receive from these improvements. This Guidebook for electric utilities explains how to conduct customer interruption cost studies and describes commonly-used, value-based planning methods. The authors intend that this Guidebook will serve as a reference for utility personnel, policymakers and experts in survey design and administration who may be planning to implement CIC studies. It brings the utility industry up-to-date using modern survey technologies, practices, and data analytics to estimate CICs and, ultimately, use the estimates to address both traditional and emerging planning needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Review of Authentication Strategies and Trends for Distributed Energy Resources (DERs)

In this study we review literature on machine to machine (M2M) authentication and encryption pertaining to communication with grid-attached power inverters. We regard security recommendations from NIST, constrained device recommendations from CoAP, as well as influences from the existing markets. We will not focus on passwordless or multifactor schemes of user authentication, the handover/roaming authentication of mobile systems, or the group authentication of WiMAX/LTE communications. The de-facto standards for authentication and encryption are certificate-based public key cryptography and AES, respectively. While certificate-based public key cryptography is widely adopted, certificate management is seen as an Achilles heel of public key infrastructure (PKI). State of the art authentication system research includes work on certificateless authentication; however, much work in the areas of privacy preservation, efficient or lightweight systems continue to be based in public key methods. We will see efforts such as bilinear pairing, aggregate message authentication codes, one-time signatures, and Merkle trees surface and resurface with improved authentication approaches. Though research continues to produce new encryption schemes, AES prevails as a viable choice, as it can be implemented across a variety of resource constrained devices. Other lightweight encryption algorithms often employ the same fundamental addition-rotation-xor operations as AES while achieving higher efficiency, but at steep tradeoffs to security. Despite mathematical proofs of the security of cryptographic algorithms, in practice the greatest weaknesses continue to be incurred during implementation. Security researchers will find edge cases and bugs that allow unintentional behavior. In the following sections, accepted methodologies of authentication and encryption are discussed. Due diligence for securing M2M communications requires consideration during planning, design, implementation and product lifetime, as opposed to a set-it and forget-it policy. Best practices can be gleaned from published successes and failures, with no single end-all, be-all detailed solution.

97 MATHEMATICS AND COMPUTING↗

Thomson scattering at general fusion

This paper provides an overview of the Thomson scattering diagnostic in use at General Fusion, including recent upgrades and upcoming plans. The plasma experiment under examination produces temperatures in the 50-500 eV range with density on the order of 10{sup 20} m{sup −3}. A four spatial point collection optics scheme has been implemented, with plans to expand to six spatial points. Recent changes to the optics of the laser beamline have reduced stray light. The system employs a frequency doubled Nd:YAG laser (532 nm), a grating spectrometer, and a photomultiplier array based detector.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

RH-LLW Disposal Facility Project CD-2/3 to Design/Build Proposal Reconciliation Report

A reconciliation plan was developed and implemented to address potential gaps and responses to gaps between the design/build vendor proposals and the Critical Decision-2/3 approval request package for the Remote-Handled Low Level Waste Disposal Facility Project. The plan and results of the plan implementation included development of a reconciliation team comprised of subject matter experts from Battelle Energy Alliance and the Department of Energy Idaho Operations Office, identification of reconciliation questions, reconciliation by the team, identification of unresolved/remaining issues, and identification of follow-up actions and subsequent approvals of responses.

99 GENERAL AND MISCELLANEOUS↗

Development of evaluation models of manpower needs for dismantling the dry conversion process-related equipment in uranium refining and conversion plant (URCP)

Evaluation models for determining the manpower needs for dismantling various types of equipment in uranium refining and conversion plant (URCP) have been developed. The models are widely applicable to other uranium handling facilities. Additionally, a simplified model was developed for easily and accurately calculating the manpower needs for dismantling dry conversion process-related equipment (DP equipment). It is important to evaluate beforehand project management data such as manpower needs to prepare an optimized decommissioning plan and implement effective dismantling activity. The Japan Atomic Energy Agency (JAEA) has developed the project management data evaluation system for dismantling activities (PRODIA code), which can generate project management data using evaluation models. For preparing an optimized decommissioning plan, these evaluation models should be established based on the type of nuclear facility and actual dismantling data. In URCP, the dry conversion process of reprocessed uranium and others was operated until 1999, and the equipment related to the main process was dismantled from 2008 to 2011. Actual data such as manpower for dismantling were collected during the dismantling activities, and evaluation models were developed using the collected actual data on the basis of equipment classification considering the characteristics of uranium handling facility. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Proposed Evaluation Framework for New and Emerging Low Embodied-Carbon Concrete Technologies

New opportunities for carbon reductions in buildings create a strong need for a common framework and method for those who design, build and influence construction to evaluate lifecycle carbon reductions from design decisions and technology choices. These opportunities include a wide range of low-embodied-carbon concrete materials being rapidly developed and introduced to the market. How to evaluate these newer materials and technologies has become critical for both public- and private-sector actors seeking to decarbonize building constructions by leveraging the Infrastructure Investment and Jobs Act (IIJA) and Inflation Reduction Act (IRA) funds. We propose an evaluation framework to assess the lifecycle carbon reductions from adoption of these technologies, including a subset of key “must have” (1) technical criteria (embodied carbon level, technology development stage); (2) market criteria (market size, scalability); and (3) financial criteria (cost of technology implementation compared to businessas-usual) from a range of options. We discuss how to use the framework and illustrate it using a “heatmap,” rating score and short case study of a promising technology. We also propose a plan to implement this framework that includes (1) standardized measurement and validation methods for verifying emission reductions from these technologies, and (2) avenues to implement real world demonstrations. We conclude with recommendations for next steps on framework refinement and commercialization strategy development.

Singh, Reshma↗

RADBALL TECHNOLOGY TESTING FOR HOT CELL CHARACTERIZATION

Operations at various U.S. Department of Energy sites have resulted in substantial radiological contamination of tools, equipment, and facilities. It is essential to use remote technologies for characterization and decommissioning to keep worker exposures as low as reasonably achievable in these highly contaminated environments. A significant initial step in planning and implementing D&D of contaminated facilities involves the development of an accurate assessment of the radiological, chemical, and structural conditions inside of the facilities. Collected information describing facility conditions using remote technologies could reduce the conservatism associated with planning initial worker entry (and associated cost).

42 ENGINEERING↗

Advanced Energy Retrofit Guide (AERG): Practical Ways to Improve Energy Performance; Healthcare Facilities (Book)

The Advanced Energy Retrofit Guide for Healthcare Facilities is part of a series of retrofit guides commissioned by the U.S. Department of Energy. By presenting general project planning guidance as well as detailed descriptions and financial payback metrics for the most important and relevant energy efficiency measures (EEMs), the guides provide a practical roadmap for effectively planning and implementing performance improvements in existing buildings. The Advanced Energy Retrofit Guides (AERGs) are intended to address key segments of the U.S. commercial building stock: retail stores, office buildings, K-12 schools, grocery stores, and healthcare facilities. The guides' general project planning considerations are applicable nationwide; the energy and cost savings estimates for recommended EEMs were developed based on energy simulations and cost estimates for an example hospital tailored to five distinct climate regions. These results can be extrapolated to other U.S. climate zones. Analysis is presented for individual EEMs, and for packages of recommended EEMs for two project types: existing building commissioning projects that apply low-cost and no-cost measures, and whole-building retrofits involving more capital-intensive measures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

End-to-end differentiable digital twin for the IOTA/FAST facility

As the design complexity of modern accelerators grows, there is more interest in using controllable-fidelity simulations that have fast execution time or can yield additional insights about accelerator state. One notable example of additional information are gradients of physical observables with respect to design parameters produced by differentiable simulations. The IOTA/FAST facility has recently begun a program to implement and experimentally validate an end-to-end digital twin to serve as a virtual accelerator test stand, allowing for rapid prototyping of new software and experiments with minimal beam time costs. In this contribution we will discuss our plans and progress. Specifically, we will cover the selection and benchmarking of both physics and ML codes for linac and ring simulation, the development of generic interfaces between surrogate and physics-based sections, and presenting the control interface as either a deterministic event loop or a fully asynchronous EPICS soft input/output controller. We will also discuss challenges in model calibration and uncertainty quantification, as well as future plans to implement larger proton accelerators like PIPII and Booster.

Kuklev, N. [Fermilab]↗

EC Transmission Line Risk Identification and Mitigation Analysis

The purpose of this document is to assist in evaluating and planning for the cost, schedule, and technical project risks associated with the delivery and operation of the EC (Electron cyclotron) transmission line system. In general, the major risks that are anticipated to be encountered during the project delivery phase associated with the implementation of the Procurement Arrangement for the EC transmission line system are associated with: (1) Undefined or changing requirements (e.g., functional or regulatory requirements); (2) Underperformance of prototype, first unit, or production components during testing; (3) Unavailability of qualified vendors for critical components Technical risks associated with the design and operation of the system are also identified.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FY17 Strategic Themes.

I am pleased to present this summary of the FY17 Division 1000 Science and Technology Strategic Plan. As this plan represents a continuation of the work we started last year, the four strategic themes (Mission Engagement, Bold Outcomes, Collaborative Environment, and Safety Imperative) remain the same, along with many of the goals. You will see most of the changes in the actions listed for each goal: We completed some actions, modified others, and added a few new ones. As I’ve stated previously, this is not a strategy to be pursued in tension with the Laboratory strategic plan. The Division 1000 strategic plan is intended to chart our course as we strive to contribute our very best in service of the greater Laboratory strategy. I welcome your feedback and look forward to our dialogue about these strategic themes. Please join me as we move forward to implement the plan in the coming months.

99 GENERAL AND MISCELLANEOUS↗

Data sharing report characterization of population 7: Personal protective equipment, dry active waste, and miscellaneous debris, surveillance and maintenance project Oak Ridge National Laboratory Oak Ridge, Tennessee

The U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (EM-OR) requested that Oak Ridge Associated Universities (ORAU), working under the Oak Ridge Institute for Science and Education (ORISE) contract, provide technical and independent waste management planning support under the American Recovery and Reinvestment Act (ARRA). Specifically, DOE EM-OR requested that ORAU plan and implement a sampling and analysis campaign targeting certain URS|CH2M Oak Ridge, LLC (UCOR) surveillance and maintenance (S&M) process inventory waste. Eight populations of historical and reoccurring S&M waste at the Oak Ridge National Laboratory (ORNL) have been identified in the Waste Handling Plan for Surveillance and Maintenance Activities at the Oak Ridge National Laboratory, DOE/OR/01-2565&D2 (WHP) (DOE 2012) for evaluation and processing to determine a final pathway for disposal. Population 7 (POP 7) consists of 56 containers of aged, low-level and potentially mixed S&M waste that has been staged in various locations around ORNL. Several of these POP 7 containers primarily contain personal protective equipment (PPE) and dry active waste (DAW), but may contain other miscellaneous debris. This data sharing report addresses the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) specified waste in a 13-container subpopulation (including eight steel boxes, three 55-gal drums, one sealand, and one intermodal) that lacked sufficient characterization data for possible disposal at the Environmental Management Waste Management Facility (EMWMF) using the approved Waste Lot (WL) 108.1 profile.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗