Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Flight Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Orbital construction demonstration study

A conceptual design and program plan for an Orbital Construction Demonstration Article (OCDA) was developed that can be used for evaluating and establishing practical large structural assembly operations. A flight plan for initial placement and continued utility is presented as a basic for an entirely new shuttle payload line-item having great future potential benefit for space applications. The OCDA is a three-axis stabilized platform in low-earth orbit with many structural nodals for mounting large construction and fabrication equipments. This equipment would be used to explore methods for constructing the large structures for future missions. The OCDA would be supported at regular intervals by the shuttle. Construction experiments and consumables resupply are performed during shuttle visit periods. A 250 kw solar array provides sufficient power to support the shuttle while attached to the OCDA and to run construction experiments at the same time. Wide band communications with a Telemetry and Data Relay Satellite compatible high gain antenna can be used between shuttle revisits to perform remote controlled, TV assisted construction experiments.

Source record↗

Space shuttle launch vehicle aerodynamic uncertainties: Lessons learned

The chronological development and evolution of an uncertainties model which defines the complex interdependency and interaction of the individual Space Shuttle element and component uncertainties for the launch vehicle are presented. Emphasis is placed on user requirements which dictated certain concessions, simplifications, and assumptions in the analytical model. The use of the uncertainty model in the vehicle design process and flight planning support is discussed. The terminology and justification associated with tolerances as opposed to variations are also presented. Comparisons of and conclusions drawn from flight minus predicted data and uncertainties are given. Lessons learned from the Space Shuttle program concerning aerodynamic uncertainties are examined.

Hamilton, J. T.↗

NASA C-141/KAO Comet Halley observations

As part of NASA's Airborne Astronomy Program, research teams studied the infrared emissions of comet Halley before and after perihelion from NASA's C-141 Kuiper Airborne Observatory (KAO) and from NASA's Lear Jet Observatory (LJO). The objectives were to determine the presence of water vapor and other molecules and the composition of dust in the coma and nucleus. The C-141/KAO, the LJO, the detecting instruments, and the observational flight plans are described. The observed spectral range extended from 2 to 800 microns, plus wide-field, visible photography. The C-141/KAO's flights occurred in December 1985 from California and in March and April 1986 from New Zealand. The LJO's observations were made from Kwajalein Island in April 1986.

Haughney, L. C.↗

The Development and Evaluation of an Operational Aerobraking Strategy for the Mars 2001 Odyssey Orbiter

The Mars 2001 Odyssey Orbiter successfully completed the aerobraking phase of its mission on January 11, 2002. This paper discusses the support provided by NASA's Langley Research Center to the navigation team at the Jet Propulsion Laboratory in the planning and operational support of Mars Odyssey Aerobraking. Specifically, the development of a three-degree-of-freedom aerobraking trajectory simulation and its application to pre-flight planning activities as well as operations is described. The importance of running the simulation in a Monte Carlo fashion to capture the effects of mission and atmospheric uncertainties is demonstrated, and the utility of including predictive logic within the simulation that could mimic operational maneuver decision-making is shown. A description is also provided of how the simulation was adapted to support flight operations as both a validation and risk reduction tool and as a means of obtaining a statistical basis for maneuver strategy decisions. This latter application was the first use of Monte Carlo trajectory analysis in an aerobraking mission.

Tartabini, Paul V.↗

Tactical Conflict Detection in Terminal Airspace

Air traffic systems have long relied on automated short-term conflict prediction algorithms to warn controllers of impending conflicts (losses of separation). The complexity of terminal airspace has proven difficult for such systems as it often leads to excessive false alerts. Thus, the legacy system, called Conflict Alert, which provides short-term alerts in both en-route and terminal airspace currently, is often inhibited or degraded in areas where frequent false alerts occur, even though the alerts are provided only when an aircraft is in dangerous proximity of other aircraft. This research investigates how a minimal level of flight intent information may be used to improve short-term conflict detection in terminal airspace such that it can be used by the controller to maintain legal aircraft separation. The flight intent information includes a site-specific nominal arrival route and inferred altitude clearances in addition to the flight plan that includes the RNAV (Area Navigation) departure route. A new tactical conflict detection algorithm is proposed, which uses a single analytic trajectory, determined by the flight intent and the current state information of the aircraft, and includes a complex set of current, dynamic separation standards for terminal airspace to define losses of separation. The new algorithm is compared with an algorithm that imitates a known en-route algorithm and another that imitates Conflict Alert by analysis of false-alert rate and alert lead time with recent real-world data of arrival and departure operations and a large set of operational error cases from Dallas/Fort Worth TRACON (Terminal Radar Approach Control). The new algorithm yielded a false-alert rate of two per hour and an average alert lead time of 38 seconds.

Tang, Huabin↗

Flow prediction over a transport multi-element high-lift system and comparison with flight measurements

Accurate prediction of surface-pressure distributions, merging boundary-layers, and separated-flow regions over multi-element high-lift airfoils is required to design advanced high-lift systems for efficient subsonic transport aircraft. The availability of detailed measurements of pressure distributions and both averaged and time-dependent boundary-layer flow parameters at flight Reynolds numbers is critical to evaluate computational methods and to model the turbulence structure for closure of the flow equations. Several detailed wind-tunnel measurements at subscale Reynolds numbers were conducted to obtain detailed flow information including the Reynolds-stress component. As part of a subsonic-transport high-lift research program, flight experiments are conducted using the NASA-Langley B737-100 research aircraft to obtain detailed flow characteristics for support of computational and wind-tunnel efforts. Planned flight measurements include pressure distributions at several spanwise locations, boundary-layer transition and separation locations, surface skin friction, as well as boundary-layer profiles and Reynolds stresses in adverse pressure-gradient flow.

Vijgen, P. M. H. W.↗

Software Management Environment (SME) concepts and architecture, revision 1

This document presents the concepts and architecture of the Software Management Environment (SME), developed for the Software Engineering Branch of the Flight Dynamic Division (FDD) of GSFC. The SME provides an integrated set of experience-based management tools that can assist software development managers in managing and planning flight dynamics software development projects. This document provides a high-level description of the types of information required to implement such an automated management tool.

Hendrick, Robert↗

June 1997 ER-2 Flight Measurements

Within our current understanding of the atmospheric ionizing radiation, the ER-2 flight package was designed to provide a complete characterization of the physical fields and evaluate various dosimetric techniques for routine monitoring. A flight plan was developed to sample the full dynamic range of the atmospheric environment especially at altitudes relevant to the development of the High Speed Civil Transport. The flight of the instruments occurred in June of 1997 where predictive models indicated a maximum in the high altitude radiation environment occurring approximately nine months after the minimum in the solar sunspot cycle. The flights originated at Moffett field at the Ames Research Center on ER-2 aircraft designated as 706. The equipment was shipped mid- May 1997 for unpacking and checkout, size fitting, systems functional test, and preflight testing on aircraft power with flight readiness achieved on May 30, 1997. The equipment was qualified on its first engineering flight on June 2, 1997 and the subsequent science gathering flights followed during the period of June 5-15, 1997. Herein we give an account of the flight operations.

Jones, Irby W.↗

Simulations used in the development and flight test of the HiMAT vehicle

Real-time simulations have been essential in the flight-test program of the highly maneuverable aircraft technology (HiMAT) remotely piloted research vehicle at the Dryden Flight Research Facility of NASA Ames Research Center. The HiMAT project makes extensive use of simulations in design, development, and qualification for flight, pilot training, and flight planning. Four distinct simulations, each with varying amounts of hardware in the loop, were developed for the HiMAT project. The use of simulations has been the key to flight qualification of the HiMAT vehicle. Specifically, they are useful in detecting anomalous behavior of the flight software and hardware at the various stages of development, verification, and validation.

Evans, M. B.↗

Strategic and Tactical Functions in an Autonomous Air Traffic Management System

This paper evaluates, by means of fast-time simulation, performance of a candidate system for autonomous air traffic management. Advancing towards autonomy in air traffic management may be necessary in order for new air vehicle types such as electric Vertical Take Off and Landing (eVTOL) to operate safely and efficiently in airspace shared with conventional traffic. To account for uncertain prediction, autonomous air traffic management was divided into two integrated and coordinated subsystems: strategic scheduling, performed at predeparture, and tactical conflict detection and resolution, performed throughout the flight. The conflict detection and resolution subsystem contained a second tactical scheduling function that applied to flights operating in the airspace near the destination airport. This paper compares and contrasts the two subsystems and uses fast-time simulation to demonstrate the comparisons. A scenario of 54 flights inbound to Newark Liberty International Airport was simulated multiple times with different parameters. The scenario was created using flight plans recorded from the National Airspace System on a low weather, average traffic day in April 2018. Whereas the routes were not changed, the departure times of the flights were modified to increase arrival rates at the Newark runway and arrival meter fixes. Results of the simulations showed that the autonomous air traffic management system was able to safely manage the traffic, even with prediction uncertainty. In addition, they showed the importance of including flight holding maneuvers, in addition to path stretching, in conflict detection and resolution and of coordinating strategic and tactical scheduling. Finally, a tradeoff between absorbing the delay calculated by strategic scheduling on the ground versus in the air showed that taking most of the delay on the ground is cost effective for a simple idealized cost function. However, taking a little of the delay in the air prevented throughput on the runway from dropping for short periods due to trajectory prediction uncertainty.

air traffic control↗

Strategic and Tactical Functions in an Autonomous Air Traffic Management System

This paper evaluates, by means of fast-time simulation, performance of a candidate system for autonomous air traffic management. Advancing towards autonomy in air traffic management may be necessary in order for new air vehicle types such as electric Vertical Take Off and Landing (eVTOL) to operate safely and efficiently in airspace shared with conventional traffic. To account for uncertain prediction, autonomous air traffic management was divided into two integrated and coordinated subsystems: strategic scheduling, performed at predeparture, and tactical conflict detection and resolution, performed throughout the flight. The conflict detection and resolution subsystem contained a second tactical scheduling function that applied to flights operating in the airspace near the destination airport. This paper compares and contrasts the two subsystems and uses fast-time simulation to demonstrate the comparisons. A scenario of 54 flights inbound to Newark Liberty International Airport was simulated multiple times with different parameters. The scenario was created using flight plans recorded from the National Airspace System on a low weather, average traffic day in April 2018. Whereas the routes were not changed, the departure times of the flights were modified to increase arrival rates at the Newark runway and arrival meter fixes. Results of the simulations showed that the autonomous air traffic management system was able to safely manage the traffic, even with prediction uncertainty. In addition, they showed the importance of including flight holding maneuvers, in addition to path stretching, in conflict detection and resolution and of coordinating strategic and tactical scheduling. Finally, a tradeoff between absorbing the delay calculated by strategic scheduling on the ground versus in the air showed that taking most of the delay on the ground is cost effective for a simple idealized cost function. However, taking a little of the delay in the air prevented throughput on the runway from dropping for short periods due to trajectory prediction uncertainty.

air traffic control↗

The role of simulation in the development and flight test of the HiMAT vehicle

Real time simulations have been essential in the flight test program of the highly maneuverable aircraft technology (HiMAT) remotely piloted research vehicle at NASA Ames Research Center's Dryden Flight Research Facility. The HiMAT project makes extensive use of simulations in design, development, and qualification for flight, pilot training, and flight planning. Four distinct simulations, each with varying amounts of hardware in the loop, were developed for the HiMAT project. The use of simulations in detecting anomalous behavior of the flight software and hardware at the various stages of development, verification, and validation has been the key to flight qualification of the HiMAT vehicle.

Evans, M. B.↗

Defining Dynamic Route Structure

This poster describes a method for defining route structure from flight tracks. Dynamically generated route structures could be useful in guiding dynamic airspace configuration and helping controllers retain situational awareness under dynamically changing traffic conditions. Individual merge and diverge intersections between pairs of flights are identified, clustered, and grouped into nodes of a route structure network. Links are placed between nodes to represent major traffic flows. A parametric analysis determined the algorithm input parameters producing route structures of current day flight plans that are closest to todays airway structure. These parameters are then used to define and analyze the dynamic route structure over the course of a day for current day flight paths. Route structures are also compared between current day flight paths and more user preferred paths such as great circle and weather avoidance routing.

Zelinski, Shannon↗

Urban Air Mobility Airspace Dynamic Density

Effective flight planning requires information about a variety of potential threats, such as adverse weather or airspace restrictions, and about alternatives available if unforeseen events occur. Expected traffic along the route of flight is also essential to a safe outcome so that, for example, adequate fuel/energy supply can be loaded prior to flight. A dynamic density (DD) metric is introduced for the emerging urban air mobility (UAM) concept to predict airspace congestion that may lead to loss of separation between aircraft or less efficient operations. Using inspiration from dynamic density metric research for traditional air traffic management and a two-way highway analogy, we develop a dynamic density metric for a portion of airspace (aUAM corridor) that aggregates the impact from five factors: aircraft density, density of populous clusters, mean number of aircraft in populous clusters, mean distance between aircraft, and minimum distance between aircraft. This works describes our methodology, rationale, use cases, and visualization techniques to efficiently present the DD metric to an operator for informed decision making. We also present an approach for validating the metric. However, validation remains part of future work.

UAM↗

Using Machine-Learning to Dynamically Generate Operationally Acceptable Strategic Reroute Options

The newly developed Trajectory Option Set (TOS), a preference-weighted set of alternative routes submitted by flight operators, is a capability in the U.S. traffic flow management system that enables automated trajectory negotiation between flight operators and Air Navigation Service Providers. The objective of this paper is to describe and demonstrate an approach for automatically generating pre-departure and airborne TOSs that have a high probability of operational acceptance. The approach uses hierarchical clustering of historical route data to identify route candidates. The probability of operational acceptance is then estimated using predictors trained on historical flight plan amendment data using supervised machine learning algorithms, allowing the routes with highest probability of operational acceptance to be selected for the TOS. Features used describe historical route usage, difference in flight time and downstream demand to capacity imbalance. A random forest was found to be the best performing algorithm for learning operational acceptability, with a model accuracy of 0.96. The approach is demonstrated for an historical pre-departure flight from Dallas/Fort Worth International Airport to Newark Liberty International Airport.

Evans, Antony↗

Using Machine-Learning to Dynamically Generate Operationally Acceptable Strategic Reroute Options

The newly developed Trajectory Option Set (TOS), a preference-weighted set of alternative routes submitted by flight operators, is a capability in the U.S. traffic flow management system that enables automated trajectory negotiation between flight operators and Air Navigation Service Providers. The objective of this paper is to describe and demonstrate an approach for automatically generating pre-departure and airborne TOSs that have a high probability of operational acceptance. The approach uses hierarchical clustering of historical route data to identify route candidates. The probability of operational acceptance is then estimated using predictors trained on historical flight plan amendment data using supervised machine learning algorithms, allowing the routes with highest probability of operational acceptance to be selected for the TOS. Features used describe historical route usage, difference in flight time and downstream demand to capacity imbalance. A random forest was found to be the best performing algorithm for learning operational acceptability, with a model accuracy of 0.96. The approach is demonstrated for an historical pre-departure flight from Dallas/Fort Worth International Airport to Newark Liberty International Airport.

Evans, Antony↗

Ground Risk Assessment Service Provider (GRASP) Development Effort as a Supplemental Data Service Provider (SDSP) for Urban Unmanned Aircraft System (UAS) Operations

NASA’s Unmanned Aircraft System (UAS) Traffic Management (UTM) project aims to enable the integration of new aviation paradigms such as Unmanned Aircraft Systems (UAS) while providing the necessary infrastructure for future concepts such as On-Demand Mobility (ODM) and Urban Air Mobility (UAM) operations in the National Airspace System (NAS). In order to do so, the UTM project has developed an architecture to allow communication among UAS operators, UAS Service Suppliers (USS), Air Navigation Service Providers (ANSP), and the public. As part of this framework, the Supplemental Data Service Providers (SDSP) are envisioned as model and/or data based services that disseminate essential or enhanced information to ensure safe operations within low-altitude airspace. These services include terrain and obstacle data, specialized weather data, surveillance, constraint information, risk monitoring, etc. This paper highlights the development efforts of a non-participant casualty risk assessment SDSP called Ground Risk Assessment Service Provider (GRASP) which assists operators with preflight planning. GRASP is based on the previously introduced UTM Risk Assessment Framework (URAF) and allows UAS operators to simulate and visualize potential non-participant casualty risks associated with their proposed flight. The risk assessment capability also allows operators to revise their flight plans if the casualty risks are determined to be above acceptable thresholds. GRASP is configured to account for future improvements including servicing airborne aircraft as part of NASA’s System-Wide Safety (SWS) project.

Ancel, Ersin↗