At least 361 records · Page 20

U328 Electrical Reliability Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL’s) Project Management Office (PMO) is planning to install an underground electrical duct bank at the 3200 block of the Livermore Site (project). The proposed project will include a new electrical substation and feeders, demolition and replacement of the U328C utility building with a new structure to the west, re-routing of utilities, and update of the parking lot. This Sampling and Analysis Plan (SAP) outlines the procedures to collect and evaluate environmental samples for disposition of the excavated soil during the project and geotechnical samples for pavement design. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2022), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) process (EPA, 2006). In addition to the environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection and evaluation of the geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

The role of the Technology Application Center in the technology transfer program

The need for and use of an active technology dissemination program by the Environmental Protection Agency is elaborated. The complexities associated with arriving at an acceptable solution to an environmental problem are addressed, and the mechanisms and associated products used by the technology transfer program to transfer the latest viable technological alternatives to the potential user are explained.

Shinnick, W. A.↗

Successful Implementation of a Natural Resource Restoration Plan at the Fernald Preserve - 19568

The Fernald Preserve, Ohio, Site is a former uranium-processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425-hectare (ha) (1050-acre) tract of land, approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. The US Department of Energy (DOE) Office of Legacy Management is responsible for management of the site. Site remediation and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and contaminated soil was completed in 2006, but aquifer remediation is ongoing. Portions of the site are open to the public, including approximately 11 km (7 miles) of walking trails that are open year-round and a Fernald Preserve Visitors Center open four days a week. Stakeholders were instrumental in providing recommendations for final land use of the site as an undeveloped park with an emphasis on wildlife. Final land use decisions were also instrumental in the resolution of a CERCLA natural resource damage claim. The State of Ohio sued DOE in 1986 for damages to state natural resources under Section 107 of CERCLA. The suit was stayed until completion of all Records of Decision (RODs) for the site. The last ROD was signed in 1996. DOE, which was both a Natural Resource Trustee (NRT) and a potentially responsible party (PRP) under CERCLA, initiated consultation with other site NRTs in 1993. A Trustee Council was formed that included DOE, Ohio Environmental Protection Agency (representing the State of Ohio), and the US Fish and Wildlife Service (representing the US Department of the Interior). The NRTs agreed collectively to conduct sitewide ecological restoration, consistent with the stakeholder vision of final land use. A conceptual restoration plan was drafted in 1998. This Natural Resource Restoration Plan (NRRP) developed goals for site restoration, as well as provisions for monitoring and maintenance of restored areas. The NRTs signed a Memorandum of Understanding in 2001, and DOE integrated ecological restoration design and construction into remediation and closure activities for the site. The NRT relationship became contentious in the following years as a result of a disagreement over monitoring commitments and compensation for groundwater injury. Final settlement was reached in 2008. As part of the settlement, DOE paid $13.75 million into the NRT fund as compensation for natural resource damages. In addition, the NRRP was finalized, and long-term commitments for monitoring and maintenance of ecologically restored areas were put in place. An Environmental Covenant was established and recorded with Hamilton and Butler Counties that ensures site activity and use limitations remain in place. The NRTs used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The NRTs partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management, and since the program's inception in the Fall of 2012, more than 1820 ha (4500 acres) have been permanently protected via easement or purchase. Future decisions by the NRTs regarding monitoring and maintenance of restored areas will be negotiated in 2020. The site Restored Area Maintenance Plan (RAMP) was developed in 2010. The RAMP is a requirement within the NRRP and is scheduled for review following 10 years of implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PNNL-Sequim Campus Radionuclide Air Emissions Report for Calendar Year 2022

The U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest Site Office has oversight and stewardship duties associated with the Pacific Northwest National Laboratory Sequim Campus. Some research projects have the potential to emit low levels of radioactive materials. This report is prepared to document compliance with the Code of Federal Regulation, Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, “National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities” and Washington Administrative Code Chapter 246-247, "Radiation Protection–Air Emissions." Compliance is indicated by comparing the estimated effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public with the 10 millirem per year (mrem/yr) U.S. Environmental Protection Agency (EPA) standard. The PNNL-Sequim Campus has only fugitive emissions sources. Despite the fact that the regulations are intended for application to point source emissions, fugitive emissions are included with regard to complying with the EPA standard. The EDE to the Campus MEI due to routine operations in 2022 was 7.5E-07 mrem (7.5E-09 mSv). No non-routine emissions occurred in 2022. The PNNL-Sequim Campus is in compliance with the federal and state 10 mrem/yr standard.

40 CFR 61 Subpart H↗

Addendum to the Rainier Mesa/Shoshone Mountain Flow and Transport Model Report, Nevada National Security Site, Nevada (Rev. 1 with ROTC 1)

This addendum to the Rainier Mesa/Shoshone Mountain Flow and Transport Model Report provides additional analyses, insights, and explanations to the report in response to the Nevada Division of Environmental Protection assessment of the Peer Review Panel’s review of the U.S. Department of Energy (DOE) Environmental Management Nevada Program document. This addendum also provides a discussion of how the model results can be interpreted to aid in the evaluation of potential exposure pathways and support future monitoring strategies in the closure report stage.

54 ENVIRONMENTAL SCIENCES↗

2018 Annual Site Environmental Report Sandia National Laboratories, New Mexico

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the United States Department of Energy (DOE) National Nuclear Security Administration. The National Nuclear Security Administration's Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, New Mexico. Activities at the site support research and development programs with a wide variety of national security missions, resulting in technologies for nonproliferation, homeland security, energy and infrastructure, and defense systems and assessments. DOE and its management and operating contractor for Sandia are committed to safeguarding the environment reassessing sustainability practices and ensuring the validity and accuracy of the monitoring data presented in this Annual Site Environmental Report. This report summarizes the environmental protection and monitoring programs in place at Sandia National Laboratories, New Mexico, during calendar year 2018. Environmental topics include air quality, ecology, environmental restoration, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety, and Health Reporting and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

Sandia National Laboratories Annual Site Environmental Report, 2019: New Mexico

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the United States Department of Energy (DOE) National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, New Mexico. Activities at the site support research and development programs with a wide variety of national security missions, resulting in technologies for nonproliferation, homeland security, energy and infrastructure, and defense systems and assessments. DOE and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this Annual Site Environmental Report. This report summarizes the environmental protection and monitoring programs in place at Sandia National Laboratories, New Mexico, during calendar year 2019. Environmental topics include air quality, ecology, environmental restoration, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety, and Health Reporting, and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

2022 Annual Site Environmental Report for Sandia National Laboratories, Albuquerque, New Mexico

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, New Mexico. Activities at the site support research and development programs with a wide variety of national security missions, resulting in technologies for nonproliferation, homeland security, energy and infrastructure, and defense systems and assessments. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection and monitoring programs in place at Sandia National Laboratories, New Mexico, during calendar year 2022. Environmental topics include cultural resource management, chemical management, air quality, ecology, environmental restoration, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting, and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

2023 Annual Site Environmental Report for Sandia National Laboratories, Albuquerque, New Mexico

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at Sandia National Laboratories, New Mexico. Activities at the site support research and development programs with a wide variety of national security missions, resulting in technologies for nonproliferation, homeland security, energy and infrastructure, and defense systems and assessments. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection and monitoring programs in place at Sandia National Laboratories, New Mexico, during calendar year 2023. Environmental topics include cultural resource management, chemical management, air quality, ecology, environmental restoration, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting, and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

NASA/Air Force/Environmental Protection Agency Interagency Depainting Study

Many popular and widely used paint stripping products have traditionally contained methylene chloride as their main active ingredient. However, the Environmental Protection Agency (EPA) has critically curved the allowable use of methylene chloride under the National Emission Standard for Hazardous Air Pollutants regulating Aerospace Manufacturing and Rework Facilities . Compliance with this rule was mandatory by September 1998 for affected facilities. An effort is underway to identify and evaluate alternative depainting technologies emphasizing those believed both effective and environmentally benign. On behalf of the EPA and in cooperation with the United States Air Force, the National Aeronautics and Space Administration is conducting a technical assessment of several alternative technologies ( i.e. : chemical stripping, two CO2 blasting processes, CO2 xenon lamp coating removal, CO2 Laser stripping, plastic media blasting, sodium bicarbonate wet stripping, high pressure water stripping, and wheat starch blasting). These depainting processes represent five removal method categories, namely abrasive, impact, cryogenic, thermal, and/or molecular bonding dissociation. This paper discusses the test plan and parameters for this interagency study. Several thicknesses of clad and non-clad aluminum substrates were used to prepare test specimens. Each depainting process has been assigned a specimen lot, all of which have completed three to five stripping cycles. Numerous metallurgical evaluations are underway to assess the impact of these alternative depainting processes upon the structural integrity of the substrate.

Clark-Ingram, Marceia↗

West Valley Demonstration Project (WVDP) (Annual Site Environmental Report (ASER), Calendar Year 2022)

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2022. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2022 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 578: Miscellaneous Inactive Sites Nevada National Security Site, Nevada, (Rev. 0)

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 578, Miscellaneous Inactive Sites, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 578 comprises the following 11 corrective action sites (CASs) located in Areas 2, 3, 4, 6, 7, 12, and 23 of the Nevada National Security Site: • 02-26-01, Lead (Concrete Box w/Lining) • 02-26-07, Gun Turret w/Lead in Barrel • 03-16-01, U-3auS Disposal Site • 04-26-02, Lead on Instrument Bunker • 06-99-07, Sump • 07-99-01, Miscellaneous Debris • 12-02-11, UST-P-2 • 12-06-01, Muckpile • 12-06-04, Muckpile • 23-12-01, Boiler (2) • 23-99-04, Salvage Yard This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 578 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary. This will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.

54 ENVIRONMENTAL SCIENCES↗

Verification of EPA's ''Preliminary Remediation Goals for radionuclides'' (PRG) electronic calculator

The U.S. Environmental Protection Agency (EPA) requested an external, independent verification study of their updated “Preliminary Remediation Goals for Radionuclides” (PRG) electronic calculator. The calculator provides PRGs for radionuclides that are used as a screening tool at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and Resource Conservation and Recovery Act (RCRA) sites. These risk-based PRGs establish concentration limits under specific exposure scenarios. The purpose of this verification study is to determine that the calculator has no inherit numerical problems with obtaining solutions as well as to ensure that the equations are programmed correctly. There are 167 equations used in the calculator. To verify the calculator, all equations for each of seven receptor types (resident, construction worker, outdoor and indoor worker, recreator, farmer, and composite worker) were hand calculated using the default parameters. The same four radionuclides (Am-241, Co-60, H-3, and Pu-238) were used for each calculation for consistency throughout.

54 ENVIRONMENTAL SCIENCES↗

Integrated Project Review (IPR) Program

Environmental Protection and Compliance Division (EPC-DO) owns institutional responsibility for compliance with Federal, State, and local environmental requirements. EPC SMEs want to know about all activities and projects being conducted at the Lab. Our regulatory framework requires LANL customers to use the Integrated Review Tool which includes PRID, EXID, and Siting. SD400 Environmental Management System, Rev 5 states all new/modified work, activities, operations and projects at the Lab must be reviewed for applicable environmental requirements through the IRT.

54 ENVIRONMENTAL SCIENCES↗

Biota Modeling in EPA’s Preliminary Remediation Goal and Dose Compliance Concentration Calculators for Use in EPA Superfund Risk Assessment: Explanation of Intake Rate Derivation, Transfer Factor Compilation, and Mass Loading Factor Sources

The Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) calculators are screening level risk assessment tools that set forth the Environmental Protection Agency’s (EPA) recommended approaches and currently available risk assessment guidance for response actions at Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites, commonly known as Superfund. The environmental screening levels derived by the PRG and DCC calculators are used to identify isotopes contributing the highest risk and dose as well as establish preliminary remediation goals. Each calculator has residential gardening and subsistence farmer exposure scenarios that model transfer of contaminants from soil and water into various types of biota (crops and animal products). New publications of human intake rates of biota; farm animal intakes of water, soil, and fodder; and soil to plant interactions require updates be implemented into the PRG and DCC calculators. Recent improvements in the biota modeling for these calculators include newly derived biota intake rates, enhanced soil mass loading factors (MLFs), and more comprehensive soil to plant transfer factors (BV’s) and soil to tissue transfer factors (TFs) for animals. New biota have been added in both the produce and animal products categories that greatly improve the accuracy and utility of the PRG and DCC calculators and encompass greater geographic diversity on a national and international scale.

54 ENVIRONMENTAL SCIENCES↗

Technology and Innovation Roadmap

This Technology and Innovation Roadmap (Roadmap) presents a comprehensive and integrated assessment of technology needs related to executing the River Protection Project (RPP) baseline, reducing risk, and providing opportunity for improvement in executing efficiencies, worker safety and environmental protection. As such, some of the proposed activities herein are pending final decision in the form of an upcoming Tri-party Holistic Agreement. Addressing the identified technology needs will contribute to achieving successful completion of the Hanford Site tank waste cleanup mission.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The effect of monitoring complexity on stakeholder acceptance of CO2 geological storage projects in the US gulf coast region

Environmental monitoring at geologic CO 2 storage sites is required by regulations for the purposes of environmental protection and emissions accounting in the case of leakage to surface. However, another very important goal of environmental monitoring is to assure stakeholders that the project is monitored for safety and effectiveness. With current efforts to optimize monitoring for cost-effectiveness, the question remains: will optimization of monitoring approaches degrade stakeholder assurance, or do heavily-instrumented sites communicate higher risk to a stakeholder? We report the results of a stakeholder survey in Gulf Coast states of the US where carbon capture and storage (CCS) is developing quickly. We rely on a 2 by 2 factorial experiment in which we manipulate message complexity (complex v. simple) and social norm (support from scientists v. support from community members). Subjects were randomly assigned to one of four conditions: 1) complex message with scientist support; 2) complex message with community member support; 3) simple message with scientist support; or 4) simple message with community member support. In addition to the experimental stimuli, subjects were also asked about their need for cognition, attitudes toward science and scientists, attitudes about climate change and support for carbon capture and storage (CCS). Our sample is drawn from residents in states bordering the western Gulf of Mexico (Texas, Louisiana, Florida) where CO 2 geologic storage is being planned both onshore and offshore. The results offer important implications for public outreach efforts to key stakeholders.

54 ENVIRONMENTAL SCIENCES↗

Exploring the Feasibility of a Carbon Dioxide Storage Hub in Western North Dakota

The University of North Dakota Energy & Environmental Research Center (EERC) and project partner ONEOK, Inc. (ONEOK) are investigating the feasibility of establishing a CO2 (carbon dioxide) storage hub in western North Dakota—in the heart of the Williston Basin. The conceived Roughrider Carbon Storage Hub would store CO2 captured from six gas-processing plants owned and operated by project partner ONEOK and a planned gas-to-liquids plant. This 2-year U.S. Department of Energy-sponsored Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Phase II feasibility study is evaluating the aggregation of the CO2 captured from these seven sources for injection into stacked geologic storage complexes. The proposed hub includes several aspects that make it a highly qualified candidate for a feasibility study with a notably reduced project risk profile. These include 1) a project partner (ONEOK) with a committed goal to reduce greenhouse gas emissions; 2) prior subsurface data analysis supporting a potential stacked storage configuration with adequate CO2 storage resource; 3) commitment from local, regional, and state-level stakeholders; and 4) a state with U.S. Environmental Protection Agency underground injection control Class VI primacy. ONEOK’s assets in the Williston Basin provide significant environmental benefits by capturing and processing natural gas that may otherwise be flared or vented. Storing CO2 from these gas-processing facilities will reduce overall CO2 emissions in the basin while providing essential services to producers there and contributing to continued energy independence in the domestic markets.