Overview of the Physics and Engineering Design of NSTX Upgrade
Abstract not provided
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided
Abstract not provided.
Abstract not provided
Explore the source record for details and available documents.
N/A
Switchable Polarity Solvent Forward Osmosis (SPS FO) is a semi-permeable membrane-based water treatment technology. INL is currently advancing SPS FO technology such that a prototype unit can be designed and demonstrated for the purification of produced water from oil and gas production operations. The SPS FO prototype unit will used the thermal energy in the produced water as a source of process heat, thereby reducing the external process energy demands. Treatment of the produced water stream will reduce the volume of saline wastewater requiring disposal via injection, an activity that is correlated with undesirable seismic events, as well as generate a purified product water stream with potential beneficial uses. This paper summarizes experimental data that has been collected in support of the SPS FO scale-up effort, and describes how this data will be used in the sizing of SPS FO process equipment. An estimate of produced water treatment costs using the SPS FO process is also provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Abstract not provided.
This paper discusses plans for implementing UK government policy for the safe geological disposal of higher activity radioactive waste. In order to progress the programme for geological disposal in the absence of a specific site, RWM has developed generic, illustrative disposal system designs for three host geological environments. These geological environments are typical of those being considered in other countries and have been chosen because they represent the range that may need to be addressed when developing the Geological Disposal Facility (GDF) for the UK. This paper provides an overview of the updated 2016 design of the UK geological disposal facility and describes the processes of construction, transport, waste package receipt, handling and emplacement and the design characteristics that the disposal facility will need to include for the waste inventory. The paper provides examples of the approach to ensure confidence in safety over the GDF life cycle and discusses the challenges in the design, construction and operation of a nationally significant infrastructure project with a scheduled waste disposal of more than 150 years. (authors)