Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Distributed Scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

`SkyPy`: A package for modelling the Universe

SkyPy is an open-source Python package for simulating the astrophysical sky. It comprises a library of physical and empirical models across a range of observables and a command-line script to run end-to-end simulations. The library provides functions that sample realisations of sources and their associated properties from probability distributions. Simulation pipelines are constructed from these models using a YAML-based configuration syntax, while task scheduling and data dependencies are handled internally and the modular design allows users to interface with external software. SkyPy is developed and maintained by a diverse community of domain experts with a focus on software sustainability and interoperability. By fostering development, it provides a framework for correlated simulations of a range of cosmological probes including galaxy populations, large scale structure, the cosmic microwave background, supernovae and gravitational waves. Version 0.4 implements functions that model various properties of galaxies including luminosity functions, redshift distributions and optical photometry from spectral energy distribution templates. Future releases will provide additional modules, for example, to simulate populations of dark matter halos and model the galaxy-halo connection, making use of existing software packages from the astrophysics community where appropriate.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

PRAIS: Distributed, real-time knowledge-based systems made easy

This paper discusses an architecture for real-time, distributed (parallel) knowledge-based systems called the Parallel Real-time Artificial Intelligence System (PRAIS). PRAIS strives for transparently parallelizing production (rule-based) systems, even when under real-time constraints. PRAIS accomplishes these goals by incorporating a dynamic task scheduler, operating system extensions for fact handling, and message-passing among multiple copies of CLIPS executing on a virtual blackboard. This distributed knowledge-based system tool uses the portability of CLIPS and common message-passing protocols to operate over a heterogeneous network of processors.

Goldstein, David G.↗

Direct method of design and stress analysis of rotating disks with temperature gradient

A method is presented for the determination of the contour of disks, typified by those of aircraft gas turbines, to incorporate arbitrary elastic-stress distributions resulting from either centrifugal or combined centrifugal and thermal effects. The specified stress may be radial, tangential, or any combination of the two. Use is made of the finite-difference approach in solving the stress equations, the amount of computation necessary in the evolution of a design being greatly reduced by the judicious selection of point stations by the aid of a design chart. Use of the charts and of a preselected schedule of point stations is also applied to the direct problem of finding the elastic and plastic stress distribution in disks of a given design, thereby effecting a great reduction in the amount of calculation. Illustrative examples are presented to show computational procedures in the determination of a new design and in analyzing an existing design for elastic stress and for stresses resulting from plastic flow.

Manson, S S↗

An efficient procedure for scheduling packets in a multibeam satellite-switched TDMA system

A satellite-switched, multi-beam system using N sub T transponders is considered, in which a large number of ground stations are distributed over N sub Z (not less than N sub T) zones. Each station transmits information digitally in a packet-switched time division multiple access mode, with all packets of fixed length. A demand-assigned packet scheduling procedure is described which achieves high throughput with relatively low average time delay, adapts easily to fluctuating demand from individual earth stations, and automatically schedules transmissions to avoid adjacent zone interference.

Stern, T. E.↗

Interleaved Observation Execution and Rescheduling on Earth Observing Systems

Observation scheduling for Earth orbiting satellites solves the following problem: given a set of requests for images of the Earth, a set of instruments for acquiring those images distributed on a collecting of orbiting satellites, and a set of temporal and resource constraints, generate a set of assignments of instruments and viewing times to those requests that satisfy those constraints. Observation scheduling is often construed as a constrained optimization problem with the objective of maximizing the overall utility of the science data acquired. The utility of an image is typically based on the intrinsic importance of acquiring it (for example, its importance in meeting a mission or science campaign objective) as well as the expected value of the data given current viewing conditions (for example, if the image is occluded by clouds, its value is usually diminished). Currently, science observation scheduling for Earth Observing Systems is done on the ground, for periods covering a day or more. Schedules are uplinked to the satellites and are executed rigorously. An alternative to this scenario is to do some of the decision-making about what images are to be acquired on-board. The principal argument for this capability is that the desirability of making an observation can change dynamically, because of changes in meteorological conditions (e.g. cloud cover), unforeseen events such as fires, floods, or volcanic eruptions, or un-expected changes in satellite or ground station capability. Furthermore, since satellites can only communicate with the ground between 5% to 10% of the time, it may be infeasible to make the desired changes to the schedule on the ground, and uplink the revisions in time for the on-board system to execute them. Examples of scenarios that motivate an on-board capability for revising schedules include the following. First, if a desired visual scene is completely obscured by clouds, then there is little point in taking it. In this case, satellite resources, such as power and storage space can be better utilized taking another image that is higher quality. Second, if an unexpected but important event occurs (such as a fire, flood, or volcanic eruption), there may be good reason to take images of it, instead of expending satellite resources on some of the lower priority scheduled observations. Finally, if there is unexpected loss of capability, it may be impossible to carry out the schedule of planned observations. For example, if a ground station goes down temporarily, a satellite may not be able to free up enough storage space to continue with the remaining schedule of observations. This paper describes an approach for interleaving execution of observation schedules with dynamic schedule revision based on changes to the expected utility of the acquired images. We describe the problem in detail, formulate an algorithm for interleaving schedule revision and execution, and discuss refinements to the algorithm based on the need for search efficiency. We summarize with a brief discussion of the tests performed on the system.

Khatib, Lina↗

The role of scientists in developing Hubble Space Telescope

The objective of the Hubble Space Telescope Program is to build and operate a high-performance, fully-instrumented and long-lived optical observatory in earth orbit. Key Program elements are (1) a logistic strategy of Shuttle launch/maintenance and TDRSS communications, (2) overall responsibility at the MSFC Project for developing both the flight and ground systems, and (3) scientific participation in ST development and responsibility after launch for conducting the observing program. The ST Project is a management structure with a budget and schedule for delivering an ST system capable of achieving its established scientific objectives. The Project distributes through contracts the responsibility for supplying particular components, but retains the responsibility for system-level integrity. Scientists have set the performance objectives and now support the Project during the development stage by providing (1) PI management of the five Science Instruments, (2) continuing translations of scientific requirements into engineering specifications, (3) oversight of designs and performance tests, and (4) specific expertise on technical concerns.

Brown, R. A.↗

Learning Search Control Knowledge for Deep Space Network Scheduling

While the general class of most scheduling problems is NP-hard in worst-case complexity, in practice, for specific distributions of problems and constraints, domain-specific solutions have been shown to perform in much better than exponential time.

Deep Space Network Search Control↗

Exact and Approximate Probabilistic Symbolic Execution

Probabilistic software analysis seeks to quantify the likelihood of reaching a target event under uncertain environments. Recent approaches compute probabilities of execution paths using symbolic execution, but do not support nondeterminism. Nondeterminism arises naturally when no suitable probabilistic model can capture a program behavior, e.g., for multithreading or distributed systems. In this work, we propose a technique, based on symbolic execution, to synthesize schedulers that resolve nondeterminism to maximize the probability of reaching a target event. To scale to large systems, we also introduce approximate algorithms to search for good schedulers, speeding up established random sampling and reinforcement learning results through the quantification of path probabilities based on symbolic execution. We implemented the techniques in Symbolic PathFinder and evaluated them on nondeterministic Java programs. We show that our algorithms significantly improve upon a state-of- the-art statistical model checking algorithm, originally developed for Markov Decision Processes.

Symbolic Execution↗

CRI planning and scheduling for space

Computer Resources International (CRI) has many years of experience in developing space planning and scheduling systems for the European Space Agency. Activities range from AIT/AIV planning over mission planning to research in on-board autonomy using advanced planning and scheduling technologies in conjunction with model based diagnostics. This article presents four projects carried out for ESA by CRI with various subcontractors: (1) DI, Distributed Intelligence for Ground/Space Systems is an on-going research project; (2) GMPT, Generic Mission Planning Toolset, a feasibility study concluded in 1993; (3) OPTIMUM-AIV, Open Planning Tool for AIV, development of a knowledge based AIV planning and scheduling tool ended in 1992; and (4) PlanERS-1, development of an AI and knowledge-based mission planning prototype for the ERS-1 earth observation spacecraft ended in 1991.

Aarup, Mads↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Distribution System State Estimation With High Penetration of Demand Response Enabled Loads

Demand-side operations incentivize utility customers to take part in various grid services. A demand response enabled load (DREL) is a flexible grid asset that schedules electricity consumption in response to a time-of-use (TOU) energy price. Consequently, its energy profile differs from that of a conventional load that is insensitive to price. This difference may cause new challenges for distribution system state estimation (DSSE). It is well known that DSSE often needs to use pseudo-measurements based on historic load profiles to increase system observability. However, historic profiles of conventional loads are not representative of DREL behaviors. Additionally, the inaccuracy impacts DSSE results and other DSSE-dependent operations. In this paper, we propose an online pseudo-measurement generation approach for DSSE with DRELs. We formulate an optimization model to represent DRELs self-adjusting actions. Sampling-based stochastic optimization techniques are proposed to account for uncertainties in DRELs. A set of representative DREL behavior data corresponding to the samples are used to characterize DREL pseudo-measurements. Case studies with modified IEEE 123-bus test system verify the validity of the proposed work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Intelligent Planning and Scheduling for Controlled Life Support Systems

Planning in Controlled Ecological Life Support Systems (CELSS) requires special look ahead capabilities due to the complex and long-term dynamic behavior of biological systems. This project characterizes the behavior of CELSS, identifies the requirements of intelligent planning systems for CELSS, proposes the decomposition of the planning task into short-term and long-term planning, and studies the crop scheduling problem as an initial approach to long-term planning. CELSS is studied in the realm of Chaos. The amount of biomass in the system is modeled using a bounded quadratic iterator. The results suggests that closed ecological systems can exhibit periodic behavior when imposed external or artificial control. The main characteristics of CELSS from the planning and scheduling perspective are discussed and requirements for planning systems are given. Crop scheduling problem is identified as an important component of the required long-term lookahead capabilities of a CELSS planner. The main characteristics of crop scheduling are described and a model is proposed to represent the problem. A surrogate measure of the probability of survival is developed. The measure reflects the absolute deviation of the vital reservoir levels from their nominal values. The solution space is generated using a probability distribution which captures both knowledge about the system and the current state of affairs at each decision epoch. This probability distribution is used in the context of an evolution paradigm. The concepts developed serve as the basis for the development of a simple crop scheduling tool which is used to demonstrate its usefulness in the design and operation of CELSS.

Leon, V. Jorge↗

Extensions to the Parallel Real-Time Artificial Intelligence System (PRAIS) for fault-tolerant heterogeneous cycle-stealing reasoning

Extensions to an architecture for real-time, distributed (parallel) knowledge-based systems called the Parallel Real-time Artificial Intelligence System (PRAIS) are discussed. PRAIS strives for transparently parallelizing production (rule-based) systems, even under real-time constraints. PRAIS accomplished these goals (presented at the first annual C Language Integrated Production System (CLIPS) conference) by incorporating a dynamic task scheduler, operating system extensions for fact handling, and message-passing among multiple copies of CLIPS executing on a virtual blackboard. This distributed knowledge-based system tool uses the portability of CLIPS and common message-passing protocols to operate over a heterogeneous network of processors. Results using the original PRAIS architecture over a network of Sun 3's, Sun 4's and VAX's are presented. Mechanisms using the producer-consumer model to extend the architecture for fault-tolerance and distributed truth maintenance initiation are also discussed.

Goldstein, David↗

Fuzzified PaCcET for Economic-Emission Scheduling of Microgrids

In this paper, a new approach is proposed to solve a multi-objective economic-emission scheduling problem in microgrids (MGs) by simultaneously minimizing the energy and emission costs of the MG with various distributed energy resources (DERs). The proposed approach is an extension of a computationally effective multiobjective optimization technique, Pareto concavity elimination transformation (PaCcET). The proposed approach, referred to as Fuzzified-PaCcET, employs a fuzzy logic controller to dynamically revise crossover and mutation rates in the original PaCcET leading to the faster convergence of the solution. The proposed approach finds the best Pareto front, also referred to as a Non-dominated set (NDS) of solutions, instead of finding a single optimal solution. In order to find the solutions on concave areas of the Pareto front, an iterative objective space transformation is performed in the PaCcET algorithm to allow a linear combination of objective functions (in the transformed objective space). The proposed Fuzzified-PaCcET-based scheduling is implemented on a MG with various dispatchable and non-dispatchable DERs to find the set of optimal solutions according to the total fuel cost of DERs, as well as the most optimum environmental cost. In order to extract the best compromise solution (BCS) among NDS of solutions, a fuzzy-based method is implemented. The comparison of the simulation results of the Fuzzified-PaCcET with that of PaCcET shows that Fuzzified-PaCcET can generate better solution with less computational burden.

Gautam, Mukesh↗

Fuzzified PaCcET for Economic-Emission Scheduling of Microgrids

In this paper, a new approach is proposed to solve a multi-objective economic-emission scheduling problem in microgrids (MGs) by simultaneously minimizing the energy and emission costs of the MG with various distributed energy resources (DERs). The proposed approach is an extension of a computationally effective multiobjective optimization technique, Pareto concavity elimination transformation (PaCcET). The proposed approach, referred to as Fuzzified-PaCcET, employs a fuzzy logic controller to dynamically revise crossover and mutation rates in the original PaCcET leading to the faster convergence of the solution. The proposed approach finds the best Pareto front, also referred to as a Non-dominated set (NDS) of solutions, instead of finding a single optimal solution. In order to find the solutions on concave areas of the Pareto front, an iterative objective space transformation is performed in the PaCcET algorithm to allow a linear combination of objective functions (in the transformed objective space). The proposed Fuzzified-PaCcET-based scheduling is implemented on a MG with various dispatchable and non-dispatchable DERs to find the set of optimal solutions according to the total fuel cost of DERs, as well as the most optimum environmental cost. In order to extract the best compromise solution (BCS) among NDS of solutions, a fuzzy-based method is implemented. The comparison of the simulation results of the Fuzzified-PaCcET with that of PaCcET shows that Fuzzified-PaCcET can generate better solution with less computational burden.

42 ENGINEERING↗

Cosmogenic nuclides: Observable effects of Martian volatiles

Cosmic-ray produced (cosmogenic) nuclides in returned Martian samples could be used to study the amounts and distributions of volatiles in the recent past on Mars. In planning for the gamma-ray spectrometer experiment that is scheduled to fly on the Mars Observer, many calculations were done on the nuclear reactions that should occur in the Martian surface, studying especially the production and transport of neutrons. It is found that three aspects of Mars can very significantly affect the production of cosmogenic products in Mars: the Martian atmosphere and the presence of H2O in or CO2 on the surface of Mars. These volatile components can greatly affect the energy and spatial distributions of neutrons, expecially those with thermal or near thermal energies, in the surface of Mars. In turn, these neutrons produce many cosmogenic nuclides that can be observed in samples returned from Mars.

Reedy, R. C.↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗

Fast-Time Simulation for Evaluating the Impact of Estimated Flight Ready Time Uncertainty on Surface Metering

NASA has been developing and demonstrating new concepts and technologies for Integrated Arrival, Departure, and Surface (IADS) traffic management capabilities under the Airspace Technology Demonstration 2 (ATD-2) project. One of the IADS capabilities in the ATD-2 project is surface metering enabled by a tactical surface scheduler to provide controllers with the pushback advisories for departures at gates. The tactical surface scheduler uses the estimated flight ready times provided by airlines, called Earliest Off-Block Times (EOBTs), as input to calculate the target off-block times for pushback advisories. However, the EOBTs are often inaccurate and deviate from the actual flight ready times, which may reduce the benefits of surface metering. In this paper, a linear regression model is developed to model the EOBT uncertainty distribution over time based on actual EOBT data collected at Charlotte airport. This EOBT model is integrated with a tactical surface scheduler and a fast-time simulation tool. To evaluate the impact of the EOBT accuracy on airport surface operations, fast-time simulations are implemented for selected traffic scenarios under different levels of modelled EOBT accuracy. The simulation results show that the EOBT uncertainty affects several performance metrics related to the surface metering, such as gate hold, taxi time reduction, and target takeoff time predictability, which in turn influences ATD-2's scheduler performance.

tactical surface scheduler↗