At least 361 records · Page 20

Nebraska Integrated Carbon Capture and Storage Pre-Feasibility Study

In collaboration with the Nebraska Public Power District (NPPD), the Energy & Environmental Research Center (EERC) has conducted a pre-feasibility study for a commercial-scale carbon dioxide (CO 2 ) geologic storage complex in western Nebraska integrated with potential CO 2 capture at Gerald Gentleman Station (GGS). GGS is the largest coal-fired electricity-generating station in Nebraska, emitting 8.5 million metric tons (Mt) of CO 2 annually, and is located near the town of Sutherland. This pre-feasibility (Phase 1) project has been executed as part of the U.S. Department of Energy (DOE) CarbonSAFE program, a multiphase initiative to support the deployment of large-scale carbon capture and storage (CCS) projects. Each CarbonSAFE project is required to demonstrate the potential to capture and store at least 50 million tonnes (Mt) of CO 2 over a 25-year operational period. The EERC and NPPD established a coordination team to identify challenges to a potential Nebraska CCS project, comprising local stakeholder organizations, which met twice in Lincoln and via several Webinars, providing feedback and guidance throughout the pre-feasibility study. The EERC also secured the technical support of Schlumberger Carbon Services and Computer Modelling Group Ltd. (CMG). The project comprised four technical themes, all using published information sources. Regional and stakeholder analysis, including identification of sensitive environmental areas, potential resource conflicts, and strategies for public outreach. A review of geographic and socioeconomic characteristics, in combination with geologic characterization in the subbasinal analysis described below, identified an area to the southwest and within a 75-mile radius of GGS as the most prospective for development of a storage site. This area largely avoided lands with protected status such as wetlands. A public outreach plan has also been developed for implementation in any further phases of CCS assessment in western Nebraska, for example a CarbonSAFE Phase 2 feasibility study. Scenario analysis, addressing economic and regulatory factors. GGS is the only single major source of CO 2 emissions capable of satisfying the CarbonSAFE 50-Mt scale requirement within the study region. Chemical absorption using amines was identified as the most viable technology for postcombustion CO 2 capture at GGS. The total cost of a CCS project at GGS was estimated to be between $67/tonne CO 2 for capture and auxiliary boiler to minimize parasitic load and $70/tonne CO 2 avoided cost, using the Carnegie-Mellon University Integrated Environmental Control Model (IECM). The total avoided cost included the capture facility and parasitic load, a flue gas desulfurization plant required for the use of amine solvent technology, transport via pipeline, and dedicated storage infrastructure. Nebraska has no legislation in place to address typical CCS-specific issues, for example pore space ownership for storage. Long-term liability, therefore, falls under the U.S. Environmental Protection Agency Underground Injection Control (UIC) Class 6 program regulations. Subbasinal analysis, addressing the potential for a dedicated subsurface “container” to store the required 50-Mt quantity of CO 2 . Modeling and simulation studies identified an area to the southwest of GGS with the potential for storage of 50 Mt CO 2 in the Cloverly Formation, comprising sandstones with interbedded and intermingled shales. The area of review (AOR) that would be required for monitoring under a Class VI operating permit was estimated to be as high as 400–700 square miles, due to uncertain pressure effects. The viability of this storage option is subject to significant uncertainty due to the relatively limited amount of existing characterization data available to the pre-feasibility study; for example, dynamic simulation indicated that the proposed storage rate might require as little as two or as many as 14 injection wells. A key uncertainty is the relative proportion and distribution of sandstone and shale within the Cloverly Formation. A preliminary, semiquantitative risk assessment also suggested uncertainty over storage capacity and injectivity constitute the most significant project risks at this pre-feasibility stage. No assessed risks were considered to rule out the possibility of a project moving to deployment. National Risk Assessment Partnership (NRAP) validation, using software tools developed by the National Energy Technology Laboratory (NETL) to assess risks associated with the potential 50-Mt CO 2 storage complex. NRAP tools were used to assess hypothetical leakage scenarios. Results broadly supported the conclusion of the semiquantitative risk analysis – for example, even worst-case analysis of theoretical leakage scenarios found limited migration rates and impacts. In summary, the work undertaken in this Phase 1 pre-feasibility study has shown that western Nebraska has potential to host a commercial-scale CCS project, including a dedicated storage “container” for 50 Mt of CO 2 . However, the following key challenges would need to be overcome: The business case for deploying CCS projects is uncertain; recently announced federal tax credits and sales of CO 2 for enhanced oil recovery may not cover the full costs of a CCS project at GGS, as estimated by this pre-feasibility study. The potential 50-Mt CO 2 dedicated storage container defined in this pre-feasibility study should be regarded as having a relatively low level of readiness to support a CCS project. Public outreach would be a vital element in western Nebraska, where sensitivities around such environmental issues as water resource protection and pipeline construction would need to be carefully addressed.

54 ENVIRONMENTAL SCIENCES↗

Manufacturing Induced Residual Stress Development and Deformation in PMDI-10 Structural Foam

In this report, we investigate how manufacturing conditions result in the warpage of moderate density PMDI polyurethane foam (12-50 lb/ft 3 ) when they are released from a mold. We have developed a multiphysics modeling framework to simulate the manufacturing process including resin injection, foaming and mold filling, gelation of the matrix, elevated cure, vitrification, cool down, and demolding. We have implemented this framework within the Sierra Mechanics Finite Element Code Suite. We couple Aria for flow, energy conservation, and foaming/curing kinetics with Adagio for the nonlinear viscoelastic solid response in a multi-staged simulation process flow. We calibrate a model for the PMDI-10S (10 lb/ft 3 free rise foam) through a suite of characterization data presented here to calibrate the solid cure behavior of the foam. The model is then used and compared to a benchmark experiment, the manufacturing and warpage over 1 year of a 10 cm by 10 cm by 2.5 cm foam "staple". This component features both slender and thick regions that warp considerably differently over time. Qualitative agreement between the model and the experiment is achieved but quantitative accuracy is not.

36 MATERIALS SCIENCE↗

Feasibility Evaluation of Potential Stimulation Methods for Collab Experiment 3. Recommendation Report

In support of the Collab Project Milestone 1.4, INL is to submit a recommendation report describing feasible methods to investigate during Experiment 3 to DOE. This report fulfils this FY18Q1 SMART milestone. Twenty one potential methods were consideration for testing as part of Collab Experiment 3. The potential methods have been categorized as; Fracture Initiation, Stimulation Fluids, Stimulation Methods and Flow Control. The categories have been further divided into three general groups (e.g. high, medium, low) based on applicability to the scale of measurement at Collab (~10 meter) and it’s applicably to FORGE. The highest relevant methods (not necessary in order) are: 1) fracture initiation within the borehole, 2) use of slickwater fracturing fluids, 3) use of viscous fracturing fluids, 4) simultaneous stimulation of multiple wells, 5) use of energetic fluids to initiate larger fractures or connect a borehole to existing fractures, 6) injection of diverters to control short circuits and working fluid loss, 7) testing of borehole isolation techniques to control water flow pathways in the reservoir, and 8) use of multiple injection and production wells to characterize a fracture. Fractures created in Experiments 1 and 2 offer the opportunity to test engineering solutions to issues encountered in the stimulation process or during the fracture flow testing. An advantage of using these sites is that there would be a wealth of baseline characterization data for the site, and the borehole monitoring system and experimental infrastructure is already established and could possibly be reused. This suggested potential method list should be considered preliminary due to the timing of this report and the status of Collab Experiments 1 and 2 as well as the need for preliminary modeling to assess each of the proposed methods effectiveness.

15 GEOTHERMAL ENERGY↗

Results from the Interim Salt Disposition Program Macrobatch 11 Tank 21H Acceptance Samples

Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of verification of Macrobatch (Salt Batch) 11 for the Interim Salt Disposition Program (ISDP) for processing. This document reports characterization data on the samples of Tank 21H and fulfills the requirements of Deliverable 3 of the Technical Task Request (TTR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization Report for ORISE South Campus Building SC-13, Oak Ridge, Tennessee

Building SC-13, located on the Oak Ridge Institute for Science and Education’s South Campus (SC) on Bethel Valley Road in Oak Ridge, Tennessee, is slated for demolition in the near future. Characterization data for the building was collected to verify that, if present, contamination levels do not exceed concentration limitations set forth by the Toxic Substances Control Act (TSCA), Resource Conservation and Recovery Act (RCRA), or Oak Ridge Reservation (ORR) Landfills’ waste acceptance criteria so that disposal of building materials associated with the demolition of Building SC-13 can be accepted at the landfills.

42 ENGINEERING↗

Regional Feedstock Partnership 2019 Workshop Report

The U.S. Department of Energy (DOE) and the Sun Grant Initiative began the Regional Feedstock Partnership (RFP) in 2007 primarily to address information gaps associated with sustainably and reliably producing a billion-tons of biomass annually by the year 2030 for the U.S. bioenergy industry. The culmination of these efforts were reported in the Sun Grant/DOE Regional Feedstock Partnership Final Technical Report. The same biomass resources used to support these yield and sustainability efforts included analytical characterization data representing biomass quality. Considerable effort has been put into collection, harmonization, and archival of the analytical data, metadata, and physical samples associated with the thousands of samples collected from the RFP field trials. This data provides a unique opportunity to understand the impacts of agronomic and forest production practices, as well as environmental factors, on biomass material attributes relevant to bioenergy production. To more efficiently develop these relationships, this workshop was held to bring together the experts who conducted the RFP field trials and the biomass attribute data analysts. The objectives of the workshop included the following: • Enable face-to-face interactions with field trial experts, allowing for insights into the species and field trials themselves that are not obvious looking at data alone • Fill in metadata and analytical gaps from the RFP for future analyses • Share results from analysis of RFP biomass properties for each species along with associated field experiment observations/results • Discuss the potential to develop biomass quality maps • Discuss preparation of peer-reviewed publications for each species • Discuss outlines for a comprehensive summary report on the evaluation of RFP biomass material attributes for quality determination, focusing on the results of peer-reviewed publications and analysis of compiled RFP biomass attribute datasets

09 BIOMASS FUELS↗

Broadband Characterization and Circuit Model Development of Transmission-Scale Transformers

This report describes broadband measurements of transmission-scale transformers typical in the electric power grid. This work was performed as part of the EMP Resilient Grid LDRD project at Sandia National Laboratories to generate circuit models that can be used for high-altitude electromagnetic pulse (HEMP) coupling simulations and response predictions. The objective of the work was to obtain characterization data of substation yard equipment across a frequency range relevant to HEMP. Vector network analyzer measurements up to 100 MHz were performed on two power transformers at ABB-Hitachi and a single ITEC potential transformer. Custom cable breakouts were designed to interface with the transformer terminals and provide ground connections to the chassis at the base of the transformer bushings. The three-phase terminals of the power transformers were measured as a common mode impedance using a parallel resistive splitter, and the single-phase terminals of the potential transformer were measured directly. A vector fitting algorithm was used to empirically fit circuit models to the resulting two-port networks and input impedances of the measured objects. Simplified circuit representations of the input impedances were also generated to assess the degree of precision needed for high-altitude electromagnetic pulse response predictions, which were performed in Sandia's XYCE circuit simulator platform. HEMP coupling simulations using the transformer models showed significant reduction in the voltage peak and broadening in the pulse width seen at the power transformer compared to the traveling wave voltage. This indicated the importance of the load condition when defining the coupled insult in an electric power substation. Simplified circuit models showed a similar voltage at the transformer with a smoothed waveform. The presence of potential transformers in the simulation did not significantly change the simulated voltage at the power transformer. Single-port input impedance models were also developed to define load conditions when transfer characteristics were not necessary.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Acceptable Knowledge Technologist Procedure

Process acceptable knowledge (AK) is a waste stream characterization method that can be used to meet all or part of the waste analysis requirements appropriate for the waste. The method may include documented knowledge of process (KOP), additional characterization data, and/or facility records of analysis. LANL will use process AK to ensure chemical compatibility; assign matrix parameter categories and Environmental Protection Agency (EPA) hazardous waste numbers (HWNs) commonly referred to as EPA codes to waste streams; and determine the waste material parameters and radionuclides present in waste streams.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tools, Feasibility, and Cost of Monitoring Plan (SECARB Phase III 9.1.1a, b, c, d, e, f, g)

This report completes several Phase III milestone reporting obligations in Subtask 9.1.1 and Budget Period 3 general reporting requirements, specifically Phase III milestone 9.1.1. g "Subsurface Monitoring Plan" with subparts a-g, Assessment of Feasibility, Cost & Likely Success of Cross-Well EM, crosswell acoustic, CASSM, VSP, borehole logging, repeat seismic, geochemical monitoring, and related methods and backup and archival methods. This report builds on work done for Phase II and in the first year of Phase III and reflects the integration of results of a teamwide planning meeting held in Austin at the Bureau of Economic Geology (BEG) April 8–9, 2008, and a planning and review meeting held September 23, 2008. This report provides the consensus plan for site-specific characterization and monitoring that were used to guide engineering design. The team expected that further plan modifications would be required during the engineering design, cost evaluation, and timeline adjustment that will occur prior to drilling and installation. This report was then updated to include additional adjustments needed as site characterization data were gathered during fieldwork in the summer of 2009 and as the design was finalized.

01 COAL, LIGNITE, AND PEAT↗

Geologic Modeling and Simulation Report for the Aquistore Project

The Plains CO 2 Reduction (PCOR) Partnership, through the Energy & Environmental Research Center (EERC), is collaborating with the Petroleum Technology Research Centre (PTRC) on site characterization; modeling and simulation; risk assessment; public outreach; and monitoring, verification, and accounting (MVA) activities for the Aquistore project. The Aquistore project is a carbon capture, utilization, and storage (CCUS) project situated near the town of Estevan, Saskatchewan, Canada, and the U.S.–Canada border. This project is managed by PTRC and will serve as buffer storage of carbon dioxide (CO 2 ) from the SaskPower Boundary Dam CCUS project, the world’s first commercial-scale postcombustion CCUS project from a coal-fired electric generating facility. To date, an injection well and an observation research well (~500 ft apart) have been drilled and completed at the Aquistore site, with injection anticipated to begin in 2014. Using a combination of site characterization data provided by PTRC and independently acquired information, the PCOR Partnership has constructed a static geologic model to assess the potential storage capacity of the Aquistore site and provide the foundation for dynamic simulation. The geologic model and the results of the predictive simulations will be used in the risk assessment process to help define an overall monitoring plan for the project and to assure stakeholders that the injected CO 2 will remain safely stored at the Aquistore site.

54 ENVIRONMENTAL SCIENCES↗

EGS Collab SIGMA-V Project: Stimulation Investigations for Geothermal Modeling Analysis and Validation Phase 1 Report. For the period February 2017 – March 2019

The EGS Collab project was initiated in March 2017 to enable the subsurface modelling and research community to establish validations against controlled, small-scale, in-situ experiments focused on rock fracture behavior and permeability enhancement. The EGS Collab project is to provide the opportunity for reservoir model prediction and validation, in coordination with in depth analysis of geophysical and other fracture characterization data with an ultimate goal of further elucidating the basic relationship between stress, seismicity and permeability enhancement. In addition, the project is to identify and quantify other key governing parameters that impact permeability as well as understanding how these parameters change throughout the three EGS development phases (identify/characterize site, create reservoir, operate power plant). The project is to use comprehensive instrumentation and data collection effort to inform baseline, predictive, and post stimulation reservoir modeling is essential. This report describes the activities performed in Phase 1 of the project. The work done to date is extensive, and a large number of participants have contributed significant effort to enable project success. From planning to execution, we have stayed on track to address the objectives established by the Department of Energy in the paragraph above.

15 GEOTHERMAL ENERGY↗

EGS Collab SIGMA-V Project: Stimulation Investigations for Geothermal Modeling Analysis and Validation: For the period February 2017 – March 2019 (Phase 1 Report)

The EGS Collab project was initiated in March 2017 to enable the subsurface modelling and research community to establish validations against controlled, small-scale, in-situ experiments focused on rock fracture behavior and permeability enhancement. The EGS Collab project is to provide the opportunity for reservoir model prediction and validation, in coordination with in depth analysis of geophysical and other fracture characterization data with an ultimate goal of further elucidating the basic relationship between stress, seismicity and permeability enhancement. In addition, the project is to identify and quantify other key governing parameters that impact permeability as well as understanding how these parameters change throughout the three EGS development phases (identify/characterize site, create reservoir, operate power plant). The project is to use comprehensive instrumentation and data collection effort to inform baseline, predictive, and post stimulation reservoir modeling is essential. This report describes the activities performed in Phase 1 of the project. The work done to date is extensive, and a large number of participants have contributed significant effort to enable project success. From planning to execution, we have stayed on track to address the objectives established by the Department of Energy in the paragraph above.

15 GEOTHERMAL ENERGY↗

Visualizing Uranium Crystallization from Melt: Experiment-Informed Phase Field Modeling and Machine Learning

The focus of this project was to observe and simulate the solidification of uranium metal at the crystallographic level from its molten state. Melting experiments were conducted at two different scales to observe microstructural evolution using either a laboratory-scale induction furnace (hundreds of grams of metal) or a microscope heating stage (hundreds of milligrams of metal), respectively. Experimental parameters and characterization data were then used to inform a phase field model of gamma-U crystal growth as dendrites with or without secondary phase impurities in the form of uranium carbide particles. Finally, training datasets were generated by the phase field model as inputs to a neural network, developed with the aim of providing a faster, cheaper surrogate model for microstructural simulations within a given parameter space. Progress is reported herein for each of these task areas. Ultimately, 1) an optical microscope heating stage capability has been stood-up for uranium metal solidification studies, 2) a phase field model was advanced to simulate multiple uranium grains growing in the presence of carbide impurity particles and 3) a neural network was constructed and optimized to predict the microstructure features of individually growing uranium crystals.

36 MATERIALS SCIENCE↗

Stochastic Modeling Workflow to Generate Representative Geologic Variability in Training Dataset for SMART Initiative

The poster discusses the modeling workflow to generate ensemble of geologic realizations of the Illinois Basin Decatur Project (IBDP) site, based on available site characterization data and inherent uncertainty of those data, for use by project collaborators in DOE SMART Initiative (Phase 2) to build their forward modeling, history matching, and optimization workflows. This poster is summarized from the technical report for the SMART project submitted to U.S. DOE earlier this year.

Ganesh, Priya Ravi↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Characterization of C-Reactor (105-C) Moderator Tanks 204 and 205

Area Completion Project (ACP)/Savannah River Nuclear Solutions (SRNS) has requested Savannah River National Laboratory (SRNL) to perform chemical and radiological analyses on moderator heavy water samples from C-Reactor (105-C) in Moderator Tanks 204 and 205. The heavy water samples have been characterized using SRNL analytical methods. Information generated from the characterization of these heavy water samples provide a basis for determining the residual contamination remaining in the tanks. These analyses are needed in order to update the C-Reactor Contaminant migration groundwater model and report, to help determine a disposition pathway for the moderator water, and to ship samples off-site to the Southwest Research Institute (SWRI). This report presents characterization results for the March 2024 C-Reactor Moderator Tank 204 and 205 heavy water samples. SRNL results are critical to allow ACP to complete this Performance Based Incentive project on time. Based on the characterization data provided in this report, results of these samples meet customer expectations and satisfy the Technical Assistance Request (TAR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Hanford Waste End Effector Phase II Test Report

This report describes the Phase II testing program of the Hanford Waste End Effector (HWEE) at the Washington River Protection Solutions Cold Test Facility (CTF). Phase II testing builds on the completed Phase I development testing (PNNL-26856) to address some key actual waste challenges as outlined in the Phase II test plan (PNNL-27422). This testing demonstrated retrieval of a mixed layered simulant and retrieval of uneven simulant profiles like that found near tank walls. A separate demonstration using only the HWEE conveyance jet pump assessed the lifting capabilities of this device for transporting waste out of an underground tank. The Pacific Northwest National Laboratory (PNNL)-designed robotic gantry system and associated systems (e.g., tanks, high-pressure water delivery and valves, instruments, etc.) used at CTF during Phase I were modified and upgraded to implement the Phase II test program and measure various process parameters. The tests demonstrated retrieval of water and Kaolin (sludge) simulant to determine pumping rate, dilution factors, and screen fouling rate. This report will first describe the test equipment, instrumentation, simulant preparation procedures, and testing methodology. Testing results presented include HWEE water usage versus operating pressure of modified components from Phase I, simulant characterization data, dilution ratios, and retrieval rates. Reaction forces and other factors that would affect the remote operation of the HWEE will also be presented. Results of the separate jet pump vertical lift demonstration to a fixed height of at least 35 feet are also presented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site

The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure process for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗