Disposition of Radioisotope Thermoelectric Generators Currently Located at the Oak Ridge National Laboratory - 12232

Under the American Recovery and Reinvestment Act (ARRA), the U.S. Department of Energy (DOE) awarded SEC Federal Services Corporation (SEC) a 34-building demolition and disposal (D and D) project at the Oak Ridge National Laboratory (ORNL) that included the disposition of six Strontium (Sr-90) powered Radioisotope Thermoelectric Generators (RTGs) stored outside of ORNL Building 3517. Disposition of the RTGs is very complex both in terms of complying with disposal facility waste acceptance criteria (WAC) and U.S. Department of Transportation (DOT) requirements for packaging and transportation in commerce. Two of the RTGs contain elemental mercury which requires them to be Land Disposal Restrictions (LDR) compliant prior to disposal. In addition, all of the RTGs exceed the Class C waste concentration limits under Nuclear Regulatory Commission (NRC) Waste Classification Guidelines. In order to meet the LDR requirements and Nevada National Security Site (NNSS) WAC, a site specific treatability variance for mercury was submitted to the U.S. Environmental Protection Agency (EPA) to allow macro-encapsulation to be an acceptable treatment standard for elemental mercury. By identifying and confirming the design configuration of the mercury containing RTGs, the SEC team proved that the current configuration met the macro-encapsulation standard of 40 Code of Federal Regulations (CFR) 268.45. The SEC Team also worked with NNSS to demonstrate that all radioisotope considerations are compliant with the NNSS low-level waste (LLW) disposal facility performance assessment and WAC. Lastly, the SEC team determined that the GE2000 Type B cask met the necessary size, weight, and thermal loading requirements for five of the six RTGs. The sixth RTG (BUP-500) required a one-time DOT shipment exemption request due to the RTG's large size. The DOT exemption justification for the BUP-500 relies on the inherent robust construction and material make-up of the BUP- 500 RTG. DOE-ORO, SEC, and the entire SEC RTG team are nearing the conclusion of the Sr-90 RTG disposition challenge - a legacy now 50 years in the making. Over 600,000 Ci of Sr-90 waste await disposal and its removal from ORNL will mark an historical moment in the clean-up of the cold-war legacy in the ORNL central industrial area. Elimination (i.e., removal) of the RTGs will reduce security risks at ORNL and disposal will permanently eliminate security risks. The RTGs will eventually decay to benign levels within a reasonable timeframe relative to radiological risks posed by long-lived isotopes. The safety authorization basis at ORNL Building 3517 will be reduced enabling greater operational flexibility in future clean-out and D and D campaigns. Upon disposition the Department of Energy will realize reduced direct and indirect surveillance and maintenance costs that can be reapplied to accelerated and enhanced clean-up of the Oak Ridge Reservation. At present, waste profiles for the RTGs are developed and under review by NNSS RWAP staff and approval authorities. Disposition schedule is driven by the availability of compliant shipping casks necessary to safely transport the RTGs from ORNL to NNSS. The first disposal of the RCA RTG is expected in April 2012 and the remaining RTGs disposed in 2012 and 2013. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Y-12 National Security Complex's Sustainable Recovery and Transformation - 12420

American Recovery and Reinvestment Act (ARRA) funds were used at the Y-12 National Security Complex (Y-12) to remove legacy materials from large contaminated excess facilities in order to prepare the facilities for demolition, demolish five excess buildings, and clean up sources of environmental contamination. The legacy materials and buildings presented many challenges and the potential hazards included depleted uranium and other radiological contaminants, lead, polychlorinated biphenyls, Freon, mold, mildew, asbestos, beryllium and mercury. Y-12 project teams have integrated sustainable waste management practices into each of the seven ARRA projects. The ARRA clean up efforts have resulted in the reduction of potential environmental, health, and safety risks posed by the excess facilities and sources of environmental contamination. Y-12's ARRA project teams focused on completing the activities in a sustainable, timely and safe manner. The site utilized a systematic material disposition evaluation process to ensure that materials were not automatically dis-positioned as waste. ARRA projects have recycled or reused over 1.3 million pounds of materials while preventing over 3 million vehicle miles traveled for waste disposal. Y-12 ARRA projects have worked over 2 million safe work hours without a lost time injury. The site has already begun to beneficially reuse land cleared by ARRA project activities to support sustainable transformation efforts. The Y-12 ARRA project activities have demonstrated that large complex projects can be completed sustainably and safely while maintaining an aggressive schedule. Through careful planning and execution, ARRA projects at the site have sustainably reduced the potential environmental, health, and safety risks posed to site employees and the community by the excess facilities and sources of environmental contamination. Y-12's systematic material disposition process ensured that materials were not automatically assumed to be wastes and facilitated the evaluation of all unneeded materials for reuse or recycling. The site's pervasive pollution prevention culture is reflected in the recycling or reuse of over 1.3 million pounds of materials by the ARRA project teams. While the disposal of a large volume of ARRA wastes could not be avoided, the projects were able to reduce the local and national impacts of waste transportation and disposal through careful planning and efficient execution. The site has conserved natural resources through the preservation and beneficial reuse of materials and land cleared by ARRA activities. Y-12 has taken steps to preserve its history as the site undergoes a sustainable and safe transformation for the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Simple Waste Solutions for Complex Facilities - 12433

The buildings in the 300 Area, including several Category 3 nuclear facilities are undergoing deactivation, decommissioning, decontamination and demolition (D4) by Washington Closure Hanford (WCH) as part of the River Corridor Closure Contract (RCCC). The D4 process has generated a wide variety of low-level radioactive and low-level radioactive mixed waste as well as TRU. The Hanford Site-wide Transportation Safety Document (TSD) has been successfully utilized to transport waste streams that otherwise would not be able to be shipped. The TSD accomplished this by establishing a comprehensive set of onsite transportation and packaging performance standards and risk-based standards. The requirements and standards presented are equivalent to DOT and NRC standards (10 CFR 71). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remediation of Uranium Impacted Sediments in a Watercourse - 12486

In 2009, remediation was initiated for a non-operational fuel cycle facility previously used for government contract work. Between 2009 and the spring of 2011, remediation efforts were focused on demolition of contaminated buildings and removal of contaminated soil. In the late spring of 2011, the last phase of remediation commenced involving the removal of contaminated sediments from portions of a 1,200 meter long gaining stream. Planning and preparation for remediation of the stream began in 2009 with submittal of permit applications to undertake construction activities in a wetland area. The permitting process was lengthy and involved securing permits from multiple agencies. However, early and frequent communication with stakeholders played an integral role in efficiently obtaining the permit approvals. Frequent communication with stakeholders throughout the planning and remediation process also proved to be a key factor in timely completion of the project. The remediation of the stream involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation and disposal. Many safeguards were employed to protect several species of concern in the work area, water management during project activities, challenges encountered during the project, methods of Final Status Survey, and stream restoration. The planning and permitting effort for the Site Brook remediation began in May 2009 and permits were approved and in place by February 2011. The remediation and restoration of the Site Brook began in April 2011 and was completed in November 2011. The remediation of the Site Brook involved the use of temporary bladder berms to divert surface water flow, water diversion piping, a sediment vacuum removal system, excavation of sediments using small front-end loaders, sediment dewatering, and waste packaging, transportation, disposal, FSS, and restoration. Early and frequent communications with stakeholders proved to be a key factor in timely completion of the project. Challenges encountered during the remediation effort were overcome by proper planning and having preparedness procedures in place prior to executing the work. With the remediation and restoration successfully completed, the only remaining task is to monitor/maintain the restoration for 10 years. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Overview and History of DOE's Hanford Site - 12502

Hanford's DOE offices are responsible for one of the largest nuclear cleanup efforts in the world, cleaning up the legacy of nearly five decades of nuclear weapons production. Nowhere in the DOE Complex is cleanup more challenging than at the Hanford Site in southeastern Washington. Hanford cleanup entails remediation of hundreds of large complex hazardous waste sites; disposition of nine production reactors and the preservation of one as a National Historic Landmark; demolition of hundreds of contaminated facilities including five enormous process canyons; remediation of billions of gallons of contaminated groundwater; disposition of millions of tons of low-level, mixed low-level, and transuranic waste; disposition of significant quantities of special nuclear material; storage and ultimate disposition of irradiated nuclear fuel; remediation of contamination deep in the soil that could impact groundwater; decontamination and decommissioning of hundreds of buildings and structures; and treatment of 56 million gallons of radioactive waste in 177 large underground tanks through the construction of a first-of-its-kind Waste Treatment Plant. Cleanup of the Hanford Site is a complex and challenging undertaking. The DOE Richland Operations Office has a vision and a strategy for completing Hanford's cleanup including the transition to post-cleanup activities. Information on the strategy is outlined in the Hanford Site Completion Framework. The framework describes three major components of cleanup - River Corridor, Central Plateau, and Tank Waste. It provides the context for individual cleanup actions by describing the key challenges and approaches for the decisions needed to complete cleanup. The U.S. Department of Energy (DOE), as regulated by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology), is implementing a strategy to achieve final cleanup decisions for the River Corridor portion of the Hanford Site. The DOE Richland Operations Office (RL) and DOE Office of River Protection (ORP) have prepared this document to describe the strategy and to begin developing the approach for making cleanup decisions for the remainder of the Hanford Site. DOE's intent is that the Completion Framework document will facilitate dialogue among the Tri-Parties and with Hanford's diverse interest groups, including Tribal Nations, State of Oregon, Hanford Advisory Board, Natural Resource Trustees, and the public. Future cleanup decisions will be enhanced by an improved understanding of the challenges facing cleanup and a common understanding of the goals and approaches for cleanup completion. The overarching goals for cleanup are sevenfold. - Goal 1: Protect the Columbia River. - Goal 2: Restore groundwater to its beneficial use to protect human health, the environment, and the Columbia River. - Goal 3: Clean up River Corridor waste sites and facilities to: Protect groundwater and the Columbia River. Shrink the active cleanup footprint to the Central Plateau, and support anticipated future uses of the land. - Goal 4: Clean up Central Plateau waste sites, tank farms, and facilities to: Protect groundwater. Minimize the footprint of areas requiring long-term waste management activities. Support anticipated future uses of the land. - Goal 5: Safely manage and transfer legacy materials scheduled for off-site disposition including special nuclear material (including plutonium), spent nuclear fuel, transuranic waste, and immobilized high-level waste. - Goal 6: Consolidate waste treatment, storage, and disposal operations on the Central Plateau. - Goal 7: Develop and implement institutional controls and long-term stewardship activities that protect human health, the environment, and Hanford's unique cultural, historical and ecological resources after cleanup activities are completed. These goals embody more than 20 years of dialogue among the Tri-Party Agencies, Tribal Nations, State of Oregon, stakeholders, and the public. They carry forward key values captured in forums such as the Hanford Future Site Uses Working Group, Tank Waste Task Force, Hanford Summits, and Hanford Advisory Board Exposure Scenario Workshops, as well as more than 200 advice letters issued by the Hanford Advisory Board (http://www.hanford.gov/page.cfm/hab). These goals help guide all aspects of Hanford Site cleanup. Cleanup activities at various areas of the site support the achievement of one or more of these goals. These goals help set priorities to apply resources and sequence cleanup efforts for the greatest benefit. These goals reflect DOE's recognition that the Columbia River is a critical resource for the people and ecology of the Pacific Northwest. The 50-mile stretch of the river known as the Hanford Reach is home to the last free-flowing section of the river in the U.S. As one of the largest rivers in North America, its waters support a multitude of uses that are vital to the economic and environmental well being of the region and it is particularly important in sustaining the culture of Native Americans. Cleanup actions must protect this river. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Robotics in Decommissioning and Decontamination - 12536

Decommissioning and dismantling of nuclear facilities is a significant challenge worldwide and one which is growing in size as more plants reach the end of their operational lives. The strategy chosen for individual projects varies from the hands-on approach with significant manual intervention using traditional demolition equipment at one extreme to bespoke highly engineered robotic solutions at the other. The degree of manual intervention is limited by the hazards and risks involved, and in some plants are unacceptable. Robotic remote engineering is often viewed as more expensive and less reliable than manual approaches, with significant lead times and capital expenditure. However, advances in robotics and automation in other industries offer potential benefits for future decommissioning activities, with the high probability of reducing worker exposure and other safety risks as well as reducing the schedule and costs required to complete these activities. Some nuclear decommissioning tasks and facility environments are so hazardous that they can only be accomplished by exclusive use of robotic and remote intervention. Less hazardous tasks can be accomplished by manual intervention and the use of PPE. However, PPE greatly decreases worker productivity and still exposes the worker to both risk and dose making remote operation preferable to achieve ALARP. Before remote operations can be widely accepted and deployed, there are some economic and technological challenges that must be addressed. These challenges will require long term investment commitments in order for technology to be: - Specifically developed for nuclear applications; - At a sufficient TRL for practical deployment; - Readily available as a COTS. Tremendous opportunities exist to reduce cost and schedule and improve safety in D and D activities through the use of robotic and/or tele-operated systems. - Increasing the level of remote intervention reduces the risk and dose to an operator. Better environmental information identifies hazards, which can be assessed, managed and mitigated. - Tele-autonomous control in a congested unstructured environment is more reliable compared to a human operator. Advances in Human Machine Interfaces contribute to reliability and task optimization. Use of standardized dexterous manipulators and COTS, including standardized communication protocols reduces project time scales. - The technologies identified, if developed to a sufficient TRL would all contribute to cost reductions. Additionally, optimizing a project's position on a Remote Intervention Scale, a Bespoke Equipment Scale and a Tele-autonomy Scale would provide cost reductions from the start of a project. Of the technologies identified, tele-autonomy is arguably the most significant, because this would provide a fundamental positive change for robotic control in the nuclear industry. The challenge for technology developers is to develop versatile robotic technology that can be economically deployed to a wide range of future D and D projects and industrial sectors. The challenge for facility owners and project managers is to partner with the developers to provide accurate systems requirements and an open and receptive environment for testing and deployment. To facilitate this development and deployment effort, the NNL and DOE have initiated discussions to explore a collaborative R and D program that would accelerate development and support the optimum utilization of resources. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Stewardship at Hanford - 17023

The Hanford Site's Long-Term Stewardship (LTS) Program is responsible for 220 square miles of the Site's River Corridor, which includes 1,527 waste sites, 6 Manhattan Project Era production reactors that have been placed in interim safe storage, and 46 miles of Columbia River shoreline. More than 24,000 cleanup and historic documents have been identified, indexed, and tagged in the LTS records and document libraries. The LTS program, operated by the Mission Support Alliance, LLC (MSA) manages and provides surveillance and maintenance of facilities and institutional controls and all associated monitoring to ensure continued protectiveness of human health and the environment. Since 2010, through collaborative efforts with DOE and its prime contractors, land in 14 geographic areas and six cocooned reactor facilities were transitioned (mid-contract) from the River Corridor Closure Contractor to the LTS program. This accomplishment relied heavily on Site contractors and DOE working together to address challenges. Other stakeholders were informed of LTS progress through the Hanford LTS web site, presentations, and briefings. Hanford's LTS program is responsible for ensuring the protectiveness of cleanup remedies and the management of institutional controls once cleanup objectives have been achieved. LTS accomplishes this by adhering to post-cleanup requirements specified in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) and the Resource Conservation and Recovery Act of 1976 (RCRA) cleanup decision documents. The LTS program conducted inspection and surveillance and maintenance (S and M) activities of the cocooned 105-F Reactor in October 2014 and the other five reactors in 2015 and 2016. Reactor entries and internal inspections typically are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls, and roof. The cocooning process is designed to protect the reactor for 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The results of the recent 5-year inspections allowed DOE to negotiate an extended 10-year inspection cycle, which led to a $5 million avoidance in lifecycle inspection costs. Hanford's LTS program is successfully shifting from a program focused on transitioning land and waste sites to a program focused on data management and S and M activities for those buildings and waste sites within the program. This paper will highlight the accomplishments and collaborative efforts in addressing the challenges faced by Hanford's LTS program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

LaserSnake2: An Innovative Approach to Nuclear Decommissioning - 17080

Nuclear decommissioning challenges exist the world over and require innovative approaches to ensure safe and cost effective dismantling of high hazard nuclear facilities. LaserSnake technology makes use of the flexibility and dexterity of snake arm robots to deploy high-powered laser cutting, lifting and manipulation tools. This paper describes the development and use of the system to achieve the successful size reduction and removal of a substantial stainless steel vessel within the First Generation Reprocessing Plant (FGRP) at Sellafield in the UK. Due to the environment, nuclear decommissioning is an extremely challenging activity. High ambient radiation levels often preclude entry to the areas involved, and as industry tries to minimise dose uptake, even moderate radiation levels now require remote solutions. 'In-situ' size reduction of process plant, including vessels and pipework, will allow the removal of the nuclear inventory from a building prior to further decontamination and demolition. The term 'in situ' is in this case used to mean work done on plant items within their existing cells as opposed to moving items from their original location to a dedicated size reduction facility. Traditional size reduction cutting methods, such as reciprocating saws or grinders, pose a significant challenge for remote deployment platforms. This includes the loss of haptic feedback and the length of time taken to perform the task, and difficulty dealing with the reaction forces. Although remote engineered solutions for these tools are possible, they are are typically complicated, unreliable and expensive. Robot deployed laser cutting is widely used in non-nuclear industrial sectors, and offers a simpler method for size reduction. LaserSnake2 is a UK collaborative project, co-funded by the Nuclear Decommissioning Authority, Innovate UK and the Department of Energy and Climate Change. The project combined the skills of robotic experts and laser and optic specialists, to develop a remote handling technology suited for deployment within active nuclear environments. As well as meeting strict safety case requirements, the system provides a safe and cost effective method for decommissioning of complex nuclear spaces. An overview of the system development and deployment is presented in this paper. In July 2016, a successful decommissioning campaign was conducted in the FGRP at Sellafield. The LaserSnake2 system was used to size reduce a double-skinned dissolver vessel within a radiologically active nuclear cell. Planning of the size reduction method and processes, as well as results of the campaign itself are described in this paper. The containment procedures and radiological considerations for the system are presented along with the effects of operations on the cell and ventilation systems. LaserSnake, developed as a modular arm system with up to 4.5 m of articulation, carries an integrated tool comprising a high power, decommissioning specific, laser cutting head, high definition cameras and high powered illumination LEDs. It is designed for precise dismantling work within confined and hazardous environments. The tool can be interchanged, allowing the snake-arm robot also to carry grippers, environmental mapping sensors and other tools which may prove advantageous during a decommissioning campaign. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long Reach Manipulator for PCV Repair at Fukushima Daiichi - 17082

Various Research and Development (R and D) efforts related to the retrieval of damaged fuel debris at Fukushima Daiichi Nuclear Power Plant in Japan have been made since the accident occurred in March 2011. Since 2012, the Primary Containment Vessel (PCV) Repair Project has been one of the major improvement tasks required in the reactor buildings in order to start fuel debris retrieval activities. The primary purpose of this project is to create a water boundary in the lower sections of the PCV using remote handling methods. A designated long reach remote manipulator for this project, called the Fukushima Repair Manipulator (FRM), has been developed to perform inspection, light demolition, and deployment of various tools to supply sealing material to fill the vent tubes as a part of the PCV Repair Project. The FRM is a single hydraulic manipulator which has 7 degrees of freedom, over 9 m reach, tool change capability and a payload of 50 kg at maximum reach. These features provide a safe, robust, efficient and allow for flexible operations in limited access and visibility around the operating area. This paper will provide a system description of this manipulator and planned remote operations for the PCV Repair Project. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Application of Robotics Technology to D and D - 17249

The Knowledge Management Information Tool (KM-IT) is a web-based system developed to maintain and preserve the deactivation and decommissioning (D and D) knowledge base across the Department of Energy (DOE) complex. The system was developed by the Applied Research Center (ARC) at Florida International University (FIU) with the support of the D and D community, including the DOE Office of Environmental Management (DOE EM), and with the active collaboration and support of the DOE's Energy Facility Contractors Group (EFCOG). The KM-IT system is a D and D community driven system tailored to serve the technical issues faced by the D and D workforce across the DOE Complex. As part of the D and D KM-IT, FIU has developed a robotics database in collaboration with DOE EM and Nuvision/Cogentus which currently contains over 500 robotics technologies along with information about the robotics technology vendors. This information is aggregated in real time and presented as a robotics technology fact sheet to the end user based on the selected technology. FIU is researching these technologies and studying their capabilities and application to D and D. As part of the research, FIU is categorizing each technology into specific application areas: characterization, decontamination, inspection, and demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Novel Gamma Attenuation Methods Utilized for Waste Characterization of UO{sub 2}F{sub 2}-Bearing Materials at the Paducah GDP - 17327

The Paducah Gaseous Diffusion Plant (PGDP) is currently under deactivation with demolition in the decades to follow. UO{sub 2}F{sub 2}-bearing waste is generated at PGDP by UF{sub 6} hydrolysing to materials such as pipes, valves, PPE, etc. when UF{sub 6} is exposed to humid air. In addition, Al{sub 2}O{sub 3} and NaF trap materials contain significant amounts of Uranium. The UO{sub 2}F{sub 2} deposits within the generated waste can be of sub-gram levels to several hundreds of localized grams and are much denser than the surrounding interfering matrix materials and may be of very complex geometric and chemical forms such as with the Al{sub 2}O{sub 3} and NaF trap materials. The main objective is to characterize the fissile (U-235) content of the UO{sub 2}F{sub 2}-bearing waste so as to meet the Data Quality Objectives (DQO) for proper disposal. If a waste container cannot meet the DQO then it must be subjected to costly remediation, repackaging and re-characterization processes. We have developed, at PGDP, several novel model-based methods and techniques that vastly improve the standard gamma attenuation correction methods and do not require Working Reference Materials (WRM) for calibration. These new methods involve rotating and non-rotating 18.9 liter (5 U.S. gallon) waste containers with and without a transmission modality. A new model-based variant of differential attenuation has been developed that provides a high-quality self-absorption correction that does not require knowledge of the Uranium enrichment or isotopic ratios. For more challenging waste containers, a method using multi-view (non-rotating) 18.9 liter waste containers has been considered using a recently developed Advanced ISOCS{sup C} Uncertainty Estimator (AIUE) package. The new methods suffice to significantly improve accuracy and precision and to lower the Total Measurement Uncertainty (TMU) leading to satisfactory DQO's that were not previously achievable using the standard gamma attenuation correction methods. In this paper we present real 18.9 liter waste container and Working Reference Material (WRM) data subjected to the new methods and compared to standard methods depicting the significant improvement in the DQO that is realized. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Opportunities and limits of Decay storage based on Dismantled Materials in Nuclear Power Plants - 17650

We investigate the potential of decay storage of low and intermediate radioactive waste for release procedures. We present the Safetec software tool HL3 and its application to data from the German nuclear power plant at the site in Stade. In general, during the dismantling process of nuclear power plants, waste of slightly contaminated and/or activated systems is produced in large amounts. These are in particular demolition rubble from concrete structures and ingots from the melting process of metals. If, at the time of disposal, the nuclear inventory is near or slightly above federal clearance limits, the material cannot be released as conventional waste. However, due to the decline of the nuclear inventory over time, a significant amount of that waste could qualify for the release procedure in the future. Although this concept of decay storage is well known, specific predictions of the mass flow to be released is non-trivial. The mass flow over time depends on the composition of known and assumed nuclides (nuclide vector), as well as on the underlying threshold values for release. To handle the waste stream as a function of time, the nuclide composition and specific threshold values, Safetec developed a bespoke software tool named HL3. Its primary function is to visualize and to test/analyze various nuclide vectors and its decompositions over time. For the application within German law, threshold values according to the different disposal routes can be considered. Using the batch interface in the software tool HL3, large amounts of data can be automatically analyzed in a traceable and quick way. To test both, the tool and the benefit for the concept of decay storage, we have applied our code HL3 to material from the dismantling of the pressurized-water reactor at the site in Stade, Germany. We set the focus on concrete debris and metal ingots, which in principle are best suited for decay storage over years. The assignment and the packaging of that waste from Stade were based on application documents for decommissioning of the Year 2000 and according to the state of art conditioning technique at that time. Based on the data of that waste and the appropriate disposal routes, we calculate and discuss the amount of waste releasable after decay storage. As for the situation in Germany, we find that only a negligible amount would be releasable, mainly due to other reasons. These are the deterioration of detectability of radionuclides with time, and other regulatory conditions. However, on an international scale, a different assessment can be drawn. Our results thus motivate to reconsider the option of interim decay storage to reduce radioactive waste in large amounts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning concepts for the norwegian nuclear research facilities Halden and Kjeller - 15022

The Norwegian nuclear research facilities Halden and Kjeller are near the end of their current operational licenses. Thus, the Norwegian Ministry of Trade, Industry and Fisheries have decided that a concept evaluation study shall be made on the decommissioning alternatives for these facilities. This task was given to Ndcon (Westinghouse and Studsvik) with their broad experience in decommissioning planning and decades of nuclear expertise, together with DNV GL, that is certified in Norway for concept evaluation studies. The decommissioning alternatives that have been evaluated are strategy, end-state and waste management options. The decommissioning strategies are the IAEA defined immediate dismantling, deferred dismantling and entombment. The different end-states that have been evaluated are unrestricted use (green field), light industry (brown field) and other nuclear activity, in which the site will continue to have a nuclear license even after the decommissioning. The waste management options are direct disposal of materials, recycling of materials off-site and recycling on-site. The result of the cost estimation is that it is possible to identify viable alternatives for a chosen decommissioning strategy, end state and waste management options. The expected duration of the decommissioning program is 10 years for both sites, the dismantling and demolition period is expected to be able to perform within 4 years. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-term stewardship - surveillance and maintenance at Hanford - 15155

In FY 2015, Hanford's Long-Term Stewardship (LTS) Program is tasked to complete the required entries into five cocooned plutonium production reactors (105-C, 105-D, 105-F, 105-H and 105-N), which sit adjacent to the Columbia River. The first reactor entered in October 2014, the cocooned plutonium production reactor, 105-F, signaled the LTS Program's entry into the Surveillance and Maintenance (S and M) era. Reactor entries at Hanford are conducted at 5-year intervals to assess the condition of the structures and evaluate potential deterioration of the reactor core, shield walls and roof. The cocooned structures are designed to protect the reactor core for up to 75 years while radioactive decay continues, ultimately making the structures safe for demolition and removal. The 105-F entry demonstrates that the LTS program at Hanford is shifting from a program focused on transitioning cleaned up land and waste sites to a program focused primarily on S and M activities. The entry process is carefully planned, choreographed and monitored to ensure safety of the workers and minimize the time the reactor structure is opened. The process includes controlled opening of the reactor, air quality monitoring, structural safety inspections, and radiological clearance. Once the structure is cleared for entry, assessments of the structural integrity and radiologic conditions are completed. Evaluation of the interior temperature and flood monitoring equipment is conducted. Facility visits by regulators and DOE personnel close out the process prior to welding the door closed until the next assessment, five years later. This paper will document execution of the entry work package, identify challenges overcome, and provide video documentation as reference material for future workers and the public. The current LTS program has responsibility for approximately 100,000 acres, over 200 waste sites and six cocooned reactors. Just over 5,600 documents have been identified, indexed and tagged for storage in the LTS document library. The program has successfully completed seven consecutive transitions since July 2011, with six more transitions planned in the next 18 months to support the U.S. Department of Energy Richland Operations Office's (DOE-RL) near-term cleanup objectives to significantly reduce the footprint of active cleanup operations for the River Corridor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-level waste relocation requires use of new technology in aging nuclear facility - 15269

The West Valley Demonstration Project (WVDP) is preparing to relocate 278 canisters of vitrified high-level waste (HLW) from their current location inside the Main Plant Process Building (MPPB) to an outdoor pad for long-term, on-site storage. The waste was produced at the WVDP between 1996 and 2002 and was originally placed in interim storage inside the MPPB in anticipation of off-site shipment for disposal. Relocation of the canisters to a new on-site location is now necessary as part of WVDP Phase 1 Site Decommissioning work to enable pre-demolition activities inside the MPPB to proceed. The logistics of packaging and moving the HLW canisters within an aging facility to another on-site location has provided numerous technical challenges with subsequent innovations. Significant preparations have taken place to resolve structural inadequacies, including sub-surface soil subsidence issues, antiquated equipment, and facility reconfigurations to support up to 134 metric ton (148 ton) loads. To perform the transfer and storage of the HLW canisters, new equipment and fabrications were required including a robust storage system consisting of stainless steel canister overpacks within steel-reinforced concrete storage casks, three specialty cask transporters, a remotely operated welding system and construction of an outdoor engineered storage pad to store the 56 casks containing the relocated HLW canisters. Packaging and relocation of vitrified canisters is scheduled to begin in 2015. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford building 324 REC hot cell decommissioning approach - 15484

The 324 Building is a facility located at the Hanford Site and is undergoing decontamination and demolition (D and D) activities by Washington Closure Hanford (WCH). In October 1986, an in-cell leak of approximately 1.3 million curies occurred with a substantial fraction being lost into the subsurface soil beneath the floor of a large hot cell complex. Sampling under the hot cell floor revealed hot spots in the soil and cobble reading in excess of 10,000 R. In January of 2014, WCH contracted an AREVA lead team with Kurion as primary design agent to remove the B-Cell floor and highly contaminated underlying soils. The objective of this project is to remove the contaminated debris and soil and repackage them into the existing adjacent hot cells for final disposition as monoliths. The approach to this project uses an innovate combination of existing cell equipment, commercial equipment, and special tools to perform a series of completely remote operations. Also, a novel waste handling approach allows all the highly radioactive waste to remain within the existing cells. The remote handling approach to this project is to use customized off-the-shelf excavators which are mounted and operated remotely inside the cell. These can be moved and replaced remotely with a -Plug-and-Play- connection method. All the cables and utilities for the excavator and tools are managed through this cell connection with connections in a worker-accessible gallery space. The remote excavators are wall-mounted, which frees up the floor for the excavator work. The design also includes a transfer barrier which allows the B-Cell door to remain open during waste transfers while preventing spread of contamination between cells. The project balances the use of existing cell equipment such as cranes and shield doors, with the use of new remote equipment Existing equipment will be removed from the floor of the hot cell to adjacent cells. The concrete floor and stainless steel liner will then be remotely cut and removed, revealing the contaminated soil beneath the cell. The contaminated soil will be mixed with grout in the cell using the excavators and then placed in rigid bins. These bins will then be placed in the adjacent cells using existing overhead cranes. The waste containers allow optimal utilization of the limited adjacent hot cell space and improve the characteristics of the final waste monolith package. The system will use each bin once which significantly decreases the risk of contamination spread. The project includes a full-scale mockup facility in which all installation and operational activities will be tested and proven prior to hot cell construction activities. The mockup facility will also be used for operator training before actual hot work starts. This facility will remain available for use during operations with a full set of spares for redundancy and to support operations modeling during construction and remediation activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Dismantling and Packaging of the RPV and Thermal Shield at the Obrigheim NPP - 16073

The Obrigheim Nuclear Power Plant (KWO) is located in the Federal State of Baden- Wuerttemberg in Germany and was operated by the EnKK-KWO. The Nuclear Power Plant - a light water pressurized water reactor with 357 MW of electrical power - was operated from 1968 to 2005. In June 2009 the Energiewerke Nord GmbH (EWN) was charged with the dismantling planning and dismantling of the reactor. According to the German nuclear and radiation protection law, several licenses will be required for the realisation of this task. This also applies to the disposal of the waste produced by dismantling, which must finally be stored in the German final repository for low and medium-radioactive waste (underground repository 'Konrad'). In spring 2010 EWN completed all application documents for the dismantling of the reactor pressure vessel (RPV) and the RPV internals and EnKK-KWO delivered them to the responsible Environmental Ministry of Baden-Wuerttemberg. Since then it has been worked intensively on the design, construction and manufacturing of the facilities for dismantling. With a separate notification of amendment, it was applied for the license to install and commission the facilities for the dismantling of the RPV and the RPV internals at the Environmental Ministry of Baden-Wuerttemberg in October 2010. This notification of amendment was confirmed in summer 2012. In September 2011 the work process and test plan and the technical information about the campaign for the removal of the radioactive waste resulting from the RPV with internals, peripheral components and secondary waste with the aim of final disposal in the Federal Repository 'Konrad' was submitted to the Federal Office for Radiation Protection. The evaluation and assessment of the work process and test plan was concluded in August 2013, when it was audited by TUV Nord EnSys without any further measures and indications. On September 10 the work process and test plan was released by the Federal Office for radiation protection. The dismantling of the RPV internals upper core and lower core structure started in September 2013 in the wet cutting area in room 01.106/306 and were finished in October 2014. In the presentation 'Dismantling of the Obrigheim NPP Reactor and Waste Management' held on the WM Symposia in Phoenix, 2014, an overview about the remote cutting and packaging of the upper and lower core structure was given. In today's presentation the subsequent dismantling activities will be outlined and evaluated. The presentation will start with the short description of the basic frame conditions for the nuclear licensing procedure, important procedural principles, and necessary plant-specific conditions. After the remote cutting and packing of the reactor internals of the upper and lower core structure was completed, the wet cutting area 'reactor room 01.106/306' was cleaned and the reactor room rebuilt into a cutting area for peripheral components. After the peripheral components were dismantled, all preconditions were set to lift the RPV from its mounting position and to arrange it in the upper reactor room 01.306. After these activities were completed, the lifting of the RPV was prepared and the cutting area 'Dismantling of the RPV insulation in the reactor room 01.106/306' was set up. To carry out this task, a strand jack unit with connection block was installed on the bridge of the reactor building crane. The opening created by the dismantling of the pool plate was closed with a flap door. The manipulators used for the wet cutting of the RPV internals were also used for the remote dismantling of the RPV insulation and mounted in the cutting area. The remote facilities were handled from a control centre and/or control stand. The air-technical housing which has already been used for the remote dismantling of the RPV internals was designed for the dismantling of the RPV insulation and was extended for this dismantling scope with appropriate ventilation systems. A special feature is the fixation of the RPV insulation at the RPV corpus. The RPV insulation consists of insulation wool, wire mesh and metal-sheet insulation. This 'Sandwich Construction' is detached with a steel corset at the RPV corpus and partly tightened. The insulation of the RPV bottom dome is tightened at the supporting frame. Due to the activation of the material in the core area and the resulting high ambient dose rate the RPV insulation can only be dismantled remotely. Additionally, as asbestos fibers are expected to be found in the insulation the dismantling has to be performed according to the Technical Rules for hazardous substances. The demolition, restoration or maintenance works have to be performed remotely according to the Technical Rules for hazardous substances when the RPV is located in the cutting area. But in case of dismantling of a power reactor no such experience can be found. Beginning with the explanation of the technical, radiological and substantial boundary conditions this presentation will not only impart knowledge about the dismantling of the RPV insulation but also about the remote controlled packaging of the metal sheet insulation and the manual conditioning of the RPV insulation. Subsequently, reports on the remotely controlled cutting and packaging of the RDB are given. Here is particularly interesting that cutting methods have been used and how the activity determination of the segments was carried out. On the basis of the evaluation of the realisation the subsequent dismantling activities will be lined out. In parallel to the dismantling tasks, the waste package documentation for the final repository was issued, checked and confirmed for the containers loaded with parts of the RDB internals. The most important stages are exemplified in this presentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Simple Solution to a Complex Problem: Hexavalent Chromium in Landfill Storm water - 16129

Management of hexavalent chromium (Cr+6)-contaminated water at the Environmental Management Waste Management Facility (EMWMF) is a significant operational challenge, in addition to the challenges already posed by water management. The Cr+6 discharge criterion of 16 micrograms per liter (μg/L) is typically met; however, when demolition debris containing Cr+6 is received for disposal, concentrations up to 280 μg/L have been seen. The large volume of water generated at EMWMF from the 130-cm (51-in.) annual precipitation creates a complex water management problem that must be quickly addressed to maintain compliant landfill operations. The EMWMF Operations Team devised and implemented a simple, low-cost method to rapidly reduce the Cr+6 from the landfill storm water. The Cr+6 reduction system uses inexpensive, commercially available components of which the key is conventional steel wool in 760-L (200-gal) plastic bins. The Cr+6-impacted storm water is pumped through the bins, where the Cr+6 reacts with the elemental iron of the steel wool and reduces to trivalent chromium. The water then spills back into the ponds. Water is continuously recirculated through the bins until the release criterion is verified to be achieved, allowing the storm water to be discharged into the adjacent receiving stream. This cost-effective system is operated with in-house craft personnel, requiring only minimal additional training and hazard controls. The system can operate continuously with minimal intervention and has successfully processed millions of liters of storm water. The success of the initial installation has been refined over time, allowing Cr+6 reduction to proceed 24 hours a day and 7 days a week, with a Cr+6 reduction rate of about 20 μg/L per day. The system is scalable to achieve even higher reduction rates and adaptable to other metals. Through October 2015, over 65.1E6 L (17.2E6 gal) of contact water with Cr+6 above the release criterion was managed using the EMWMF system. This simple solution to a complex water management problem provides significant cost savings and operational efficiencies over traditional transportation and treatment at a water treatment facility. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗