Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Coal Power Generator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Valuing the Future Electric Grid: A Bid-Based Approach

Energy storage resources (ESRs) and other zero marginal cost (ZMC) resources have unique characteristics that are not fully captured in today’s electricity planning and operations modeling tools. Because the modeling assumptions used in these tools are simplified approximations of how operations and investment decisions occur in the real-world, accurately representing cost and operational characteristics are key for determining how these resources impact price formation. Questions such as—Where should we build new transmission? Will a small modular reactor earn enough revenue to participate in the future electric grid? Is retrofitting a coal plant with carbon capture technology economically feasible?—all require accurate electricity prices, which aren’t available from today’s electricity planning and operations modeling tools. As an example, production cost models (PCMs) are heavily utilized tools that determine the cost and reliability of the electric system. However, as PCMs were developed to help thermal generators manage their fuel inventories, production cost modeling is largely based on fuel prices. Because ESRs do not incur fuel costs, they are often modeled as ZMC resources. In reality, ESRs incur opportunity costs as well as technology-specific (degradation) costs that are non-trivial to calculate but are important for price formation. In this research, we identify options to incorporate more realistic opportunity and degradation costs in ESR bidding algorithms. Expanding available bidding assumptions allows energy system modelers to develop more accurate economic valuations for ESRs, leading to more accurate price formation from leading energy system modeling tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

High Yield, Economical and Environmentally Benign Production of Rare Earth Elements from Coal Ash (Phase II Final Summary Report)

Fly ash stored in landfills and ponds across the United States is an attractive, abundant domestic resource for the cost-effective recovery of rare earth elements (REE) and other critical minerals (CM). Physical Sciences Inc. (PSI) and its team members, Winner Water Services (WWS) and University of Kentucky/Center for Applied Energy Research (UK/CAER) successfully executed a multiphase program that developed technologies and their implementation in a pilot plant. We demonstrated plant operations for cost-effective and environmentally-friendly production of rare earth element oxide (REO) concentrates, and the critical minerals scandium and aluminum (in the forms of salts or oxide products), from coal ash. We also constructed and demonstrated a research-scale (0.5 kg/day) micropilot facility to validate the key physical and chemical processing operations, predict yields, and troubleshoot process bottlenecks. The project team then designed, constructed and operated two decoupled pilot plants: (1) an operational pilot plant for physical separation processes with capacity of 0.4 metric tons per day (tpd), where we optimized processes to produce selected ash fractions as the feedstock for chemical processing and as valuable byproducts such as cenospheres, magnetic ash, and secondary fuel carbon, and (2) an operational pilot plant for chemical ash processing with a capacity of 0.5 tpd that developed optimized processes for the production of: (a) REO concentrates, (b) critical minerals (Sc, Al), and (c) beneficiated ash as a valuable byproduct suitable for cement applications. In Phase I, the project team (with Equinox Chemicals in place of WWS) developed and demonstrated the feasibility of the physical and chemical separation processes, developed the design of a pilot plant, and began the development of a preliminary techno-economic model. In the baseline (initial) Phase II program, the project team developed and demonstrated the above pilot scale plant, producing salable REE concentrates, including Y and Sc (REYSc), plus commercially viable byproducts, using environmentally safe and high-yield physical and chemical enrichment processes. The team successfully demonstrated chemical pilot design, construction, shakedown, and operations of the plant. We produced the Phase II deliverable REYSc concentrate ((50 g of >60 wt.% purity REYSc salts on elemental basis), generated the feed for the Phase II follow-on program, identified processing challenges for future optimizations, and refined the techno-economic model. In the Phase II follow-on program, the project team: (1) developed and demonstrated processes to increase the REE amount by 3X (content basis) and convert the Phase II REE salt mixture to an oxide mixture, (2) produced/delivered >38 g of REO mixture with >85 wt.% purity (elemental basis); (3) developed processes to recover critical minerals scandium and aluminum from intermediate streams; (4) produced/delivered > 1 g of scandium salt mixture with >85 wt. % purity (elemental basis); (5) produced/delivered > 100 g of aluminum oxide type material with >70% wt. purity (elemental basis); and (6) updated the techno-economic model from the baseline Phase II program to assess CAPEX and OPEX of a commercial operation. This program has developed extensive databases on process chemistry, unit operations, plant engineering, and techno-economics that will enable further scale-up toward commercial plant design. Specific future developments will be focused on achieving dramatic savings in energy, reagent usage, and operating costs. The combined results will contribute significantly for maturing the technologies of REE recovery from coal byproducts and promote the establishment of domestic REE and CM supply chains.

01 COAL, LIGNITE, AND PEAT↗

Prairie State Generating Company 2D Seismic Interpretation

The objectives of the Illinois Storage Corridor (ISC) project are to accelerate commercial deployment of carbon capture utilization and storage at two individual sites and receive approvals for Underground Injection Control (UIC) Class VI permits for construction at each site (ISC Project Narrative, 2020). As part of this project, and as part of the subsurface geologic characterization, two-dimensional (2D) seismic data was acquired at both sites. This report summarizes the findings from two phases of 2D acquisition and seismic interpretation at the Prairie State Generating Company site near Marissa, Illinois. The seismic data indicates the presence of three faults that completely transect the storage and confining units. The initial 2021 2D seismic acquisition revealed the presence of a feature two miles east of the Lively Grove #1 characterization well. The feature is a polyphase fault with a component of strike-slip motion, forming a small positive flower structure. The second phase of 2D seismic acquisition in 2022 constrained the maximum extent of the fault, indicating it has a relatively limited length. Other 2022 seismic lines revealed the presence of two other faults that transect the storage and confining units in the southwest and northeast portions of the 2D seismic acquisition area. The 2021 and 2022 2D seismic surveys have identified three specific locations within the project area that may have an elevated risk of out of zone CO 2 migration due to faulting. Further technical work will be needed to quantify this risk and determine how and if this risk will impact the placement of CO 2 injection wells across the project area.

01 COAL, LIGNITE, AND PEAT↗

Flue-Gas Desulfurization Effluent Management using an Innovative Low-Energy Biosorpotion Treatment System to Remove Key Contaminants

Among the most critical water contaminants of concern affecting wide geographical regions and a number of industries and natural systems is selenium. Selenium found in surface, ground and wastewater in originates from natural sources, as well as industrial sources such as petroleum refineries, electronics manufacturing, pesticides, and coal power plants and mining also contribute to selenium contamination in water in the US. At high concentrations, selenium is toxic to human and wildlife. There are a number of technologies that have been used to treat selenium and other similar contaminants in water. Biological treatment of selenium has been used in the past to reduce soluble SeVI and/or SeIV to insoluble Se0, which is then filtered in the same vessel. The insoluble selenium (Se0) is then backwashed from the system and solids are separated for subsequent disposal, if they meet the leaching and water content criteria. In order to promote biological reduction to insoluble Se0, heating of bioreactor is needed in some applications, and excess food source (electron donor) is added so that all selenium can be filtered. An additional disadvantage of these systems is the significant amount of water lost due to extensive and frequent backwash and rinse cycles. When comparing the advantages and energy requirements of the various treatment technologies, RO membrane filtration immediately stands out due to the excessive energy expenditure needed to pump water across the membrane although RO is an effective way to remove selenium. In addition, RO requires extensive pretreatment, such as MF membrane, and frequent maintenance, rendering it an expensive option that may be out of reach for certain applications. In fact, although the performance was good during the pilot testing by the NSMP Working Group for treatment naturally occurring selenium in the surface water, the high electricity requirements and significant reject water stream made it an infeasible alternative. While conventional ion exchange maybe an effective treatment option, it requires frequent regeneration of the resin when applied to highly contaminated water, which leads to several tons of contaminant-laden, high-salinity brine that needs to be disposed off-site each day. One of the water systems in the west coast currently uses ion exchange for selenium treatment and has been trucking selenium laden hazardous brine waste weekly in the last several years. Pneumatic pumping and rinse water pumping required for ion exchange also increase the energy usage. In comparison, adsorption process is a passive treatment system where contaminated water comes in contact with an adsorption media in a vessel. Typically, there is no mixing, backwash, or recycle pumping required, thus significantly reducing the energy usage. A passive single-use adsorption system does not require backwash, thereby generating small amount of process waste, and producing the highest water yield among the alternatives. The energy and water efficiencies, and applicability for SeVI and SeIV are summarized in Table 1. Despite these benefits though, adsorption typically does not work for the most oxidized form of selenium (SeVI). The innovative biosorption process integrates both process to increase the treatment efficiency while minimizing energy, chemical, and time required to treat both SeVI and SeIV. Additional advantages include simple partial biological reduction with reduced on-site waste generation, which lead to water and electricity savings, and less operational need compared to biological treatment alone. This makes biosorption especially suitable for remote areas, where liquid backwash and brine disposal may be cost prohibitive or infeasible.

20 FOSSIL-FUELED POWER PLANTS↗

5G-TSN Architecture Capable of Providing Real-time Situational Awareness to Fossil-Energy (FE) Generation Systems (Final Technical Report)

This final report highlights the comprehensive achievements of the project focused on developing and validating a 5G-Time Sensitive Networking (TSN) architecture tailored for real-time operational awareness in fossil energy systems. The initiative successfully advanced through a series of technical milestones, including the integration of EMI-aware network models, deployment of advanced simulation frameworks, and real-world performance characterization at key sites such as UTEP and Fabens. Through the strategic use of NetSim® software, the team created and validated network configurations for wired and wireless environments, tested under varying congestion conditions, and verified network slicing implementations for URLLC-specific applications. Major accomplishments include the migration of simulation tools to the latest NetSim® version to support accurate modeling of TSN and network slicing, extensive EMI measurement campaigns, and the development of a robust simulation model for end-to-end SCADA system integration. Simulations compared both TDD and FDD duplexing modes, revealing insights into their performance under congested conditions. The wireless network was benchmarked for throughput, jitter, and delay metrics, aligning with 3GPP Release 15/16 and IEEE 802.1-TSN standards. A peer-reviewed conference paper was accepted and published, contributing to the broader academic and industrial discourse on 5G-TSN integration in energy systems, in addition to a journal article. Despite minor delays due to software limitations, the project achieved its objectives and delivered validated architecture ready for deployment in advanced energy network environments.

01 COAL, LIGNITE, AND PEAT↗

Bench-Scale Testing of a High Efficiency, Ultra-Compact Process for Pre-Combustion CO 2 Capture (Final Report)

The overarching objective of this bench-scale study is to field-validate the technical feasibility of a membrane- and adsorption-enhanced water gas shift (WGS) reaction process that employs a carbon molecular sieve (CMS) membrane reactor (MR) followed by an adsorption reactor (AR) for pre-combustion CO 2 capture while demonstrating progress towards achievement of the overall performance goals of CO 2 capture with 95% CO 2 purity at a cost of electricity (COE) of 30% less than the baseline capture approaches. The main goal of this bench-scale project is to advance the proposed MR-AR transformative CO 2 capture technology to a sufficient maturity level so that our present industrial partners (M&PT and Worley) can potentially adapt the technology for further small pilot-scale testing. The project began at TRL 4, as the system prototype had already been validated in the laboratory on simulated syngas (as part of project DE-FE0026423). The project ended at TRL 5, via scaling-up of the prototype system and testing it on actual syngas at a host site (CAER at the University of Kentucky (UKy)). The project was carried-out in two different phases: In Phase I (during BP1 of the project), the team designed, constructed, and assembled the bench-scale experimental MR-AR system, prepared the membranes, adsorbents, and catalysts, tested the bench-scale unit with simulated syngas to validate functionality, and prepared a preliminary TEA of the technology. In Phase II (during BP2 of the project), the team installed the unit at the test site at the UKy site and completed all utility connections and hookups, field-tested the novel MR-AR process in the bench-scale system using real syngas, collected and analyzed experimental data, and completed a detailed TEA of the technology. A key aim of the project was to identify and address the technical and process risks and to generate information to advance the technology to the next stage of development. All project milestones and success criteria were met. Specifically, the team: (i) designed, constructed and assembled a bench scale system that handled 1 – 5 scfm syngas and tested its functionality with simulated syngas; (ii) prepared high performance CMS membrane tubes (ID: 3.5 mm, OD: 5.7 mm, 30” long) that meet the target H 2 permeance ( > 1 m 3 /(m 2 .hr.bar) or (> 370.3 GPU)) and a target H 2 /CO selectivity >80 at the relevant temperature (up to 300oC) and pressure conditions (up to 25 bar) with a <10% decline in performance over each 250 hr. testing period (iii) procured commercial sour-shift catalyst in sufficient quantity and prepared up to 10 kg of pelletized adsorbent for use at relevant conditions (250oC 2.5wt.% and target sorbent attrition rate < 0.2; (iv) installed the bench-scale unit at the test site (UKy) and tested the MR-AR technology using real syngas for over 250 hr. for both static and flow experiments; (v) updated the TEA analysis based on bench-scale data and met CO 2 capture goals of 95% CO 2 purity at a cost of electricity 30% less than baseline capture approaches. The CMS membranes, HTC adsorbents and catalysts employed all exhibited very robust and stable performance during the long-term run (over a >250 hr live syngas run). Furthermore, the proposed MR-AR IGCC system achieved a LCOE with a N 2 sale price of $\$$ 30/ton, with N 2 compression (no N 2 compression) of 101.2 $\$$/MWh (95.3 $\$$/MWh), which represents a 29.8% (33.9%) LCOE reduction in the baseline IGCC with carbon capture of 144.2 $\$$/MWh. The proposed MR-AR IGCC delivers a CO 2 capture cost of 44.8 $\$$/tonne (39.9 $\$$/tonne) vs 98.1 $\$$/tonne of the baseline capture case and a net power production of 586 MWe (623 MWe) vs 556 MWe of the baseline capture case.

01 COAL, LIGNITE, AND PEAT↗

Enhancing the Quantification of Critical Elements in WTE and Coal Ash via Alkaline Fusion: Superiority of Lithium Metaborate (LiBO 2 )

Ashes generated from coal combustion, as well as waste incineration, can be a potential source of critical elements necessary for the ongoing transition towards electrification and greener energy technologies. For the quantification of critical elements, traditional methods such as acid digestion are time-intensive and can fail to dissolve critical elements in refractory minerals. One potential solution is to adopt alkaline fusion for faster, total digestion. However, the role of flux choice and the subsequent digestion efficiency (DE) is unknown. Here, we report a systematic investigation on the feasibility of alkaline fusion with Lithium Metaborate (LiBO 2 ) and Lithium Tetraborate (Li 2 B 4 O 7 ) as fluxes for the digestion of two standard reference materials (BCR 176R and SRM 1633c). Our findings suggest that LiBO 2 yields higher DE values than Li 2 B 4 O 7 for several critical REEs and volatiles, such as Pb and Cd. Specifically, for REEs in SRM 1633c, the DE values with LiBO 2 are, on average, ~16 percent higher than those with Li 2 B 4 O 7 . Similarly, for Pb and Cd in BCR 176R, the DE values with LiBO 2 are ~20 percent higher than with Li 2 B 4 O 7 . These results suggest that LiBO 2 is a superior flux for rapid ash digestion.

01 COAL, LIGNITE, AND PEAT↗

Examination of coal combustion management sites for microbiological and chemical signatures of groundwater impacts

Coal combustion accounts for 40% of the world’s electricity and generates more than a billion tons of coal combustion products (CCP) annually, half of which end up in landfills and impoundments. CCP contain mixtures of chemicals that can be mobile in the environment and impact the quality of surface water and potable groundwater. In this investigation, water samples from 14 coal combustion management sites across 4 physiographic regions in the United States, paired with background and down-gradient groundwater samples, were analyzed for water chemistry and microbiology. The objective was to determine if microbiology data alone, or supported by chemistry data, could reliably differentiate source waters and identify sites where CCP is known or expected to be influencing groundwater. Two percent of the total amplicons showed genus level conservation across CCP management sites, regions, and sample types; corresponding to ubiquitous, facultatively aerobic proteobacterial taxa that are generally recognized for the potential to respire using different terminal electron acceptors. Ordination plots did not reveal significant differences ( p > 0.05) in 16S rRNA gene amplicon diversity by CCP management site, water sample types, or physiographic regions. Contrastingly, chemistry distinguished sample types by standard water quality metrics (total dissolved solids, Ca:SO 4 ratio), alkali earth metals (K, Na, Li), selenium, boron, and fluoride. A focused evaluation of 16S rRNA gene amplicons for a subset of CCP management sites revealed microbiological features and chemical drivers (F, Ca, temperature) that positively identified the single CCP management site confirmed to have groundwater impacted by CCP leachate. At this site, 9 genera (>0.5% relative abundance) were exclusive to CCP porewater and downgradient groundwater. Inferred metabolisms for these taxa indicates potential for N and S biogeochemical transformations and 1-C metabolism that are consistent with a reducing environment, as evidenced by low ORP and depleted SO 4 2− . This research contributes to a growing understanding of conditions where these data types, analyses, and interpretation methods could be applied for distinguishing influence from CCP on the surrounding environment, as well as practical limitations.

01 COAL, LIGNITE, AND PEAT↗

Phase II Field Demonstration at Lansing Smith Generating Plant, Southport, Florida (Final Report)

The Final Technical Report: Field Test Design and Pressure Management Strategies for Phase II Field Demonstration of Optimal Pressure Control, Plume Management, and Produced Water Strategies presents the culmination of multi-year efforts under the U.S. Department of Energy’s Brine Extraction and Storage Test (BEST) program, led by EPRI in partnership with Gulf Power at the Plant Smith site near Panama City, Florida. The project was designed to evaluate and demonstrate the technical feasibility of managing subsurface pressures and fluid movement associated with large-scale CO₂ injection, using low-salinity water as a proxy fluid. Through a combination of field injection testing, reservoir modeling, and optimization studies, the research team developed and refined active and passive brine extraction strategies aimed at controlling injection-induced pressure buildup, mitigating risks of fault activation, and managing plume migration. The field demonstration incorporated a new injection well (TIW-2), a new monitoring/extraction well (TEMW-A), and an existing well (TIW-1) repurposed for passive pressure relief. Complementary geophysical monitoring was designed to track plume development and evaluate the effectiveness of pressure management strategies. The report details the integrated workflow encompassing wellfield development, regulatory permitting, model calibration, and survey design. It includes a comprehensive electromagnetic (EM) modeling and inversion study used to develop a cost-effective, time-lapse geophysical monitoring plan capable of imaging the evolving low-salinity plume within the highly saline Lower Tuscaloosa formation. Reservoir simulation results guided the design of the 17-month injection program and the timing of active extraction to maintain formation pressures below a hypothetical fault reactivation threshold. Supporting analyses evaluated potential injectivity risks related to clay fines migration and geochemical incompatibility, identifying practical mitigation measures such as salinity and pH control. The final design recommends a series of crosswell EM surveys—conducted before, during, and after injection—as the most effective and economical approach for plume imaging, supplemented by continuous downhole pressure and flow monitoring. Collectively, the study provides a field-ready framework for cost-effective pressure management and monitoring in support of future CO₂ storage projects.

01 COAL, LIGNITE, AND PEAT↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗

Retrofitting Holcim Ste. Genevieve Cement Plant with CO2 Capture Plant Using Air Liquide Cryocap™ FG Technology

The global cement manufacturing industry is a major contributor to carbon dioxide emissions. The International Energy Agency's "Net Zero Emissions by 2050 Scenario" identifies CCS as a major strategy for meeting that goal. This project is among the first attempts to transfer capture technology developed at coal-fired power plants to the cement industry. The main objective of the project is to execute and complete a front-end engineering and design (FEED) studies for commercial-scale, carbon capture projects that separates 95% of the total CO2 emissions at the Holcim (US) Ste. Genevieve cement manufacturing facility using Air Liquide’s Pressure Swing Adsorption system (PSA) assisted Cryocap™ technology. The Holcim Ste. Genevieve cement plant in Missouri, US, boasts one of the largest single cement production lines in the world, with a capacity of approximately 12,000 t/day. The plant currently uses traditional fuels, namely coal and petcoke. The captured CO2 will be pipeline and geological storage grade. The industrial host site emits approximately 3.0 million tonne CO2/yr. Air Liquide’s Cryocap™ technology has been developed over the last 18+ years for CO2 capture applications. It has been shown to be applicable to a variety of industrial applications (e.g., steel, cement, SMR, Fluidized Catalytic Crackers (FCCs)). Cryocap™ FG consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The project team is led by the Prairie Research Institute at the University of Illinois at Urbana-Champaign. The tasks include: complete FEED study for retrofitting the industrial facility with a carbon capture system to support developing a detailed cost estimate; business case analysis outlining the anticipated revenue and credits if projects was built and operated; technoeconomic analysis (TEA) outlining how capture system achieves DOE capture goals; and life cycle (LCA) analysis demonstrating zero net carbon emissions. The FEED study was successfully completed. This includes completing the process basis of design; preliminary engineering; outside battery limits (OSBL) detailed engineering including a Zero Liquid Discharge (ZLD) wastewater treatment system; inside battery limits (ISBL) detailed engineering [1]. An overall project capital cost estimate within a -20%/+30% accuracy was developed. The major contributors to the Total Plant Cost (TPC), by system, are the costs associated with the Outside Battery Limit (OSBL) section of the plant which includes a new river water intake structure and a Zero Liquid Discharge (ZLD) system. By cost category, the major contributors to the TPC are equipment and subcontractor costs, followed closely by engineering, construction management, home office and contractor fees. The TEA has been created to reflect the findings of the project. It analyzes the economic performance of the Cryocap™ technology by reviewing the estimated capital costs, operating cost, and revenue. The Cost of Capture (COC) associated with the Cryocap™ technology for 95% CO2 capture, when considering NETL 2018 economic assumptions (42/58 debt/equity ratio, 5.15% interest on debt and 1.42% return on equity in real dollars) and 2022 economic assumptions (42/58 debt/equity ratio, 8.82% interest on debt and 4.90% return on equity in real dollars) was found to be much lower than that for the DOE-NETL’s base-line cases. The highest contributors to the COC are annualized capital expenditures (CAPEX) and electricity consumption which can be offset by using lower cost renewable sources. The LCA was conducted using OpenLCA which is an open-source software that is recommended by NETL. The database utilized for this study was a modified version of TRACI 2.1 (developed by the US. Environmental Protection Agency’s National Risk Management Research Laboratory and modified by NETL). The Cryocap™ FG technology does not consume fuels in significant quantities and does not utilize specialized chemical solvents subject to decomposition, such as those utilized in amine-based carbon capture systems. The Cryocap™ FG technology mainly utilizes electricity as its energy input; hence, its calculated emissions are mainly associated with the generation of electricity offsite and are dependent on the energy matrix of the grid at the time of project implementation. The water consumption impact of the Cryocap™ FG is mostly for makeup of the water lost by evaporation in the cooling tower; however, the carbon capture plant will be equipped with a ZLD system to avoid effluent streams and minimize water consumption. The successful construction and operation of this plant based on this study results will provide a means to demonstrate an economically attractive and transformational capture technology that can be used to retrofit existing plants and be deployed at new plants.

01 COAL, LIGNITE, AND PEAT↗

Illinois Storage Corridor, CarbonSAFE Phase III: UIC Class VI Permitting Plan

The Illinois Storage Corridor (ISC) project evaluated two distinct sites to determine the feasibility of commercial-scale CO₂ storage at each. The project leveraged the region's exceptional geological characteristics, particularly the well-characterized Cambro-Ordovician Storage Complex, to enable permanent geological storage of more than 50 million tonnes of CO₂ over 30 years. The two storage sites are located at One Earth Energy (OEE) facility in northcentral Illinois and Prairie State Generating Company (PSGC) in southcentral Illinois. Once operational, these facilities will combine to capture and store more than 6.5 million tonnes of CO₂ per year, positioning the ISC among the largest carbon storage regions globally. Preliminary homogeneous dynamic modeling based on regional and site-specific reservoir characteristics indicates promising injection capabilities at both locations. For the OEE site, modeling predicts a maximum allowable injection rate of 3.7 MTPA, with a baseline scenario of 1.7 MTPA over 30 years producing a CO₂ plume radius of 1.4 miles at end of injection. For the PSGC site, incorporating recent well data, modeling indicates a single-well maximum injection rate of 2.1 MTPA, with a plume radius of 4.2 miles at end of injection for the 60 MT over 30 years scenario. The primary objective of this CarbonSAFE Phase III project is to develop and submit Class VI Underground Injection Control (UIC) permit applications to the U.S. Environmental Protection Agency Region 5. The permitting plan outlines comprehensive site characterization, Area of Review delineation, monitoring programs, well construction designs, financial responsibility provisions, and post-injection site care procedures necessary to demonstrate safe, permanent CO₂ storage protective of underground sources of drinking water. Three UIC Class VI permit applications for the OEE site were submitted to EPA in October 2022 and are progressing through technical review, with final permit decision projected by June 2026. Through five rounds of Requests for Additional Information and responses, the applications have been refined to address computational modeling, area of review delineation, well integrity, monitoring protocols, and financial assurance requirements. For the PSGC site, finalized characterization and permitting documentation was delivered directly to the facility in July 2023 due to business constraints precluding formal federal regulatory submission. This comprehensive permitting effort builds upon extensive prior subsurface evaluations and demonstration projects that have confirmed the feasibility of widespread commercial-scale carbon storage in the region.

01 COAL, LIGNITE, AND PEAT↗

Bench-scale Development of a Transformational Graphene Oxide-based Membrane Process for Post-combustion CO 2 Capture

Graphene-based materials, such as graphene and graphene oxide (GO), have been considered as next-generation membrane materials. GTI Energy and The State University of New York at Buffalo (UB) have been developing a transformational GO-based membrane process (designated as GO2) that integrates a high CO 2 /N 2 selectivity membrane (GO-1) and a high CO 2 flux membrane (GO-2) for post-combustion CO 2 capture. An innovative membrane structure, consisting of GO nanochannels intercalated by single-walled carbon nanotube (SWCNT), was developed. The membrane prepared on hollow fiber substrate showed CO 2 permeance as high as 1,300 GPU with CO 2 /N 2 selectivity >200. The membranes were successfully scaled up to effective area of 50-100 cm 2 . The 50-100 cm 2 membranes showed CO 2 /N 2 selectivity ≥200 and CO 2 permeance ≥1,000 GPU for the GO-1 type, and CO 2 /N 2 selectivity ≥20 and CO 2 permeance ≥2,500 GPU for the GO-2 type. The CO 2 capture performance of the GO-based membranes was tested using a simulated flue gas. The testing results indicate that the GO-based membranes are stable in the presence of flue gas contaminants. The GO-based membranes were then further scaled up to a surface area of 1,000 cm 2 . Good stability was achieved during an integrated testing with GO-1 and GO-2 membranes using simulated flue gas. A bench-scale system was designed, constructed, and tested at the National Carbon Capture Center (NCCC). Good stability was achieved during testing of a single-stage process with >10 shutdowns/startups at NCCC. During the integrated testing, the membranes showed good stability at 50°C and 57°C. 70-90% CO 2 removal efficiencies and ≥95% CO 2 purity were validated during the steady state operation at NCCC. Techno-economic analysis indicates the GO2 membrane-based process technology provides a reduction in both the levelized cost of electricity (LCOE) and cost of capture when compared to the reference B12B case presented in the Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural Gas to Electricity study prepared by the National Energy Technology Laboratory (NETL), before considering any system optimization or improvement opportunities. The benefits are primarily driven by a reduction in the equipment costs of the CO 2 capture process vs. the solvent-based reference process in NETL Case B12B as well as a decrease in the base plant size.

20 FOSSIL-FUELED POWER PLANTS↗

Studies on the Encapsulation of Brine Generated from a Process Using Selective Electrodialysis Reversal

This topical report summarizes the laboratory testing, geochemical modeling, and mineralogical testing conducted to examine the efficacy of wastewater encapsulation for the brine generated from the Saltworks Flex electrodialysis reversal technology. Within the laboratory testing, the short- and long-term physical properties of seven separate mix designs were examined along with the leaching of each mix design. Additionally, geochemical thermodynamic modeling was used along with mineralogical analyses to help gain a fundamental understanding of the chemistry involved in the encapsulation process. Encapsulation is a process that results in the immobilization of constituents of interest by creating an engineered material that contains the waste within its matrix, both physically and chemically, in such a manner that the receiving environment is protected from adverse effects. Within the context of this study, encapsulation mix designs involved mixing the Saltworks brine with fly ash and various additives, principally lime (calcium oxide) and cement, to form a paste that eventually sets and hardens into a monolith upon placement in a landfill. Moisture conditioning fly ash with wastewater sources for on-site landfill disposal is a process that is in use at some sites and has been presented as a viable option to dispose of liquid wastes. However, because chemical reactions that can lead to sequestration of constituents of interest are not optimized, leaching can occur. Therefore, in this study, mixes were created to mimic moisture conditioning, as well as engineered pastes of varying mix designs. The study found that engineered encapsulation mixes provide significant resistance to leaching compared to moisture conditioning alone. The best performing encapsulation mix used lime as the additive, which proved superior to the use of cement. After 90 days of curing, this encapsulated mix was 5.5 times stronger than the moisture conditioned mix. Additionally, this mix exhibited an approximate 2.5 order of magnitude drop in hydraulic conductivity compared to the moisture conditioned mix. When comparing leaching, nearly all the chloride was found to evolve from the moisture conditioned mix, whereas only 6.7% of the chlorine contained in the best performing encapsulated mix leached out. Mineralogical analysis via X-ray diffraction (XRD) showed a significant concentration of the chloride sequestering mineral, Friedel’s salt, in the best performing encapsulation mix, whereas none was observed in the moisture conditioned mix, pointing to it being the primary chemical mechanism for chloride retention, along with the physical impermeability of the material. With respect to the modeling study, the model was successful in predicting the presence of most mineral phases observed in the XRD analysis.

01 COAL, LIGNITE, AND PEAT↗

Minimizing Cr-Evaporation from Balance Of Plant Components By Utilizing Cost-Effective Alumina-Forming Austenitic Steels

A solid oxide fuel cell (SOFC) is a clean and efficient energy conversion device. The development of intermediate-temperature SOFCs has made it preferable to use metallic interconnects (MICs) to greatly reduce the cost and significantly increase the efficiency compared to ceramic interconnect materials. However, gaseous chromium species will evaporate from the chromium-containing layer formed on the surface of commonly used MICs and balance of plant (BoP) components. Volatile chromium species have been shown to form solid deposits which poison the cathodes of SOFCs, causing drastic cell performance degradation and thereby limiting commercialization. In order to alleviate the Cr poisoning and achieve long-term high performance of SOFC stacks, various Al 2 O 3 -forming austenitic (AFA) stainless steels applied at different temperatures are evaluated in this project. Based on our Phase I results (500 h operation), it is shown that on the AFAs, an alumina-based protective layer forms under high temperature that is invulnerable to water vapor effects and suppresses the diffusion of chromium and manganese which can prevent the generation of spinels on the alloy surface. Therefore, 310S, OC4 and OC5 at 800 °C and 625, OC11 and OC11LZ at 900 °C are selected to be tested in the Phase II long-term operation. From the results, we find that besides the lower Cr evaporation rates and better oxidation resistance of AFAs than benchmark alloys after short-term (500 h) operation, AFAs also possess the sturdy and compact alumina layer after a long-term operation (5000 h). A protective oxide layer is of great importance for the long-term high-temperature operation of structural materials. The high-temperature oxidation behavior of AFAs and commercial 310S and 625 alloys in Air + 10% H 2 O at 800 °C and 900 °C is systematically investigated. Severe breakaway oxidation and minor spallation are observed for the 310S and 625 after the long-term operation, while the AFAs show high oxidation resistance. It is found that the formation of a continuous alumina layer could greatly prevent the volatilization of chromium vapors. In addition, the corresponding evolving models are discussed. Chromium evaporation from BoP components in high-temperature environment could severely deteriorate the electrochemical performance of SOFC. Several methods were applied to evaluate the Cr evaporation rates of BoP after 500 h exposure at 800 °C to 900 °C in air with 10% H 2 O. An optimal method was designed to exclude the effect of silicon (Si) deposits from quartz tube and sodium (Na) deposits from the sodium carbonate on the oxidation process and the chemical interaction between Cr gaseous species and alumina tube which could provide further quantitative correlation of the evaporated Cr species quantities and degradation rates of SOFC. Based on the great performance of AFAs after long-term operation, AFAs are assembled with Anode-supported cells (ASC) to investigate the the Cr deposition of anode-supported cell under a constant current density of 0.5 A cm -2 at 800 °C with AFA alloys compared with commercial alloys. In addition, the anodic and cathodic processes are deconvoluted by distribution of relaxation times (DRT) method which are comprehensively discussed. It is found out that the voltage exhibited a slight decrease of 5.09 % and 1.54 % in the presence of OC11 and OC11LZA alloy, respectively. However, a considerable decrease of 22.14 % and 12.06 % was determined in the presence of 310S and 625 alloy, respectively. AFAs possessing the low-cost, low Cr evaporation rates and the high oxidation resistance will make it of great potential to replace the existing BoP components.

01 COAL, LIGNITE, AND PEAT↗

Development of Self-Assembly Supports Enabling Transformational Membrane Performance for Cost-Effective Carbon Capture

This final technical report describes work conducted by Membrane Technology and Research, Inc. (MTR) for the U.S. Department of Energy (DOE), National Energy Technology Lab (NETL) on the development of membranes with transformational performance for carbon capture under award number DE-FE0031596. The work was performed from June 1, 2018 through May 31, 2024. For more than a decade, MTR has worked in partnership with DOE to develop an innovative membrane-based CO 2 capture process. This effort has included the first test of membrane modules with coal-fired flue gas at the Arizona Public Services (APS) Cholla plant in 2010; the accumulation of >11,000 hours of flue gas operation for Polaris modules on a bench-scale 1 tonne/day (TPD) system at the National Carbon Capture Center (NCCC); scale-up of first-generation (Gen-1) Polaris to a 20 TPD small pilot system, and successful operation of this system on a flue gas slipstream at NCCC and in integrated boiler testing at Babcock & Wilcox (B&W). Through continued development efforts, a second-generation (Gen-2) version of the Polaris membrane has been scaled-up to pilot production. This membrane offers 70% higher CO 2 permeance with similar selectivity to the base case Polaris. MTR also developed planar modules designed specifically for the low-pressure, high-volumetric flow rate process conditions of flue gas operation. These new modules have significantly lower pressure-drop values compared to the type originally used (spiral-wound modules), which results in significant energy savings. The goal of the work described in this report was to improve on the Polaris Gen-2 membrane with the ultimate aim to reduce the cost of carbon capture. The majority of the effort was to develop improved support membranes for the multi-layer composite structure of MTR’s Polaris membrane. Earlier work at MTR had identified the support structure as limiting membrane permeances, not because the support itself represents a permeation resistance, but because the distribution of pores at the surface of the support imposes a geometric restriction to diffusion in the layers above it. Support membranes were prepared from a range of polymers, including commercially available block copolymers and a custom synthesized block copolymer alternative. The best support membranes developed in this project reduced the geometric restriction by a factor of two to three. These supports then were used to produce Polaris composite membranes with improved permeances. The second topic was to create a high-selectivity version of the Polaris membrane. The high-selectivity version uses a novel selective polymeric material and high selectivities were confirmed in experiments at MTR. The material is not easily made into very thin films. Consequently, the permeances are significantly lower than the Polaris Gen-2 membrane. The utility of this membrane is therefore limited to the carbon dioxide purification step that produces liquid CO 2 . A Technical and Economic Analysis (TEA) was performed for a carbon capture system that uses both advanced membrane types. The TEA shows the novel advanced membranes reduce the cost of capture by 10%, from $63.32/tonne CO 2 to $56.90/tonne CO 2 (2022 USD). Most of the development work was carried out with laboratory-scale casting and coating equipment. A number, but not all, of the improvements identified have been implemented on commercial-scale manufacturing equipment. The focus of future work at MTR is to incorporate the advancements made into the Polaris membrane manufacturing process.

01 COAL, LIGNITE, AND PEAT↗

A Process with Decoupled Absorber Kinetics and Solvent Regeneration through Membrane Dewatering and In-Column Heat Transfer (Final Report)

This report summarizes the work conducted on project DE-FE0031604 where University of Kentucky Center for Applied Energy (UK CAER) has validated its intensified CO 2 capture process through substantial enhancements to the kinetics of the absorption process and energy reductions by absorber temperature profile modification, dewatering and heat integration technologies for achieving significant capital and operating cost reductions. To address DOE’s objective of improving post-combustion CO 2 capture technology and reducing associated cost, UK CAER employed an intensified process which combined three key aspects targeted at overcoming inherent limitations or barriers in the conventional CO 2 capture and desorption process. The process designed to be independent of the type of solvent used, included (1) the use of 3-D printed two-channel structured packing material to control the temperature profile and increase the CO 2 absorption rate in the absorber, (2) a zeolite membrane dewatering unit for dewatering of the carbon-rich solvent to decouple solvent concentration needs for CO 2 absorption and desorption, and (3) a rich-split feed with two-phase flow heat transfer prior to the stripper that provided a secondary point of vapor generation to provide energy savings in steam extraction and solvent regeneration. The project was executed over two budget periods. This involved testing of individual process components which included the advanced heat transfer packing and the dewatering membrane on UK CAER’s 30 liter per minute (L/min) CO 2 (3” Column) capture bench unit with simulated flue gas in the first budget period. Subsequent scaled-up testing of these components together with the split-feed configuration were also tested in UK CAER’s 0.1 MWth CO 2 capture unit with coal-derived flue gas in the second-budget period. Long term studies were done during this period to assess process and solvent performance over extended duration. Project partners Lawrence Livermore National Laboratory (LLNL) and Media & Process Technology (MPT) led the development efforts for the advanced packing material and dewatering membrane respectively. Data from the long term testing was used as input for an environmental, health and safety (EH&S) assessment for the process and scaled technology performed by ALL4 LLC. Trimeric Corporation also completed a techno-economic analysis (TEA) for the UK CAER technology which was compared to the DOE reference Case B12B. Tests on the 3” column capture unit showed that the advanced heat transfer packing could be used to lower the bulge temperature in the absorber, and this was also proven in the scaled testing in the 0.1 MWth CO 2 capture unit. The bulge temperature could be lowered by >10 °C, changing the temperature profile in the absorber, and showed potential to enhance absorption with the ability to tailor the profile to provide conditions suitable for a solvent’s properties and kinetics. Conditions for short term evaluation of a 19” zeolite dewatering membrane on the 3” column capture unit yielded desirable fluxes and sustained rejection rates of >80%. However, for the scaled testing of six membrane modules consisting of 21 parts of 31-inch-long membrane tubes in each bundle (surface area 0.3 m 2 ), over a more extended duration, similar rejection rates could not be achieved. With the split-feed of the rich stream to the stripper, improved heat recovery minimized waste heat exiting the top of the stripper. The stripper exhaust temperatures could be reduced by >10 °C; reducing the amount of water vaporization contributed to lowering the regeneration energy by ~ 15%. The energy benefit could be sustained from the long term monitoring of the solvent performance. The solvent properties were not significantly impacted over the long-term operations. The benefits of the UK CAER process demonstrated experimentally were mostly validated from the TEA comparing a commercial scale application of the technology to DOE reference Case B12B. The cost of CO 2 capture for the UK CAER technology was estimated to be ~$34.97/tonne of CO 2 captured; a reduction of 23% compared to Case B12B. The increase in cost of electricity was also shown to be 16% lower than that of Case B12B. The total parasitic demand was also shown to be 11% lower. The key drivers for the benefits are a result of the process intensification approaches employed in the UK CAER technology for enhanced solvent performance, effective heat recovery and improved energy performance. The EH&S assessment did not find any major environmental concerns or barriers to the full scale implementation of the technology.

20 FOSSIL-FUELED POWER PLANTS↗

Qualitative Risk Assessment of Legacy Wells within the Estimated Prairie State Generating Company Area of Review

This report details the digitization of a legacy wellbore database, including data processing assumptions, parameter estimation, and risk assessment methodology. The database, comprising 6,454 documents, was provided by ISGS. It includes valuable data from the Prairie State Generating Company (PSGC) and One Earth Energy (OEE) sites of the CarbonSAFE Phase III – Illinois Storage Corridor project. The report focuses on wells within a 15-mile radius from the Lively Grove #1 (LG#1) well at PSGC site, evaluating subsurface conditions and potential risks. A total of 4,386 wellbores within 15 miles of the LG#1 well were filtered based on depth and formation codes. LG#1 is the stratigraphic well at the PSGC site drilled in 2021. Ninety-four (94) wells penetrating the Maquoketa Shale Group (the primary confining unit) within the estimated area-of-review (AoR) for the PSGC site were evaluated using a qualitative risk assessment (QRA) methodology. The QRA developed by Arbad et al. 2022 focuses on legacy wells within the AoR and categorizes them based on well construction details. The QRA identifies wells that need immediate attention by categorizing them based on penetration depth and protection. Wells within the AoR were categorized into nine groups based on penetrations and protections. These categories range from Type 1 wells, with no documentation, to Type 9 wells, which do not penetrate the primary confining unit or storage reservoir (unit). Well accessibility within the AoR varies based on well status, including Dry & Abandoned (DA), Plugged & Abandoned (PA), Injection (INJ), Oil/Gas Producing (PROD), and Observation (Obs) wells. Accessibility levels were determined by well construction, with DA wells being the least accessible and Observation wells the most accessible, impacting gas leakage detection possibilities. Remedial action priority of wells decreases from Type 1 to Type 9 wells. Type 1 to Type 6 wells with status DA and PA require immediate attention, while Type 7 and Type 8 wells are low priority. A risk matrix used to prioritize corrective actions for legacy wells is proposed to categorize wells within an AoR based on penetrations, protections, and accessibility. The methodology involves data acquisition, well categorization into nine types, and determining CO 2 leakage pathways using well schematics and geospatial mapping. This approach is particularly useful for managing the integrity of legacy wells throughout the lifecycle of a Carbon Capture and Storage (CCS) project. A qualitative risk assessment of 94 wells within the AoR of the PSGC site identified 54 wells with high priority for corrective action due to penetration of the primary containment seal. The assessment utilizes color-coded maps to categorize well types and prioritize corrective actions, providing a comprehensive analysis. Schematics of wells penetrating the primary confining unit were drawn, and leakage pathways were identified. Details of all wells penetrating the confining zone are provided in the appendix, including information on well types, plugging, and casing status.

01 COAL, LIGNITE, AND PEAT↗