Competitiveness Improvement Project (CIP)

Through the Competitiveness Improvement Project (CIP), the U.S. DOE supports small businesses who design and manufacture small or medium wind turbine technology through cost-shared subcontracts awarded via a competitive process. The goals of the CIP are to: improve cost competitiveness with other distributed generation technology through optimized designs and advanced manufacturing processes; increase the number of certified small and medium wind turbine designs across a wide range of sizes; and accelerate deployment of improved, certified distributed wind energy technology. NREL manages the projects through a defined period of performance subcontract, providing technical monitoring and coordinating technical assistance from DOE labs.

advanced manufacturing↗

It Just Keeps Getting Better-Tru Waste Inventory

The Waste Isolation Pilot Plant (WIPP) opened on March 26, 1999, becoming the nation's first deep geologic repository for the permanent disposal of defense-generated transuranic (TRU) waste. In May 1998, the U. S. Environmental Protection Agency (EPA) certified WIPP and re-certified WIPP in March 2006. The knowledge of TRU waste inventory is fundamental to packaging, transportation, disposal strategies, resource allocation, and is also imperative when working in a regulatory framework. TRU waste inventory data are used to define the waste that will fill the WIPP repository in terms of volume, radionuclides, waste material parameters, other chemical components, and to model the impact of the waste on the performance of the WIPP over a 10,000-year evolution. The data that pertain to TRU waste is defined in the WIPP Land Withdrawal Act (LWA), as '..waste containing more that 100 nanocuries of alpha-emitting transuranic isotopes per gram of waste, with half-lives greater than 20 years..' Defining TRU waste further, the wastes are classified as either contact-handled (CH) or remote-handled (RH) TRU waste, depending on the dose rate at the surface of the waste container. CH TRU wastes are packaged with an external surface dose rate not greater than 200 milli-rem (mrem) per hour, while RH TRU wastes are packaged with an external surface dose rate of 200 mrem per hour or greater. The Los Alamos National Laboratory-Carlsbad Operations (LANL-CO) Inventory Team has developed a powerful new database, the Comprehensive Inventory Database (CID), to maintain the TRU waste inventory information. The CID is intended to replace the Transuranic Waste Baseline Inventory Database (TWBID), Revision 2.1, as the central inventory information repository for tracking all existing and potential (TRU) waste generated across the Department of Energy (DOE) TRU waste complex. It is also the source for information submitted for the Annual TRU Waste Inventory Reports some of which will be used in future Compliance Re-certification Applications (CRAs) for the WIPP. Currently, the DOE is preparing for the second re-certification, CRA-2009. The CID contains comprehensive TRU waste inventory that is consistent, relevant, and easily accessible to support DOE needs, not only the CRAs and performance assessments, but also waste management planning activities and other regulatory needs (e.g., National Environmental Policy Act (NEPA) analyses). The comprehensive inventory contains information obtained via inventory updates and approved acceptable knowledge (AK) characterization information to ensure inventory data integrity is maintained and the inventory is current. The TRU waste inventory is maintained in the CID under configuration management as defined in the LANL-CO Quality Assurance Program. The CID was developed using Microsoft{sup TM} Access Data Project{sup TM} (ADP) technology with a Microsoft SQL Server{sup TM} back end. The CID is user friendly, contains more fields, provides for easy upload of data, and has the capability to generate fully qualified data reports. To go along with the new database, the LANL-CO Inventory Team has developed an improved data collection/screening process and has excellent communications with the TRU waste site personnel. WIPP has now received over 6,000 shipments, emplaced over 50,000 cubic meters of CH waste, and successfully completed one re-certification. With a new robust qualified database, the CID, to maintain the inventory information, the TRU waste inventory information is continuously improving in quality, accuracy, and usability (better). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Hazardous Waste Facility Permit - 2008 Update

Important new changes to the Hazardous Waste Facility Permit (HWFP) were implemented during 2007. The challenge was to implement these changes without impacting shipping schedules. Many of the changes required advanced preparation and coordination in order to transition to the new waste analysis paradigm, both at the generator sites and at the WIPP without interrupting the flow of waste to the disposal facility. Not only did aspects of waste characterization change, but also a new Permittees' confirmation program was created. Implementing the latter change required that new equipment and facilities be obtained, personnel hired, trained and qualified, and operating procedures written and approved without interruption to the contact-handled (CH) transuranic (TRU) waste shipping schedule. This was all accomplished successfully with no delayed or cancelled shipments. Looking forward to 2008 and beyond, proposed changes that will deal with waste in the DOE TRU waste complex is larger than the TRUPACT-IIs can handle. Size reduction of the waste would lead to unnecessary exposure risk and ultimately create more waste. The WIPP is working to have the Nuclear Regulatory Commission (NRC) certify the TRUPACT-III. The TRUPACT-III will be able to accommodate larger sized TRU mixed waste. Along with this new NRC-certified shipping cask, a new disposal container, the Standard Large Box, must be proposed in a permit modification. Containers for disposal of TRU mixed waste at the WIPP must meet the DOT 7A standards and be filtered. Additionally, as the TRUPACT-III/Standard Large Box loads and unloads from the end of the shipping cask, the proposed modification will add horizontal waste handling techniques to WIPP's vertical CH TRU waste handling operations. Another major focus will be the Hazardous Waste Facility Permit reapplication. The WIPP received its HWFP in October of 1999 for a term of ten years. The regulations and the HWFP require that a new permit application be submitted 180-days before the expiration date of the HWFP. At that time, the WIPP will request only one significant change, the permitting of Panel 8 to receive TRU mixed waste. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Startup of the New 200 West Pump-and-Treat, Hanford Site, Richland, Washington - 13214

On June 28, 2012, CH2M HILL Plateau Remediation Company (CHPRC) completed the construction and acceptance testing for a new 2,500 gallon-per-minute (gpm) pump-and-treat (P and T) system in the 200 West Area of the Hanford Site in Washington State. This system is designed to remove Tc-99, carbon tetrachloride, trichloroethene (TCE), nitrate, and total and hexavalent chromium from groundwater using ion exchange, anoxic and aerobic bioreactors, and air stripping. The system will eventually remove uranium from groundwater using ion exchange as well. The startup of the P and T system is important because it will ensure that contaminants from the 200 West Area never reach the Columbia River. When fully operational, the 200 West P and T will include approximately 23 extraction wells and 21 injection wells. The extraction wells are 8 inches in diameter, are completed with well screens 100 feet or more in length, and are distributed throughout the central portion of the 5-square-mile carbon tetrachloride plume. The injection wells are also 8 inches in diameter and are installed up-gradient of the plumes to recharge the aquifer and down-gradient of the plumes for flow-path control. Groundwater in the 200 West Area is approximately 250 feet below ground surface, and the aquifer is 200 feet or more in thickness. All of the contaminants (except nitrate) are found within the perimeter of the carbon tetrachloride plume and occur at various depths throughout the aquifer. The 200 West P and T consists of two separate buildings to conduct groundwater treatment. The RAD building contains an ion exchange system to remove Tc-99 from groundwater at a maximum flow rate of 600 gpm. The RAD building only accepts water from those extraction wells showing elevated Tc-99 concentrations. Groundwater initially fills an influent tank, is then pumped through particulate filters (to remove suspended materials), and then passes through two parallel treatment trains containing Purolite{sup R} A530E resin (which has been proven effective in removing Tc-99). The water is then transferred to the biological treatment building for further treatment. When the lead vessel in each of the two treatment trains becomes fully loaded with Tc-99, the Purolite A530E resin is transferred to a separate tank where it is heated to 160 deg. F to remove volatile organics prior to disposal at the Environmental Restoration Disposal Facility. The biological treatment building has a maximum flow capacity of 2,500 gpm. Groundwater from the nonradiological extraction wells and treated groundwater from the RAD building are initially pumped into an equalization tank and then into two parallel fluidized bed reactors (FBRs). The FBRs contain granulated activated carbon in suspension for microbes to populate, a carbon-based food source for the microbes to eat (e.g., MicroCg{sup TM}, molasses, or sodium lactate), and nitrate for the microbes to breathe (represents 'anoxic' conditions that contain little or no dissolved oxygen). The FBRs are maintained at a temperature between 55 deg. F and 90 deg. F, and at a pH between 6.5 and 6.8, to maximize microbial growth. The FBRs break down the nitrate, reduce the hexavalent chromium to trivalent chromium, and break down a good portion of the carbon tetrachloride and TCE. From the FBRs, groundwater is pumped through a carbon separation tank, then through a splitter box that divides the water evenly between four membrane bioreactors (MBRs) that further break down the contaminants. The MBRs have aeration capacity to provide sufficient oxygen for maintaining the aerobic biological process. The MBRs use submerged membranes for filtration. Vertically strung fibers are found in the membrane zone where a vacuum draws water through tiny pores in the fibers. The liquid is then pumped to air strippers to remove any volatile organics that have passed through the bioreactors. Solids from the MBRs are pumped to rotary drum thickeners and centrifuges for dewatering prior to lime being added to kill the bacteria and control odor. The conditioned sludge is then disposed at the Environmental Restoration Disposal Facility. The final treated water is then pumped to the injection well field. The 200 West P and T is a Leadership in Energy and Environmental Design (LEED) gold-certified facility that has an expected 70% energy cost savings over the lifetime of the plant. Fifty percent of the steel used in construction was recycled, 420 tons of recycled concrete were used, and over 75% of construction waste was diverted from landfills. The plant is only staffed one shift per day, and it uses a call-out system if the plant goes down during off-shift hours. Initial sampling results have shown that the 200 West P and T is successfully reducing contaminant levels well below the cleanup levels specified in the Record of Decision, Hanford 200 Area 200-ZP-1 Superfund Site, Benton County, Washington [1]. CHPRC and the U.S. Department of Energy are continuing to look for ways to reduce operational costs, such as testing alternative resins for removing radionuclides and finding less expensive carbon substrate sources. The benefit to others is a LEED gold-certified, 2,500 gpm P and T system that may be used as a model for other complex sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Repackaging of High Fissile TRU Waste at the Transuranic Waste Processing Center - 13240

Twenty-six drums of high fissile transuranic (TRU) waste from Oak Ridge National Laboratory (ORNL) operations were declared waste in the mid-1980's and placed in storage with the legacy TRU waste inventory for future treatment and disposal at the Waste Isolation Pilot Plant (WIPP). Repackaging and treatment of the waste at the TRU Waste Packaging Center (TWPC) will require the installation of additional equipment and capabilities to address the hazards for handling and repackaging the waste compared to typical Contact Handled (CH) TRU waste that is processed at the TWPC, including potential hydrogen accumulation in legacy 6M/2R packaging configurations, potential presence of reactive plutonium hydrides, and significant low energy gamma radiation dose rates. All of the waste is anticipated to be repackaged at the TWPC and certified for disposal at WIPP. The waste is currently packaged in multiple layers of containers which presents additional challenges for repackaging activities due to the potential for the accumulation of hydrogen gas in the container headspace in quantities than could exceed the Lower Flammability Limit (LFL). The outer container for each waste package is a stainless steel 0.21 m{sup 3} (55-gal) drum which contains either a 0.04 m{sup 3} or 0.06 m{sup 3} (10-gal or 15-gal) 6M drum. The inner 2R container in each 6M drum is ∼12 cm (5 in) outside diameter x 30-36 cm (12-14 in) long and is considered to be a > 4 liter sealed container relative to TRU waste packaging criteria. Inside the 2R containers are multiple configurations of food pack cans, pipe nipples, and welded capsules. The waste contains significant quantities of high burn-up plutonium oxides and metals with a heavy weight percentage of higher atomic mass isotopes and the subsequent in-growth of significant quantities of americium. Significant low energy gamma radiation is expected to be present due to the americium in-growth. Radiation dose rates on inner containers are estimated to be 1-3 mSv/hr (100-300 mrem/hr) with an unshielded dose rate on the waste itself of over 10 mSv/hr (1 rem/hr). Additional equipment to be installed at the TWPC will include a new perma-con enclosure and a shielded/inert glovebox in the process building to repackage and stabilize the waste. All of the waste will be repackaged into Standard Pipe Overpacks. Most of the waste (21 of the 26 drums) is expected to be repackaged at the food-pack can level (i.e. the food-pack cans will not be opened). Five of the incoming waste containers are expected to be repackaged at the primary waste level. Three of the containers exceed the 200 gram Pu-239 Fissile Gram Equivalent (FGE) limit for the Standard Pipe Overpack. These three containers will be repackaged down to the primary waste level and divided into eight Standard Pipe Overpacks for shipment to WIPP. Two containers must be stabilized to eliminate any reactive plutonium hydrides that may be present. These containers will be opened in the inert, shielded glovebox, and the remaining corroded plutonium metal converted to a stable oxide form by using a 600 deg. C tube furnace with controlled oxygen feed in a helium carrier gas. The stabilized waste will then be packaged into two Standard Pipe Overpacks. Design and build out activities for the additional repackaging capabilities at the TWPC are scheduled to begin in Fiscal Year 2013 with repackaging, stabilization, and certification activities scheduled to begin in Fiscal Year 2014. Following repackaging and stabilization activities, the Standard Pipe Overpacks will be certified for disposal at WIPP utilizing Non-Destructive Examination (NDE) to verify the absence of prohibited items and Non-Destructive Assay (NDA) to verify the isotopic content under the TWPC WIPP certification program implemented by the Central Characterization Project (CCP). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance of a HPGe System for Surface and Container Measurements - 13582

The decommissioning of a nuclear facility or post-accident cleanup is an immense engineering effort requiring an array of specialist tools and techniques. The decommissioning and cleanup activities generate large quantities of low activity waste. For economic disposal, it is desirable to certify the waste as suitable for free release. Every container must be assayed to a sufficient degree of accuracy and sensitivity so that it may be certified to be or not to be suitable for 'free release'. In a previous work, the performance of a highly-automated system for free release of large numbers of containers was presented in which the spectroscopy hardware comprised four ORTEC Interchangeable Detector Module (IDM) mechanically cooled HPGe spectrometers in conjunction with ORTEC ISOPlus waste assay software. It was shown that the system was capable of assaying large containers to free release levels in reasonable measurement times. Not all operations have enough waste to justify an automated system or rapid assay results may be required, perhaps in a remote location. To meet this need, a new mobile system has been developed for the assay of smaller objects (drums, boxes, and surfaces) In-Situ. The system incorporates the latest generation IDM-200 and ISOPlus software and a new variant of the ISOCart hardware. This paper will describe the system and performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Status and Plans - 2012 - 12049

The Waste Isolation Pilot Plant (WIPP), a deep geologic repository for safe disposal of long-lived transuranic radioactive waste related to the nation's defense, is completing its 12. year of operations. WIPP's mission includes coordination of all Department of Energy (DOE) sites to prepare, package and characterize transuranic (TRU) waste for final shipment and emplacement in WIPP. Five of the 10 disposal panels planned have been filled and sealed from ventilation. Additional small quantity sites have been de-inventoried by consolidating their waste through the certified characterization line at the Idaho National Laboratory (INL). New emplacement methods for RH waste in shielded containers are being considered for disposal by WIPP's regulatory authorities. A new large Type B shipping package, was added to the WIPP transportation fleet, and facility modifications to the WIPP waste unloading and emplacement processes for large containers were completed in 2011. Shipments from the Savannah River site in these new large rectangular packages began in August 2011. Licensing efforts are proceeding for a new criticality control over-pack container that will allow almost twice the fissile content to be shipped than previously. This will reduce the number and cost of shipments of Special Nuclear Material (SNM) declared as waste. Modifications to WIPP regulatory requirements for the disposal footprint and disposal unit closure systems are in progress. These, and other developments, make for exciting times at WIPP. This paper provides an up-to-date look at the many aspects of America's only deep geologic long-lived radioactive waste repository, which is completing its 12. year of operations. A record year of safe and compliant shipments to WIPP tops the list of accomplishments in 2011. Four more small quantity sites were de-inventoried by consolidating their waste through the certified characterization line at INL in 2011. A new Type B shipping package, the TRUPACT-III has been added to the transportation fleet, and large waste boxes are being shipped from SRS without the need for repackaging. New emplacement methods for remote-handled waste in shielded containers are undergoing regulatory review. WIPP plans to license a new criticality control payload container that will allow almost twice the fissile content to be shipped than previously, thereby reducing the number and cost of shipments of SNM declared as waste. Other regulatory modifications planned in 2012 include approval of a design change that would replace the disposal concept for panels 9 and 10 from using the common access drifts (the 'mains') with a new footprint south of panels 4 and 5. DOE also plans to change the panel closure design set forth in its certification by EPA and the HWFP by the NMED. The panel closure design change will be a rule making under EPA's procedures and a class 3 permit modification request under NMED procedures. Plans for achieving 90% of legacy TRU waste retrieval and emplacement in WIPP by 2015 have been developed. Key to the success of this so-called 90/15 plan is adequate funding, both for WIPP operations, as well as for TRU retrieval programs at the generator sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Container Approval for the Disposal of Radioactive Waste with Negligible Heat Generation in the German Konrad Repository - 12148

Since the license for the Konrad repository was finally confirmed by legal decision in 2007, the Federal Institute for Radiation Protection (BfS) has been performing further planning and preparation work to prepare the repository for operation. Waste conditioning and packaging has been continued by different waste producers as the nuclear industry and federal research institutes on the basis of the official disposal requirements. The necessary prerequisites for this are approved containers as well as certified waste conditioning and packaging procedures. The Federal Institute for Materials Research and Testing (BAM) is responsible for container design testing and evaluation of quality assurance measures on behalf of BfS under consideration of the Konrad disposal requirements. Besides assessing the container handling stability (stacking tests, handling loads), design testing procedures are performed that include fire tests (800 deg. C, 1 hour) and drop tests from different heights and drop orientations. This paper presents the current state of BAM design testing experiences about relevant container types (box shaped, cylindrical) made of steel sheets, ductile cast iron or concrete. It explains usual testing and evaluation methods which range from experimental testing to analytical and numerical calculations. Another focus has been laid on already existing containers and packages. The question arises as to how they can be evaluated properly especially with respect to lack of completeness of safety assessment and fabrication documentation. At present BAM works on numerous applications for container design testing for the Konrad repository. Some licensing procedures were successfully finished in the past and BfS certified several container types like steel sheet, concrete until cast iron containers which are now available for waste packaging for final disposal. However, large quantities of radioactive wastes had been placed into interim storage using containers which are not already licensed for the Konrad repository. Safety assessment of these so-called 'old' containers is a big challenge for all parties because documentation sheets about container design testing and fabrication often contain gaps or have not yet been completed. Appropriate solution strategies are currently under development and discussion. Furthermore, BAM has successfully initiated and established an information forum, called 'ERFA QM Konrad Containers', which facilitates discussions on various issues of common interest with respect to Konrad container licensing procedures as well as the interpretation of disposal requirements under consideration of operational needs. Thus, it provides additional, valuable supports for container licensing procedures. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological characterization of high Cs-137 waste items at LANL combining Cs-137 NDA results and acceptable process knowledge - 15592

Radiological characterization is an important component to disposition and disposal of radioactive waste at the Los Alamos National Laboratory. Gamma and neutron based non-destructive assay systems are available at LANL's TA-54 Area G for radiological characterization and are generally very effective in quantifying the transuranic radionuclide concentration required for a TRU or low level waste disposition determination. This is routinely performed by scaling some nuclides to direct assay results using acceptable process knowledge scaling from a directly measured key TRU nuclide, e.g., for gamma systems using a standard isotopic distribution to determine the amount of Pu-240 associated with a measured value of Pu-239. However, for two groups of LANL waste items that have high levels of Cs-137, these non-destructive assay systems were unable to make a standard TRU/LLW determination. Therefore, it was necessary to apply an extension of the typical scaling technique that keyed in on the direct Cs-137 gamma assay result to effectively characterize these waste items for TRU processing or LLW disposition. Two basic types of waste packages contained the high Cs-137 waste requiring special scaling: drums and boxes. The drums included 55-gallon, 85-gallon and 110-gallon volume sizes and the boxes included a corrugated metal box, a Standard Waste Box, and several overpack boxes containing oversized waste. All of these items contained radioactive waste generated from operations at the Chemistry and Metallurgical Research facility at LANL that included hot cell, metallographic sectioning and maintenance activities. All of the drums as well as the CMB, SWB and one oversized item in a plywood box were located above-ground at LANL's TA-54 Area G, while five of the oversized items were hot cell liners in metal boxes stored below-ground in shafts. All of the items were measured in the 2013-2014 time period at TA-54 Area G with LANL NDA systems. Most of the items were counted with LLW certified far-field gamma spectroscopy systems employing portable far-field HPGe detectors and carts and some of the items were counted on WIPP certified gamma only or gamma with neutron NDA systems. In all cases Cs-137 was quantified directly with a gamma measurement but the key TRU nuclides were not detectable. Thus, for each waste item AK/PK was studied and scaling factors to Cs-137 were established and applied to provide a comprehensive radiological characterization. A total of 49 waste items were successfully characterized as LLW based on this technique. The above ground waste items were dispositioned and disposed of at an offsite LLW repository and the below ground boxes were left in place as LLW in the TA-54 Area G shafts. This NDA with scaling application has proved effective and defensible in these high Cs-137 cases at LANL and will continue to be used as applicable and appropriate for future waste characterization at LANL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shortage of Type B LLRW Casks in the US to Serve Nuclear Plants and National Labs - 15663

In early 2012, the industry experienced sudden shortage of Type B Low Level Radioactive Waste (LLRW) transport casks available for transportation of nuclear waste and sealed sources within the United States (US) of America. Some of the events which created this situation include, but not limited to, opening of a new LLRW Disposal facility (Andrews County, TX) managed by Waste Control Specialists (WCS) for Class A, B and C LLRW, retirement of vast majority of previously certified Type B LLRW transport packages, more stringent regulatory certification requirements and increased demand for LLRW transportation casks to support decommissioning of nuclear power plant and transportation of sealed sources. Cask designers are still in the process of responding to the emerging needs of the industry. This paper will provide a detailed background and discuss the events that have occurred in recent years that have led to a shortage of Type B LLRW transport casks available to service the industry with transportation of resins, used filters, irradiated hardware and sealed sources. In addition, this paper will provide an overview of currently available, being fabricated Type B packages as well as information about the tentative designs of Type B LLRW transport casks to be designed and certified in the US by cask design/manufacturing firms in the near future. In conclusion section, this paper will summarize whether the LLRW Type B transport cask supply market for discussed payloads will be able to adequately respond to the industry demand. Potential ways for long term resolution of this issue will be discussed. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote-Handled TRU Storage Challenges at Sandia National Laboratories/ New Mexico - 16071

The events at the Waste Isolation Pilot Plant (WIPP) in February 2014 had a significant impact on the packaging, storage, and disposal options at Sandia National Laboratories/New Mexico (Sandia) as with other transuranic generator sites. In 2012, Sandia had identified accountable material for disposal, fresh and irradiated mixed oxide (MOX) and uranium oxide (UO{sub 2}), which had been used in experiments conducted in the 1970's and 1980's. During the 2012/2013 timeframe, discussions with WIPP determined the samples and experimental vessels qualified as remote-handled (RH) transuranic (TRU) waste for disposal at WIPP. Sandia began discussions with WIPP to determine the process to repackage and characterize the material for disposal at WIPP in addition to obtain funding to complete the project. By January 2014, Sandia had contracted with Nuclear Waste Partnerships, LLC (NWP) to provide Central Characterization Program (CCP) certified visual examination (VE) and dose-to-curie (DTC) support to package and certify the accountable material/waste. Work began on February 3, 2014 with the arrival of two VE operators. On February 5, 2014, a salt truck caught fire in the underground and on February 14, 2014, the radiological release occurred at WIPP initiating a suspension of shipments. The length of the suspension was not known at the time. Sandia was only a couple of days into this long-term project, had signed a contract with NWP for support, and was still responsible for meeting earlier negotiated milestones. There were 37 parent containers which included experimental vessels from 3 to 10 feet long and unused material pieces. The original plan was to package each of the 37 parent containers separately, but several issues, including the suspension of shipments, made it imperative that a new path forward be developed. Because space is limited in the Auxiliary Hot Cell Facility (AHCF), the storage configuration for criticality safety and material-at-risk was of the highest importance. Therefore, packaging in the fewest number of containers without exceeding WIPP limits, keeping the accountable items together, and not violating any safety basis requirements was Sandia's goal. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportation Cask for Bare High Burnup Used Nuclear Fuel - 16362

A conceptual design for a reusable transportation cask (the 6625B-HB) capable of transporting boiling water reactor (BWR) and pressurized water reactor (PWR) used nuclear fuel (UNF) assemblies, including high burnup UNF, was produced for the Department of Energy (DOE) by AREVA. This cask could be configured to ship these assemblies either as bare fuel or fuel loaded into single-assembly damaged fuel cans (DFCs). The 6625B-HB cask has been designed with reasonable assurance it can be certified by the Nuclear Regulatory Commission (NRC) under 10 CFR Part 71 based on AREVA TN's experience with the MP197HB (a transportation cask designed to ship high burnup UNF in a dry storage canister), fabricated within existing facilities, used by most utilities, and transported by rail. The level of detail developed for the 6625B-HB is intended to support analyses and planning activities that DOE is performing in laying the groundwork for an integrated waste management system, which includes preparing for future large-scale transport of UNF to consolidated interim storage or disposal facilities. The details of the conceptual design include cask characteristics (e.g., capacity, dimensions, and masses), characteristics of the UNF that could be shipped in this cask system concept, estimates of costs to fabricate this cask system, an assessment of operational activity durations and associated cumulative doses for loading and unloading this cask system, and identification of potential limitations or anticipated licensing considerations of relevance for this cask system. This design concept for a reusable transportation cask would enhance the high-burnup fuel assembly carrying capacity as compared to other NRC-certified transportation casks and, unlike welded canister systems, could be used for shipment of bare UNF assemblies taken directly from reactor spent fuel pools (SFPs). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Basis of Knowledge for Oxidizing Chemicals in TRU Waste - 18654

A new Waste Isolation Pilot Plant (WIPP) document for implementing new requirements in the WIPP Waste Acceptance Criteria (WAC) titled Basis of Knowledge for Evaluating Oxidizing Chemicals in the TRU waste was issued in July, 2017 and has now been implemented on several waste streams. The February 14, 2014, airborne radiation release in Room 7 of the WIPP underground disposal unit 7 was caused by an exothermic chemical reaction of nitrate oxidizing chemicals and organic materials in a single 55-gallon container. That event exposed hazards not previously evaluated in the WIPP safety basis. A new WIPP Documented Safety Analysis (DSA), Revision 5b, was developed that addressed potential hazards related to the airborne radiation release and evaluated and addressed new fire hazard scenarios. The revised hazards analysis within the DSA specifically included potential chemical exothermic reactions in waste containers and propagating fires. Compliance with WAC was credited as initial conditions to the hazards analysis, and Chapter 18 was added making the WIPP WAC compliance program a safety management program within the DSA. The WIPP DSA, Revision 5b, Chapter 18, and the WIPP WAC require the use of this document when performing the enhanced acceptable knowledge (AK) process on transuranic (TRU) waste determined to contain oxidizing chemicals. The WIPP WAC was revised to address the conditions and requirements of DSA Revision 5b. The use of this Basis of Knowledge (BoK) by WIPP Certified Programs is specified in the WIPP WAC, Appendix H, Enhanced Acceptable Knowledge. This document establishes criteria that must be used by the WIPP Certified Programs to evaluate TRU waste containing one or more oxidizing chemicals to determine acceptability at the WIPP as-is and to identify when additional evaluation or treatment is required. This BoK also includes options and requirements to be used by TRU waste sites when further evaluation, testing, and/or treatment are required. The U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) will review requests, plans, and technical justifications and provide written decisions prior to implementation by the TRU waste sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenges in Long-Term Records Preservation and Access - 19549

The US Department of Energy Office of Legacy Management (LM) mission includes preserving records and information about the nation's Cold War-era weapons projects and making that information available for years to come. As LM assumes responsibility for each project, records documenting operations and cleanup activities are absorbed into a central recordkeeping system. Each record category is governed by a federal retention requirement. Routine administrative records are kept just a few years, while the most important records have 'permanent' retention requirements and are transferred to the National Archives typically within 25 years of creation. It is relatively easy for LM to meet retention requirements for these routine and permanent records. LM's big preservation challenge is with records with tremendously long retention requirements. Records with 75-year retention requirements are common, and a small subset of LM records pertaining to waste disposal requires 150-year retention periods. LM must consider the best format for maintaining each of its records collections. Should physical records be boxed up for long-term storage, or should they be digitized? Each option has associated benefits, costs, and risks. Keeping records in paper format avoids digitizing expense and preserves the original media, but the paper must be maintained in a certified storage facility. A vermin infestation or sprinkler malfunction at a certified facility may be rare but could easily destroy records. Keeping the paper and making reference or backup electronic copies reduces the risk of loss but requires diligence and resources to keep the physical records and electronic versions synchronized. This becomes an overwhelming task in a database with millions of records. Entirely replacing paper records with digitized versions as electronic records introduces the risk that records could be lost due to a cybersecurity incident or made inaccessible by evolving technology. LM's early electronic records management efforts were limited to documents saved to PDF format. More recently, LM has embraced the benefits of maintaining records in native formats. (A spreadsheet includes formulas and other details lost when converted to a PDF file.) But whether the file is saved as a Microsoft Excel spreadsheet or PDF document, how do we ensure the file is readable in 75 or 150 years when these records meet their retention requirement? We have no way of knowing for sure from our 2019 vantage point-no more than we would expect to get good technology advice from someone 150 years ago. We cannot predict the technological future, but we can make sure our current electronic records environment is healthy and future ready. This includes making sure the electronic recordkeeping system is built on a modern platform and ensuring that each record in the system is saved in a current format. Quality standards are critical for electronic records to be future ready. Implementing quality involves an organization-wide approach to having consistently formatted file names and complete and descriptive metadata. Quality PDF documents are scanned to settings that ensure characters are machine-readable (with optical character recognition, or OCR). LM is currently replacing its electronic recordkeeping system and simultaneously modernizing its organizational approach to data management; it is replacing a traditional electronic records repository with a system that also manages records stored anywhere across the computer network. This new records management approach will require new thinking in how LM manages a dramatically increased volume of information across the network while not losing focus on its responsibility for long-term records preservation and access. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cask RT-100 Type B(U) Self-Certification for DOT 7A, Type A Nuclear Waste Transportation - 20098

The purpose of this Type A certification is to diversify the use of the RT-100 cask by allowing the end user to transport either Type A or Type B radioactive waste in accordance with the handling procedures for each waste category. The project's scope included the development of a matrix that contains all applicable requirements for a Type A package from the Code of Federal Regulations (CFR), Title 49 for the Department of Transportation (DOT) with a justification for each requirement. Moreover, the scope included the writing of conditions and restrictions list for the transportation of Type A nuclear waste, the writing of a compliance statement, and the design and fabrication of a Type A placard to be permanently placed on the RT-100 cask. Type A packages are self-certified by the end user using one of three methods as permitted by 49 CFR 173.461, either by performance of tests with prototypes or samples of the specimens representing the packaging, or reference to a previous satisfactory demonstration of compliance of a sufficiently similar nature, or calculations or reasoned evaluation using reliable and conservative procedures and parameters. Since the RT-100 cask was licensed by the Nuclear Regulatory Commission (NRC) as a Type B cask, Robatel relied on the method of reference to a previous satisfactory demonstration of compliance of a sufficiently similar nature for Type A certification. This method was determined to be acceptable, since Type B packages are evaluated for more demanding transport conditions than those required for Type A packages. This paper presents Robatel's process for certifying the RT-100 cask for Type A shipments, an overview of the DOT regulations related to Type A packages, and the documents that were generated for the end user. This paper is concluded with a discussion on the advantages of having the option to transport both Type A and Type B nuclear waste, and possible future projects to further improve the operation of the cask when making Type A shipments. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety software release options to support plant start-up and commissioning activities - 285

The schedule demands on new nuclear power plant site testing and commissioning programs challenge the plant's Instrumentation and Control (I and C) supplier's ability to provide certified safety software releases to meet the needs of these programs. This paper outlines the typical certified safety software development and certification process which follows a Waterfall software life-cycle model. The conflicts that result between supporting the site program and the safety software supplier's internal certification program are identified. An adapted 'functional' safety release process is presented that supports the site program's needs for software changes and in parallel enables the safety software certification process to proceed. Comparisons between the two safety software release processes are examined and the benefits realized through the use of the adapted 'functional' safety software release process are discussed. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Modeling Analysis for Nuclear Material Transport Package

This paper describes the computational models for the thermal analyses for 9975 nuclear material package under the Normal Conditions of Transport (NCT) and the Hypothetical Accident Conditions (HAC). The package 9975 is a DOE certified package that has been used in the DOE complex for transportation and long term storage of radioactive material. The NCT and HAC thermal analyses for the 9975 package were performed here by taking a computational heat transfer method. The HAC thermal models described here are identical to the models in the current DOE certified 9975 package. Thermal models in this work are for an undamaged package to meet all the regulatory requirements during an HAC thermal event. The model was created using modified shielding where the lead was encapsulated in a 0.036 inches stainless steel casing. The impact of this casing was studied earlier when the modification was proposed and it was found to have minimal impact on the component temperatures. Therefore, the analyses in this paper are good for packages with or without the shielding modifications. Analytical studies show that the realistic value for the solar absorptivity for the stainless steel surface fabricated from the rolling operation is about 0.5. The NCT analyses documented in this report use an absorptivity value of 0.5 to get more realistic component temperature results. Sensitivity studies were also performed to assess the impact of variability in the solar absorptivity for drum surface in the previous work for the NRC certification. The analysis in this paper is based on PuO{sub 2} in a food can. The food can is considered uncredited convenience containers inside the Primary Containment Vessel (PCV) of the 9975 package. PCV is located inside Secondary Containment Vessel (SCV). PuO{sub 2} has a density of 2 g/cc and a heat generation rate of 19 watts. This calculation evaluates the thermal performance for 9975 package with food can configuration during NCT and HAC per NRC regulations in 10 CFR Part 71. The objective of the calculation is to demonstrate that the maximum component temperatures are below their design limits. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing the Benefits of Seismic Isolation of Nuclear Structures in Terms of Reduced Risk and Cost

Seismic isolation is a mature technology that has been implemented in many civil structures, including buildings, bridges, liquid natural gas tanks, and off shore oil platforms, both in the United States and other countries, to mitigate the damaging effects of earthquakes. Seismic isolation has also been used in nuclear structures in France and South Africa, but not yet in the United States: neither in the Department of Energy facilities nor in commercial nuclear power plants (NPPs). This is primarily due to a lack of guidelines, codes and standards for the analysis, design and construction specific to seismically isolated nuclear structures. However, seismic isolation of nuclear structures has seen increased research interest in the recent years and the recently published national consensus standard, America Society of Civil Engineers (ASCE) Standard 4-16 'Seismic analysis of safety related nuclear structures', now incorporates language and commentary (Chapter 12) for seismically isolating surface or near-surface-mounted nuclear facilities, including NPPs. Seismic isolation substantially reduces horizontal seismic loads (demands) on structures, systems, and components. Reduction in demand results in four potential benefits: (1) economic: reduction in capital cost, (2) increased safety: reduction in the mean annual frequency of unacceptable performance, (3) insurance: protection against increases in the known seismic hazard after construction by minimizing the effort to re-qualify and re-certify structures, systems and components, and (4) recertification: the opportunity to certify an existing NPP design for a region of higher seismic hazard. Item (2) above, an increase in safety (reduction of seismic risk), was explored in Huang et al., wherein it was demonstrated that the implementation of seismic isolation reduced seismic risk in nuclear power plant structures. Studies that assess item (1) have not been performed although the use of isolation may lead to large reductions in the capital cost of safety-related nuclear facilities. Funding provided by Nuclear Safety Research and Development in the Department of Energy (DOE) allowed the authors to develop a framework for assessing the economic benefits and reductions in seismic risk afforded by the use of seismic (base) isolation. The framework includes probabilistic risk assessment and estimation of overnight capital costs (OCC's) of a sample generic DOE nuclear facility (GDNF). The project is documented in detail in Bolisetti et al. and Yu et al., and key results are presented here. The GDNF considered in this study is based on a facility constructed at the Idaho National Laboratory. The GDNF is a two-story reinforced concrete building with an embedded basemat and is founded on soft rock at the boundary of Site Class B and Site Class C (B/C boundary) as characterized by ASCE/SEI Standard 7. The GDNF is assumed to handle radiological materials, and its structure, systems and components (SSC's) are designed to effectively confine these materials in the event of an internal failure. The GDNF is populated with components that are generic to safety-related nuclear structures. A single system, which is intended to confine a loss of materials-at-risk (MAR) to the interior of the structure, is chosen for this study. Accordingly, a hypothetical event tree and fault tree are assumed for risk assessment. The isolation system for the GDNF is designed per Chapter 12 of ASCE/SEI 4-16 but is not optimized. The isolation system consists of 38 lead rubber bearings installed in one horizontal plane below the basemat. Details of the GDNF, including the SSC's, event tree and fault tree, and isolation system, are presented in the project report and Yu et al.. This study includes seismic risk assessment and cost estimation for four cases: (1) the GDNF is located at a site of low to moderate seismic hazard and is constructed on a conventional (non-isolated) foundation; (2) the GDNF is located at the same site as case 1, but is seismically isolated; (3) the GDNF is located at a site of high seismic hazard and is constructed on a conventional foundation; and (4) the GDNF is located at the same site of high seismic hazard as case 3, but is seismically isolated. In this study, the DOE site at Idaho National Laboratory (INL) is chosen as the low to moderate seismic hazard site for cases 1 and 2, and the Los Alamos National Laboratory (LANL) is chosen as the high seismic hazard site for cases 3 and 4.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗