Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COST ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Space Station Freedom operations costs

Measures to reduce the operation costs of the Space Station which can be implemented in the design and development stages are discussed. Operational functions are described in the context of an overall operations concept. The provisions for operations cost responsibilities among the partners in the Space Station program are presented. Cost estimating methodologies and the way in which operations costs affect the design and development process are examined.

Accola, Anne L.↗

The Penguin: a Low Reynolds Number Powered Glider for Station Keeping Missions

The Penguin is a low Reynolds number (approx. 100,000) remotely piloted vehicle (RPV). It was designed to fly three laps indoors around two pylons in a figure-eight course while maximizing loiter time. The Penguin's low Reynolds number mission is an important one currently being studied for possible future flights in the atmospheres of other planets and for specialized military missions. Although the Penguin's mission seemed quite simple at first, the challenges of such low Reynolds number flight have proven to be quite unique. In addition to the constraint of low Reynolds number flight, the aircraft had to be robust in its control, highly durable, and it had to carry a small instrument package. The Penguin's flight plan, concept, performance, aerodynamic design, weight estimation, structural design, propulsion, stability and control, and cost estimate is detailed.

Costello, J. K.↗

A Framework for Preliminary Design of Aircraft Structures Based on Process Information

This report discusses the general framework and development of a computational tool for preliminary design of aircraft structures based on process information. The described methodology is suitable for multidisciplinary design optimization (MDO) activities associated with integrated product and process development (IPPD). The framework consists of three parts: (1) product and process definitions; (2) engineering synthesis, and (3) optimization. The product and process definitions are part of input information provided by the design team. The backbone of the system is its ability to analyze a given structural design for performance as well as manufacturability and cost assessment. The system uses a database on material systems and manufacturing processes. Based on the identified set of design variables and an objective function, the system is capable of performing optimization subject to manufacturability, cost, and performance constraints. The accuracy of the manufacturability measures and cost models discussed here depend largely on the available data on specific methods of manufacture and assembly and associated labor requirements. As such, our focus in this research has been on the methodology itself and not so much on its accurate implementation in an industrial setting. A three-tier approach is presented for an IPPD-MDO based design of aircraft structures. The variable-complexity cost estimation methodology and an approach for integrating manufacturing cost assessment into design process are also discussed. This report is presented in two parts. In the first part, the design methodology is presented, and the computational design tool is described. In the second part, a prototype model of the preliminary design Tool for Aircraft Structures based on Process Information (TASPI) is described. Part two also contains an example problem that applies the methodology described here for evaluation of six different design concepts for a wing spar.

Rais-Rohani, Masoud↗

Correlation of Spacecraft Mission and Project Costs

A key component of any cost risk analysis is the level of correlation between individual elements of cost. This analysis supplements the available historical records with the cost estimates from the JPL Advanced Design Team. The costs from actual JPL flight projects are then used to validate the results, clearly indicating that, on average, the correlation between elements of cost is between 0.4 and 0.7.

correlation↗

Preliminary Multivariable Cost Model for Space Telescopes

Parametric cost models are routinely used to plan missions, compare concepts and justify technology investments. Previously, the authors published two single variable cost models based on 19 flight missions. The current paper presents the development of a multi-variable space telescopes cost model. The validity of previously published models are tested. Cost estimating relationships which are and are not significant cost drivers are identified. And, interrelationships between variables are explored

Stahl, H. Philip↗

NASA Space Technology Roadmaps and Priorities: Restoring NASA's Technological Edge and Paving the Way for a New Era in Space

Success in executing future NASA space missions will depend on advanced technology developments that should already be underway. It has been years since NASA has had a vigorous, broad-based program in advanced space technology development, and NASA's technology base is largely depleted. As noted in a recent National Research Council report on the U.S. civil space program: Future U.S. leadership in space requires a foundation of sustained technology advances that can enable the development of more capable, reliable, and lower-cost spacecraft and launch vehicles to achieve space program goals. A strong advanced technology development foundation is needed also to enhance technology readiness of new missions, mitigate their technological risks, improve the quality of cost estimates, and thereby contribute to better overall mission cost management. Yet financial support for this technology base has eroded over the years. The United States is now living on the innovation funded in the past and has an obligation to replenish this foundational element. NASA has developed a draft set of technology roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist. The NRC appointed the Steering Committee for NASA Technology Roadmaps and six panels to evaluate the draft roadmaps, recommend improvements, and prioritize the technologies within each and among all of the technology areas as NASA finalizes the roadmaps. The steering committee is encouraged by the initiative NASA has taken through the Office of the Chief Technologist (OCT) to develop technology roadmaps and to seek input from the aerospace technical community with this study.

Source record↗

Estimating Airline Operating Costs

The factors affecting commercial aircraft operating and delay costs were used to develop an airline operating cost model which includes a method for estimating the labor and material costs of individual airframe maintenance systems. The model permits estimates of aircraft related costs, i.e., aircraft service, landing fees, flight attendants, and control fees. A method for estimating the costs of certain types of airline delay is also described.

Maddalon, D. V.↗

Analysis of satellite servicing cost benefits

Under the auspices of NASA/JSC a methodology was developed to estimate the value of satellite servicing to the user community. Time and funding precluded the development of an exhaustive computer model; instead, the concept of Design Reference Missions was involved. In this approach, three space programs were analyzed for various levels of servicing. The programs selected fall into broad categories which include 80 to 90% of the missions planned between now and the end of the century. Of necessity, the extrapolation of the three program analyses to the user community as a whole depends on an average mission model and equivalency projections. The value of the estimated cost benefits based on this approach depends largely on how well the equivalency assumptions and the mission model match the real world. A careful definition of all assumptions permits the analysis to be extended to conditions beyond the scope of this study.

Builteman, H. O.↗

Parametric Cost Analysis: A Design Function

Parametric cost analysis uses equations to map measurable system attributes into cost. The measures of the system attributes are called metrics. The equations are called cost estimating relationships (CER's), and are obtained by the analysis of cost and technical metric data of products analogous to those to be estimated. Examples of system metrics include mass, power, failure_rate, mean_time_to_repair, energy _consumed, payload_to_orbit, pointing_accuracy, manufacturing_complexity, number_of_fasteners, and percent_of_electronics_weight. The basic assumption is that a measurable relationship exists between system attributes and the cost of the system. If a function exists, the attributes are cost drivers. Candidates for metrics include system requirement metrics and engineering process metrics. Requirements are constraints on the engineering process. From optimization theory we know that any active constraint generates cost by not permitting full optimization of the objective. Thus, requirements are cost drivers. Engineering processes reflect a projection of the requirements onto the corporate culture, engineering technology, and system technology. Engineering processes are an indirect measure of the requirements and, hence, are cost drivers.

Dean, Edwin B.↗

An evaluation of contractor projected and actual costs

GSFC contractors with cost-plus contracts provide cost estimates for each of the next four quarters on a quarterly basis. Actual expenditures over a two-year period were compared to the estimates, and the data were sorted in different ways to answer several questions and give quantification to observations, such as how much does the accuracy of estimates degrade as they are made further into the future? Are estimates made for small dollar amounts more accurate than for large dollar estimates? Other government agencies and private companies with cost-plus contracts may be interested in this analysis as potential methods of contract management for their organizations. It provides them with the different methods one organization is beginning to use to control costs.

Kwiatkowski, K. A.↗

Design considerations for high-altitude, long-endurance, microwave-powered aircraft

The sizing and performance analyses have been conducted in the design of long-endurance, high-altitude airplanes. These airplanes receive power either continuously beamed from a phased array transmitter or intermittently beamed from a dish transmitter. Results are presented for the cases of flight in zero wind speed and nonzero wind speed. Sensitivity studies indicate that the vehicle size is relatively insensitive to changes in the transmitter size. Cost estimates were made using models that excluded the airplane cost. Using a reference payload, results obtained from array and dish configurations were compared. Comparisons showed savings in cost as well as smaller vehicle sizes when an array transmitter was used.

Nguyen, H. Q.↗

Direct broadcast satellite-radio: Portable and mobile reception trade-offs

There has been considerable international effort in the areas of system studies, system development, and regulatory work for a Direct Broadcast Satellite Radio (DBS-R). An important milestone will be the 1992 World Radio Administrative Conference (WARC 1992) consideration of frequency allocation in the 500 - 3000 MHz range for such a service. There is an interagency agreement between Voice of America and the National Aeronautics and Space Administration for a coordinated program in DBS-R. This program includes seven tasks: systems tradeoff studies, propagation measurements, satellite experiment and demonstration, receiver development, market studies, regulatory studies, and WARC preparations. The findings of ongoing work under the first task, systems tradeoff studies, are discussed. Topics covered include digital bit rate and audio quality, propagation considerations and link margin estimates for portable reception, link margin estimates for mobile reception, coverage, and satellite size and cost estimates for a regional DBS-R coverage example.

Golshan, Nasser↗

Parametric Cost Modeling of Space Missions Using the Develop New Projects (DMP) Implementation Process

This paper presents an overview of a parametric cost model that has been built at JPL to estimate costs of future, deep space, robotic science missions. Due to the recent dramatic changes in JPL business practices brought about by an internal reengineering effort known as develop new products (DNP), high-level historic cost data is no longer considered analogous to future missions. Therefore, the historic data is of little value in forecasting costs for projects developed using the DNP process. This has lead to the development of an approach for obtaining expert opinion and also for combining actual data with expert opinion to provide a cost database for future missions. In addition, the DNP cost model has a maximum of objective cost drivers which reduces the likelihood of model input error. Version 2 is now under development which expands the model capabilities, links it more tightly with key design technical parameters, and is grounded in more rigorous statistical techniques. The challenges faced in building this model will be discussed, as well as it's background, development approach, status, validation, and future plans.

Rosenberg, Leigh↗

Launcher Systems Development Cost: Behavior, Uncertainty, Influences, Barriers and Strategies for Reduction

This paper will report on the activities of the IAA Launcher Systems Economics Working Group in preparations for its Launcher Systems Development Cost Behavior Study. The Study goals include: improve launcher system and other space system parametric cost analysis accuracy; improve launcher system and other space system cost analysis credibility; and provide launcher system and technology development program managers and other decisionmakers with useful information on development cost impacts of their decisions. The Working Group plans to explore at least the following five areas in the Study: define and explain development cost behavior terms and concepts for use in the Study; identify and quantify sources of development cost and cost estimating uncertainty; identify and quantify significant influences on development cost behavior; identify common barriers to development cost understanding and reduction; and recommend practical, realistic strategies to accomplish reductions in launcher system development cost.

Shaw, Eric J.↗

An Unmanned Spacecraft Subsystem Cost Model for Advance Mission Planning

This paper reports on the development of a parametric cost model that is being built at JPL to estimate costs of future, deep space, robotic science missions. Because of the changes in the mission implementation process and technology changes, the model is being built in a dramatically different manner than past models which have had access to a data base that drew heavily on the correlation between mass and actual costs.

Parametric↗

Cost models and economical packaging of LSI's

Report discusses mathematical models used to estimate costs of developing and fabricating microcircuits. Second part discusses LSI packaging using tape chip carrier technology.

Himmel, R. P.↗

Commercial Fishing Port Development in North Florida

The author has identified the following significant results. Seven major counties were examined: Escambia, Bay, Gulf, Franklin, Wakulla, Nassau, and Duval. Population and economic activity were reviewed, along with commercial fishing and port facilities. Recommendations for five northwest Florida counties were based on interpretation of aerial photographs, satellite imagery, an aerial survey site visit, and published data. Major needs in Pensacola included docking, ice supply, and net and engine repair services. Costs for additional docks, an ice plant, and gear storage were estimated at $3,658,600. Port users in Panama City identified additional docking and gear storage as primary needs, along with gear repair and a marine railway. Estimated costs for dock and gear storage were $2,860,000. Added docking, gear storage, and ice supply, as well as gear electronics and diesel repair were needed in Port St. Joe. Costs were calculated at $1,231,500. Franklin County has three ports (Apalachicola - $1,107,000 for docks and gear storage, Eastpoint - $420,000 for additional docks, and Carrabella - $2,824,100 for docks, gear storage, and ice plant).

Mathis, K.↗