A semantic disambiguation algorithm to reason about cars from the shapes in over-segmentation of high-resolution orthophotos.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
This radio spot provides general information about hydrogen and fuel cells.
Replacing your accelerator’s timing system with a completely different architecture is not something that happens very often. Perhaps even rarer is the requirement that the replacement not interfere with the accelerator’s normal operational cycle. In 2011, The Los Alamos Neutron Science Center (LANSCE) began the purchasing and installation phase of a nine-year rolling upgrade project which will eventually result in the complete replacement of the low-level RF system, the timing system, the industrial I/O system, the beam-synchronized data acquisition system, the fastprotect reporting system, and much of the diagnostic equipment. These projects are mostly independent of each other, with their own installation schedules, priorities, and time-lines. All of them, however, must interface with the timing system.
The scope of the project included the following: install new network backbone, replace 201 MHz rf tubes, replace low-level rf system, replace timing system, replace industrial I/O system, replace beam synchronous data acquisition system, replace fast protect reporting system, new wire scanner hardware, and new beam position/phase monitor hardware--all of this to be done while continuing to deliver beam to users. Lessons learned, for anyone contemplating a similarly ambitious upgrade: You can’t replace the whole system at once. Some compatibility must be maintained between the old and new systems. Always have a way to fall back. Have sympathy for the operations staff. You will be surprised.
Some technological revolutions are flashy, and some are almost invisible. We're quite familiar with the flashy ones; they've given us powerful computers we can hold in the palms of our hands, devices that can pinpoint our locations by way of orbiting satellites, and the ability to bank and shop without leaving our homes.
Distortion and buildup of residual stresses are common design problems in structures manufactured using additive manufacturing techniques, popularly known as 3D printing. These problems lead to poor product quality, which often is improved by trial and error, where the sensitivity of different manufacturing configurations to product quality are experimentally determined. With the introduction of Big Area Additive Manufacturing (BAAM), where significant amount of material is deposited per unit time, trial and error philosophy reduces the economical efficiency of the process. In this work, a numerical simulation methodology based on Finite Element Method (FEM), multi-scale damage mechanics and fracture mechanics is introduced to simulate the BAAM process for determining product quality in terms of distortions, material damage and interface fracture due to manufacturing. In addition, this tool can be used to obtain the sensitivities of the manufacturing configurations with respect to product quality in an economically efficient manner compared to the trial and error philosophy. Computational tools providing a fully coupled thermo-mechanical solution of polymer additive manufacturing with chopped fiber reinforced plastics are presented.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.