Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Asset Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Digital Assurance Checklist for Homeowners and Installers

This document provides a comprehensive Digital Assurance Checklist for securing behind-the-meter energy assets, focusing on both installers and homeowners. As distributed energy resources (DERs) such as solar PV and battery storage become integral to residential energy systems, cybersecurity emerges as a critical component of reliability and safety. The guide outlines actionable steps for installers during pre-installation, commissioning, and post-installation phases, emphasizing practices like network segmentation, credential management, firmware validation, and homeowner education. For homeowners, the document introduces a tiered approach to cyber hygiene—from essential measures like strong Wi-Fi credentials and automatic updates to advanced strategies such as network segmentation, DNS filtering, and intrusion detection. By adopting these practices, stakeholders can mitigate cyber risks, safeguard energy infrastructure, and ensure resilient, secure operation of DER systems. Additional resources and references to industry standards are included to support implementation.

99 - GENERAL AND MISCELLANEOUS↗

Avista’s Shared Energy Economy Model Pilot: A Techno-economic Assessment

As part of the second round of the Washington Clean Energy Fund, Avista Corp received a $3.5 million matching grant in support of a shared energy economy project to test the integration of energy assets–from rooftop solar and battery storage to building energy management systems–that can be shared and used for multiple purposes. The goal of this project is to demonstrate how both the customer and the utility can benefit from this shared energy economy model and demonstrate that the electric grid can become more reliable, efficient, resilient, and flexible. Pacific Northwest National Laboratory was engaged by the U.S. Department of Energy and the Washington State Department of Commerce to work with Avista in assessing the benefits of the shared energy economy model. This report documents the techno-economic assessment of the shared energy economy model, including the definition of use cases and applications, collection and preparation of data and input parameters, development of modeling and optimization methods, and case studies and analysis results.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ARM FY2026 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) User Facility maintains a suite of advanced atmospheric radar systems that serve as critical tools in ARM’s mission to provide continuous, high-quality observations for advancing the understanding and modeling of atmospheric processes. These radar systems enable detailed characterization of clouds, precipitation, and dynamic structures in the atmosphere, supporting a broad range of scientific applications. The number of deployed systems exceeds what current staffing levels can fully support for continuous 24/7/365 operation. As such, it is essential to have a clearly defined and community-informed plan that prioritizes radar operations and communicates ARM’s strategy for sustaining and evolving these observational assets. This FY2026 Radar Plan outlines ARM’s approach to managing its radar portfolio—balancing scientific impact, operational feasibility, and long-term sustainability. It reflects ARM’s continued commitment to delivering calibrated, well-documented radar data products that enable process-level studies and support the development and evaluation of weather and climate models. Through this plan, ARM aims to ensure transparency in decision-making, alignment with user needs, and support for innovative science across the facility’s fixed and mobile observatories. Given uncertainties around the Fiscal Year (FY) 2026 budget, this plan was developed to assume business as usual and will be updated as budgets and plans may change. It should be noted that, given the limited timeframe involved, this plan will be more succinct than previous plans.

47 OTHER INSTRUMENTATION↗

ARPA-E PERFORM datasets

Time-coincident load, wind, and solar data including actual and probabilistic forecast datasets at 5-min resolution for ERCOT, MISO, NYISO, and SPP. Wind and solar profiles are supplied for existing sites as well as planned sites based on interconnection queue projects as of 2021. For ERCOT actuals are provided for 2017 and 2018 and forecasts for 2018, and for the remaining ISOs actuals are provided for 2018 and 2019 and forecasts for 2019. There datasets were produced by NREL as part of the ARPA-E PERFORM project, an ARPA-E funded program that aim to use time-coincident power and load seeks to develop innovative management systems that represent the relative delivery risk of each asset and balance the collective risk of all assets across the grid. For more information on the datasets and methods used to generate them see https://github.com/PERFORM-Forecasts/documentation.

5-min data↗

Mobile Aircrafticing Forecast System

An integrated mobile field system for forecasting ground and in-flight aviation icing hazards would be a vital asset for winter operations. Improved icing forecasts are critical to managing aviation icing hazards.

Forecasting Icing Winter↗

Western Aeronautical Test Range

This viewgraph presentation reviews the work of the Western Aeronautical Test Range (WATR). NASA's Western Aeronautical Test Range is a network of facilities used to support aeronautical research, science missions, exploration system concepts, and space operations. The WATR resides at NASA's Dryden Flight Research Center located at Edwards Air Force Base, California. The WATR is a part of NASA's Corporate Management of Aeronautical Facilities and funded by the Strategic Capability Asset Program (SCAP). Maps show the general location of the WATR area that is used for aeronautical testing and evaluation. The products, services and facilities of WATR are discussed,

Sakahara, Robert D.↗

HybridSystemsSimulations.jl - Solving the Merchant Collocated Facilities with JuMP

The development of new clean-generation technologies also leads to new plant-level architectures that combine several generation and storage assets behind the point of connection. These co-located generation resources (Hybrid Systems) primarily operate as merchant assets that employ automated market bidding models and internal Energy Management Systems (EMS) to comply with the operator's signals. Formulating an optimal bidding model requires embedding the EMS control model into the bidding algorithm, resulting in a bi-level optimization problem. In this presentation, we first showcase using JuMP to formulate and solve this problem effectively for multiple merchant systems and the bidding outcomes considering different model formulations. Second, the bidding outcomes are later integrated into a PowerSimulations.jl (also built with JuMP) simulation to study the system-level effects of the various merchant bidding and the interactions between market-clearing models and the embedded EMS model. We will showcase simulations conducted in the RTS system considering different levels of merchant hybrid systems participation. The presentation provides the following specific insights on JuMP usage: 1) the Formulation of specialized bi-level problems with custom cuts to solve the merchant hybrid system bidding problem; 2) the integration of a modular model within a complex simulation workflow supported by JuMP in PowerSimulations.jl; 3) Accelerating the solution of power systems operations simulation that employ agent optimization problems using JuMP.

energy markets↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗

Project: Corbomite - Product: ConsoleWorks REACT

TDi Technologies presents ConsoleWorks REACT, an advanced platform designed to tackle the complexities of cyber and operational risk assessment. This comprehensive solution goes beyond asset-focused approaches by considering the impact of both assets and people have on the security and operation of critical infrastructure, specifically targeting preventing gird mis-operation by evaluating real-time human interaction or commands with critical assets. The hypothesis suggests that by integrating the assessment of user commands into the overall risk assessment process, organizations can make more informed decisions, prioritize resources effectively, and respond promptly to potential threats. This hypothesis forms the basis for the development of a proactive and holistic risk management approach that is more comprehensive and context aware than traditional models which only look at assets, patch levels, configuration and threat intel by collecting that information off the network vs directly from the asset, human, and human interaction all in real-time. ConsoleWorks' unique man-in-the-middle architecture is a key feature that sets it apart in the cybersecurity landscape. This architecture enables the real-time observation, enforcement, and commands or interaction risk transparency of user interaction with critical infrastructure to be risk mitigated and audited as they are aggregated with device and human risk factors for a more comprehensive risk threat score across a device or group of devices. This architecture allows ConsoleWorks to act as a secure intermediary between users and critical assets, monitoring all interactions and ensuring that only authorized commands are sent to the asset to be executed. This not only enhances security but also provides a comprehensive audit trail of all user activities, contributing to compliance efforts and facilitating incident investigation and risk management. By integrating this unique architecture with our comprehensive risk assessment methodology, ConsoleWorks REACT provides a powerful solution for managing cyber and operational risks, enabling organizations to maintain a robust security posture and effectively mitigate potential threats. To that end, the primary objective of this project was to research and develop a robust solution that enables the energy industry to mitigate the risks associated with human actions that can compromise the security or operations of assets critical to energy delivery, generation, transmission and operation. ConsoleWorks REACT plays a pivotal role in achieving this goal by leveraging its unique capabilities to monitor and track all user activity. Through its Zero Trust approach, which emphasizes continuous verification, the platform ensures secure access to assets and serves as the centralized human response and notification platform for addressing cyber and operational issues.

97 MATHEMATICS AND COMPUTING↗

Enterprise SRS: Leveraging Ongoing Operations to Advance National Programs - 13108

The SRS is re-purposing its vast array of assets to solve future national issues regarding environmental stewardship, national security, and clean energy. The vehicle for this transformation is Enterprise SRS which presents a new, strategic view of SRS as a united endeavor for 'all things nuclear' as opposed to a group of distinct and separate entities with individual missions and organizations. Key among the Enterprise SRS strategic initiatives is the integration of research into facilities in conjunction with ongoing missions to provide researchers from other national laboratories, academic institutions, and commercial entities the opportunity to demonstrate their technologies in a relevant environment and scale prior to deployment. To manage that integration of research demonstrations into site facilities, The DOE Savannah River Operations Office, Savannah River Nuclear Solutions, and the Savannah River National Laboratory (SRNL) have established the Center for Applied Nuclear Materials Processing and Engineering Research (CANMPER). The key objective of this initiative is to bridge the gap between promising transformational nuclear materials management advancements and large-scale deployment of the technology by leveraging SRS assets (e.g. facilities, staff, and property) for those critical engineering-scale demonstrations necessary to assure the successful deployment of new technologies. CANMPER will coordinate the demonstration of R and D technologies and serve as the interface between the engineering-scale demonstration and the R and D programs, essentially providing cradle-to-grave support to the R and D team during the demonstration. While the initial focus of CANMPER will be on the effective use of SRS assets for these demonstrations, CANMPER also will work with research teams to identify opportunities to perform R and D demonstrations at other facilities. Unique to this approach is the fact that these SRS assets will continue to accomplish DOE's critical nuclear material missions (e.g., processing in H-Canyon and plutonium storage in K-Area). The demonstration can be accomplished in a more cost-effective manner through the use of existing facilities in conjunction with ongoing missions. Essentially, the R and D program would not need to pay the full operational cost of a facility, just the incremental cost of performing the demonstration. Current CANMPER activities have been focused on integrating advanced safeguards monitoring technology demonstrations into the SRS H-Canyon and advanced location technology demonstrations into K-Area Materials Storage. These demonstrations are providing valuable information to researchers and program owners. In addition these demonstrations are providing CANMPER with an improved protocol for demonstration management that can be exercised across the entire SRS (and to offsite venues) to ensure that future demonstrations are done efficiently and provide an opportunity to use these unique assets for multiple purposes involving national laboratories, academia, and commercial entities. Key among the envisioned future demonstrations is the use of H-Canyon to demonstrate new nuclear materials separations technologies critical for advancing the mission needs of three major program offices: DOE-EM, DOE-Nuclear Energy (DOE-NE), and the NNSA. Given the modular design of H-Canyon, the demonstrations would be accomplished using a process frame. The demonstration equipment would be installed on the process frame and that frame would then be positioned into an H Canyon cell so that the demonstration is performed in a radiological environment involving prototypic nuclear materials. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Reference Suite Addressing Challenges of Providing Assurance for Fault Management Architectural Design

Research into complexities of software systems Fault Management (FM) and how architectural design decisions affect safety, preservation of assets, and maintenance of desired system functionality has coalesced into a technical reference (TR) suite that advances the provision of safety and mission assurance. The NASA Independent Verification and Validation (IVV) Program, with Software Assurance Research Program support, extracted FM architectures across the IVV portfolio to evaluate robustness, assess visibility for validation and test, and define software assurance methods applied to the architectures and designs. This investigation spanned IVV projects with seven different primary developers, a wide range of sizes and complexities, and encompassed Deep Space Robotic, Human Spaceflight, and Earth Orbiter mission FM architectures. The initiative continues with an expansion of the TR suite to include Launch Vehicles, adding the benefit of investigating differences intrinsic to model-based FM architectures and insight into complexities of FM within an Agile software development environment, in order to improve awareness of how nontraditional processes affect FM architectural design and system health management.

Fitz, Rhonda↗

Conservation Voltage Reduction with Distributed Energy Resource Management System, Grid-Edge, and Legacy Devices: Preprint

Distribution utilities use conservation voltage reduction (CVR) to obtain energy savings and lower peak demand by reducing bus voltages. Traditionally, the CVR is accomplished by controlling the legacy assets such as load tap changers, voltage regulators, and capacitor banks. The deployment of the advanced distribution management system (ADMS) and distributed energy resource management system (DERMS) enables the integration of distributed energy resources into the distribution networks and provide the grid services including CVR. This paper studies the coordinated operation of an ADMS and a DERMS in achieving CVR and voltage regulation. A commercial ADMS uses legacy devices and Edge-of-Network Grid Optimization (ENGO) devices to obtain energy savings through CVR. A prototype DERMS dispatches the photovoltaic smart inverters based on real-time optimal power low to ensure voltage regulation across the feeder. The results show that the coordinated operation of ADMS and DERMS is effective in achieving CVR and voltage regulation. Specifically, energy savings of up to 4.7% are observed in the real utility distribution system used in this study.

advanced distribution management system↗

Sensor to User - NASA/EOS Data for Coastal Zone Management Applications Developed from Integrated Analyses: Verification, Validation and Benchmark Report

The NASA Applied Sciences Program seeks to transfer NASA data, models, and knowledge into the hands of end-users by forming links with partner agencies and associated decision support tools (DSTs). Through the NASA REASoN (Research, Education and Applications Solutions Network) Cooperative Agreement, the Oceanography Division of the Naval Research Laboratory (NRLSSC) is developing new products through the integration of data from NASA Earth-Sun System assets with coastal ocean forecast models and other available data to enhance coastal management in the Gulf of Mexico. The recipient federal agency for this research effort is the National Oceanic and Atmospheric Administration (NOAA). The contents of this report detail the effort to further the goals of the NASA Applied Sciences Program by demonstrating the use of NASA satellite products combined with data-assimilating ocean models to provide near real-time information to maritime users and coastal managers of the Gulf of Mexico. This effort provides new and improved capabilities for monitoring, assessing, and predicting the coastal environment. Coastal managers can exploit these capabilities through enhanced DSTs at federal, state and local agencies. The project addresses three major issues facing coastal managers: 1) Harmful Algal Blooms (HABs); 2) hypoxia; and 3) freshwater fluxes to the coastal ocean. A suite of ocean products capable of describing Ocean Weather is assembled on a daily basis as the foundation for this semi-operational multiyear effort. This continuous realtime capability brings decision makers a new ability to monitor both normal and anomalous coastal ocean conditions with a steady flow of satellite and ocean model conditions. Furthermore, as the baseline data sets are used more extensively and the customer list increased, customer feedback is obtained and additional customized products are developed and provided to decision makers. Continual customer feedback and response with new improved products are required between the researcher and customer. This document details the methods by which these coastal ocean products are produced including the data flow, distribution, and verification. Product applications and the degree to which these products are used successfully within NOAA and coordinated with the Mississippi Department of Marine Resources (MDMR) is benchmarked.

Hall, Callie↗

An Error Analysis of the Phased Array Antenna Pointing Algorithm for STARS Flight Demonstration No. 2

STARS is a multicenter NASA project to determine the feasibility of using space-based assets, such as the Tracking and Data Relay Satellite System (TDRSS) and Global Positioning System (GPS), to increase flexibility (e.g. increase the number of possible launch locations and manage simultaneous operations) and to reduce operational costs by decreasing the need for ground-based range assets and infrastructure. The STARS project includes two major systems: the Range Safety and Range User systems. The latter system uses broadband communications (125 kbps to 500 kbps) for voice, video, and vehicle/payload data. Flight Demonstration #1 revealed the need to increase the data rate of the Range User system. During Flight Demo #2, a Ku-band antenna will generate a higher data rate and will be designed with an embedded pointing algorithm to guarantee that the antenna is pointed directly at TDRS. This algorithm will utilize the onboard position and attitude data to point the antenna to TDRS within a 2-degree full-angle beamwidth. This report investigates how errors in aircraft position and attitude, along with errors in satellite position, propagate into the overall pointing vector.

Carney, Michael P.↗