Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Advanced avionics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgment, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs a 300 million bit-per-second (Mbps) return link for harvesting payload science. In the coming eighteen months, it will step up to 600 Mbps. Already there is talk of a 1.2 billion bit-per-second (Gbps) upgrade for the ISS and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgement, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs its high-data-rate return link for harvesting payload science. In the coming months, it will double that data rate and is forecast to fully utilize that capability. Already there is talk of an upgrade that quadruples the current data rate allocated to ISS payload science before the end of its mission and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

CAE for thermal management of aerospace electronic boards using the BETAsoft program

Aerospace electronic boards require special attention to thermal management due to constraints such as their need to be light, small, and maintain high power densities. Also, cooling is mainly through conductive and radiative modes with minor or negligible convective cooling. Due to these particular requirements, thermal design has become an integrated part of the electronic design process in order to avoid expensive repeat prototyping and to ensure high reliability. To achieve high speed simulations, the BETAsoft code uses semi-empirical formulations and an advanced finite difference scheme that incorporates local adaptive grids. Detailed conduction, convection and radiation heat transfer is considered. Various benchmark verifications of the software simulation compared to infrared images typically prove to be within 10% of each other. The thermal analysis of a sample avionic card in a natural convection environment is shown. Then, the individual effects of attaching metal screws to the casing, increasing radiative emissivities of the casing, increasing the conductance of the wedge lock, adding an aluminum core to the board, adding metal strips in board layers, inserting conduction pads under components, and adding heat sinks to components are demonstrated.

Bobish, Kimberly↗

Wide Field X-Ray Telescope Mission Concept Study Results

The Wide Field X-Ray Telescope (WFXT) is an astrophysics mission concept for detecting and studying extra-galactic x-ray sources, including active galactic nuclei and clusters of galaxies, in an effort to further understand cosmic evolution and structure. This Technical Memorandum details the results of a mission concept study completed by the Advanced Concepts Office at NASA Marshall Space Flight Center in 2012. The design team analyzed the mission and instrument requirements, and designed a spacecraft that enables the WFXT mission while using high heritage components. Design work included selecting components and sizing subsystems for power, avionics, guidance, navigation and control, propulsion, structures, command and data handling, communications, and thermal control.

Hopkins, R. C.↗

A highly reliable, high performance open avionics architecture for real time Nap-of-the-Earth operations

An Army Fault Tolerant Architecture (AFTA) has been developed to meet real-time fault tolerant processing requirements of future Army applications. AFTA is the enabling technology that will allow the Army to configure existing processors and other hardware to provide high throughput and ultrahigh reliability necessary for TF/TA/NOE flight control and other advanced Army applications. A comprehensive conceptual study of AFTA has been completed that addresses a wide range of issues including requirements, architecture, hardware, software, testability, producibility, analytical models, validation and verification, common mode faults, VHDL, and a fault tolerant data bus. A Brassboard AFTA for demonstration and validation has been fabricated, and two operating systems and a flight-critical Army application have been ported to it. Detailed performance measurements have been made of fault tolerance and operating system overheads while AFTA was executing the flight application in the presence of faults.

Harper, Richard E.↗

Technology research for digital flight control

The use of advanced digital systems for flight control and guidance for a specific mission is investigated. The research areas include advanced electronic system architectures, tests with the global positioning system (GPS) in a helicopter, and advanced integrated systems concept for rotorcraft. Emphasis is on a search and rescue mission, differential global positioning systems to provide a data base of performance information for navigation, and a study to determine the present usage and trends of microcomputers and microcomputer components in the avionics industries.

Carestia, R. A.↗

Reusable structure for the Advanced Launch System

The U.S. Advanced Launch System (ALS) effort has been established to reduce the cost of payload mass to orbit and increase launch reliability. One approach to reducing costs of primarily expendable launch vehicles is to recover and reuse the most costly elements (i.e., the main engines and the avionics hardware); this is the mission of the propulsion/avionics (P/A) module. This study was conducted to identify material and design options for P/A module structure. A critical structural element is the aeroshell which: (1) provides the reentry aerodynamic surface, (2) shields other subcomponents from reentry heating, and (3) absorbs touchdown loads. Two P/A module types are required for the ALS: one that flies a high-temperature return from orbit profile and another that flies a cooler suborbital profile. For system cost benefits, common structure is desired for both types. A design concept is developed for a honeycomb sandwich structure that can survive the suborbital-reentry heating rates and the return-from-orbit heating rates with an ablative thermal protection system. Thermal analyses show that structural temperatures from aerodynamic heating are within material capabilities. Stress analyses indicate the structural design can support the critical loads.

Gibbins, Martin N.↗

Thermal cycling testing to failure of a ceramic column grid array package for space applications

Ceramic column grid array (CCGA) packages have been used increasingly in logic and microprocessor functions, telecommunications, flight avionics boards, payload electronics boards, engineering navigational and science cameras, electronic assemblies, and other applications, because of their inherent advantages such as high electrical interconnect density, very good thermal and electrical performance, and compatibility with standard surface-mount technology (SMT) packaging assembly processes. Because these advanced electronic packages tend to have less solder-joint strain-relief than do leaded flat-pack electronic packages, the reliability of CCGA packages in challenging thermal environments is a very important consideration for their short- and long-term use in JPL-NASA space missions. In this study, we assembled daisy chains of polyimide printed wiring boards from CCGA-interconnect packages, inspected the boards nondestructively, and then subjected them to thermal cycling to assess their reliability in thermal environments from +125°C to -40°C±25°C. The test hardware consists of a CCGA 1752 package (CN version). The package was divided into four daisy-chained sections that were electrically monitored for their continuity during thermal cycling. The CCGA 1752 package is roughly 45 mm × 45 mm with a 42-mm × 42-mm array of 80%/20% Pb/Sn columns on a 1.00-mm pitch. The resistance of the daisy-chained CCGA interconnects was continuously monitored during thermal cycling in a gaseous nitrogen environment. Electrical continuity resistance measurements as a function of thermal cycling are reported here; tests to date have shown significant change to an open circuit in daisy-chain resistance as a function of thermal cycling. The change in interconnect resistance becomes increasingly noticeable with increasing number of thermal cycles. This paper describes the experimental thermal-cycling test results of CCGA 1752 package reliability testing under an extremely wide temperature range. The first failure was observed at 1479th thermal cycle. We report the thermal-cycle reliability test data for ~2500 thermal cycles.

Ramesham, Rajeshuni↗

An Intern Experience with NASA’s Artemis Program

“3...2...1...Go For Launch”. Nasa’s Kennedy Space Center is projected to launch the first mission of theArtemis Program by the end of this year, 2021. I have had the opportunity to contribute directly to this mission through my internship with their Engineering organization from January to August of 2021.Within their Engineering organization, I am an intern for the Avionics branch. Throughout this experience I have completed two projects with one project still in progress. These projects allowed me to work directly with the Orion vehicle’s software and hardware power ups, checkouts, and tests. I became familiarized with the engineering concepts that allowed this advanced technology to perform as intended.In addition, I became acquainted with the operations and tasks that are completed during a LaunchCountdown, both at a detailed level as well as a higher managerial level. Lastly, I worked directly with the software algorithm that detects and responds to onboard faults and failures. I have analyzed and made conclusions based on data and documentation, allowing my team to benefit from a condensed, centralized informational file. In addition to my technical experience, I have learned a significant amount about how the Kennedy Space Center operates, it’s history, and the history of the agency. The education I received from the Engineering department at Texas A&M University not only allowed me to obtain this internship, but provided me with the required background in computer and electrical engineering principles to be successful in this organization.

Sarah Bianco↗

Preparations for the Launch, Cruise, and Orbital Operations Phases of the Psyche Mission

“Psyche: Journey to a Metal World” was selected in 2017 as the 14th mission in NASA’s Discovery program. The mission uses an electric propulsion (EP) system to rendezvous with and orbit the large metal asteroid (16) Psyche. Spacecraft development is a hybrid approach with deep-space avionics provided by the Jet Propulsion Laboratory (JPL) and a solar electric propulsion chassis based on Maxar’s 1300-series GEO communications satellites. The payload suite is comprised of a magnetometer, multispectral imager, and gamma ray & neutron spectrometer science instruments and the Deep Space Optical Communications advanced technology demonstration.The spacecraft is currently in the final integration and test phase to support a planned launch period open in August 2022. With under a year until liftoff, final pre-liftoff preparations are underway for the mission’s major in-flight Phases. The Launch Phase is the mission’s only critical event as the vehicle autonomously deploys the solar arrays and delivers the spacecraft to a safe state. Following a planned 70-day Initial Checkout Phase, the spacecraft thrusts with the EP system through the majority of a 3.5-year Cruise Phase, which includes a Mars gravity assist, to rendezvous with (16) Psyche. The Approach Phase uses optical navigation while continuing to thrust with the EP engines to deliver the spacecraft into orbit. Orbital Operations are baselined for 20 months as the spacecraft steps through four progressively lower orbital altitudes to study the largest M-type asteroid in the solar system.

Hart, William↗

NASA's Hypersonic Investment Area

NASA has established long term goals for access to space. The third generation launch systems are to be fully reusable and operational around 2025. The goal for third-generation launch systems represents significant reduction in cost and improved safety over the current first generation system. The Advanced Space Transportation Office (ASTP) at NASA s Marshall Space Flight Center (MSFC) has the agency lead to develop space transportation technologies. Within ASTP, under the Hypersonic Investment Area (HIA), third generation technologies are being pursued in the areas of propulsion, airframe, integrated vehicle health management (IVHM), avionics, power, operations and system analysis. These technologies are being matured through research and both ground and flight-testing. This paper provides an overview of the HIA program plans and recent accomplishments.

Hueter, Uwe↗

System Architectural Considerations on Reliable Guidance, Navigation, and Control (GN and C) for Constellation Program (CxP) Spacecraft

This final report summarizes the results of a comparative assessment of the fault tolerance and reliability of different Guidance, Navigation and Control (GN&C) architectural approaches. This study was proactively performed by a combined Massachusetts Institute of Technology (MIT) and Draper Laboratory team as a GN&C "Discipline-Advancing" activity sponsored by the NASA Engineering and Safety Center (NESC). This systematic comparative assessment of GN&C system architectural approaches was undertaken as a fundamental step towards understanding the opportunities for, and limitations of, architecting highly reliable and fault tolerant GN&C systems composed of common avionic components. The primary goal of this study was to obtain architectural 'rules of thumb' that could positively influence future designs in the direction of an optimized (i.e., most reliable and cost-efficient) GN&C system. A secondary goal was to demonstrate the application and the utility of a systematic modeling approach that maps the entire possible architecture solution space.

Dennehy, Cornelius J.↗

Global system data bus using the Digital Autonomous Terminal Access Communication protocol

Modern digital avionic systems with distributed processing require networking to connect the many elements. Digital Autonomous Terminal Access Communication (DATAC) is one of many such networks. DATAC has been implemented on the Transport Systems Research Vehicle (TSRV), a Boeing 737 aircraft operated by the National Aeronautics and Space Administration's Advanced Transport Operating Systems Program Office (ATOPS). This paper presents the TSRV implementation of the DATAC bus, a description of the DATAC system, a synchronization mechanism, details of data flow throughout the system, and a discussion of the modes available with DATAC. Numerous flight tests have been conducted using DATAC as the only means of communication between systems with outstanding results. DATAC is now an integral part of the TSRV and is expected to satisfy near term as well as future requirements for growth and flexibility.

Holmes, David C. E.↗

Hybrid Power Management Program Evaluated Ultracapacitors for the Next Generation Launch Transportation Project

The NASA Glenn Research Center initiated baseline testing of ultracapacitors to obtain empirical data in determining the feasibility of using ultracapacitors for the Next Generation Launch Transportation (NGLT) Project. There are large transient loads associated with NGLT that require a very large primary energy source or an energy storage system. The primary power source used for this test was a proton-exchange-membrane (PEM) fuel cell. The energy storage system can consist of batteries, flywheels, or ultracapacitors. Ultracapacitors were used for these tests. NASA Glenn has a wealth of experience in ultracapacitor technology through the Hybrid Power Management (HPM) Program, which the Avionics, Power and Communications Branch of Glenn s Engineering Development Division initiated for the Technology Transfer and Partnership Office. HPM is the innovative integration of diverse, state-ofthe- art power devices in optimal configurations for space and terrestrial applications. The appropriate application and control of the various advanced power devices (such as ultracapacitors and fuel cells) significantly improves overall system performance and efficiency. HPM has extremely wide potential. Applications include power generation, transportation systems, biotechnology systems, and space power systems. HPM has the potential to significantly alleviate global energy concerns, improve the environment, and stimulate the economy.

Eichenberg, Dennis J.↗

The Miniature Autonomous Extravehicular Robotic Camera (MiniAERCam) for Spacecraft Inspection and Remote

AERCam is a nano-satellite class free-flying spacecraft with a full suite of avionics, propulsion, navigation, and communications. 1) 3 major development programs, one ending in DTO of protoflight unit, other two ending in ground demonstrations with integrated hardware and software. 2) Incremental increase in capability to reduce crew workload, provide better inspection capability. 3) Two crew evaluations and 4) Significant technology advancement.

Mitchell, Jennifer D.↗

State-of-the-art cockpit design for the HH-65A helicopters

In the design of a HH-65A helicopter cockpit, advanced integrated electronics systems technology was employed to achieve several important goals for this multimission aircraft. They were: (1) integrated systems operation with consistent and simplified cockpit procedures; (2) mission-task-related cockpit displays and controls, and (3) reduced pilot instrument scan effort with excellent outside visibility. The integrated avionics system was implemented to depend heavily upon distributed but complementary processing, multiplex digital bus technology, and multifunction CRT controls and displays. This avionics system was completely flight tested and will soon enter operational service with the Coast Guard.

Castleberry, D. E.↗

Research and technology 1989

The Marshall Space Flight Center annual report summarizes their advanced studies, research programs, and technological developments. Areas covered include: transportation systems; space systems such as Gravity Probe-B and Gamma Ray Imaging Telescope; data systems; microgravity science; astronomy and astrophysics; solar, magnetospheric, and atomic physics; aeronomy; propulsion; materials and processes; structures and dynamics; automated systems; space systems; and avionics.

Source record↗

SLS Flight Software Testing: Using a Modified Agile Software Testing Approach

NASA's Space Launch System (SLS) is an advanced launch vehicle for a new era of exploration beyond earth's orbit (BEO). The world's most powerful rocket, SLS, will launch crews of up to four astronauts in the agency's Orion spacecraft on missions to explore multiple deep-space destinations. Boeing is developing the SLS core stage, including the avionics that will control vehicle during flight. The core stage will be built at NASA's Michoud Assembly Facility (MAF) in New Orleans, LA using state-of-the-art manufacturing equipment. At the same time, the rocket's avionics computer software is being developed here at Marshall Space Flight Center in Huntsville, AL. At Marshall, the Flight and Ground Software division provides comprehensive engineering expertise for development of flight and ground software. Within that division, the Software Systems Engineering Branch's test and verification (T&V) team uses an agile test approach in testing and verification of software. The agile software test method opens the door for regular short sprint release cycles. The idea or basic premise behind the concept of agile software development and testing is that it is iterative and developed incrementally. Agile testing has an iterative development methodology where requirements and solutions evolve through collaboration between cross-functional teams. With testing and development done incrementally, this allows for increased features and enhanced value for releases. This value can be seen throughout the T&V team processes that are documented in various work instructions within the branch. The T&V team produces procedural test results at a higher rate, resolves issues found in software with designers at an earlier stage versus at a later release, and team members gain increased knowledge of the system architecture by interfacing with designers. SLS Flight Software teams want to continue uncovering better ways of developing software in an efficient and project beneficial manner. Through agile testing, there has been increased value through individuals and interactions over processes and tools, improved customer collaboration, and improved responsiveness to changes through controlled planning. The presentation will describe agile testing methodology as taken with the SLS FSW Test and Verification team at Marshall Space Flight Center.

Bolton, Albanie T.↗