Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Accelerator Control System”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 361 records · Page 20

Japanese Structure Survey of Radiation Oncology in 2007 Based on Institutional Stratification of Patterns of Care Study

Purpose: To evaluate the ongoing structure of radiation oncology in Japan in terms of equipment, personnel, patient load, and geographic distribution to identify and improve any deficiencies. Methods and Materials: A questionnaire-based national structure survey was conducted from March to December 2008 by the Japanese Society of Therapeutic Radiology and Oncology (JASTRO). These data were analyzed in terms of the institutional stratification of the Patterns of Care Study. Results: The total numbers of new cancer patients and total cancer patients (new and repeat) treated with radiation in 2007 were estimated at 181,000 and 218,000, respectively. There were 807 linear accelerator, 15 telecobalt, 46 Gamma Knife, 45 {sup 60}Co remote-controlled after-loading, and 123 {sup 192}Ir remote-controlled after-loading systems in actual use. The linear accelerator systems used dual-energy function in 539 units (66.8%), three-dimensional conformal radiation therapy in 555 (68.8%), and intensity-modulated radiation therapy in 235 (29.1%). There were 477 JASTRO-certified radiation oncologists, 826.3 full-time equivalent (FTE) radiation oncologists, 68.4 FTE medical physicists, and 1,634 FTE radiation therapists. The number of interstitial radiotherapy (RT) administrations for prostate, stereotactic body radiotherapy, and intensity-modulated radiation therapy increased significantly. Patterns of Care Study stratification can clearly identify the maturity of structures based on their academic nature and caseload. Geographically, the more JASTRO-certified physicians there were in a given area, the more RT tended to be used for cancer patients. Conclusions: The Japanese structure has clearly improved during the past 17 years in terms of equipment and its use, although a shortage of personnel and variations in maturity disclosed by Patterns of Care Study stratification were still problematic in 2007.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Aircraft control system

An aircraft control system is described which is particularly suited to rotary wing aircraft. Longitudinal acceleration and course rate commands are derived from a manual control stick to control translational velocity of the aircraft along a flight path. In the collective channel the manual controls provide vertical velocity commands. In the yaw channel the manual controls provide sideslip or heading rate commands at high or low airspeeds, respectively. The control system permits pilots to fly along prescribed flight paths in a precise manner with relatively low work load.

Rempfer, P. S.↗

A hardware overview of the RHIC LLRF platform

The RHIC Low Level RF (LLRF) platform is a flexible, modular system designed around a carrier board with six XMC daughter sites. The carrier board features a Xilinx FPGA with an embedded, hard core Power PC that is remotely reconfigurable. It serves as a front end computer (FEC) that interfaces with the RHIC control system. The carrier provides high speed serial data paths to each daughter site and between daughter sites as well as four generic external fiber optic links. It also distributes low noise clocks and serial data links to all daughter sites and monitors temperature, voltage and current. To date, two XMC cards have been designed: a four channel high speed ADC and a four channel high speed DAC. The new LLRF hardware was used to replace the old RHIC LLRF system for the 2009 run. For the 2010 run, the RHIC RF system operation was dramatically changed with the introduction of accelerating both beams in a new, common cavity instead of each ring having independent cavities. The flexibility of the new system was beneficial in allowing the low level system to be adapted to support this new configuration. This hardware was also used in 2009 to provide LLRF for the newly commissioned Electron Beam Ion Source.

43 PARTICLE ACCELERATORS↗

Solar Cruiser Technology Maturation Plans

The NASA Marshall Space Flight Center (MSFC) developed the Solar Cruiser mission concept to mature solar sail technology for use in future Heliophysics missions, as well as missions of interest across a broad user community (e.g., space weather and Earth polar observatories). Solar Cruiser will serve as a pathfinder for missions that observe the solar environment from unique vantage points such as a high inclination solar mission opening a fundamentally new range of observational capabilities for the Heliophysics Program and for space weather monitoring. Sustained observations away from the Sun-Earth line (SEL) present unique opportunities for answering the outstanding science questions of Heliophysics, improving space-weather monitoring and prediction, and revealing new information about our Sun and solar system. Propellantless solar sails can be used to create artificial equilibria and maintain indefinite station-keeping at locations sunward of L1 along the SEL, or at any desired offset from the SEL leading or trailing the Earth in its orbit. They can change the heliocentric inclination of a spacecraft from the ecliptic to as high as solar polar, stopping and remaining at any intermediate inclination orbit in between. Sails can be used to hover over the Earth’s poles, using solar photon pressure to offset the Earth’s gravitational attraction, creating functional equivalents of geostationary earth orbits. The Solar Cruiser mission would fly a small spacecraft with a large (>1,600 square meter) solar sail containing embedded reflectivity control devices (RCDs) and photovoltaic cells. The mission concept includes successful deployment of the solar sail, validation of all sail subsystems, controlled station-keeping inside of the Sun-Earth L1 point, attitude control of the sail with the RCDs (including spinning and de-spinning), demonstration of pointing performance for science imaging, and an increase in heliocentric inclination (out of the ecliptic). To demonstrate the requisite sail technology, the Solar Cruiser project will design, fabricate, deploy, and fly the Solar Sail Propulsion Element (SSPE). The SSPE incorporates the following three systems: • The Solar Sail System (SSS) provides the large propulsive surface required for acceleration and smaller reflectivity-changing surfaces for roll control. • The Active Mass Translator System (AMT) provides SSPE motion with respect to the sailcraft bus for pitch and yaw control. • The Solar Sail Attitude Determination and Control System (SSADCS) consists of embedded software to 1) provide autonomous sailcraft attitude estimation, attitude pointing control, and reaction wheel momentum management following sail deployment and 2) execute the uplinked inertial attitude pointing commands to maintain the desired sailcraft trajectory. The plans for maturing each of these technology systems to TRL 5 and beyond are described herein.

Solar Sail↗

BXS Re-calibration

Early in the commissioning it was noticed by Cecile Limborg that the calibration of the BXS spectrometer magnet seemed to be different from the strength of the BX01/BX02 magnets. First the BX01/BX02 currents were adjusted to 135 MeV and the beam energy was adjusted to make the horizontal orbit flat. Then BX01/BX02 magnets were switched off and BXS was adjusted to make the horizontal orbit in the spectrometer line flat, without changing the energy of the beam. The result was that about 140-141 MeV were required on the BXS magnet. This measurement was repeated several times by others with the same results. It was not clear what was causing the error: magnet strength or layout. A position error of about 19 mm of the BXS magnet could explain the difference. Because there was a significant misalignment of the vacuum chamber in the BXS line, the alignment of the whole spectrometer line was checked. The vacuum chamber was corrected, but the magnets were found to be in the proper alignment. So we were left with one (or conceivably two) magnet calibration errors. Because BXS is a wedged shaped magnet, the bend angle depends on the horizontal position of the incoming beam. As mentioned, an offset of the beam position of 19 mm would increase or decrease the bend angle roughly by the ratio of 135/141. The figure of 19 mm is special and caused a considerable confusion during the design and measurement of the BXS magnet. This is best illustrated in Figure 1 which was taken out of the BXS Traveler document. The distance between the horizontal midplanes of the poles and the apex of the beam path was chosen to be 19 mm so the beam is close to the good field region throughout its entire path. Thus it seemed possible that there was an error that resulted in the beam not being on this trajectory, or conversely, that the magnetic measurements were done on the wrong trajectory and the magnet was then mis-calibrated. Mechanical measurements of the vacuum chamber made in the tunnel indicated that the vacuum chamber was in fact in the proper position with respect to the magnet - not 19 mm off to one side - so the former possibility was discounted. Review of the Fiducial Report and an interview with Keith Caban convinced me that there was no error in the coordinate system used for magnet measurements. I went and interviewed Andrew Fischer who did the magnetic measurements of BXS. He had extensive records, including photographs of the setups and could quickly answer quite detailed questions about how the measurement was done. Before the interview, I had a suspicion there might have been a sign flip in the x coordinate which because of the wedge would result in the wrong path length and a miscalibration. Andrew was able to pin-point how this could have happened and later confirmed it by looking an measurement data from the BXG magnet done just after BXS and comparing photographs. It turned out that the sign of the horizontal stage travel that drives the measurement wire was opposite that of the x coordinate in the Traveler, and the sign difference wasn't applied to the data. The origin x = 0 was set up correctly, but the wire moved in the opposite direction to what was expected, just as if the arc had been flipped over about the origin. To quantitatively confirm that this was the cause of the observed difference in calibration I used the 'grid data', which was taken with a Hall probe on the BXS magnet originally to measure the FINT (focusing effect) term, and combined it with the Hall probe data taken on the flipped trajectory, and performed the field integral on a path that should give the same result as the design path. This is best illustrated in Figure 2. The integration path is coincident with the desired path from the pivot points (x = 0) outward. Between the pivot points the integration path is a mirror image of the design path, but because the magnet is fairly uniform, for this portion it gives the same result. Most of the calibration error resulted simply from the different path length between the design path and the measured path. The results of the integration on the equivalent path are given in Table 1. The corrected calibration has been used to generate a new polynomial for BXS which was implemented in the control system.

43 PARTICLE ACCELERATORS↗

Radiation Hardened Beam Instrumentations for Multi-mega-watt Beam Facilities

A beam instrumentation is an essential element for the successful operate particle accelerators in which various diagnostics and beam control systems are integrated into beam optics. However, the performance of beam instrumentation is often subject to constraints such as prompt radiation dose, integrated radiation dose, operation (ambient) temperature and humidity, available space, and strength of embedded electromagnetic fields at the monitoring point. These constraints will limit the dynamic range of operational beam parameters, like the maximum achievable beam power. A seamless R\&D effort to develop the radiation hardened beam instrumentation should be made for future multi-MW beam facilities. In this paper, we describes about a radiation hardened beam instrumentation based on the operational experience of the NuMI beam line.

43 PARTICLE ACCELERATORS↗

The g-LIMIT Microgravity Vibration Isolation System for the Microgravity Science Glovebox

For many microgravity science experiments in the International Space Station, the ambient acceleration environment will be exceed desirable levels. To provide a more quiescent acceleration environment to the microgravity payloads, a vibration isolation system named g-LIMIT (GLovebox Integrated Microgravity Isolation Technology) is being designed. g-LIMIT is a sub-rack level isolation system for the Microgravity Science Glovebox that can be tailored to a variety of applications. Scheduled for launch on the UF-1 mission, the initial implementation of g-LIMIT will be a Characterization Test in the Microgravity Science Glovebox. g-LIMIT will be available to glovebox investigators immediately after characterization testing. Standard MSG structural and umbilical interfaces will be used so that the interface requirements are minimized. g-LIMIT consists of three integrated isolator modules, each of which is comprised of a dual axis actuator, two axes of acceleration sensing, two axes of position sensing, control electronics, and data transmission capabilities in a small-volume package. In addition, this system provides the unique capability for measuring quasi-steady acceleration of the experiment independent of accelerometers as a by-product of the control system and will have the capability of generating user-specified pristine accelerations to enhance experiment operations.

Whorton, Mark S.↗

First SELAP Algorithm Operational Experience of the New LLRF 3.0 RF Control System

The JLAB LLRF 3.0 system has been developed and is replacing the 30-year-old LLRF systems in the CEBAF accelerator. The LLRF system builds upon 25 years of design and operational RF control experience (digital and analog), and our recent collaboration in the design of the LCLSII LLRF system. The new system also incorporates a cavity control algorithm using a fully functional phase and amplitude locked Self Exciting Loop (SELAP). The first system (controlling 8 cavities) was installed and commissioned in August of 2021. Since then the new LLRF system has been operating with cavity gradients up to 20 MV/m, and electron beam currents up to 350 uA. This paper discusses the operational experience of the LLRF 3.0 SELAP algorithm along with other software and firmware tools like cavity and klystron characterization and quench detection.

Plawski, T. E.↗

Radiation Safety System

The goal of this work is to provide an overview of a Radiation safety system (RSS) designed for protection from prompt radiation hazard at accelerator facilities. RSS design parameters, functional requirements and constraints are derived from hazard analysis and risk assessment undertaken in the design phase of the facility. The two main subsystems of a RSS are access control system (ACS) and radiation control system (RCS). In this text, a common approach to risk assessment, typical components of ACS and RCS, desirable features and general design principles applied to RSS are described.

43 PARTICLE ACCELERATORS↗

Investigation of an automatic spin prevention system for fighter airplanes

An investigation was conducted to evaluate the effectiveness of an automatic spin-prevention system for current fighter airplanes as a first step in determining the feasibility of such a system. The concept makes use of the components of the conventional flight-control system with the addition of control logic to monitor angle of attack, yaw rate, and normal acceleration. Analytical techniques were used to study the system concept applied to three representative fighter configurations, and model flight tests were employed to evaluate a prototype system on a representative fighter configuration. Emphasis was placed on the development of the control logic required. A discussion of possible implementations of the system concept is presented. Results of the investigation indicated that a relatively simple system (with full control authority) was effective in preventing the developed spins of the fighter configurations considered and that the system design is dependent on the stall and spin characteristics of the particular airplane.

Gilbert, W. P.↗

A Flight Evaluation of an Airborne Physiological Instrumentation System, Including Preliminary Results Under Conditions of Varying Accelerations

A physiological instrumentation system capable of recording the electrocardiogram, pulse rate, respiration rate, and systolic and diastolic blood pressures during flight has been developed. This instrumentation system was designed for use during control studies at varied levels of acceleration in order to monitor the well-being of the pilot and at the same time to obtain data for study of the relationships between his various physiological functions and his performance capability. Flights, made in a T-33 aircraft, demonstrated the ability of the system to obtain the desired physiological data in flight. The data obtained in these flights, although limited in nature, indicate a slowing of the pulse rate under the subgravity conditions of brief duration. There appeared to be a proportional nearly in-phase relationship between pulse rate and acceleration. A decrease in diastolic blood pressure together with an increase in pulse pressure was noted during subgravity conditions and an elevation of the diastolic pressure together with a decrease in pulse pressure du-ring increased accelerations. No change worthy of note was seen in the records of the systolic blood pressure, the respiration rate, or the electrocardiogram over the range of acceleration studied (0 to 3 g).

Smedal, Harald A.↗

A Components Database Design and Implementation for Accelerators and Detectors

Many accelerator and detector systems being fabricated for the PEP-II Accelerator and BABAR Detector needed configuration control and calibration measurements tracked for their components. Instead of building a database for each distinct system, a Components Database was designed and implemented that can encompass any type of component and any type of measurement. In this paper we describe this database design that is especially suited for the engineering and fabrication processes of the accelerator and detector environments where there are thousands of unique component types. We give examples of information stored in the Components Database, which includes accelerator configuration, calibration measurements, fabrication history, design specifications, inventory, etc. The World Wide Web interface is used to access the data, and templates are available for international collaborations to collect data off-line.

43 PARTICLE ACCELERATORS↗

Networked Lighting Power and Control Platform for Solid State Lighting in Commercial Office Applications

Redwood Systems' objective is to further accelerate the acceptance of solid state lighting (SSL) with fine grain and easy-to-use control. In addition, increased and improved sensor capability allows the building owner or user to gather data on the environment within the building. All of this at a cost equal to or less than that of code-compliant fluorescent lighting. The grant we requested and received has been used to further enhance the system with power conversion efficiency improvements and additional features. Some of these features, such as building management system (BMS) control, allow additional energy savings in non-lighting building systems.

42 ENGINEERING↗

PICMG xTCA Standards Extensions for Physics: New Developments & Future Plans

After several years of planning and workshop meetings, a decision was reached in late 2008 to organize PICMG xTCA for Physics Technical Subcommittees to extend the ATCA and MTCA telecom standards for enhanced system performance, availability and interoperability for physics controls and applications hardware and software. Since formation in May-June 2009, the Hardware Technical Subcommittee has developed a number of ATCA, ARTM, AMC, MTCA and RTM extensions to be completed in mid-to-late 2010. The Software Technical Subcommittee is developing guidelines to promote interoperability of modules designed by industry and laboratories, in particular focusing on middleware and generic application interfaces such as Standard Process Model, Standard Device Model and Standard Hardware API. The paper describes the prototype design work completed by the lab-industry partners to date, the timeline for hardware releases to PICMG for approval, and the status of the software guidelines roadmap. The paper also briefly summarizes the program of the 4th xTCA for Physics Workshop immediately preceding the RT2010 Conference. he case for developing ATCA and MicroTCA (xTCA) specification extensions for physics has been covered in several previous papers. Briefly, ATCA and MicroTCA is the first all-serial communication platform available to the physics community to support both massively complex accelerator controls and massively large, high bandwidth and throughput experimental data acquisition systems. The major strength of xTCA is its multi-layer highly scalable managed platform architecture designed to achieve the highest possible system availability. Physics research imaging technologies have driven industrial applications in a wide range of medical scanners, for example, and in turn continue to evolve to exponentially higher speeds and resolution through new computer, communications industry and analog-to-digital conversion chip developments. The high availability managed platform is an important new tool for the instrumentation and control systems of these most complex scientific machines and instruments ever invented. Adaptation of the xTCA platforms to physics was undertaken by a collaboration starting in May-June 2009 with the PICMG open specifications industry consortium. The remainder of this paper discusses the results of lab-industry committee work as well as important concomitant prototype developments among participating laboratories and industries.

43 PARTICLE ACCELERATORS↗

Performance of the NIRS fast scanning system for heavy-ion radiotherapy

Purpose: A project to construct a new treatment facility, as an extension of the existing HIMAC facility, has been initiated for the further development of carbon-ion therapy at NIRS. This new treatment facility is equipped with a 3D irradiation system with pencil-beam scanning. The challenge of this project is to realize treatment of a moving target by scanning irradiation. To achieve fast rescanning within an acceptable irradiation time, the authors developed a fast scanning system. Methods: In order to verify the validity of the design and to demonstrate the performance of the fast scanning prior to use in the new treatment facility, a new scanning-irradiation system was developed and installed into the existing HIMAC physics-experiment course. The authors made strong efforts to develop (1) the fast scanning magnet and its power supply, (2) the high-speed control system, and (3) the beam monitoring. The performance of the system including 3D dose conformation was tested by using the carbon beam from the HIMAC accelerator. Results: The performance of the fast scanning system was verified by beam tests. Precision of the scanned beam position was less than {+-}0.5 mm. By cooperating with the planning software, the authors verified the homogeneity of the delivered field within {+-}3% for the 3D delivery. This system took only 20 s to deliver the physical dose of 1 Gy to a spherical target having a diameter of 60 mm with eight rescans. In this test, the average of the spot-staying time was considerably reduced to 154 {mu}s, while the minimum staying time was 30 {mu}s. Conclusions: As a result of this study, the authors verified that the new scanning delivery system can produce an accurate 3D dose distribution for the target volume in combination with the planning software.

60 APPLIED LIFE SCIENCES↗

Determining Exercise Strength Requirements for Astronaut Critical Mission Tasks: Reaching Under G-Load

The critical mission tasks assessments effort seeks to determine the physical performance requirements that astronauts must meet in order to safely and successfully accomplish lunar exploration missions. These assessments will determine astronaut preflight strength, fitness, and flexibility requirements, and the extent to which exercise and other countermeasures must prevent the physical deconditioning associated with prolonged weightlessness. The purpose is to determine the flexibility and strength that crewmembers must possess in order to reach Crew Exploration Vehicle controls during maneuvers that result in sustained acceleration levels ranging from 3.7G to 7.8G. An industry standard multibody dynamics application was used to create human models representing a 5th percentile female, a 50th percentile male, and a 95th percentile male. The additional mass of a space suit sleeve was added to the reaching arm to account for the influence of the suit mass on the reaching effort. The human model was merged with computer models of a pilot seat and control panel for the Crew Exploration Vehicle. Three dimensional paths were created that guided the human models hand from a starting position alongside its thigh to three control targets: a joystick, a keyboard, and an overhead switch panel. The reaching motion to each target was repeated under four vehicle acceleration conditions: nominal ascent (3.7G), two ascent aborts (5.5G and 7.8G) and lunar reentry (4.6G). Elbow and shoulder joint angular excursions were analyzed to assess range of motion requirements. Mean and peak elbow and shoulder joint torques were determined and converted to equivalent resistive exercise loads to assess strength requirements. Angular excursions for the 50th and 95th percentile male models remained within joint range of motion limits. For the 5th percentile female, both the elbow and the shoulder exceeded range of motion limits during the overhead reach. Elbow joint torques ranged from 10 N-m (nominal ascent) to 60 N-m (ascent abort). Shoulder joint torques ranged from 65 N-m (nominal ascent) to 280 N-m (ascent abort). Maximal equivalent exercise loads reached 30 lb in tricep extension, 9 lb in bicep curl, 110 lb in unilateral pullover and unilateral bench press for nominal conditions (lunar reentry), and 188 lb in unilateral pullover and unilateral bench press. The location of the pilot seat was found to be inadequately located to allow a 5th percentile female to reach the switches on the overhead panel. Elbow strength requirements were found to be well within population norms. Shoulder strength was found to be a limiting factor. Reaching under nominal ascent and lunar reentry conditions was found to require near maximal shoulder strength. Reaching under ascent abort conditions requires shoulder strength well beyond population norms. Pilot seats must adjust to accomodate a 5th percentile female. Exercise countermeasures must maintain maximal pullover and bench press strength to allow pilots to reach and operate controls during lunar reentry. Reaching will not be possible during ascent abort conditions. Flight controls should be built into armrests or flight control must be accomplished by autonomous systems during acceleration exceeding 4.6G.

Schaffner, Grant↗

Towards Agentic AI on Particle Accelerators

As particle accelerators grow in complexity, traditional control methods face increasing challenges in achieving optimal performance. This paper envisions a paradigm shift: a decentralized multi-agent framework for accelerator control, powered by Large Language Models (LLMs) and distributed among autonomous agents. We present a proposition of a self-improving decentralized system where intelligent agents handle high-level tasks and communication and each agent is specialized control individual accelerator components. This approach raises some questions: What are the future applications of AI in particle accelerators? How can we implement an autonomous complex system such as a particle accelerator where agents gradually improve through experience and human feedback? What are the implications of integrating a human-in-the-loop component for labeling operational data and providing expert guidance? We show two examples, where we demonstrate viability of such architecture.

43 PARTICLE ACCELERATORS↗

Test equipment data package for the KC-135 fiber pulling apparatus

The Fiber Pulling Apparatus (FPA) is a device designed to produce continuous glass fibers from simulated lunar soil, and to determine the effects of reduced gravity, specifically 1/6 g on fiber formation and resultant properties. Briefly, pre-melt simulated lunar soil will be placed in a pint crucible and heated to 1200 C or higher, up to a maximum temperature of 1400 C. At a given temperature, a quartz fiber will be immersed into the melt and then pulled through a chill block and wound onto a cylindrical bobbin using a servo motor control. A high resolution video camera will record the fiber as it is being pulled. This assembly wil be enclosed in Plexiglas. Before fiber pulling commences, the apparatus will be backfilled with dry nitrogen. A separate data acquisition system will support this apparatus. This system will contain a personal computer, video recorder, and monitor. Temperature, acceleration, winding speed, and video images will be controlled and recorded using the data acquisition system. Thus, the FPA will consist of two hardware packages, the fiber production assembly and the data acquisition rack. The primary objective of this test is to determine the effects of 1/6 g on the formation of continuous glass fiber made from simulated lunar soil. Baseline studies using the FPA on the ground will provide a reference for the 1/6 g studies. Of particular interest will be the effect of 1/6 g on the free fluid zone where the fiber exits the crucible. In the fiber spinning parlance this zone is known as the upper jet region, where the boundary slope is greater than one tenth. The properties of the resulting glass fiber will depend on the jet shape as well as distributions of velocity, temperature and tension within the jet. It is unknown at this time how 1/6 g will effect these parameters.

Kosten, Sue↗