Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “wind turbine certification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

30 records · Page 2

Design Load Basis Guidance for Distributed Wind Turbines

Aeroelastic modeling (AM) is the primary methodology for structural and performance assessment of any wind turbine. Nonetheless, the use of AM in the distributed wind (DW) industry sector is limited due to several challenges (Damiani, Davis, & Summerville, 2022). One of these challenges lies in the perceived complexity of generating a proper set of numerical simulations to extract and process the key outputs for component design and verification, and, ultimately, achieve certification. This makes it difficult to reliably predict the structural and performance response of small wind turbines. From the investigation carried out in (Damiani & Davis, 2022), it is apparent that many stakeholders in this sector believe that a comprehensive guide for developing a design load basis (DLB) for distributed wind turbines (DWTs) is necessary.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Small Turbine Certification and/or Listing Awardee: NPS Solutions LLC

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by NPS Solutions LLC for Small Turbine Certification and/or Listing. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

U.S. Department of Energy Competitiveness Improvement Project (CIP) 2024 Small Turbine Certification and Listing Awardee: Uprise Energy

This fact sheet describes the 2024 Competitiveness Improvement Project (CIP) award received by Uprise Energy for small turbine certification and listing. The U.S. Department of Energy's (DOE's) CIP awards cost-shared subcontracts and technical support to manufacturers of small and medium-sized wind turbines. Managed by NREL on behalf of DOE's Wind Energy Technologies Office, CIP helps advance wind energy as a cost-effective, distributed generation technology option.

17 WIND ENERGY↗

Cybersecurity Standards for Distributed Energy Resources: Gaps and Harmonization Strategy

This report examines cybersecurity standards for Distributed Energy Resources (DERs) in light of their rapid growth and increasing integration into energy systems. It identifies critical gaps in existing frameworks, including inadequate coverage of DER-specific challenges, complexities in implementing comprehensive standards, integration issues with legacy systems, adoption hurdles for newer standards, and a lack of harmonization across regulatory landscapes. The analysis highlights vulnerabilities such as data integrity risks, unauthorized device control, and denial-of-service attacks across various DER technologies like solar PV, wind turbines, energy storage systems, and hydrogen fuel cells. The report proposes a harmonization strategy to address these deficiencies by developing unified cybersecurity requirements, certification programs, and training resources while fostering collaboration among stakeholders such as government agencies, industry groups, DER operators, manufacturers, and research institutions. A phased roadmap is outlined to refine and implement these measures through pilot testing and widespread adoption. Ultimately, the report underscores the urgent need for coordinated efforts to enhance DER cybersecurity and ensure the reliable operation of future energy systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

2022 Prototype Installation and Testing Awardee: Windward Engineering

The 60-kilowatt (kW) Zephyr 21/60 wind turbine from Windward Engineering uses a low-cost, full-span independent pitch system that can act as a redundant aerodynamic braking system. This design uses a relatively simple pneumatic rotary vane actuator, allowing each of the turbine's three blades to be pitched independently and any single blade to activate emergency braking for the entire turbine. A previous Competitiveness Improvement Project (CIP) funding award enabled Windward Engineering to design and develop the Zephyr 21/60 wind turbine's aeroelastic model and pitch system. At the end of this current Competitiveness Improvement Project award, a fully validated aeroelastic model will make it possible to certify Windward Engineering's Zephyr 21/60 design and quantify the technology's levelized cost of energy in preparation for certification and entry into the distributed wind market. The Zephyr 21/60 will feature an attractive levelized cost of energy, improved reliability, and a full-span pitch system for safe and redundant protection against rotor overspeed (which occurs when the rotor turns beyond its design limit).

CIP↗

2022 Small Turbine Certification Awardee: Eocycle America Corporation

Eocycle's Competitiveness Improvement Project (CIP) award will fund certification testing of the company's EOX S-16 25-kW turbine to make sure it meets UL electrical safety standards. In addition to validating the turbine's reliability and anticipated reduced maintenance requirements, UL certification will also boost consumer confidence in the technology, with the potential to increase the market for the entire small-wind industry.

Competitiveness Improvement Project↗

Improvements to the Simplified Loads Methodology in IEC 61400-2: November 22, 2021 - November 21, 2022

The "Simplified Loads Model" (SLM) of IEC 61400-2 provides a simple methodology to assess the structural integrity of a small wind turbine (SWT). The SLM is unique to the small wind turbine standard. It was included to allow SWT manufacturers with limited resources to undertake integrity checks at a reasonable cost in time and resources and avoid the expense of detailed aeroelastic simulations. Unfortunately, the SLM has gained the reputation of being overly conservative and this has reduced its value to the SWT community and its use in SWT design and certification. Conservatism in design standards is needed but excessive conservatism is not. The aim of this report is to address the principal areas of excess conservatism and recommend changes to the SLM that preserve its simplicity but reduce the excess. The changes for the ultimate loads are consistent with their treatment in aeroelastic modelling for certification and with related codes for wind loading on structures. The recommendations for a new fatigue design load case are also based on aeroelastic simulations, in this case of five SWTs of varying configurations with rated power from 2.4 to 50 kW. It is also pointed out the design load case for yawed operation omits an important term. The recommended inclusion of this term would make the SLM slightly more conservative for this case.

17 WIND ENERGY↗

Distributed Wind Monitoring Best Practices

Accessible performance and operational data have been identified as a key enabler for distributed wind energy industry advancement. While utility-scale wind turbines benefit from reliable and continuous supervisory control and data acquisition (SCADA)-based monitoring platforms, monitoring of the U.S. fleet of distributed wind (DW) turbines has been more inconsistent, unreliable, and sometime difficult to access. Without fleet monitoring data, the industry will never understand and thus work to improve turbine under-performance and reliability issues. For the DW industry to scale up, attract investors, and boost credibility, fleetwide monitoring must be robust and reliable, select data must be made accessible to stakeholders, and the data must be in a format useful to users. To help move the industry toward a more standardized, accessible stream of monitoring data, this distributed wind monitoring best practices report attempts to cover topics including key monitoring channels, hardware, communication strategies, and accessibility. Strategic engagement with DW original equipment manufacturers (OEMs), service providers, lab and university researchers, testing organization, certification bodies, end users and solar photovoltaic (PV) monitoring experts has enabled a better understanding of the current state-of-the-art of monitoring and aided in articulating this set of best practices that will guide OEMs toward harmonized monitoring strategies, aimed at a future goal of achieving accessible performance and operational data for the entire fleet of U.S. distributed wind turbines.

17 WIND ENERGY↗

Conceptual Design of a Tension Leg Platform With 22.3 MW Vertical Axis Turbine

Here, this paper presents the conceptual design of a tension leg platform (TLP) for the ARCUS “towerless” vertical-axis wind turbine (VAWT). VAWTs are ideal for floating offshore sites and have several advantages over horizontal-axis wind turbines (HAWT) including reduced top mass, lower center of gravity, increased energy capture, and in turn lower cost. The towerless ARCUS VAWT drives these advantages further through increased structural efficiency and by enabling more optimized TLP designs with simplified installation procedures. For hull sizing, we have studied three turbine sizes with corresponding power ratings of 5.1 MW, 10.4 MW and 22.3 MW. The largest turbine was identified as having the greatest potential to reduce the levelized cost of energy (LCOE) and is the reference size used for the further detailed design process. The conceptual design of the VAWT TLP has been awarded with an ABS Approval in Principle Certificate. This paper contains brief analysis results and design findings for a TLP designed to house a VAWT, including the following topics: • Applicable Design Codes • Metocean Conditions • ARCUS Turbine Loads • Design Load Cases and Requirements - Pre-service TLP Stability - In-place TLP Global Performance • Platform Configurations, Hull Structure Scantling Design, Weight and CG Estimation, and General Arrangement Drawings • Hull Ballast Plan for both Pre-service and In-place Conditions • Pre-service Quayside Integration, Transportation and Wet Tow Stability Analysis • Global Performance Analysis for Motions and Tendon tensions • Summary of cost components and system levelized cost of energy

17 WIND ENERGY↗

Hawaii Fish Company Inc. Technical Assistance Voucher (Abstract)

For the past several years, the National Renewable Energy Laboratory (NREL), Sandia National Laboratories (SNL), and Pacific Northwest National Laboratory (PNNL) have provided technical assistance to the recipients of Department of Energy (DOE) -funded voucher programs, namely American-Made Challenges (AMC), the Incubator Program, and the Small Business Vouchers Program. Drawing on lessons learned and from first-hand experiences, NREL is leading a new holistic and streamlined voucher program aimed at strengthening ties between American innovators and the national labs. This new program, “Vouchers to Enable Laboratory and Organizational Collaboration for Innovation and Technology Improvements,” or VELOCITI, will leverage the successful elements of past programs, create administrative efficiencies, and enable the buildout of a national program to drive strong relationships between entrepreneurs and the national labs to accelerate the roll-out of new technologies in the US solar sector. This work will evaluate Hawaii Fish Company’s (HFC’s) floating renewable energy-powered aeration systems, designed primarily for aquaculture ponds, with crossover applications to farm ponds, reservoirs, and other water bodies. Notably, HFC’s systems include a variety of configurations, such as direct-solar systems, battery-storage systems, and systems with a secondary wind turbine option. HFC is planning to refine and commercialize their renewable energy aeration platforms. Presently, HFC is fabricating multiple configurations of the systems for deployment in multiple locations in the U.S. PNNL will apply technical expertise to assist in these goals, benefitting the industry partner by giving them an understanding of the performance of their systems. The technical objectives of this project are to understand system performance and reliability, determine a path toward certification, and model the performance of the systems in different locations.

99 GENERAL AND MISCELLANEOUS↗

An Operations and Maintenance Roadmap for U.S. Offshore Wind: Enabling a Cost-Effective and Sustainable U.S. Offshore Wind Energy Industry Through Innovative Operations and Maintenance

The United States is currently targeting 30GW of offshore wind to be installed by 2030, and 150GW by 2050. Even considering future turbine sizes, this represents thousands of new turbines installed in a diverse set of environments, each with their unique design, installation, and maintenance challenges. While much can be learned from European and Asian experience with offshore wind over the past two decades, it is important to understand the unique circumstances of the U.S. This document explores operations and maintenance of offshore wind energy, specific to the U.S. and attempts to lay out a roadmap for needed activities to ensure reliability of future installations. The roadmap was informed through dozens of interviews with a wide cross-section of the industry, including representatives from OEMs, owner/operators, service companies, certification agencies, service providers, and researchers. The roadmap first describes the problem by component - blades, drivetrain and nacelle, structures and foundations, and electrical systems - through a look at current practices and opportunities for improvement in the areas of Failure Mode Analysis and Mitigation; Monitoring, Sensing, and Inspection; and Maintenance Execution. Crosscutting areas of Digitalization, Robotics and Automation, Prognostics and Health Management and O&M Optimization, Experimentation and Demonstration, Standardization, and Design Optimization Considering Reliability and O&M are then discussed. Finally, the roadmap summarizes all of these topics with recommendations for short (1-3 years), medium (4-7 years), and long term (8-12 years) activities, with a description of needed public and private sector contributions.

17 WIND ENERGY↗

Scale Model Icing Research Tunnel

NASA Lewis Research Center's Icing Research Tunnel (IRT) is the world's largest refrigerated wind tunnel and one of only three icing wind tunnel facilities in the United States. The IRT was constructed in the 1940's and has been operated continually since it was built. In this facility, natural icing conditions are duplicated to test the effects of inflight icing on actual aircraft components as well as on models of airplanes and helicopters. IRT tests have been used successfully to reduce flight test hours for the certification of ice-detection instrumentation and ice protection systems. To ensure that the IRT will remain the world's premier icing facility well into the next century, Lewis is making some renovations and is planning others. These improvements include modernizing the control room, replacing the fan blades with new ones to increase the test section maximum velocity to 430 mph, installing new spray bars to increase the size and uniformity of the artificial icing cloud, and replacing the facility heat exchanger. Most of the improvements will have a first-order effect on the IRT's airflow quality. To help us understand these effects and evaluate potential improvements to the flow characteristics of the IRT, we built a modular 1/10th-scale aerodynamic model of the facility. This closed-loop scale-model pilot tunnel was fabricated onsite in the various shops of Lewis' Fabrication Support Division. The tunnel's rectangular sections are composed of acrylic walls supported by an aluminum angle framework. Its turning vanes are made of tubing machined to the contour of the IRT turning vanes. The fan leg of the tunnel, which transitions from rectangular to circular and back to rectangular cross sections, is fabricated of fiberglass sections. The contraction section of the tunnel is constructed from sheet aluminum. A 12-bladed aluminum fan is coupled to a turbine powered by high-pressure air capable of driving the maximum test section velocity to 550 ft/sec (Mach 0.45). The air turbine and instrumentation are housed inside a fiberglass nacelle. Total and static pressure measurements can be taken around the loop, and velocity and flow angularity measurements can be taken with hot-wire and five-hole probes at specific locations. The Scale Model Icing Research Tunnel (SMIRT) is undergoing checkout tests to determine how its airflow characteristics compare with the IRT. Near-term uses for this scale-model tunnel include determining the aerodynamic effects of replacing the 52-yearold W-shaped heat exchanger with a flat-faced heat exchanger. SMIRT is an integral part of the improvements planned for the IRT because testing the proposed IRT improvements in a scale-model tunnel will lower costs and improve productivity.

Canacci, Victor A.↗