Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “water segmentation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

History, Current Operations and Management of Water Systems on the International Space Station

In November 2000, the Expedition 1 crew to the International Space Station (ISS) arrived onboard, thus beginning a 19+ year need to provide potable water to the crew, as well as water to key life support systems. For the first 8 years of ISS operations, the water systems' operations were relatively simple. It consisted of manifesting water via cargo ships or generated via the Space Shuttle fuel cells and stored on ISS to supplement the water processing systems on the Russian segment of the ISS. In 2008, the Water Processor Assembly (WPA), Urine Processor Assembly (UPA), along with a U.S. provided toilet arrived onboard, supplementing the Oxygen Generator Assembly (OGA). This new equipment, known as Regen ECLSS (Regenerative Environmental Control and Life Support Systems), provided a significant capability in recycling fluid within the ISS and minimized manifestation needs. Early in the operations of the Regen ECLSS system, it became clear that the tank capacities were under sized. This led to excessive use of costly crew time to perform water operations. In 2012, a group of ISS flight controllers and engineers proposed and developed a new system that would provide integrated water tanks that could be fully operated from Mission Control on the ground to move water around within the systems. This system has very recently been installed on the ISS and commissioning operations have occurred. This paper will provide a general history of water operations on the ISS, as new systems arrived, and new operations were required. Challenges with water balance, to both avoid overfilling the system as well as avoid running out of water, will be discussed, along with touching on the convoluted steps the Flight Control team had to perform daily to predict future water needs. Finally, the new water storage system will be discussed and the benefits it brings to ISS water operations.

Christopher A Brown↗

International Space Station USOS Potable Water Dispenser On-Orbit Functionality vs Design

The International Space Station (ISS) currently provides potable water dispensing for rehydrating crewmembers food and drinking packages with one system located in the United States On-orbit Segment (USOS) and one system in the Russian Segment. The USOS Potable Water Dispenser (PWD) was delivered to ISS on ULF2, Shuttle Mission STS-126, and was subsequently activated in November 2008. The PWD activation on ISS is capable of supporting an ISS crew of six but nominally supplies only half the crew. The PWD is designed to provide incremental quantities of hot and ambient temperature potable water to US style food packages. PWD receives iodinated water from the US Laboratory Fuel Cell Water Bus, which is fed from the Water Processing Assembly (WPA). The PWD removes the biocidal iodine to make the water potable prior to dispensing. A heater assembly contained within the unit supplies up to 2.0 liters of hot water (65 to 93oC) every thirty minutes. This quantity supports three to four crewmembers to rehydrate their food and beverages from this location during a single meal. The unit is designed to remain functional for up to ten years with replacement of limited life items such as filters. To date, the PWD on-orbit performance has been acceptable. Since activation of the PWD, there have been several differences between on-orbit functionality and expected performance of hardware design. The comparison of on-orbit functionality to performance of hardware design is outlined for the following key areas: microbiology, PWD to food package water leakage, no-dispense scenarios, under-dispense scenarios, and crewmember feedback on actual on-orbit use.

Toon, Katherine P.↗

Regenerative (Regen) ECLSS Operations Water Balance

In November 2008, the Water Regenerative System racks were launched aboard Space Shuttle flight, STS-126 (ULF2) and installed and activated on the International Space Station (ISS). These racks, consisting of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA), completed the installation of the Regenerative (Regen) ECLSS systems which includes the Oxygen Generator Assembly (OGA) that was launched 2 years prior. With the onset of active water management on the US segment of the ISS, a new operational concept was required, that of "water balance." Even more recently, in 2010 the Sabatier system came online which converts H2 and CO2 into water and methane. The Regen ECLSS systems accept condensation from the atmosphere, urine from crew, and processes that fluid via various means into potable water which is used for crew drinking, building up skip-cycle water inventory, and water for electrolysis to produce oxygen. Specification rates of crew urine output, condensate output, O2 requirements, toilet flush water and drinking needs are well documented and used as a general plan when Regen ECLSS came online. Spec rates are useful in long term planning, however, daily or weekly rates are dependent on a number of variables. The constantly changing rates created a new challenge for the ECLSS flight controllers, who are responsible for operating the ECLSS systems onboard ISS. This paper will review the various inputs to rate changes and inputs to planning events, including but not limited to; crew personnel makeup, Regen ECLSS system operability, vehicle traffic, water containment availability, and Carbon Dioxide Removal Assembly (CDRA) capability. Along with the inputs that change the various rates, the paper will review the different systems, their constraints and finally the operational means by which flight controllers manage this new challenge of "water balance."

Tobias, Barry↗

International Space Station Water Balance Operations

In November 2008, the Water Regenerative System racks were launched aboard Space Shuttle flight, STS-126 (ULF2) and installed and activated on the International Space Station (ISS). These racks, consisting of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA), completed the installation of the Regenerative (Regen) Environmental Control and Life Support Systems (ECLSS), which includes the Oxygen Generation Assembly (OGA) that was launched 2 years prior. With the onset of active water management on the US segment of the ISS, a new operational concept was required, that of water balance . In November of 2010, the Sabatier system, which converts H2 and CO2 into water and methane, was brought on line. The Regen ECLSS systems accept condensation from the atmosphere, urine from crew, and processes that fluid via various means into potable water, which is used for crew drinking, building up skip-cycle water inventory, and water for electrolysis to produce oxygen. Specification (spec) rates of crew urine output, condensate output, O2 requirements, toilet flush water, and drinking needs are well documented and used as the best guess planning rates when Regen ECLSS came online. Spec rates are useful in long term planning, however, daily or weekly rates are dependent upon a number of variables. The constantly changing rates created a new challenge for the ECLSS flight controllers, who are responsible for operating the ECLSS systems onboard ISS from Mission Control in Houston. This paper reviews the various inputs to water planning, rate changes, and dynamic events, including but not limited to: crew personnel makeup, Regen ECLSS system operability, vehicle traffic, water storage availability, and Carbon Dioxide Removal Assembly (CDRA), Sabatier, and OGA capability. Along with the inputs that change the various rates, the paper will review the different systems, their constraints, and finally the operational challenges and means by which flight controllers manage this new concept of "water balance."

Tobias, Barry↗

Market trends

A very large segment of the over water, long haul passenger market, 31% of the passengers who provide 42% of the passenger revenue, offers a significant market for an advanced supersonic transport. This is for both the first class and full-fare economy passenger markets. The supersonic transport may be more competitive here in spite of lower costs of subsonic transports, as passenger preference is a more powerful variable than DOC. This latter fact was amply demonstrated in the late fifties when the jets completely replaced the reciprocating engine transports on most world routes, in spite of slightly higher fares.

Fitzsimmons, R. D.↗

Anode arc motion in high power arcjets

The long-term operational lifetime of most medium to high power arcjets is currently limited by the rapid deterioration of the arcjet electrodes. To a large extent, the rate of this deterioration is related to the motion of the arc discharge on the electrode surfaces. This paper details a series of experiments aimed at studying the temporal behavior of dc arcs on a water-cooled radially-segmented 30 kW class arcjet anode. The experimental anode used for these tests was made of copper, and was divided into four equivalent radial segments which were electrically isolated with aluminum oxide gaskets. The current carried by each segment was measured independently using four calibrated resistive shunts, and was analyzed by digital computer. The tests were limited to nitrogen propellant over a current range of 100-250 A dc. Results show that for the range of total currents considered here, the current distribution in the segmented arcjet anode is generally asymmetric, exhibiting random fluctuations over a wide range of frequencies.

Harris, W. J.↗

Augmentation of blood circulation to the fingers by warming distant body areas

Future activities in space will require greater periods of time in extreme environments in which the body periphery will be vulnerable to chilling. Maintaining the hands and fingers in comfortable conditions enhances finger flexibility and dexterity, and thus effects better work performance. We have evaluated the efficacy of promoting heat transfer and release by the extremities by increasing the blood flow to the periphery from more distant parts of the body. The experimental garment paradigm developed by the investigators was used to manipulate the temperature of different body areas. Six subjects, two females and four males, were evaluated in a stage-1 baseline condition, with the inlet temperature of the circulating water in the liquid cooling/warming garment (LCWG) at 33 degrees C. At stage 2 the total LCWG water inlet temperature was cooled to 8 degrees C, and at stage 3 the inlet water temperature in specific segments of the LCWG was warmed (according to protocol) to 45 degrees C, while the inlet temperature in the rest of the LCWG was maintained at 8 degrees C. The following four body-area-warming conditions were studied in separate sessions: (1) head, (2) upper torso/arm, (3) upper torso/arm/head, and (4) legs/feet. Skin temperature, heat flux and blood perfusion of the fingers, and subjective perception of thermal sensations and overall physical comfort were assessed. Finger temperature (T(fing)) analyses showed a statistically significant condition x stage interaction. Post-hoc comparisons (T(fing)) indicated that at stage 3, the upper torso/arm/head warming condition was significantly different from the head, upper torso/arm and legs/feet conditions, showing an increase in T(fing). There was a significant increase in blood perfusion in the fingers at stage 3 in all conditions. Subjective perception of hand warmth, and overall physical comfort level significantly increased in the stage 3 upper torso/arm/head condition. The findings indicate that physiological methods to enhance heat transfer by the blood to the periphery within protective clothing provide an additional tool for increasing total and local human comfort in extreme environments.

NASA Discipline Life Sciences Technologies↗

Assessing Alaskan boreal forest landcover affected by climate-wildfire interactions from ground truth surveys and NASA airborne remote sensing

Alaska’s boreal forest is facing unprecedented challenges under rapid climate warming (increasingly severe fires, droughts, pest/disease outbreaks) that may destabilize its function as a global carbon sink. Forests near Fairbanks may be especially vulnerable, impacting air quality and ecosystem services. We combined GT (ground truthing) with Airborne Visible InfraRed Imaging Spectrometer (AVIRIS-NG) images collected by the NASA Arctic-Boreal Vulnerability Experiment (ABoVE) program (2017-2019) to assess landcover change at five recently burned sites (2001-2019) of different fire severities and moisture regimes within 30 miles of Fairbanks. GT included tree seedling counts, understory % cover and >50% leaf canopy color assessment. 36 circular plots (1/30 ha radius) including 6 moderate to severely burned plots were selected across sites. 31 additional sites including 12 burned sites were geotagged in photos. AVIRIS images were processed from 29 spectral bands selected to identify changes in chlorophyll and water content. Images were segmented into natural boundaries (polygons) using ENVI 5.5 software. A spectral library of 8 AVIRIS bands with high between-class/low within-class variation was used in two random forest models to predict vegetation classes (model 1: 12 classes, model 2: 14 classes) in each AVIRIS scene, using 20% of the data as training data. Model 2 classified 20% more polygons overall, but only 42% of GT/geotagged polygons were correctly classified by both models. More forest sites were correctly classified (63%) than open vegetation (32%) or post-fire sites (46%). 50% of aspen forest and post-fire polygons were misclassified as shrubland. GT revealed that post-fire plots supported 134,000 (± 48,000) tree seedlings and saplings ha-1 (0.2 - 4 m height, 64% deciduous) versus 2500 (± 2100) shrubs ha-1 (1-6 m height). > 50% canopy browning was observed in conifer forest (8 plots) with no signs of insect infestation. Canopy herbivory > 50% (leaf miner, leaf beetle) and moose herbivory of tree bark was seen across aspen sites. Our study suggests: 1) low canopy vegetation presents challenges for improved landcover classification, and 2) aspen forest should be differentiated in vegetation maps which would aid in tracking herbivory.

Alaska↗

Development of the International Space Station (ISS) Fine Water Mist (FWM) Portable Fire Extinguisher

NASA is developing a Fine Water Mist Portable Fire Extinguisher for use on the International Space Station. The International Space Station presently uses two different types of fire extinguishers: a water foam extinguisher in the Russian Segment, and a carbon dioxide extinguisher in the US Segment and Columbus and Kibo pressurized elements. Changes in emergency breathing equipment make Fine Water Mist operationally preferable. Supplied oxygen breathing systems allow for safe discharge of a carbon dioxide fire extinguisher, without concerns of the crew inhaling unsafe levels of carbon dioxide. But the Portable Breathing Apparatus (PBA) offers no more than 15 minutes of capability, and continued use of hose based supplied oxygen system increases the oxygen content in a fire situation. NASA has developed a filtering respirator cartridge for use in a fire environment. It is qualified to provide up to 90 minutes of capability, and because it is a filtering respirator it does not add oxygen to the environment. The fire response respirator cartridge does not filter carbon dioxide (CO2), so a crew member discharging a CO2 fire extinguisher while wearing this filtering respirator would be at risk of inhaling unsafe levels of CO2. Fine Water Mist extinguishes a fire without creating a large volume of air with reduced oxygen and elevated CO2. From a flight hardware design perspective, the fine water mist fire extinguisher has two major elements: (1) the nozzle and crew interface, and (2) the tank. The nozzle and crew interface has been under development for several years. It has gone through several design iterations, and has been part of more than 400 fire challenge and spray characterizations. The crew and vehicle interface aspects of the design will use the heritage of the CO2 based Portable Fire Extinguisher, to minimize the disruption to the crew and integration impacts to the ISS. The microgravity use environment of the system poses a set of unique design requirements specifically for the tank. The nozzle requirements drive a tank pressure that is 2-5 times higher than any commercially available water mist systems. Microgravity requires deliberate separation of gas and water, facilitated by a bladder, a diaphragm, a piston, or separate tanks. This paper will describe the design details of the tank and the nozzle, and discuss the trade studies that informed the decisions to select the tank and nozzle configuration.

Clements, Anna L.↗

Developing Standards to Qualify a Fine Water Mist Fire Extinguisher for Human Spaceflight

NASA is developing a Fine Water Mist Portable Fire Extinguisher for use on the International Space Station. The International Space Station presently uses two different types of fire extinguishers: a water foam extinguisher in the Russian Segment, and a carbon dioxide extinguisher in the US Segment and Columbus and Kibo pressurized elements. Changes in emergency breathing equipment make Fine Water Mist operationally preferable. Supplied oxygen breathing systems allow for safe discharge of a carbon dioxide fire extinguisher, without concerns of the crew inhaling unsafe levels of carbon dioxide. But the Portable Breathing Apparatus offers no more than 15 minutes of capability, and continued use of hose based supplied oxygen systems increases the oxygen content in a fire situation. NASA has developed a filtering respirator cartridge for use in a fire environment. It is qualified to provide up to 90 minutes of capability, and because it is a filtering respirator it does not add oxygen to the environment. The fire response respirator cartridge does not filter carbon dioxide, so a crew member discharging a CO2 fire extinguisher while wearing this filtering respirator would be at risk of inhaling unsafe levels of CO2. Fine Water Mist extinguishes a fire without creating a large volume of air with reduced oxygen and elevated CO2. Compared to the carbon dioxide based Portable Fire Extinguisher, the flight qualification of Fine Water Mist systems requires special care. Qualification of the CO2 based Portable Fire Extinguisher began with the assumption that any fire on ISS would be extinguished if the air in the fire environment reached a critical concentration of CO2. Qualification of a CO2 based system requires the developers to make assertions and assumptions about vehicle geometry and the ability of the extinguisher to deliver CO2 in different geometric configurations, but the developers did not need to make assertions or assumptions about the size of the fire, the temperature, or the heat generation rate. Fine Water Mist systems extinguish a fire predominantly by removing heat -- so qualification standards must evaluate geometry, but also temperature, heat transfer, and heat generation rate. This paper outlines and describes the methods used to develop standards used to qualify Fine Water Mist systems for a human spaceflight environment.

Graf, John↗

Development of the International Space Station (ISS) Fine Water Mist (FWM) Portable Fire Extinguisher ICES Abstract

NASA is developing a Fine Water Mist (FWM) Portable Fire Extinguisher (PFE) for use on the International Space Station. The International Space Station presently uses two different types of fire extinguishers: a water foam extinguisher in the Russian Segment, and a carbon dioxide extinguisher in the US Segment and Columbus and Kibo pressurized elements. Changes in emergency breathing equipment make Fine Water Mist operationally preferable. Supplied oxygen breathing systems allow for safe discharge of a carbon dioxide fire extinguisher, without concerns of the crew inhaling unsafe levels of carbon dioxide. But the Portable Breathing Apparatus (PBA) offers no more than 15 minutes of capability, and continued use of hose based supplied oxygen system increases the oxygen content in a fire situation. NASA has developed a filtering respirator cartridge for use in a fire environment. It is qualified to provide up to 90 minutes of capability, and because it is a filtering respirator it does not add oxygen to the environment. The fire response respirator cartridge does not filter carbon dioxide (CO2), so a crew member discharging a CO2 fire extinguisher while wearing this filtering respirator would be at risk of inhaling unsafe levels of CO2. FWM extinguishes a fire without creating a large volume of air with reduced oxygen and elevated CO2. The following paper will discuss the unique functional and performance requirements that have been levied on the FWM PFE. In addition, the NASA ISS specific fire standards will be described which were developed to establish acceptable extinguisher performance. The paper will also discuss the flight hardware design. The fin e water mist fire extinguisher has two major elements: (1) the nozzle and crew interface, and (2) the tank. The nozzle and crew interface have been under development for several years. They have gone through several design iterations, and have been part of more than 400 fire challenge and spray characterizations. The crew and vehicle interface aspects of the design will use the heritage of the CO2 based Portable Fire Extinguisher, to minimize the disruption to the crew and integration impacts to the ISS. The microgravity use environment of the system poses a set of unique design requirements specifically for the tank. The nozzle requirements drive a tank pressure that is 2-5 times higher than any commercially available water mist systems. Microgravity requires deliberate separation of gas and water, facilitated by a bladder, a diaphragm, a piston, or separate tanks. This paper will describe status of the project to date, the design details of the tank and the nozzle, and discuss the trade studies that informed the decisions to select the tank and nozzle configuration.

Clements, Anna L.↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of June 2012, and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of May 2011, and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of June 2013, and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment, and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of May 2015 and describes the technical challenges encountered and lessons learned over the past two years.

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of May 2016 and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗

Status of ISS Water Management and Recovery

Water management on ISS is responsible for the provision of water to the crew for drinking water, food preparation, and hygiene, to the Oxygen Generation System (OGS) for oxygen production via electrolysis, to the Waste & Hygiene Compartment (WHC) for flush water, and for experiments on ISS. This paper summarizes water management activities on the ISS US Segment and provides a status of the performance and issues related to the operation of the Water Processor Assembly (WPA) and Urine Processor Assembly (UPA). This paper summarizes the on-orbit status as of June 2017 and describes the technical challenges encountered and lessons learned over the past year.

Carter, Layne↗

Poly(imide-siloxane) segmented copolymer structural adhesives prepared by bulk and solution thermal imidization

The improved properties that have been demonstrated through thermal solution imidization in the case of polyimides and poly(imide-siloxane) segmented copolymers suggests significant potential for application of these new materials. Specifically, the enhancement in solubility, moisture reduction, and processability observed through this solution technique is quite dramatic. Previous work has shown that the presence of low amounts of siloxane does not detract significantly from the lap shear strength of these materials to titanium in the case of bulk thermal imidization synthesis. In addition, the siloxane incorporation results in the added advantage of resistance to hot, wet environments. This added durability is presumably due to the hydrophobic siloxane segments preventing the uptake of water at the critical interphase between the adhesive and the adherend. This paper discusses the extension of this work to the solution imidization synthesis technique recently developed in our laboratory. Results dealing with the absolute bond strengths as well as durability and failure surface analysis will be presented.

Bott, R. H.↗