Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “waste management system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Dual Fan Separator within the Universal Waste Management System

Since NASA's new spacecraft in development for both LEO and Deep Space capability have considerable crew volume reduction in comparison to the Space Shuttle, the need became apparent for a smaller commode. In response the Universal Waste Management System (UWMS) was designed, resulting in an 80% volume reduction from the last US commode, while enhancing performance. The ISS WMS and previous shuttle commodes have a fan supplying air flow to capture feces and a separator to capture urine and separate air from the captured air/urine mixture. The UWMS combined both rotating equipment components into a single unit, referred to at the Dual Fan Separator (DFS). The combination of these components resulted in considerable packaging efficiency and weight reduction, removing inter-component plumbing, individual mounting configurations and required only a single motor and motor controller, in some of the intended UWMS platform applications the urine is pumped to the ISS Urine Processor Assembly (UPA) system. It requires the DFS to include less than 2.00% air inclusion, by volume, in the delivered urine. The rotational speed needs to be kept as low as possible in centrifugal urine separators to reduce air inclusion in the pumped fluid, while fans depend on rotational speed to develop delivered head. To satisfy these conflicting requirements, a gear reducer was included, allowing the fans to rotate at a much higher speed than the separator. This paper outlines the studies and analysis performed to develop the DFS configuration. The studies included a configuration trade study, dynamic stability analysis of the rotating bodies and a performance analysis of included labyrinth seals. NASA is considering a program to fly the UWMS aboard the ISS as a flight experiment. The goal of this activity is to advance the Technical Readiness Level (TRL) of the DFS and determine if the concept is ready to be included as part of the flight experiment deliverable.

Stapleton, Tom↗

Dual Fan Separator within the Universal Waste Management System

Since NASA's new spacecraft in development for both LEO and Deep Space capability have considerable crew volume reduction in comparison to the Space Shuttle, it is clear that NASA requires a smaller and less expensive commode. The UTAS Universal Waste Management System (UWMS) was designed to address these new constraints, resulting in an 80% volume reduction in the cabin while enhancing performance. Whereas all of the current space commodes use air flow to capture both urine and feces and separate air from the captured air/urine mixture, the UWMS commode and urine fans and the urine separator were combined into a single unit. This unit enables use of a single motor and motor controller, which provides considerable packaging and weight efficiency. In some of the intended platform applications for the UWMS, the urine is pumped to a water reclamation system. The ISS Urine Processor Assembly (UPA) system requires delivered urine to include less than 0.25% air inclusion. Air inclusion in centrifugal urine separators is greatly dependent on its rotational speed. To satisfy this requirement, a gear reducer was included, allowing the fans to rotate at a much higher speed than the separator. This new design, the Dual Fan Separator (DFS) has been designed, prototyped and tested. This paper will outline the studies and analysis performed to develop the design configuration for testing. The studies included a configuration trade study, dynamic stability analysis of the rotating bodies and a performance analysis of included labyrinth seals. NASA is considereing a program to fly the UWMS aboard the ISS as a flight experiment. The goal of the design activity is to elevate the Technical Readiness Level (TRL) of the Dual Fan Separator and determine if the concept is ready to be included in flight experiment deliverable.

Stapleton, Tom↗

An Analysis of Potentially Implementing Standardized Canisters in the U.S. Commercial Waste Management System

This analytical study focuses on loading standardized transportation, aging, and disposal canisters (STADs) at commercial reactor sites and subsequent transportation, e.g., to a consolidated interim storage facility (CISF). Specifically, the amount of spent nuclear fuel (SNF) available to load into STADs with varying deployment dates is explored, and the scenarios are compared with a scenario in which STADs are never loaded at reactor sites. Two key findings are that about half of the U.S. inventory of commercial SNF could be captured in STADs if they were fully deployed by 2035 and that the percentage of SNF available to load into STADs decreases as STAD deployment is delayed.In additional scenarios, the effects of shipping STADs directly from at-reactor spent fuel pools (SFPs) to a CISF are analyzed for a STAD full deployment year of 2035. A key finding from the analysis is that the dry storage of SNF in STADs at reactor sites can be minimized by direct shipment to a CISF from reactor site SFPs. Furthermore, minimizing dry storage at reactor sites means maximizing the receipt rate for STADs at a CISF, and there is likely a more optimal point between the two scenarios for an overall cost-effective operation of waste management systems.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Universal Waste Management System

NASA is working with a number of commercial companies to develop the next low Earth orbit spacecraft. The hardware volume and weight constraints are similar to or greater than those of the Apollo era. This, coupled with the equally demanding cost challenge of the proposed commercial vehicles, causes much of the Environmental Control and Life Support System (ECLSS) designs to be reconsidered. The Waste Collection System (WCS) is within this group of ECLSS hardware. The development to support this new initiative is discussed within. A WCS concept - intended to be common for all the vehicle platforms currently on the drawing board - is being developed. The new concept, referred to as the Universal Waste Management System (UWMS), includes favorable features from previous designs while improving on other areas on previous Space Shuttle and the existing International Space Station (ISS) WCS hardware, as needed. The intent is to build a commode that requires less crew time, improved cleanliness, and a 75% reduction in volume and weight compared to the previous US ISS/Extended Duration Orbitor WCS developed in the 1990s. The UWMS is most similar to the ISS Development Test Objective (DTO) WCS design. It is understood that the most dramatic cost reduction opportunity occurs at the beginning of the design process. To realize this opportunity, the cost of each similar component between the UWMS and the DTO WCS was determined. The comparison outlined were the design changes that would result with the greatest impact. The changes resulted in simplifying the approach or eliminating components completely. This initial UWMS paper will describe the system layout approach and a few key features of major components. Future papers will describe the UWMS functionality, test results, and components as they are developed.

Stapleton, Thomas J.↗

Integrated water and waste management system for future spacecraft

Over 200 days of continuous testing have been completed on an integrated waste management-water recovery system developed by General Electric under a jointly funded AEC/NASA/AF Contract. The 4 man system provides urine, feces, and trash collection; water reclamation; storage, heating and dispensing of the water; storage and disposal of the feces and urine residue and all of other nonmetallic waste material by incineration. The heat required for the 1200 deg F purification processes is provided by a single 420-w radioisotope heater. A second 836-w radioisotope heater supplemented by 720 w of electrical heat provides for distillation and water heating. Significant test results are no pre-or-post treatment, greater than 98 per cent potable water recovery, approximately 95 per cent reduction in solids weight and volume, all outflows are sterile with the water having no bacteria or virus, and the radioisotope capsule radiation level is only 7.9 mrem/hr unshielded at 1 m (neutrons and gamma).

Ingelfinger, A. L.↗

Environmental control and waste management system design concept

Passive device contains both solid and liquid animal waste matter for extended period without being cleaned and without contaminating animal. Constant airflow dries solid waste and evaporates liquid matter. Technique will maintain controlled atmospheric conditions and cage cleanliness during periods of 6 months to 1 year.

Gandy, A. R.↗

Design for waste-management system

Study was made and system defined for water-recovery and solid-waste processing for low-rise apartment complexes. System can be modified to conform with unique requirements of community, including hydrology, geology, and climate. Reclamation is accomplished by treatment process that features reverse-osmosis membranes.

Guarneri, C. A.↗

Wet-oxidation waste management system for CELSS

A wet oxidation system will be useful in the Closed Ecological Life Support System (CELSS) as a facility to treat organic wastes and to redistribute inorganic compounds and elements. However at rather higher temperatures needed in this reaction, for instance, at 260 deg C, only 80% of organic in a raw material can be oxidized, and 20% of it will remain in the liquid mainly as acetic acid, which is virtually noncombustible. Furthermore, nitrogen is transformed to ammonium ions which normally cannot be absorbed by plants. To resolve these problems, it becomes necessary to use catalysts. Noble metals such as Ru, Rh and so on have proved to be partially effective as these catalysts. That is, oxidation does not occur completely, and the unexpected denitrification, instead of the expected nitrification, occurs. So, it is essential to develop the catalysts which are able to realize the complete oxidation and the nitrification.

Takahashi, Y.↗

Plasma reactor waste management systems

The University of North Dakota is developing a plasma reactor system for use in closed-loop processing that includes biological, materials, manufacturing, and waste processing. Direct-current, high-frequency, or microwave discharges will be used to produce plasmas for the treatment of materials. The plasma reactors offer several advantages over other systems, including low operating temperatures, low operating pressures, mechanical simplicity, and relatively safe operation. Human fecal material, sunflowers, oats, soybeans, and plastic were oxidized in a batch plasma reactor. Over 98 percent of the organic material was converted to gaseous products. The solids were then analyzed and a large amount of water and acid-soluble materials were detected. These materials could possibly be used as nutrients for biological systems.

Ness, Robert O., Jr.↗

ECLSS Universal Waste Management System (UWMS) Metal Materials Compatibility Study - Elgiloy: Electrochemical and Crevice Corrosion Evaluation

Electrochemical evaluations were conducted on samples of Elgiloy in support of the materials compatibility program for the Environmental Control and Life Support System (ECLSS). Results were compared alongside three previously tested metals: Titanium 6Al-4V, Inconel 625, and Hastelloy C276. Titanium exhibited the best results of all the metals, indicating superior corrosive nobility and galvanic protection properties. Elgiloy demonstrated anti-corrosion behavior which appeared to be superior to the two nickel-chromium alloys. For this current effort, the results have clearly shown that Elgiloy possesses excellent corrosion protection properties and is galvanically compatible with the other three metals in the subject test media.

Lee, R. E.↗

Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

Hinners, A. H., Jr.↗