SX Tank Farm Interim Surface Barrier Vadose Zone Monitoring

The Hanford Site, in southeastern Washington State, has 149 underground single-shell tanks to store hazardous radioactive waste. A number of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. While some of the leaked waste has entered the groundwater, the majority still resides in the vadose zone. Corrective measures are being taken to mitigate the groundwater impacts from past leaks and spills from contaminants that still reside within the vadose zone. Washington River Protection Solutions, LLC, constructed two interim surface barriers (identified as south and north ISBs) in 2018 over the southern portion of the 241-SX Tank Farm to minimize the migration of the residual contaminants in the vadose zone. Two monitoring instrument nests were installed in 2018 and the data acquisition system was put into function in September 2019. This document summarizes the monitoring methods, the instrument calibration and installation, and the vadose zone monitoring plan for the interim barriers in the SX tank farm.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PORFLOW modeling of Vadose zone flow and transport for the E-area intermediate level vault

In support of the E-Area Performance Assessment, a two-dimensional model of water flow and radionuclide transport through the E-Area Intermediate Level Vault (ILV) and local vadose zone has been developed using the PORFLOWTM software. The purpose of the model is to calculate flux to the water table for radionuclides eluted from the ILV during its operational life, the period of institutional control, and times following site closure. Results of model calculations will be used by a three-dimensional PORFLOW model of transport through the aquifer to determine radionuclide concentrations at a hypothetical 100 meter well and at the site boundary where contaminated groundwater could be assessed by members of the public following site closure. While newly developed, the model structure closely follows that used in the 2008 PA while incorporating a refined computational mesh, updated material properties for the vadose zone soil and vault concrete, revised infiltration rates, and new solid-liquid distribution coefficients. The model also addresses degradation of concrete hydraulic properties by blending soil and concrete water retention curves over a 500 year period. That is, the hydraulic properties of ILV concrete start out as fresh concrete at the time of site closure and degrade to soil properties over a 500 year time period. This approach has not been used previously in E-Area PA’s. The model has been used to calculate water flow through the ILV vadose zone and, on a trial basis, transport of a limited number of radionuclides from the waste region inside the ILV to the water table. Figure ES-1 provides a view of the model and an example of water flow after the concrete has substantially degraded. Figure dimensions are in centimeters. The red area in the left hand side figure is the waste disposal region within the ILV. Colored bands in the figures indicate different soil and concrete regions. Figure ES-2 shows a calculation of flux to the water table (mol/yr) for U-234 and its one-year half-life decay chain (U-234 → Th-230 → Ra-226 → Pb-210). Pb-210 flux is too small to show on the same scale used for Th-230 and Ra-226 in Figure ES-2. The model has also been used to make a preliminary evaluation of the release of tritium from TPBAR disposal containers that will be place in the ILV. A separately calculated tritium release rate as a function of time was used as a source in the PORFLOW model. The TPBAR disposal schedule and tritium release rate differ from the values used in the 2008 PA. Results from these initial trial runs are compared to calculations made for the 2008 PA ILV analysis. In brief, a new PORFLOW model of flow and transport through the ILV vadose zone has been developed and tested. The model is ready to be used for PA calculations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a vadose zone advanced monitoring system: Tools to assess groundwater vulnerability

Performing repeat pore-fluid sampling over long time-scales can provide valuable information on unsaturated zone contaminants and their potential flux to ground water. This information can be used to manage groundwater remedies and identify contaminants that need to be sequestered in the vadose zone to minimize flux to ground water. Pore-water samples are commonly used to obtain contaminant concentrations within the vadose zone, but existing methods are limited as they only provide a single sample at one location and time. The vadose zone advanced monitoring system (VZAMS) has been designed to integrate multiple technologies into a single down-borehole system that allows for sampling of pore fluids (liquid and gas) to provide information about contamination and hydraulic conditions at multiple depths (~0.3-m intervals) within a cased borehole. Testing has been completed at the laboratory scale to verify the sampling elements of VZAMS, including geochemical testing for representative contaminants known to exist at the Hanford Site, located in southeastern Washington State. Physical tests focused on the ability of the sampler to draw fluid under unsaturated conditions. Initial geochemical testing showed that the stainless steel material used with the porous cuff may affect the sampled concentrations of redox-sensitive contaminants under very dry conditions. Additional laboratory testing demonstrated that the VZAMS components are able to collect representative samples for substances of interest under expected field conditions. In this paper, the design and functionality of a novel instrument are demonstrated in support of subsequent testing in the field.

54 ENVIRONMENTAL SCIENCES↗

Model Package Report: Central Plateau Vadose Zone Models

This model package report describes concisely the modeling objectives, conceptualization, implementation, uncertainty and sensitivity, configuration control, limitations, data needs, and recommendations for improvement of the Central Plateau Vadose Zone Models. This collection of models is developed to meet the vadose zone simulation needs of the Hanford Site Composite Analysis (CA), the Hanford Site Cumulative Impact Evaluation (CIE), and are expected to find other applications in Hanford Site remedial cleanup decision-making processes. This model package report describes and documents the development of the models themselves to fulfill technical approaches defined for the CA and the CIE. This report does not document any specific calculation using these models: instead, applications of individual vadose models to perform specific calculations will be documented in environmental calculation files, including inputs and results, as appropriate. Configuration management for the Central Plateau Vadose Zone Models is managed through assignment of unique sequential numerical version numbers and archival of the models in the Environmental Modeling Management Archive.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrating Electrical Resistivity Tomography with Vadose Zone Characterization - 20246

The environmental management mission at the U.S. Department of Energy Hanford Site includes addressing subsurface contaminants that are present in the vadose zone because of historical waste discharges. Characterization is needed to support evaluation of whether contaminants at specific disposal sites will migrate to and contaminate the groundwater in the future. Drilling of boreholes and analysis of retrieved sediment samples is a standard approach to evaluating contaminant distribution in the vadose zone for the types of inorganic and radionuclide contaminants at the Hanford Site. However, borehole sampling has limitations for understanding the volumetric distribution of contaminants. The Hanford Site is now applying electrical resistivity tomography to characterize the path and volumetric extent of contaminant migration in the vadose zone. This information aids selection of appropriate locations for obtaining borehole samples and provides three-dimensional contaminant distribution information for incorporation into conceptual site models and to help configure fate and transport models. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GoldSim E-Area Low-Level Waste Lacility Vadose Zone Model Benchmarking

This report documents the development and benchmarking of the E-Area Low-Level Waste Facility (ELLWF) GoldSim Engineered and Slit Trench (ET and ST) vadose zone models. Subsequent activities (beyond the scope of this effort) will couple the GoldSim-based vadose zone models to the GoldSim aquifer model, with the intent of performing stochastic analyses that couple all pertinent fate and transport processes from the ground surface up to the 100-m Point of Assessment (POA). The benchmarking presented within this report focuses on the Slit Trench 06 (ST06) bydrostratigraphic location that resides within the center set of slit trenches. These GoldSim-based vadose zone models are generic models capable of being benchmarked to any of the other trench locations within E-Area.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for REDOX Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for PFP Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B-63 Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for U Plant Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for M Pond Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for S Farms Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed "dry" in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chloiine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thmium-230 (Th-230). The simulation time struts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP) simulator, officially named the exascale Subsurface Transport Over Multiple Phases ( eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user's guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User 's Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for LLBG-200W B for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for C-9 Pond Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of the Recharge Estimation Tool (RET) to Prepare Spatially and Temporally Variable Recharge Boundary Conditions for Hanford Site Composite Analysis Vadose Zone Models

This environmental calculation file (ECF) describes the development of a tool for translating recharge estimates into readable input for STOMP© (Subsurface Transport Over Multiple Phases) vadose zone models primarily supporting the vadose zone (VZ) facets of the updated Hanford Site Composite Analysis (CA) and the Hanford Site Cumulative Impact Evaluation (CIE). The recharge estimates are spatiotemporally variable and are produced by the Recharge Evolution Tool (RET) described in Hanford Site-wide Natural Recharge Boundary Condition for Groundwater Models (ECF-HANFORD-15-0019). Outputs from the RET are given in Esri’s™ feature class format with yearly estimates and associated metadata encapsulated in file geodatabase objects. For STOMP models, the translated output is a text file in the format of an input boundary condition card, consistent with STOMP software requirements. The text file contains assimilated spatiotemporal recharge estimates produced by the RET. The tool discussed in this document will be referred to as the “RET2STOMP” tool.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Goldsim Modeling of Vadose Zone Transport for E-Area Naval Reactor Component Disposal Areas: Model Description and Benchmarking

This report documents the development of a GoldSim® model of flow and radionuclide transport to the water table through the Naval Reactor Components Disposal Area (NRCDA) waste disposal sites and underlying vadose zones. The model is designed to be used for Monte Carlo uncertainty analysis in support of the E-Area Performance Assessment (PA). This report describes the model and shows results obtained from benchmarking the model to best-estimate deterministic results obtained using a PORFLOW model of NRCDA vadose zone transport. The PORFLOW model is three-dimensional while the GoldSim model is a simplified one-dimensional treatment. Nevertheless, the GoldSim model was able to accurately reproduce PORFLOW results with some adjustment to the nominal dispersion coefficient and vadose zone flow area used as “tuning” parameters. An example of the results obtained comparing GoldSim and PORFLOW calculation of releases of I-129, Tc-99, C-14 and Ni-59 from waste disposal containers at the 643-26E site is shown in Figure 1 below. For all of the test cases evaluated, GoldSim predicted peak concentrations within 6% of the PORFLOW values and peak times agreed within 8% with the majority of the results in better agreement. The close agreement between the two models provides confidence that GoldSim will give results accurately reflecting the behavior of releases from the NRCDA under off-normal operating conditions for sensitivity and uncertainty analysis

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of natural organic matter on plutonium vadose zone migration from an NH4Pu(V)O2CO3(s) source

Large amounts of plutonium produced at the Savannah River Site (SRS) in the latter half of the last century led to the release of plutonium to the subsurface. Low-level waste containing plutonium has also been disposed of in the SRS vadose zone. The mobility and risk posed by these plutonium sources is not well understood, in part, because of unknown interactions of the various mobile plutonium species with natural organic matter (NOM). This study investigated the influence of NOM on the behavior of plutonium(V) in the vadose zone through a combination of field lysimeter and laboratory studies. Well-defined solid sources of NH4PuVO2CO3(s) placed in 5-L lysimeters containing vadose zone soils NOM-amended or unamended were exposed to natural SRS meteorological conditions for three years. These lysimeters were removed from the field and analyzed using wet chemistry methods and X-ray absorption spectroscopy (XAS). Plutonium desorption from soils recovered from the lysimeters and laboratory batch sorption experiments using Pu-free soils both indicated that surface mediated reduction of Pu(V) to Pu(IV) was influencing Pu sorption behavior. For both lysimeters (amended and unamended with NOM), Pu migrated slowly through the lysimeter core, with > 95% of the Pu remaining within 2 cm of the source. However, without the NOM amendments, Pu was transported significantly farther than in the presence of NOM. Thus, the presence of NOM appeared to decrease the mobility. Working hypotheses to explain this behavior are that 1) formation of ternary surface-NOM-Pu complexes enhanced Pu sorption affinity causing less mobility and/or 2) formation of these ternary surface-NOM-Pu complexes prevented reoxidaiton of Pu(IV) to more mobile Pu(V) in the pore water.

plutonium, organic matter↗

A Limited-In-Scope Comparison of Subsidence Scenarios For 3D Vadose Zone PORFLOW Trench Models

This technical memorandum summarizes the results from two separate sequences of 3D PORFLOW vadose zone flow and contaminant transport models that were used to test the impact of different spatial distributions of subsidence boundary conditions. More specifically, the two simulation setups used a general conceptual model for an engineered trench (ET): one with a subsided region specified in the center of the trench and one with a subsided region located at the end of the trench. Both subsided regions had the same geometric specifications (e.g., length, width, orientation), but used water infiltration rate boundary conditions that appropriately accounted for surface runoff and lateral drainage from the adjacent upslope intact regions of the final closure cap. Because of the substantially higher water infiltration rate associated with the subsided region at the end of the trench, this geometry produced higher absolute peak fluxes to the water table for all six radionuclides that were simulated. However, the slower release rate of the centrally located subsided hole geometry produced a higher flux to the water table in the time period subsequent to the absolute peak. A third model was implemented as a control, where the water infiltration rate that corresponds to the centrally located subsided region was applied at the end of the trench to highlight the purely geometric effects. The results show that a higher water infiltration rate produces a sharper peak, while a lower infiltration rate leads to a broader peak. A centrally located hole impacts more of the waste zone, producing a higher peak when an equal infiltration rate is applied. These generalized qualitative differences, and their impacts on the overall modeling workflow (i.e., from vadose zone models to limits and dose calculations), should receive appropriate consideration during the development of conceptual models.