User Requirements for Space Station Freedom
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Environment-based disasters, such as wildfire, can cause substantial loss of life and loss of property and are costing billions of dollars annually. Existing disaster response operations are complex, with many challenges. The aim of the Scalable Traffic management for Emergency Response Operations (STEReO) system is to demonstrate the application of technologies that will enable small, low-altitude Unmanned Aerial System operations to safely take place in the airspace above a disaster event, increasing the effectiveness of the response. As a first step, the project aims to build a small prototype to demonstrate and test the core functions of this system based on user needs and requirements that were gathered from experts in the field during discussions and walkthroughs.
The capabilities, enumerated during the Planetary Data Workshop, which the ideal Planetary Data System (PDS) should provide to its users are summarized. System design and implementation activities must take into account that all requirements do not carry the same weight. While some system requirements are essential and must be met early, other requirements are of a less immediate nature and can be implemented during later stages of development. Some requirements may be determined to be not essential to the operation of a PDS or impractical, and then not considered for implementation. It is assumed, that the PDS implementation will be modular in architecture and accomplishment. The modular plan is supported by many potential benefits in that it: simplifies the design and planning activities; improves the ability to respond to the changing demands of the user community; permits incorporation of emerging technologies; and allows the implementation to remain flexible in the face of fluctuating resources.
The functional areas of application of Precise Time and Time Interval (PTTI) were considered and expanded. A comprehensive overview of the PTTI requirements and applications would provide an opportunity for individuals working in a specific functional area. Mutual problems, requirements, applications or successes shared by those in other functional areas were studied. Based upon the results of a two year study a compendium of PTTI requirements, applications and the means of meeting the requirements among Department of Defense components, other government agencies and major commercial users was compiled and is presented. It was found that the planning process for PTTI support for new acquisitions or new programs was less than a well defined, coordinated process. The processes are described in general terms and a generic model for requirements determination and subsequent coordination which may enhance the planning process and introduce cost benefits to the program is also presented.
The International Space Station (ISS) program is dependent on the concept of distributed planning, which places a large responsibility in the hands of the science users. The users assume the responsibility in submitting the operations scheduling requirements in the format required by the scheduling software. The concept of explicit and implicit resources, developed to facilitate the operations scheduling of ISS by non-scheduling experts, is presented. The proposed concepts are defined and examples of scheduling requirements, implemented using explicit and implicit resources, are described together with the requirements modeling and scheduler formatting functions. The software developed to support the implicit and explicit resources concept is discussed.
The results of investigations of materials processing in space (MPS), space experimentation apparatus, and potential industrial users of MPS commercialization are discussed.
Data relating to hydrologic and water resource systems and subsystems management are reported. Systems models, user application, and remote sensing technology are covered. Parameters governing water resources include evaportranspiration, vegetation, precipitation, streams and estuaries, reservoirs and lakes, and unsaturate and saturated soil zones.
Soil moisture observations are of broad scientific interest and practical value for a wide range of applications. The scientific community has made significant progress in estimating soil moisture from satellite-based Earth observation data, particularly in operationalizing coarse-resolution (25-50 km) soil moisture products. This review summarizes existing applications of satellite-derived soil moisture products and identifies gaps between the characteristics of currently available soil moisture products and the application requirements from various disciplines. We discuss the efforts devoted to the generation of high-resolution soil moisture products from satellite Synthetic Aperture Radar (SAR) data such as Sentinel-1 C-band backscatter observations and/or through downscaling of existing coarse-resolution microwave soil moisture products. Open issues and future opportunities of satellite-derived soil moisture are discussed, providing guidance for further development of operational soil moisture products and bridging the gap between the soil moisture user and supplier communities.
Operational experience of Saturn/Apollo space vehicle checkout and launch
There are no author-identified significant results in this report.
Registration of remotely sensed data to geodetic coordinates provides for overlay analysis of land use data. For aerial photographs of a large area, differences in scales, dates, and film types are reconciled, and multispectral scanner data are machine registered at the time of acquisition.
There are no author-identified significant results in this report.
There are no author-identified significant results in this report.
There are no author-identified significant results in this report.
A rehabilitation institute's needs and wants from a scheduling system were established by (1) studying the existing scheduling system and the variables that affect patient scheduling, (2) conducting a human-factors study to establish the human interfaces that affect patients' meeting prescribed therapy schedules, and (3) developing and administering a questionnaire to the staff which pertains to the various interface problems in order to identify staff requirements to minimize scheduling problems and other factors that may limit the effectiveness of any new scheduling system.
Areas which are influenced by solar-terrestrial coupling effects and which are internal to the Earth's magnetosphere are of interest to mission planners, spacecraft hardware designers, and those engaged in the operation of already orbiting manned or unmanned spacecraft. Accurate models are needed to predict energetic particle flux density, interactions between low energy (10 eV to 100 eV) near-Earth plasma and space systems, and neutral atmospheres. Parameters required for each of these areas are discussed.
The objective procedure was developed for identifying probable sensor and mission characteristics for an operational satellite land observing system. Requirements were systematically compiled, quantified and scored by type of use, from surveys of federal, state, local and private communities. Incremental percent increases in expected value of data were estimated for critical system improvements. Comparisons with costs permitted selection of a probable sensor system, from a set of 11 options, with the following characteristics: 30 meter spatial resolution in 5 bands and 15 meters in 1 band, spectral bands nominally at Thematic Mapper (TM) bands 1 through 6 positions, and 2 day data turn around for receipt of imagery. Improvements are suggested for both the form of questions and the procedures for analysis of future surveys in order to provide a more quantitatively precise definition of sensor and mission requirements.
The requirements implementation strategy for first level development of the Integrated Programs for Aerospace Vehicle Design (IPAD) computing system is presented. The capabilities of first level IPAD are sufficient to demonstrated management of engineering data on two computers (CDC CYBER 170/720 and DEC VAX 11/780 computers) using the IPAD system in a distributed network environment.