Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “underground injection control program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

24 records · Page 2

Contractors Road Heavy Equipment Area (SWMU 055) 2021 Annual Groundwater Monitoring Report

This document presents a summary of activities completed at the Contractors Road Heavy Equipment (CRHE) Area, located at Kennedy Space Center (KSC), Florida, from January through December 2021. The activities conducted at the CRHE Area include: - Annual groundwater sampling activities associated with site-wide plume monitoring and Underground Injection Control (UIC) monitoring in the former bioremediation Interim Measures (IM) Hot Spot 1 (HS1) area; - Direct push technology (DPT) groundwater investigation; and - Semi-annual vapor intrusion (VI) evaluation activities. This facility is designated Solid Waste Management Unit (SWMU) Number 055 (SWMU 055) under KSC’s Resource Conservation and Recovery Act Corrective Action program. This report was prepared by HydroGeoLogic, Inc. (HGL) for the National Aeronautics and Space Administration (NASA) under contract number 80KSC019F0096. The annual groundwater sampling results demonstrated that the footprint where chlorinated volatile organic compounds (VOC) are present above their State of Florida groundwater cleanup target levels (GCTLs) is not expanding overall. One non-chlorinated VOC (1,4-dioxane) is found above its GCTL at isolated points within the chlorinated VOC plume. The DPT groundwater investigation is being used to delineate the horizontal and vertical boundaries where chlorinated VOCs are present at levels above natural attenuation default concentrations. That data supports an evaluation of potential additional remedial actions. The potential for VI into the CRHE Area Office (K6-1996H) is evaluated by collected sub-slab vapor samples from four locations twice a year (once in the wet season and once in the dry season). The results for 2021 were all below the Environmental Protection Agency's vapor intrusion screening levels (VISLs) for both commercial and residential settings. The path forward for the site is to continue annual monitoring for chlorinated VOCs and 1,4-dioxane until additional remedies are implemented or the site is transitioned to long-term monitoring.

Contractors Road Heavy Equipment↗

Integrated geological, economic, and risk assessment of underground hydrogen storage

Underground hydrogen storage (UHS) is a promising option to buffer variable renewable power and support the hydrogen economy. Yet this technology is early-stage, and key uncertainties remain about how coupled processes such as geochemical and geomechanical impacts affect long-term storage security. In this paper, we seek to integrate the results from a large, multi-scale research program to quantify core feasibility metrics and situate these studies within ongoing efforts. Through this work, we evaluate hydrogen recoverability during storage by assessing diffusive losses, losses to geochemical interactions and their subsequent impact on geomechanical properties, and losses to residual saturation during injection and withdrawal. Molecular and laboratory studies show that lithologic heterogeneity, pore geometry, and mineral surface chemistry govern hydrogen–rock interactions, controlling loss pathways. High-pressure coreflooding is used to estimate relative permeabilities and measure parameters needed for reservoir-scale sensitivity analyses. These core-scale experiments found early hydrogen breakthrough at low saturations driven by capillary and viscous fingering, which limits pore-space utilization at early times, while repeated injection and withdrawal cycles improve deliverability over time. Technoeconomic factors and purity requirements for end uses are also considered as part of our comprehensive feasibility analysis. Finally, we underscore the importance of geophysical monitoring and tailored injection strategies to maintain integrity and efficiency. Together, these results provide a quantitative foundation for safe, scalable deployment of UHS and highlight priorities for future integrated studies.

08 HYDROGEN↗

SUBTASK 1.6 – BASIN ELECTRIC CARBON STORAGE RESEARCH PROJECT: NOVEL MONITORING TECHNIQUES

The Energy & Environmental Research Center (EERC) conducted baseline activities associated with an applied research project at Basin Electric Power Cooperative’s (Basin’s) carbon capture and storage (CCS) site in Beulah, North Dakota, to establish novel carbon storage-monitoring techniques as commercial methods under Cooperative Agreement No. DE-FE0024233, Subtask 1.6. The following report summarizes the baseline activities performed and briefly describes the subsequent (operational monitoring) activities that have been proposed to the U.S. Department of Energy (DOE) as part of the overall project to develop and demonstrate novel monitoring techniques at North America’s largest permitted CCS operation. Dakota Gasification Company (DGC), a wholly owned subsidiary of Basin, owns and operates the Great Plains Synfuels Plant (GPSP) approximately 5 miles northwest of the town of Beulah, North Dakota (Figure 1). In 2023, DGC received approval from the North Dakota Industrial Commission (NDIC) to develop a storage facility on-site for injecting a stream of carbon dioxide (CO2) captured from GPSP. DGC will transport the captured CO2 stream with approximately 6.8 miles of transmission lines that extend north of GPSP and inject >1 million tonnes (MMt) of CO2 annually (>1 MMt/yr) over a 12-year period with up to six underground injection control (UIC) Class VI-compliant injection wells completed in the Broom Creek Formation, a predominantly sandstone reservoir and saline aquifer underlying GPSP. The Broom Creek Formation lies approximately 5900 feet (ft) below ground surface (bgs) at GPSP. The commercial scale (i.e., >1 MMt/yr) of DGC’s permitted carbon storage project is ideal for developing and testing the novel monitoring techniques included within Subtask 1.6. The goals of this project are to demonstrate 1) the cost-effectiveness of novel monitoring technologies included as part of this research, 2) technology capability for tracking the CO2 plume and/or associated pressure response in the subsurface and monitoring out-of-zone migration, and 3) compliance with UIC Class VI program requirements. The research activities proposed for the overall project include 1) design of an automated, integrated, modular (AIM) monitoring station; 2) time-lapse electromagnetic (EM) field surveys; 3) drone-based surveillance studies; 4) time-lapse monitoring with seismic methods; 5) advanced wellbore-monitoring methods; 6) deployment of an AIM monitoring network; 7) EM monitoring of CO2 with real-time data processing; 8) continued seasonal drone-based surveillance studies; 9) seismic monitoring with passive and active surveys; and 10) wellbore monitoring with nuclear magnetic resonance (NMR) for near-surface characterization. Completion of Activities 1.0–5.0 (baseline activities) are described in this report. Upon authorization of funding by DOE, the EERC will initiate Activities 6.0– 10.0 (operational monitoring activities). Current state-of-the-art (SOA) carbon storage-monitoring techniques require countless labor hours dedicated to the acquisition of data. Once data are gathered, these SOA techniques often rely on commercial facilities to process raw data from the field. However, it is anticipated that next-generation monitoring techniques, such as those being demonstrated, will lower acquisition footprints, be less operationally intensive, and improve data acquisition efficiencies. These new techniques are more conducive to the application of machine learning, artificial intelligence, and automation, thus providing a pathway for integration into active control systems, informing site operability, and improving the integration of data for future CCS projects across the United States. Additionally, reclaimed and active mining lands are present within the project site, creating a unique opportunity to demonstrate the effectiveness of remote sensing and surface-based geophysics monitoring techniques at similar project sites that may include disturbed, unconsolidated, or actively excavated near-surface environments. The efforts included in the overall project will produce necessary designs, learnings, and data acquired during the baseline and operational monitoring periods that are necessary for time-lapse demonstration and validation of the described monitoring techniques. In addition, it is anticipated that the monitoring technologies included in this study will be compliant with UIC Class VI requirements to enable the potential for implementation at other CCS sites across the United States.

42 ENGINEERING↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

General Services Administration Reclamation Yard, SWMU 010, 2021 Groundwater Monitoring Report

This report presents a summary of the groundwater monitoring activities that occurred in November and December 2021 at General Services Administration Reclamation Yard, Solid Waste Management Unit 010, located at the John F. Kennedy Space Center (KSC), Florida. The site is monitored under KSC’s Resource Conservation and Recovery Act Corrective Action Program. This approach also meets the requirements of Chapter 62-780, Florida Administrative Code. For the purposes of this report, two separate plumes, known as the Polychlorinated Biphenyl (PCB)/Volatile Organic Aromatic (VOA) Plume and the Chlorinated Volatile Organic Compound (VOC) Plume, were identified for this site. The contaminants of concern (COCs) for the PCB/VOA Plume consists of PCBs, 1,2,4-trichlorobenzene, and breakdown products of 1,2,4-trichlorobenzene. The COCs for the Chlorinated VOC Plume are tetrachloroethene, trichloroethene, cis-1,2-dichloroethene, and vinyl chloride. The activities presented in this report include two field events: (1) November 2021 – PCB/VOA Plume groundwater sampling via Direct Push Technology – 70 groundwater samples were collected from 10 locations at varying intervals; and (2) December 2021 – Site-wide semi-annual water level measurements of 54 monitoring wells, redevelopment of 5 monitoring wells, and sampling of 35 monitoring wells. Results for the PCB/VOA plume demonstrated COCs have not rebounded since the 2018 source removal, with groundwater cleanup target levels (GCTLs) exceeded in the 10-30 ft. below ground surface interval only. In the Chlorinated VOC plume area, there were no detections of COCs above a GCTL for at least the second consecutive sampling event for the sampled wells. Cleanup objectives have been met, and it is recommended that VOC monitoring be discontinued. Underground injection control parameters will continue to be monitored in three wells until those analytes return to background concentrations.

GSA Reclamation Yard↗

Innovating the next generation of commercial smart building software

Nearly 30% of commercial building energy use is wasted due to equipment faults and HVAC controls problems. The result is increased emissions, compromised comfort and productivity, and less reliable coordination of building power needs with a clean grid. The energy impact alone represents $17 billion in potential savings. Today’s smart building software provides a robust solution to address these operational deficiencies. Energy management and information systems (EMIS) are saving up to 9% on average, with two-year paybacks. They are being incorporated into energy management processes, commissioning services, and utility programs. As effective as they are, two barriers prevent even deeper benefits; limited personnel to fix problems once they are identified, and the expense and time to manually implement changes in control systems. In partnership with the research community, the EMIS industry is developing new capabilities to overcome these barriers. Moving beyond siloed products for either fault detection and diagnostics, or optimal control, these new capabilities empower users to not only automatically identify faults, but also to push corrective action, and control improvements to their buildings. In this paper, several areas for enhancements are documented: ‘one-time’ correction of faults such as setpoints, schedules, and economizer lockouts; short-term active testing for automated proportional integral derivative (PID) loop tuning and functional testing; and continuous supervisory control for demand flexibility and year-round efficiency. Results are presented from a pair of partner implementations out of a dozen providers integrating these enhancements into their products, including field tests from across the country, and insights into operator acceptance and integration into operations and maintenance practices.

Casillas, Armando↗