Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “turbine testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Improved PFB operations: 400-hour turbine test results

A pressurized fluidized bed (PFB) coal-burning reactor was used to provide hot effluent gases for operation of a small gas turbine. Preliminary tests determined the optimum operating conditions that would result in minimum bed particle carryover in the combustion gases. Solids were removed from the gases before they could be transported into the test turbine by use of a modified two stage cyclone separator. Design changes and refined operation procedures resulted in a significant decrease in particle carryover, from 2800 to 93 ppm (1.5 to 0.05 grains/std cu ft), with minimal drop in gas temperature and pressure. The achievement of stable burn conditions and low solids loadings made possible a 400 hr test of small superalloy rotor, 15 cm (6 in.) in diameter, operating in the effluent. Blades removed and examined metallographically after 200 hr exhibited accelerated oxidation over most of the blade surface, with subsurface alumina penetration to 20 micron m. After 400 hours, average erosion loss was about 25 micron m (1 mil). Sulfide particles, indicating hot corrosion, were present in depletion zones, and their presence corresponded in general to the areas of adherent solids deposit. Sulfidation appears to be a materials problem equal in importance to erosion.

Rollbuhler, R. J.↗

Miniature probes for use in gas turbine testing

Several examples of miniature probes (null type as well as fixed position) are presented which have proved useful in aircraft and space power systems component testing and are applicable to automotive gas turbine testing. These probes are used to determine component or system performance from the measurement of gas temperature as well as total and static pressure, and flow direction. Detailed drawings of the sensors are presented along with experimental data covering the flow characteristics over the range of intended use.

Glawe, G. E.↗

Large-Scale Wind Turbine Testing in the NASA 24.4m (80) by 36.6m(120) Wind Tunnel

The 80- by 120-Foot Wind Tunnel at NASA Ames Research Center in California provides a unique capability to test large-scale wind turbines under controlled conditions. This special capability is now available for domestic and foreign entities wishing to test large-scale wind turbines. The presentation will focus on facility capabilities to perform wind turbine tests and typical research objectives for this type of testing.

Zell, Peter T.↗

DOE/NASA Mod-0 100KW wind turbine test results

The Wind Turbine demonstrates the capability of automatic unattended operation, including startup, achieving synchronism, and shutdown as dictated by wind conditions. During the course of these operations, a wealth of engineering data was generated. Some of the data which is associated with rotor and machine dynamics problems encountered, and the machine modifications incorporated as a solution are presented. These include high blade loads due to tower shadow, excessive nacelle yawing motion, and power oscillations. The results of efforts to correlate measured wind velocity with power output and wind turbine loads are also discussed.

Glasgow, J. C.↗

The NASA high pressure facility and turbine test rig

NASA Lewis Research Center is presently constructing a test facility for developing turbine-cooling and combustor technology for future-generation aircraft gas-turbine engines. Prototype engine hardware will be investigated in this facility at gas-stream conditions up to 2480 K average turbine inlet temperature and 4.14 million N/sq m turbine inlet pressure. The facility will have the unique features of fully automated control and data acquisition through the use of an integrated system of minicomputers and programmable controllers, which will result in more effective use of operating time and operators and will provide a built-in self-protection safety system. The facility, turbine rig, and turbine-cooling test program are described.

Stepka, F. S.↗

Swift Wind Turbine Testing

The purpose of this project was to independently test the Swift wind turbine according to the AWEA Small Wind Turbine Performance and Safety Standard. This project was part of the U.S. Department of Energy’s (DOE’s) Independent Testing project. The project was established to help providers of small wind turbines the opportunity to validate the product to AWEA standards. The National Wind Technology Center (NWTC) conducted testing that included duration, safety and function, power performance, and acoustic. Successful operation of the turbine was confirmed in the results of the testing. Duration requirements were met, there were no safety issues, power performance was established, and the acoustic level was verified to be low compared to other similar turbines. Data results can be assembled and submitted to the Small Wind Certification Council (SWCC) for certification of the turbine to AWEA standards.

17 WIND ENERGY↗

An overview of large wind turbine tests by electric utilities

A summary of recent plants and experiences on current large wind turbine (WT) tests being conducted by electric utilities is provided. The test programs discussed do not include federal research and development (R&D) programs, many of which are also being conducted in conjunction with electric utilities. The information presented is being assembled in a project, funded by the Electric Power Research Institute (EPRI), the objective of which is to provide electric utilities with timely summaries of test performance on key large wind turbines. A summary of key tests, test instrumentation, and recent results and plans is given. During the past year, many of the utility test programs initiated have encountered test difficulties that required specific WT design changes. However, test results to date continue to indicate that long-term machine performance and cost-effectiveness are achievable.

Vachon, W. A.↗

TEAMER – Enhanced Flow Measurement for Aquantis Tidal Turbine Test

The AQ10 is a floating, two-bladed, passive yawing tidal turbine developed by Aquantis that has a 10-meterrotor diameter, 160 kW rating, and employs reliable off-the-shelf powertrain and power conversion hardware. Aquantis is planning on-water turbine power performance and loads (blade loading and thrust)testing, where the turbine will be pushed through still water up to 4 knots and placed in a ‘station keeping’ tow in a tidal race up to its rated speed. On-water testing will be conducted using vessels and floating platforms on the sea surface to improve ease of testing and reduce disturbance to the environment. In this TEAMER project, Pacific Northwest National Laboratory (PNNL) will conduct water velocity and turbulence measurements in front of the turbine during on-water testing using acoustic Doppler instrumentation. By measuring both the tidal current flowing past the turbine and the resulting electrical power output, test results will provide a power curve (power vs flow speed) for the turbine up to rated power. Measurements of turbulence and velocity shear in front of the rotor will also provide information to assess the structural response of the rotor blades. With this analysis, Aquantis can use the performance and loads data to validate Tidal Bladed and OpenFAST simulations of the measured operating conditions. Measuring the power performance of a prototype turbine is a valuable step to improving device development and conducting a complete power performance assessment to IEC/TS 62600-200 standards in the future.

16 TIDAL AND WAVE POWER↗

FFP/NREL Collaboration on Hydrokinetic River Turbine Testing (CRADA Final Report)

This shared resources CRADA defines collaborations between the National Renewable Energy Laboratory (NREL) and Free Flow Power (FFP) set forth in the following Joint Work Statement. Under the terms and conditions described in this CRADA, NREL and FFP will collaborate on the testing of FFP's hydrokinetic river turbine project on the Mississippi River (baseline location near Baton Rouge, LA; alternate location near Greenville, MS). NREL and FFP will work together to develop testing plans, instrumentation, and data acquisition systems; and perform field measurements.

17 WIND ENERGY↗

Performance of a high-work low aspect ration turbine tested with a realistic inlet radial temperature profile

Experimental results are presented for a 0.767 scale model of the first stage of a two-stage turbine designed for a high by-pass ratio engine. The turbine was tested with both uniform inlet conditions and with an inlet radial temperature profile simulating engine conditions. The inlet temperature profile was essentially mixed-out in the rotor. There was also substantial underturning of the exit flow at the mean diameter. Both of these effects were attributed to strong secondary flows in the rotor blading. There were no significant differences in the stage performance with either inlet condition when differences in tip clearance were considered. Performance was very close to design intent in both cases.

Stabe, R. G.↗

Performance of a high-work low aspect ratio turbine tested with a realistic inlet radial temperature profile

Experimental results are presented for a 0.767 scale model of the first stage of a two-stage turbine designed for a high by-pass ratio engine. The turbine was tested with both uniform inlet conditions and with an inlet radial temperature profile simulating engine conditions. The inlet temperature profile was essentially mixed-out in the rotor. There was also substantial underturning of the exit flow at the mean diameter. Both of these effects were attributed to strong secondary flows in the rotor blading. There were no significant differences in the stage performance with either inlet condition when differences in tip clearance were considered. Performance was very close to design intent in both cases. Previously announced in STAR as N84-24589

Stabe, R. G.↗

Energy efficient engine. Low pressure turbine test hardware detailed design report

The low pressure turbine for the energy efficient engine is a five-stage configuration with moderate aerodynamic loading incorporating advanced features of decambered airfoils and extended blade overlaps at platforms and shrouds. Mechanical integrity of 18,000 hours on flowpath components and 36,000 hours on all other components is achieved along with no aeromechanical instabilities within the steady-state operating range. Selection of a large number (156) of stage 4 blades, together with an increased stage 4 vane-to-blade gap, assists in achieving FAR 36 acoustic goals. Active clearance control (ACC) of gaps at blade tips and interstage seals is achieved by fan air cooling judiciously applied at responsive locations on the casing. This ACC system is a major improvement in preventing deterioration of the 0.0381 cm (0.015 in.) clearances required to meet the integrated-core/low-spool turbine efficiency goal of 91.1% and the light propulsion system efficiency goal of 91.7%.

Cherry, D. G.↗

Energy efficient engine high pressure turbine test hardware detailed design report

The high pressure turbine configuration for the Energy Efficient Engine is built around a two-stage design system. Moderate aerodynamic loading for both stages is used to achieve the high level of turbine efficiency. Flowpath components are designed for 18,000 hours of life, while the static and rotating structures are designed for 36,000 hours of engine operation. Both stages of turbine blades and vanes are air-cooled incorporating advanced state of the art in cooling technology. Direct solidification (DS) alloys are used for blades and one stage of vanes, and an oxide dispersion system (ODS) alloy is used for the Stage 1 nozzle airfoils. Ceramic shrouds are used as the material composition for the Stage 1 shroud. An active clearance control (ACC) system is used to control the blade tip to shroud clearances for both stages. Fan air is used to impinge on the shroud casing support rings, thereby controlling the growth rate of the shroud. This procedure allows close clearance control while minimizing blade tip to shroud rubs.

Halila, E. E.↗