Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Ceramic Membranes/Modules for Ultra Efficient Hydrogen (H2) Production/Carbon Dioxide (CO2) Capture for Coal-Based Polygeneration Plants: Fabrication, Testing, and CFD Modeling

Inorganic membrane-based systems are a promising technology for precombustion CO2 capture with simultaneous H2 production. State-of-the-art packages for high temperature and pressure service consist of multiple tube membrane bundles prepared in a "candle filter" configuration, in which the membrane tubes are open at one end and sealed at the other. This configuration is used for practical reasons, specifically the need to minimize problems due to thermal expansion mismatch between the ceramic tube bundle and the steel housing. However, the primary technical problem with the candle filter format for commercial-scale installations is the inability to purge the tube side (typically the permeate side), a feature that is crucial for high H2 recovery. In this study, the focus is to design and fabricate the first dual-end open full ceramic multiple tube membrane bundle that enables tube side (permeate) purge for gas separation applications. An additional key feature of this design is the simplified module layout, as the membrane bundles can be installed end-to-end with tube side (permeate) flow directly from one bundle to the next. This layout simplifies the membrane to housing seals and yields significant improvement in membrane packing density. Detailed focus areas in our studies include: (i) Materials development and preparation of the tube-to-tube sheet potting for the dual-ended bundle; (ii) the sealing and optimal module configuration design to minimize membrane stress upon module mounting; (iii) the demonstration, via the fabrication of CMS and Pd-alloy membranes supported on full-size, dual-ended ceramic support bundles, of the first example of a purgeable ceramic membrane and module; and (iv) development of a CFD model of the membrane module for calculation of feed flow distribution, and for use in scale-up, and capital cost estimating. The CFD model was validated using experimental data with the multi-tubular membrane system, employing He/N2 as a model gas mixture (surrogate for H2/CO2), and has been shown to be quite accurate. Employing the model, we are able to study the effects of operating pressure and temperature, feed and sweep gas flow rates, and the choice of membrane tube configuration on system performance.

20 FOSSIL-FUELED POWER PLANTS↗

Advanced Ceramic Membranes/Modules for Ultra Efficient Hydrogen (H2) Production/Carbon Dioxide (CO2) Capture for Coal-Based Polygeneration Plants: Fabrication, Testing and CFD Modeling

Inorganic membrane-based systems are a promising technology for precombustion CO2 capture with simultaneous H2 production. State-of-the-art packages for high temperature and pressure service consist of multiple tube membrane bundles prepared in a "candle filter" configuration, in which the membrane tubes are open at one end and sealed at the other. This configuration is used for practical reasons, specifically the need to minimize problems due to thermal expansion mismatch between the ceramic tube bundle and the steel housing. However, the primary technical problem with the candle filter format for commercial-scale installations is the inability to purge the tube side (typically the permeate side), a feature that is crucial for high H2 recovery. In this study, the focus is to design and fabricate the first dual-end open full ceramic multiple tube membrane bundle that enables tube side (permeate) purge for gas separation applications. An additional key feature of this design is the simplified module layout, as the membrane bundles can be installed end-to-end with tube side (permeate) flow directly from one bundle to the next. This layout simplifies the membrane to housing seals and yields significant improvement in membrane packing density. Detailed focus areas in our studies include: (i) Materials development and preparation of the tube-to-tube sheet potting for the dual-ended bundle; (ii) the sealing and optimal module configuration design to minimize membrane stress upon module mounting; (iii) the demonstration, via the fabrication of CMS and Pd-alloy membranes supported on full-size, dual-ended ceramic support bundles, of the first example of a purgeable ceramic membrane and module; and (iv) development of a CFD model of the membrane module for calculation of feed flow distribution, and for use in scale-up, and capital cost estimating. The CFD model was validated using experimental data with the multi-tubular membrane system, employing He/N2 as a model gas mixture (surrogate for H2/CO2), and has been shown to be quite accurate. Employing the model, we are able to study the effects of operating pressure and temperature, feed and sweep gas flow rates, and the choice of membrane tube configuration on system performance.

20 FOSSIL-FUELED POWER PLANTS↗

Zeolite Membrane Reactor for Pre-Combustion Carbon Dioxide Capture (Final Scientific/Technical Report)

Water-gas shift (WGS) reaction followed by carbon dioxide (CO 2 ) separation is a critical step in the integrated gasification combined cycle (IGCC) process for fossil-fuel-fired electrical power generation with CO 2 capture. To intensify the IGCC process hydrogen-permselective zeolite membrane reactor offers promise to replace the conventional energy-intensive fixed-bed reactors and solvent-based CO 2 capture units. The objectives of this project were to develop a bench-scale zeolite membrane reactor (total membrane area: 932 cm 2 for a 21-tube membrane bundle) for the water-gas-shift reaction of raw syngas from an oxygen-blown coal-gasifier for H 2 production with simultaneous CO 2 separation at the capability of about 2 kilograms H 2 per day (equivalent to 2 kW IGCC power plant) and to demonstrate significant progress toward achieving overall performance goal of 90% CO 2 capture rate with 95% CO 2 purity at the cost of electricity 30% less than the baseline carbon capture approaches. This report summarizes results obtained in this project on scaling up the zeolite membrane reactor by a factor of 200 in membrane area, tests of the bench-scale zeolite membrane reactor for the water-gas-shift reaction at high temperature and high-pressure, and techno-economic analysis of the integration of the zeolite membrane reactor in IGCC power plant for the electrical generation with CO 2 capture. With effective pore modification by catalytic cracking deposition of MDES (methyldiethoxysilane), fabrication of MFI-type zeolite membranes was successfully scaled-up from a lab-scale disk type to bench-scale multiple-tube bundles on low-cost alumina supports. A Co-Mo based sour shift catalyst was evaluated and used in the zeolite membrane reactors for water-gas-shift reaction. The reaction kinetic and gas-permeation equations were developed and employed in mathematic models to guide/predict experiments/performance of zeolite membrane reactors for water-gas shift reaction. Multiple-tube zeolite membrane bundles and reactors were designed, fabricated and tested for gas separation and water-gas-shift reactions with real raw syngas from a coal-fired gasifier operated at high temperature and pressure. The zeolite membrane reactors demonstrated good long-term thermal and chemical stability and constant H 2 permeance (>300 GPU) together with a Knudsen selectivity (~4.7) for H 2 over CO 2 in the field test (cumulative time >28 hours) with high-sulfur coal-derived syngas. The zeolite-membrane-reactor integrated IGCC process was designed using the performance experimentally measured by the University of Cincinnati team with a single-tube zeolite membrane reactor that offers a CO conversion >98% with more than 90% of CO 2 and H 2 captured. With the above integrative approaches, a techno-economic analysis for a cost-benefit comparison was performed to uncover features that determine the power output, capital expenditure, operating expenditure, cost of electricity and cost of CO 2 capture in a 550-MW zeolite-membrane-reactor integrated IGCC process. The integration of the zeolite membrane reactor in IGCC could provide a significant reduction of 80% and 27% in the power consumption for Selexol™ Acid Gas Removal and CO 2 compression, respectively, which lowers the total auxiliary power consumption by 12.5%. However, the low pressure required at permeate stream for maintaining the driving force of hydrogen permeation through the zeolite membrane costs a huge power in permeate compressor, compensating the power consumption reduction achieved with the membrane reactor. Thus, for coal-fired IGCC for electricity generation with 90% CO 2 captured, the integration of the membrane reactor could provide a CO conversion ~99% and a significant drop in cost-of-electricity using zeolite membrane with H 2 permeance >600 GPU and the H 2 /CO 2 selectivity over 70.

01 COAL, LIGNITE, AND PEAT↗

Size- and Temperature-Dependent Suppression of Phonon Thermal Conductivity in Carbon Nanotube Thermoelectric Films

Heat transport in nanoscale carbon materials such as carbon nanotubes and graphene is normally dominated by phonons. Here, measurements of in-plane thermal conductivity, electrical conductivity, and thermopower are presented from 77–350 K on two films with thickness <100 nm formed from semiconducting single-walled carbon nanotubes. These measurements are made with silicon–nitride membrane thermal isolation platforms. The two films, formed from disordered networks of tubes with differing tube and bundle size, have very different thermal conductivity. One film matches a simple model of heat conduction assuming constant phonon velocity and mean free path, and 3D Debye heat capacity with a Debye temperature of 770 K. The second film shows a more complicated temperature dependence, with a dramatic drop in a relatively narrow window near 200 K where phonon contributions to thermal conductivity essentially vanish. This causes a corresponding large increase in thermoelectric figure-of-merit at the same temperature. A better understanding of this behavior can allow significant improvement in thermoelectric efficiency of these low-cost earth-abundant, organic electronic materials. Finally, heat and charge conductivity near room temperature is also presented as a function of doping, which provides further information on the interaction of dopant molecules and phonon transport in disordered nanotube films.

36 MATERIALS SCIENCE↗

Zeolite Membrane Reactor for Pre-Combustion Carbon Dioxide Capture

Water-gas shift (WGS) reaction followed by carbon dioxide (CO 2 ) separation is a critical step in the integrated gasification combined cycle (IGCC) process for fossil-fuel-fired electrical power generation with CO 2 capture. To intensify the IGCC process hydrogen-permselective zeolite membrane reactor offers promise to replace the conventional energy-intensive fixed-bed reactors and solvent-based CO 2 capture units. The objectives of this project were to develop a bench-scale zeolite membrane reactor (total membrane area: 932 cm 2 for a 21-tube membrane bundle) for the water-gas-shift reaction of raw syngas from an oxygen-blown coal-gasifier for H 2 production with simultaneous CO 2 separation at the capability of about 2 kilograms H 2 per day (equivalent to 2 kW IGCC power plant) and to demonstrate significant progress toward achieving overall performance goal of 90% CO 2 capture rate with 95% CO 2 purity at the cost of electricity 30% less than the baseline carbon capture approaches. This report summarizes results obtained in this project on scaling up the zeolite membrane reactor by a factor of 200 in membrane area, tests of the bench-scale zeolite membrane reactor for the water-gas-shift reaction at high temperature and high-pressure, and techno-economic analysis of the integration of the zeolite membrane reactor in IGCC power plant for the electrical generation with CO 2 capture.

20 FOSSIL-FUELED POWER PLANTS↗

Extended Heat Transfer Model Dataset

Data repository for the paper: Molerus and Wirth's Heat Transfer Model for Bubbling Fluidized Beds: Proposal for an Extended Model Including Immersed Tube Banks and Particle Cross-Flow Powder Technology 2025

contact time↗

Augmented Monitoring and Condition Assessment Program for SNF Wet Storage Life Extension - 20489

Approximately 27 MTHM of spent nuclear fuel (SNF) owned and managed by the U.S. Department of Energy, Office of Environmental Management is stored in the L Basin at the Savannah River Site (SRS). This 'DOE SNF' is comprised of approximately 12,000 aluminum-clad, aluminum-based fuel assemblies (∼7 MTHM), and approximately 2000 non-aluminum fuel assemblies (∼20 MTHM). A program is in progress to perform Non-Destructive Examination (NDE) of the fuel and their storage containers to characterize the materials' condition, and to evaluate the effects of service to enable continued safe wet storage of the SNF. The Augmented Monitoring and Condition Assessment Program (AMCAP), a two-part program to develop and implement remote underwater Non-Destructive Examination of the aluminum SNF, and of the containers of the non-aluminum SNF, respectively, is aimed at the characterization and evaluation of corrosion degradation of aluminum fuel and container materials. The predominant design of the aluminum SNF (ASNF) stored in L Basin is the Materials Test Reactor (MTR) equivalent design, a plate fuel design. These SNF are stored in 5'' diameter tubes or 5'' x 5'' squares (called bundles) that are nominally 12' or up to 14' long. The SNF is de-bundled and inspected using a custom-designed MTR Fuel Inspection Table. The inspection table provides for indexed fuel positioning for a video camera examination with controlled lighting. A total of 10 of the SNF originating from foreign research and test reactors were selected for examination based on burnup, enrichment, and prior damage caused by service/storage history. A special inspection campaign of these 10 assemblies is in progress. The observed corrosion damage included minor to moderate attack from general corrosion, pitting, crevice, end grain and galvanic corrosion. Example results from the completed inspections are shown and discussed. The focus is a comparison of the as-received condition versus the as-found current storage condition that will serve to validate Water Chemistry and Corrosion Monitoring Programs. The non-aluminum SNF (NASNF) stored in L Basin are of diverse design that includes various geometries with claddings of stainless steel, Zircaloy, and Hastelloy. The fuel core materials include uranium alloys, oxides/mixed oxides, and carbides. These SNF materials, originating from early experimental and test reactors, are in various physical forms including single fuel elements and cut pieces. The fuel is stored in L Basin in various configurations including in direct bundled storage in aluminum tubes and in isolation cans that are in the bundles or in a larger over-size storage container (OSC). Concern with inside-out corrosion and the potential loss of configuration control and ability to handle the storage containers prompted the development of remote NDE methods that include visual and UT technologies to assess the condition of the containers. Candidate stored materials were selected for a special inspection campaign; the development of the NDE methods for the inspection for galvanic, crevice and sediment-induced corrosion (inside-out) are discussed. A summary of the SNF storage in L Basin at the SRS, and an overview of the AMCAP to enable continued safe storage of DOE SNF are described. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Irradiation-enhanced torsional buckling capacity of carbon nanotube bundles

Molecular dynamics simulations are used to understand the torsional buckling of pristine and irradiated carbon nanotube (CNT) bundles. Irradiation-induced inter-tube defects are shown to significantly increase the critical buckling torque and critical buckling angle, while slightly increasing the torsional stiffness. In contrast, intra-tube defects are found to degrade the torsional properties. Such competing interactions cause irradiation enhancement to occur in large bundles where significant inter-tube bonding can occur. However, the irradiation enhancement effect becomes weak for very large bundles in which enhanced inter-tube interactions already exist in unirradiated bundles. In pristine CNT bundles of all sizes under torsional loading, CNTs can slip via the weakly interacting van der Waals force, whereas in the irradiated bundles, the inter-tube defects prevent slipping. The study further shows that the formation of one-dimensional carbon chain defects contributes to enhanced friction under slipping.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

A Process with Decoupled Absorber Kinetics and Solvent Regeneration through Membrane Dewatering and In-Column Heat Transfer (Final Report)

This report summarizes the work conducted on project DE-FE0031604 where University of Kentucky Center for Applied Energy (UK CAER) has validated its intensified CO 2 capture process through substantial enhancements to the kinetics of the absorption process and energy reductions by absorber temperature profile modification, dewatering and heat integration technologies for achieving significant capital and operating cost reductions. To address DOE’s objective of improving post-combustion CO 2 capture technology and reducing associated cost, UK CAER employed an intensified process which combined three key aspects targeted at overcoming inherent limitations or barriers in the conventional CO 2 capture and desorption process. The process designed to be independent of the type of solvent used, included (1) the use of 3-D printed two-channel structured packing material to control the temperature profile and increase the CO 2 absorption rate in the absorber, (2) a zeolite membrane dewatering unit for dewatering of the carbon-rich solvent to decouple solvent concentration needs for CO 2 absorption and desorption, and (3) a rich-split feed with two-phase flow heat transfer prior to the stripper that provided a secondary point of vapor generation to provide energy savings in steam extraction and solvent regeneration. The project was executed over two budget periods. This involved testing of individual process components which included the advanced heat transfer packing and the dewatering membrane on UK CAER’s 30 liter per minute (L/min) CO 2 (3” Column) capture bench unit with simulated flue gas in the first budget period. Subsequent scaled-up testing of these components together with the split-feed configuration were also tested in UK CAER’s 0.1 MWth CO 2 capture unit with coal-derived flue gas in the second-budget period. Long term studies were done during this period to assess process and solvent performance over extended duration. Project partners Lawrence Livermore National Laboratory (LLNL) and Media & Process Technology (MPT) led the development efforts for the advanced packing material and dewatering membrane respectively. Data from the long term testing was used as input for an environmental, health and safety (EH&S) assessment for the process and scaled technology performed by ALL4 LLC. Trimeric Corporation also completed a techno-economic analysis (TEA) for the UK CAER technology which was compared to the DOE reference Case B12B. Tests on the 3” column capture unit showed that the advanced heat transfer packing could be used to lower the bulge temperature in the absorber, and this was also proven in the scaled testing in the 0.1 MWth CO 2 capture unit. The bulge temperature could be lowered by >10 °C, changing the temperature profile in the absorber, and showed potential to enhance absorption with the ability to tailor the profile to provide conditions suitable for a solvent’s properties and kinetics. Conditions for short term evaluation of a 19” zeolite dewatering membrane on the 3” column capture unit yielded desirable fluxes and sustained rejection rates of >80%. However, for the scaled testing of six membrane modules consisting of 21 parts of 31-inch-long membrane tubes in each bundle (surface area 0.3 m 2 ), over a more extended duration, similar rejection rates could not be achieved. With the split-feed of the rich stream to the stripper, improved heat recovery minimized waste heat exiting the top of the stripper. The stripper exhaust temperatures could be reduced by >10 °C; reducing the amount of water vaporization contributed to lowering the regeneration energy by ~ 15%. The energy benefit could be sustained from the long term monitoring of the solvent performance. The solvent properties were not significantly impacted over the long-term operations. The benefits of the UK CAER process demonstrated experimentally were mostly validated from the TEA comparing a commercial scale application of the technology to DOE reference Case B12B. The cost of CO 2 capture for the UK CAER technology was estimated to be ~$34.97/tonne of CO 2 captured; a reduction of 23% compared to Case B12B. The increase in cost of electricity was also shown to be 16% lower than that of Case B12B. The total parasitic demand was also shown to be 11% lower. The key drivers for the benefits are a result of the process intensification approaches employed in the UK CAER technology for enhanced solvent performance, effective heat recovery and improved energy performance. The EH&S assessment did not find any major environmental concerns or barriers to the full scale implementation of the technology.

20 FOSSIL-FUELED POWER PLANTS↗

Magnetic skyrmion bundles and their current-driven dynamics

Topological charge Q classifies non-trivial spin textures and determines many of their characteristics. Most abundant are topological textures with |Q| ≤ 1, such as (anti)skyrmions, (anti)merons or (anti)vortices. In this study we created and imaged in real space magnetic skyrmion bundles, that is, multi-Q three-dimensional skyrmionic textures. These textures consist of a circular spin spiral that ties together a discrete number of skyrmion tubes. We observed skyrmion bundles with integer Q values up to 55. We show here that electric currents drive the collective motion of these particle-like textures similar to skyrmions. Bundles with Q ≠ 0 exhibit a skyrmion Hall effect with a Hall angle of ~62°, whereas Q = 0 bundles, the so-called skyrmioniums, propagate collinearly with respect to the current flow, that is, with a skyrmion Hall angle of ~0°. Here, the experimental observation of multi-Q spin textures adds another member to the family of magnetic topological textures, which may serve in future spintronic devices.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

A ROBUST MECHANISTIC APPROACH TO PREDICTION OF DEPARTURE FROM NUCLEATE BOILING

departure from nucleate boiling (DNB) sets a regulatory limit for licensing pressurized water reactors (PWRs). Under such conditions, the heated surface is permanently blanketed by a vapor film, leading to a sharp deterioration of the heat transfer coefficient at the heater/coolant interface and an abrupt temperature rise. Unfortunately, the path for an accurate, robust prediction of DNB has been elusive due to lack of consensus on its triggering mechanism. This work reviews existing physics-driven modeling tools in the first place. An evolutionary channel-scale mechanistic model that leverages key assumptions in the relatively well-accepted mechanisms of liquid sublayer dryout and near-wall bubble crowding is then proposed. Detailed validation of the proposed model has demonstrated its improved predictive capabilities over previous data/physics-driven models with regard to an extensive DNB-specific CHF test matrix covering a wide range of flow conditions. The unique feature of the proposed model lies in its ability to predict DNB for different heater geometries (including round tube, annulus, and rod bundle), which is essential in deciphering fuel performance metrics from different facilities and reactor types. The proposed model will be further implemented in fuel performance codes to help improve modeling of transient DNB scenarios such as during a reactivity-initiated accident (RIA).

Zhao, Xingang↗

Spontaneous imbibition in a square tube with corner films: theoretical model and numerical simulation

Spontaneous imbibition in an angular tube with corner films is a fundamental problem in many scientific and engineering processes. In this paper, a modified interacting capillary bundle model is developed to describe the liquid imbibition dynamics in a square tube with corner films. The square tube is decomposed into several interacting sub-capillaries and the local capillary pressure in each sub-capillary is derived based on the specific shape of its meniscus. The conductance of each sub-capillary is calculated using single-phase lattice Boltzmann simulation. The modified interacting capillary bundle model and color-gradient lattice Boltzmann method are used to simulate the liquid imbibition dynamics in the square tube with different fluid properties. The predictions by the modified interacting capillary bundle model match well with the lattice Boltzmann simulation results for different conditions, demonstrating the accuracy and robustness of the interacting capillary bundle model to describe the imbibition dynamics with corner films. In addition, the interacting capillary bundle model is helpful to investigate the mechanisms during spontaneous imbibition and the influences of fluid viscosity, surface tension, wetting phase contact angle and gravity on imbibition dynamics. Finally, a universal scaling law of imbibition dynamics for the main meniscus is developed and the scaling law for arc meniscus is also analyzed.

42 ENGINEERING↗

In-plasma photo-assisted etching of Si with chlorine aided by an external vacuum ultraviolet source

Photo-assisted etching of p-type Si was previously found to occur in a chlorine-containing, Faraday-shielded, inductively coupled plasma (ICP), and this was attributed to the vacuum ultraviolet (VUV) light generated by the plasma. Other causes for the very high etching rates were ruled out, including ion bombardment. In the present study, the substrate in the main Cl2/Ar ICP was subjected to extra VUV light that was generated in an independently controlled, auxiliary Ar/He ICP in tandem with the main ICP. The ICPs were separated by a tungsten mesh and a bundle of high-aspect-ratio quartz tubes in a honeycomb configuration. There was no measurable perturbation of the main plasma by the auxiliary plasma. The etching rate was found to be enhanced by 11%–51% with the additional VUV light provided by the auxiliary ICP. With absolute measurements of the auxiliary ICP photon flux at the sample surface, as described elsewhere, incredibly large etching yields of 90–240 Si atoms per photon were obtained. It is argued that etching is not a result of electron–hole pair formation but is instead ascribed to a photocatalytic chain reaction.

42 ENGINEERING↗

Dissolution Flowsheet for Non-Aluminum Spent Nuclear Fuel Campaign 1

As part of the Accelerated Basin De-inventory (ABD) program, H Canyon plans to dissolve non-aluminum spent nuclear fuel (NASNF) in the 6.3D electrolytic dissolver. NASNF Campaign 1 plans to electrolytically dissolve 68 bundles of fuel assemblies from the Carolinas-Virginia Tube Reactor (CVTR), Heavy Water Components Test Reactor (HWCTR), and Experimental Boiling Water Reactor (EBWR). The fuel assemblies are intact Zircaloy or stainless steel (SS) clad UO 2 rods, tubes, and plates. The H Canyon electrolytic dissolver previously dissolved a variety of UO 2 core fuel types in SS, Zircaloy, Nichrome, or Incoloy cladding from 1969 to 1980. The objective of this study was to identify flowsheet conditions through literature review and laboratory experimentation to safely dissolve NASNF Campaign 1 bundles in the H Canyon electrolytic dissolver. Bench-scale electrolytic dissolution tests were performed to demonstrate a flowsheet for NASNF Campaign 1 bundles. The outer bundles are composed of SS or Al alloy, Al 6061-T6, and contain intact Zircaloy or SS clad UO 2 fuel assemblies. The key objectives of these tests were to determine bounding dissolver chemistries and the sparge requirement to ensure H 2 concentration remain less than 60 vol % of the lower flammability limit (LFL) during dissolution. The impact of HNO 3 concentration and the addition of fluoride on the dissolution efficiency of Zircaloy, 304L SS, Al 6061-T6, and Inconel 625 were examined. While SS, Al, and Inconel 625 readily dissolve utilizing electrolytic dissolution, Zircaloy disintegrated anodically; the surface of Zircaloy oxidized and the oxide layer spalled off and settled at the bottom of the dissolver as an insoluble material. The black flakes were identified as ZrO 2 and 85% of the Zr processed was converted to black ZrO 2 flakes when Zr was anodically disintegrated in 9.5 M HNO 3 .

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗