An Enhanced Computational Framework for Energy Storage Participation in Transmission Planning with Electricity Market Participation: Dynamic Market Participation Restriction Estimation

In the previous study and report, we developed a computational framework to explore the technical and economic viability of the dual use of pumped storage hydropower (PSH) for both transmission assets and market participation. The rationale for the dual-use application is to improve the resource utilization rate and reduce the cost recovery burden. A PSH-based transmission solution generally has a large capacity, which corresponds to a higher investment cost compared to a traditional line solution. Market participation may allow the PSH asset to offset part of its high investment cost. A critical question is whether it is economically and technically viable to allow dual use of a PSH-based transmission project without jeopardizing transmission system reliability. And a more specific follow-up question is how to improve market participation performance while maintaining transmission reliability. In this study, we extend the computational framework by updating the method to determine transmission service obligation requirements dynamically based on the possibility of the need for transmission service in operation. Specifically, we correlate the need for transmission service with the probability of thermal overloading on a monitored transmission line, which is essentially based on the probability distribution of power flow and its probability of exceeding the line rating based on system dispatch and operational uncertainties. In addition, the need depends on the level of risk that a system operator is willing to take. The higher the risk tolerance, the lower the requirement that the system operator would apply to the PSH project as a transmission asset. The requirements are updated every day before the PSH project determines its market participation strategy. With the updated transmission service requirements, it is expected that a PSH project can serve as a transmission asset when the transmission system is at risk and really needs it, while it can participate in a market with sufficient information and certain restrictions. In this way, the transmission service quality and market participation performance can both be improved.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Investigating the effects of cooperative transmission expansion planning on grid performance during heat waves with varying spatial scales

There is growing recognition of the advantages of interregional transmission capacity to decarbonize electricity grids. A less explored benefit is potential performance improvements during extreme weather events. This study examines the impacts of cooperative transmission expansion planning using an advanced modeling chain to simulate power grid operations of the United States Western Interconnection in 2019 and 2059 under different levels of collaboration between transmission planning regions. Two historical heat waves in 2019 with varying geographical coverage are replayed under future climate change in 2059 to assess the transmission cooperation benefits during grid stress. The results show that cooperative transmission planning yields the best outcomes in terms of reducing wholesale electricity prices and minimizing energy outages both for the whole interconnection and individual transmission planning regions. Compared to individual planning, cooperative planning reduces wholesale electricity prices by 64.3 % and interconnection-wide total costs (transmission investments + grid operations) by 34.6 % in 2059. It also helps decrease greenhouse gas emissions by increasing renewable energy utilization. However, the benefits of cooperation diminish during the widespread heat wave when all regions face extreme electricity demand due to higher space cooling needs. Despite this, cooperative transmission planning remains advantageous, particularly for California Independent System Operator with significant diurnal solar generation capacity. This study suggests that cooperation in transmission planning is crucial for reducing costs and increasing reliability both during normal periods and extreme weather events. It highlights the importance of optimizing the strategic investments to mitigate challenges posed by wider-scale extreme weather events of the future.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗

Netload Range Cost Curves for Coordinated Transmission-Distribution Planning Under DER Growth Uncertainty

The increasing penetration of distributed energy resources (DERs) requires better coordination between transmission and distribution (T&D) planning to ensure system security and cost efficiency. However, misaligned planning horizons, computational burdens, and privacy concerns hinder effective coordination, leading to either underutilized resources caused by overinvestments or reliability risks due to underinvestment. To address this challenge, we introduce netload range cost curves (NRCCs), a novel approach for managing long-term DER growth uncertainty through T&D coordination, while preserving existing data-sharing and regulatory structures. NRCCs provide pairs of (i) peak substation netload guarantees and (ii) corresponding distribution upgrade options and costs, enabling their seamless integration into transmission planning workflows. To compute NRCCs efficiently, we develop a transmission-aware distribution network planning (TADNP), which is subsequently integrated to an iterative computation procedure. These NRCCs are then embedded into an NRCC-informed transmission planning model to enable resource-efficient coordination. We illustrate our proposed approach with a case study based on realistic distribution and transmission systems in the San Francisco Bay Area, California. Our results indicate the possibility of dramatic savings in transmission investments by incorporating the proposed NRCC-integrated T&D coordination framework.

Li, Yujia↗

Gulf of Mexico Offshore Wind Transmission - Literature Review and Gaps Analysis: Environmental Considerations, Community Readiness, and Infrastructure

The ability to effectively and efficiently connect offshore wind energy resources to end users in the Gulf of Mexico, requires coordinated transmission planning to ensure that electric transmission facilities can adequately support future offshore development. The Gulf of Mexico has substantial wind resources in both shallow shelf waters and deeper waters off the shelf where fixed bottom and floating wind technologies would be most appropriate. Most interest in offshore wind development to date has been in the central and western portions of the Gulf of Mexico (Louisiana and Texas) in federal and state waters. As a companion study to other federal activities in the offshore wind transmission space, including the Atlantic Offshore Wind Transmission Literature Review and Gaps Analysis, the Atlantic Offshore Wind Transmission Study, the West Coast Offshore Wind Transmission Literature Review and Gaps Analysis, the West Coast Offshore Wind Transmission Study, and the Advancing Offshore Wind Energy in the United States: U. S. Department of Energy Strategic Contributions Toward 30 Gigawatts and Beyond Report, this literature review and gaps analysis for offshore wind transmission in the Gulf of Mexico builds off previous literature reviews and supports the role of federal leadership to facilitate offshore wind energy. The overarching goal of this document is to identify gaps and lay the groundwork to inform coordinated transmission planning, ocean co-use, existing energy infrastructure, and siting associated with offshore wind energy development in the Gulf of Mexico. There are unique regional considerations for offshore wind transmission, which are summarized herein based on a review and assessment of publicly available information.

08 HYDROGEN↗

Statistical Steady-State Stability Analysis for Transmission System Planning for Offshore Wind Power Plant Integration

This paper presents a statistical steady-state stability analysis for transmission system planning studies in order to identify operational issues inherent in the integration of offshore wind power plants. It includes normal and contingency operation. This study considers the integration of a 1000-MW offshore wind power plant into the FirstEnergy/PJM service territory in the U.S. Great Lakes region as a case study and uses a realistic computer model of the U.S. Eastern Interconnection, a 63,000-bus test system. The results show the utility of this statistical analysis tool and its effectiveness in identification of the operational impacts as a result of the integration of offshore wind power plant.

Sajadi, Amirhossein↗

Enabling Principles for Dual Participation by Energy Storage as a Transmission and Market Asset

Because the electric transmission system is sized to meet the highest levels of customer demand, much of its designed capacity goes unused during average operating conditions. As a uniquely flexible and scalable asset capable of providing multiple grid services, energy storage can be deployed to support the transmission system and then also provide services to energy markets when not needed for transmission. This paper reviews the technical barriers in transmission planning practices and energy market design that prevent the realization of dual-use energy storage projects that provide both regulated transmission and competitive market services. Current practices create barriers against the identification of energy storage in the transmission planning process and against the participation of a regulated transmission asset in competitive energy markets. A review of regional transmission plans identifies best practices for including energy storage in the planning process by directing planners to proactively identify such projects or by providing clear mechanisms for stakeholders to propose them. Creating a market participation model for dual-use energy storage assets requires establishing when an asset will be allowed to participate in the market, how it will participate in the market, and where it will recover its costs. In answering these questions, key principles must be satisfied, such as prioritizing reliability, incrementally building on existing market design, and balancing competing objectives. Several policy options exist for satisfying those principles, giving grid operators and stakeholders significant flexibility in developing a dual-use participation model in accordance with regional policies and conditions. By objectively framing the issue and identifying policy options, this paper may inform subsequent proceedings on dual-use energy storage and be a resource to regional market operators, utilities, developers, regulators, policymakers, and other stakeholders as they collectively work on this complex issue.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Informing Transmission Supply Chain Needs from National Transmission Studies

Recent national studies indicate significant transmission expansion can provide the lowest-cost option to maintain grid reliability while meeting growing demand. However, constraints in domestic supply chains may limit grid expansion across the U.S., with higher costs and longer delays for required transmission equipment. Despite growing evidence of supply chain constraints for transmission components, transmission planning studies often assume transmission equipment is readily available for deployment or analyze future demand using historical trade and manufacturing data that may not capture evolving grid needs. This report aims to address this gap by demonstrating methods to quantify future demand for critical transmission components and input materials from national-scale planning models. These components include power transformers, generator step-up transformers, converter transformers, conductors, circuit breakers, and transmission towers and the materials include aluminum, steel, grain-oriented electrical steel (GOES), and copper. The analytical approach is applied to two nodal transmission expansion scenarios from the National Transmission Planning Study (NTP) to illustrate the methods. These scenarios represent different transmission expansion strategies for the contiguous U.S. to the year 2035: the Alternating Current (AC) scenario includes AC transmission expansion within each interconnection and the Multiterminal (MT) scenario includes interregional transmission expansion across the country using both AC and multiterminal HVDC options between neighboring zones. We also explore potential heuristics to derive transmission component demand from zonal capacity expansion models (CEMs) with coarse representation of the transmission grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Informing Transmission Supply Chain Needs from National Transmission Studies

Recent national studies indicate significant transmission expansion can provide the lowest-cost option to maintain grid reliability while meeting growing demand. However, constraints in domestic supply chains may limit grid expansion across the U.S., with higher costs and longer delays for required transmission equipment. Despite growing evidence of supply chain constraints for transmission components, transmission planning studies often assume transmission equipment is readily available for deployment or analyze future demand using historical trade and manufacturing data that may not capture evolving grid needs. This report aims to address this gap by demonstrating methods to quantify future demand for critical transmission components and input materials from national-scale planning models. These components include power transformers, generator step-up transformers, converter transformers, conductors, circuit breakers, and transmission towers and the materials include aluminum, steel, grain-oriented electrical steel (GOES), and copper. The analytical approach is applied to two nodal transmission expansion scenarios from the National Transmission Planning Study (NTP) to illustrate the methods. These scenarios represent different transmission expansion strategies for the contiguous U.S. to the year 2035: the Alternating Current (AC) scenario includes AC transmission expansion within each interconnection and the Multiterminal (MT) scenario includes interregional transmission expansion across the country using both AC and multiterminal HVDC options between neighboring zones. We also explore potential heuristics to derive transmission component demand from zonal capacity expansion models (CEMs) with coarse representation of the transmission grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Offshore Wind Into Competitive Renewable Energy Zones (CREZ) for the Philippines

The Philippines is aiming to jumpstart a domestic offshore wind industry and has incorporated offshore wind into several planning efforts. In parallel, the Philippines has also been a leader in incorporating renewable energy zones (REZs) into their power sector development and transmission plans. The objective of this study, conducted by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) in partnership with the Philippines Department of Energy (PDOE), is to incorporate offshore wind resources into the Philippines' already established competitive renewable energy zones (CREZs) to support national transmission planning, thereby merging these two previously disparate workstreams and implementing a key recommendation from the World Bank's offshore wind roadmap for the Philippines.

17 WIND ENERGY↗

Integrating Offshore Wind Into Competitive Renewable Energy Zones (CREZ) for the Philippines [Slides]

The Philippines is aiming to jumpstart a domestic offshore wind industry and has incorporated offshore wind into several planning efforts. In parallel, the Philippines has also been a leader in incorporating renewable energy zones (REZs) into their power sector development and transmission plans. The objective of this study, conducted by the U.S. Department of Energy's National Renewable Energy Laboratory (NREL) in partnership with the Philippines Department of Energy (PDOE), is to incorporate offshore wind resources into the Philippines' already established competitive renewable energy zones (CREZs) to support national transmission planning, thereby merging these two previously disparate workstreams and implementing a key recommendation from the World Bank's offshore wind roadmap for the Philippines.

17 WIND ENERGY↗

Cooperative Transmission Expansion Planning Experiment Data and Results

GO WEST is an open-source power grid modeling framework for U.S. Western Interconnection, which allows users to tailor the model depending on their research study and science questions. It covers 28 balancing authorities (BA) and 12 states in U.S. Western Interconnection. GO WEST allows users to select different number of nodes and come up with a simplified network by utilizing 10,000 nodal topology of U.S. Western Interconnection created by Texas A&M University. Users can try and select different number of nodes, mathematical formulations (linear programming vs. mixed-integer linear programming), transmission line limit scaling factors, and hurdle rate scaling factors. GO WEST offers a unit commitment and economic dispatch (UC/ED) module to simulate grid operations on an hourly scale. In this sense, users can calibrate and validate their model versions by comparing model outputs to historical datasets. TEP is an open-source transmission capacity expansion model, built on GO WEST framework. It utilizes linear programming to optimize transmission capacity addition investment on existing lines within GO WEST framework. In this sense, TEP model only increases the thermal capacity of existing transmission lines and does not add new lines to the system, which leaves the topology preserved. TEP minimizes the total cost of the system which comprises the operational cost of satisfying electricity demand (i.e., generation cost), cost of loss of load (i.e., unserved energy), cost of power flow, and cost of new transmission capacity additions (i.e., investment cost). In order to use TEP model, users need to create scenarios with GO WEST framework. In this analysis, outputs from several models are used to create future inputs to GO WEST and TEP models, including GCAM-USA, TELL, CERF and reV. This dataset includes experiment inputs and outputs from three different transmission expansion scenarios (cooperative, intermediate, and individual) for 2019 and 2059. For 2019, a base scenario to illustrate the default (i.e., historical) power grid operations is also included. This study utilizes rcp45hotter_ssp3 scenario from a previous version of GCAM-USA simulations. Sources of the shapefiles in supplementary data are HIFLD Open and U.S. Energy Atlas. Please see the README file for a detailed description of the main and supplementary data.

Capacity Expansion Model↗

Scalable Transmission Expansion Under Uncertainty Using Three-Stage Stochastic Optimization

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and uncertain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty.

multi-stage stochastic optimization↗

Scalable Stochastic Transmission Expansion: A Use Case for ExaSGD

The intermittent nature of renewable energy poses new challenges for power grids due to its variable and un- certain power output. These features of renewable generation are becoming more relevant to transmission planning as grids reach higher penetration levels of renewable energy. In this paper we present an approach for transmission planning based on scalable computational approaches which enable the explicit consideration of operational uncertainties in the planning process. Using three-stage stochastic programming and the progressive hedging algorithm, we compute transmission expansion decisions on a modified RTS-GMLC test system. We augment the grid with large amounts of wind generation and consider many operational scenarios subject to wind uncertainty. This is an example of a possible use of the ExaSGD security constrained AC optimal power flow solver.

Exascale Computing Project↗

Load Composition Analysis in Support of the NERC Load Modeling Task Force. 2019-2020 Field Test of the Composite Load Model

In 2015, NERC’s reliability standards were revised to require the use of dynamic load models in transmission planning studies. To comply with the standards, planners must use load models that explicitly represent the dynamic behavior of the different constituents of load at each load bus within their transmission planning models. The most important of these constituents are motor-driven and power electronics-based loads. Collectively, these representations are known as composite load models. In anticipation of the compliance date for the new standards, NERC’s Load Modeling Task Force (LMTF), in 2019, initiated a field test of composite load models involving the regional reliability planning entities. In support of the field test, DOE and BPA researchers developed region-specific composite load models that could be assigned to each non-industrial load bus in the planning models for each of the North American interconnections. Separate models were developed for each hour of a summer peak day, a winter peak day, and a spring light-load day. This report is the technical documentation for the load composition analysis that was conducted to develop these non-industrial composite load models.

24 POWER TRANSMISSION AND DISTRIBUTION↗