Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “time minimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Use of a priori statistics to minimize acquisition time for RFI immune spread spectrum systems

The optimum acquisition sweep strategy was determined for a PN code despreader when the a priori probability density function was not uniform. A psuedo noise spread spectrum system was considered which could be utilized in the DSN to combat radio frequency interference. In a sample case, when the a priori probability density function was Gaussian, the acquisition time was reduced by about 41% compared to a uniform sweep approach.

Holmes, J. K.↗

Electrical termination techniques

A technical review of high reliability electrical terminations for electronic equipment was made. Seven techniques were selected from this review for further investigation, experimental work, and preliminary testing. From the preliminary test results, four techniques were selected for final testing and evaluation. These four were: (1) induction soldering, (2) wire wrap, (3) percussive arc welding, and (4) resistance welding. Of these four, induction soldering was selected as the best technique in terms of minimizing operator errors, controlling temperature and time, minimizing joint contamination, and ultimately producing a reliable, uniform, and reusable electrical termination.

Oakey, W. E.↗

New procedure for determining minimum time orbit transfers

Computer program includes time minimizing function required for propellant constrained minimum time impulsive transfer between coplanar circular orbits or unrestricted orbits. Basic formulation is extended to include inclined circular or inclined elliptic orbits.

Davis, D. A.↗

Re-scheduling as a tool for the power management on board a spacecraft

The scheduling of events on board a spacecraft is based on forecast energy levels. The real time values of energy may not coincide with the forecast values; consequently, a dynamic revising to the allocation of power is needed. The re-scheduling is also needed for other reasons on board a spacecraft like the addition of new event which must be scheduled, or a failure of an event due to many different contingencies. This need of rescheduling is very important to the survivability of the spacecraft. In this presentation, a re-scheduling tool will be presented as a part of an overall scheme for the power management on board a spacecraft from the allocation of energy point of view. The overall scheme is based on the optimal use of energy available on board a spacecraft using expert systems combined with linear optimization techniques. The system will be able to schedule maximum number of events utilizing most energy available. The outcome is more events scheduled to share the operation cost of that spacecraft. The system will also be able to re-schedule in case of a contingency with minimal time and minimal disturbance of the original schedule. The end product is a fully integrated planning system capable of producing the right decisions in short time with less human error. The overall system will be presented with the re-scheduling algorithm discussed in detail, then the tests and results will be presented for validations.

Albasheer, Omar↗

Mars Opposition Piloted Nuclear Electric Propulsion (NEP)-Chem Vehicle

Many previous studies have examined sending crews to and from Mars. The most economical involved a ‘conjunction’ class whereby the crew spends around 500 days on Mars surface waiting for a ‘cheap’ return. The total mission time results in a mission duration around 3 years. Given the current demonstrated crew maximum of a 1 year stint on ISS, it is interesting to look at reducing that time to only two years, thus reducing risk and minimizing time in the Martian System. In order to meet such a short mission an ‘opposition’ class Mars mission (which includes a Venus flyby) was chosen. The energy required to perform such a mission in only two years (for the 2036 opportunity at least) is about three times that of the 3 year conjunction mission. The rocket equation clearly shows that this mission would then require several times the propellant of the three-year mission unless the Isp of the propulsion system can be increased. Electric propulsion can provide the 3-10x improvement in Isp but even with a nuclear reactor power levels could approach 10 MWe. As an alternative, a smaller reactor (1.5 MWe class) joined together with a chemical stage was found to allow for using each propulsion system to its best advantage: low thrust in interplanetary space and chemical in the gravity wells of Earth and Mars. Indeed, the use of high Isp, low thrust during the interplanetary leg of the journey’s reduced the required capture/departure ∆Vs by 5-10X. Lowering the NEP power also allowed fitting the power system into a single SLS launch – which limited the radiator area to ~ 2500m^2. For the first look a reactor using fuels created by the SP-100 program with a limit of ~1200K was assumed. Starting in the ‘Lunar Gateway’ also allowed for use of commercial tankers to fuel the vehicle in a relative benign place. A top level summary of the mission design, concept of operations, as well as a conceptual point design of the vehicle is described.

Nuclear Electric Propulsion↗

Towards Human-Friendly Efficient Control of Multi-Robot Teams

This paper explores means to increase efficiency in performing tasks with multi-robot teams, in the context of natural Human-Multi-Robot Interfaces (HMRI) for command and control. The motivating scenario is an emergency evacuation by a transport convoy of unmanned ground vehicles (UGVs) that have to traverse, in shortest time, an unknown terrain. In the experiments the operator commands, in minimal time, a group of rovers through a maze. The efficiency of performing such tasks depends on both, the levels of robots' autonomy, and the ability of the operator to command and control the team. The paper extends the classic framework of levels of autonomy (LOA), to levels/hierarchy of autonomy characteristic of Groups (G-LOA), and uses it to determine new strategies for control. An UGVoriented command language (UGVL) is defined, and a mapping is performed from the human-friendly gesture-based HMRI into the UGVL. The UGVL is used to control a team of 3 robots, exploring the efficiency of different G-LOA; specifically, by (a) controlling each robot individually through the maze, (b) controlling a leader and cloning its controls to followers, and (c) controlling the entire group. Not surprisingly, commands at increased G-LOA lead to a faster traverse, yet a number of aspects are worth discussing in this context.

multi-robot control↗

Iodine addition using triiodide solutions

The study develops: a triiodide solution for use in preparing ground service equipment (GSE) water for Shuttle support, an iodine dissolution method that is reliable and requires minimal time and effort to prepare, and an iodine dissolution agent with a minimal concentration of sodium salt. Sodium iodide and hydriodic acid were both found to dissolve iodine to attain the desired GSE iodine concentrations of 7.5 +/- 2.5 mg/L and 25 +/- 5 mg/L. The 1.75:1 and 2:1 sodium iodide solutions produced higher iodine recoveries than the 1.2:1 hydriodic acid solution. A two-hour preparation time is required for the three sodium iodide solutions. The 1.2:1 hydriodic acid solution can be prepared in less than 5 min. Two sodium iodide stock solutions (2.5:1 and 2:1) were found to dissolve iodine without undergoing precipitation.

Rutz, Jeffrey A.↗

Time-optimal bang-bang slew of rigidized SCOLE configuration

This paper addresses: (1) an application of the well-known time-optimal bang-bang control theory to the design of minimal-time limited-torque single-axis slew maneuvers for the rigidized configuration of NASA Langley Research Center's Spacecraft Control Laboratory Experiment (SCOLE) and (2) the associated generic side effects due to spillover of slew motions and applied torques. Numerical experiments that helped pinpoint the specific causes of performance degradation are discussed. Analytical as well as scientifically interesting numerical research results are given.

Lin, J. G.↗

Minimizing EVA Airlock Time and Depress Gas Losses

This paper describes the need and solution for minimizing EVA airlock time and depress gas losses using a new method that minimizes EVA out-the-door time for a suited astronaut and reclaims most of the airlock depress gas. This method consists of one or more related concepts that use an evacuated reservoir tank to store and reclaim the airlock depress gas. The evacuated tank can be an inflatable tank, a spent fuel tank from a lunar lander descent stage, or a backup airlock. During EVA airlock operations, the airlock and reservoir would be equalized at some low pressure, and through proper selection of reservoir size, most of the depress gas would be stored in the reservoir for later reclamation. The benefit of this method is directly applicable to long duration lunar and Mars missions that require multiple EVA missions (up to 100, two-person lunar EVAs) and conservation of consumables, including depress pump power and depress gas. The current ISS airlock gas reclamation method requires approximately 45 minutes of the astronaut s time in the airlock and 1 KW in electrical power. The proposed method would decrease the astronaut s time in the airlock because the depress gas is being temporarily stored in a reservoir tank for later recovery. Once the EVA crew is conducting the EVA, the volume in the reservoir would be pumped back to the cabin at a slow rate. Various trades were conducted to optimize this method, which include time to equalize the airlock with the evacuated reservoir versus reservoir size, pump power to reclaim depress gas versus time allotted, inflatable reservoir pros and cons (weight, volume, complexity), and feasibility of spent lunar nitrogen and oxygen tanks as reservoirs.

Trevino, Luis A.↗

Distributed simulation using a real-time shared memory network

The Advanced Control Technology Branch of the NASA Lewis Research Center performs research in the area of advanced digital controls for aeronautic and space propulsion systems. This work requires the real-time implementation of both control software and complex dynamical models of the propulsion system. We are implementing these systems in a distributed, multi-vendor computer environment. Therefore, a need exists for real-time communication and synchronization between the distributed multi-vendor computers. A shared memory network is a potential solution which offers several advantages over other real-time communication approaches. A candidate shared memory network was tested for basic performance. The shared memory network was then used to implement a distributed simulation of a ramjet engine. The accuracy and execution time of the distributed simulation was measured and compared to the performance of the non-partitioned simulation. The ease of partitioning the simulation, the minimal time required to develop for communication between the processors and the resulting execution time all indicate that the shared memory network is a real-time communication technique worthy of serious consideration.

Simon, Donald L.↗

Astrobee Operations on the Iss: Gui’S Impact on the Operators’ Cognitive Load

The Astrobee free-flying robots have completed their fifth successful year of operations housed in the Japanese Experimental Module (JEM) on the International Space Station (ISS). In this paper, we introduce two Graphical User Interfaces (GUI) used to operate and monitor in real-time the Astrobee free-flying robots onboard the ISS and report on the impact these GUIs have in the operator’s cognitive load. A review of the state-of-the-art GUI design for remotely teleoperated scenarios with minimal time delay is presented and the study’s conclusion used to determine the elements and recommendations to create an interface that minimizes its impact on the overall performance of an operator during an activity at the ISS. The Ground Data System (GDS) is one of the two GUIs in the study: it contains several tabs, each of which displays a different set of controls for specific tasks e.g. Overview, Run Plan, Teleoperate, Guest Science; some also display video and a three-dimensional (3D) representation of the ISS and robot based on the Astrobee’s telemetry. Most tabs enable a single operator-robot connection, however some of its tabs are capable to monitor and control up to three Astrobees simultaneously. The GDS Helper is a text-based user interface created to facilitate commanding and monitoring of an Astrobee robot directly from an SSH session. In full interactive mode it displays a maximum of 5 sections: general commanding, feedback/ack, telemetry, guest science commanding, and data, all in one view. In batch mode, it enables complex command scripting while retaining some interactive capabilities. A comparative analysis between these GUIs is carried out at an analogous ISS environment at the NASA Ames Research Center’s Granite Lab and its results presented. While GDS is able to provide an operator with control and situational awareness via its video and 3D displays, its several tabs may introduce an overwhelming amount of information confusing and delaying the operator especially during time-sensitive maneuvers where the operator may need to switch back and forth between them. GDS helper in the other hand does not provide video or 3D displays thus not allowing an operator to attain situational awareness, however it provides the operator with a design displaying commonly used data in a single window, enabling the operator to understand the state of the robot at a glance and control it through a commands entered via keyboard instead of a combination of mouse clicks and keyboard input. The results of the experiments measure the cognitive load across several operators maneuvering Astrobee to accomplish tasks ranging from fully manual to supervised activities. A GUI combining a single window displaying data along video and a 3D display is expected to reduce the operator’s cognitive load.

Astrobee↗

Evaluation of Dual Pressurized Rover Operations During Simulated Planetary Surface Exploration

Introduction: A pair of small pressurized rovers (Space Exploration Vehicles, or SEVs) is at the center of the Global Point-of-Departure architecture for future human planetary exploration. Simultaneous operation of multiple crewed surface assets should maximize productive crew time, minimize overhead, and preserve contingency return paths. Methods: A 14-day mission simulation was conducted in the Arizona desert as part of NASA?s 2010 Desert Research and Technology Studies (DRATS). The simulation involved two SEV concept vehicles performing geological exploration under varied operational modes affecting both the extent to which the SEVs must maintain real-time communications with mission control ("Continuous" vs. "Twice-a-Day") and their proximity to each other ("Lead-and-Follow" vs. "Divide-and-Conquer"). As part of a minimalist lunar architecture, no communications relay satellites were assumed. Two-person crews consisting of an astronaut and a field geologist operated each SEV, day and night, throughout the entire 14-day mission, only leaving via the suit ports to perform simulated extravehicular activities. Standard metrics enabled quantification of the habitability and usability of all aspects of the SEV concept vehicles throughout the mission, as well as comparison of the extent to which the operating modes affected crew productivity and performance. Practically significant differences in the relevant metrics were prospectively defined for the testing of all hypotheses. Results and Discussion: Data showed a significant 14% increase in available science time (AST) during Lead-and-Follow mode compared with Divide-and-Conquer, primarily because of the minimal overhead required to maintain communications during Lead-and-Follow. In Lead-and-Follow mode, there was a non-significant 2% increase in AST during Twice-a-Day vs. Continuous communications. Situational awareness of the other vehicle?s location, activities, and contingency return constraints were enhanced during Lead-and-Follow and Twice-a-Day communications modes due to line-of-sight and direct SEV-to-SEV communication. Preliminary analysis of Scientific Data Quality and Observation Quality metrics showed no significant differences between modes.

Abercromby, Andrew F. J.↗

NASA Tech Briefs, June 2014

Topics include: Real-Time Minimization of Tracking Error for Aircraft Systems; Detecting an Extreme Minority Class in Hyperspectral Data Using Machine Learning; KSC Spaceport Weather Data Archive; Visualizing Acquisition, Processing, and Network Statistics Through Database Queries; Simulating Data Flow via Multiple Secure Connections; Systems and Services for Near-Real-Time Web Access to NPP Data; CCSDS Telemetry Decoder VHDL Core; Thermal Response of a High-Power Switch to Short Pulses; Solar Panel and System Design to Reduce Heating and Optimize Corridors for Lower-Risk Planetary Aerobraking; Low-Cost, Very Large Diamond-Turned Metal Mirror; Very-High-Load-Capacity Air Bearing Spindle for Large Diamond Turning Machines; Elevated-Temperature, Highly Emissive Coating for Energy Dissipation of Large Surfaces; Catalyst for Treatment and Control of Post-Combustion Emissions; Thermally Activated Crack Healing Mechanism for Metallic Materials; Subsurface Imaging of Nanocomposites; Self-Healing Glass Sealants for Solid Oxide Fuel Cells and Electrolyzer Cells; Micromachined Thermopile Arrays with Novel Thermo - electric Materials; Low-Cost, High-Performance MMOD Shielding; Head-Mounted Display Latency Measurement Rig; Workspace-Safe Operation of a Force- or Impedance-Controlled Robot; Cryogenic Mixing Pump with No Moving Parts; Seal Design Feature for Redundancy Verification; Dexterous Humanoid Robot; Tethered Vehicle Control and Tracking System; Lunar Organic Waste Reformer; Digital Laser Frequency Stabilization via Cavity Locking Employing Low-Frequency Direct Modulation; Deep UV Discharge Lamps in Capillary Quartz Tubes with Light Output Coupled to an Optical Fiber; Speech Acquisition and Automatic Speech Recognition for Integrated Spacesuit Audio Systems, Version II; Advanced Sensor Technology for Algal Biotechnology; High-Speed Spectral Mapper; "Ascent - Commemorating Shuttle" - A NASA Film and Multimedia Project DVD; High-Pressure, Reduced-Kinetics Mechanism for N-Hexadecane Oxidation; Method of Error Floor Mitigation in Low-Density Parity-Check Codes; X-Ray Flaw Size Parameter for POD Studies; Large Eddy Simulation Composition Equations for Two-Phase Fully Multicomponent Turbulent Flows; Scheduling Targeted and Mapping Observations with State, Resource, and Timing Constraints;

Source record↗

Pre-Mission Input Requirements to Enable Successful Sample Collection by a Remote Field/EVA Team

This paper is intended to evaluate the sample collection process with respect to sample characterization and decision making. In some cases, it may be sufficient to know whether a given outcrop or hand sample is the same as or different from previous sampling localities or samples. In other cases, it may be important to have more in-depth characterization of the sample, such as basic composition, mineralogy, and petrology, in order to effectively identify the best sample. Contextual field observations, in situ/handheld analysis, and backroom evaluation may all play a role in understanding field lithologies and their importance for return. For example, whether a rock is a breccia or a clast-laden impact melt may be difficult based on a single sample, but becomes clear as exploration of a field site puts it into context. The FINESSE (Field Investigations to Enable Solar System Science and Exploration) team is a new activity focused on a science and exploration field based research program aimed at generating strategic knowledge in preparation for the human and robotic exploration of the Moon, near-Earth asteroids (NEAs) and Phobos and Deimos. We used the FINESSE field excursion to the West Clearwater Lake Impact structure (WCIS) as an opportunity to test factors related to sampling decisions. In contract to other technology-driven NASA analog studies, The FINESSE WCIS activity is science-focused, and moreover, is sampling-focused, with the explicit intent to return the best samples for geochronology studies in the laboratory. This specific objective effectively reduces the number of variables in the goals of the field test and enables a more controlled investigation of the role of the crewmember in selecting samples. We formulated one hypothesis to test: that providing details regarding the analytical fate of the samples (e.g. geochronology, XRF/XRD, etc.) to the crew prior to their traverse will result in samples that are more likely to meet specific analytical objectives than samples collected in the absence of this premission information. We conducted three tests of this hypothesis. Our investigation was designed to document processes, tools and procedures for crew sampling of planetary targets. This is not meant to be a blind, controlled test of crew efficacy, but rather an effort to recognize the relevant variables that enter into sampling protocol and to develop recommendations for crew and backroom training in future endeavors. Methods: One of the primary FINESSE field deployment objectives was to collect impact melt rocks and impact melt-bearing breccias from a number of locations around the WCIS structure to enable high precision geochronology of the crater to be performed [1]. We conducted three tests at WCIS after two full days of team participation in field site activities, including using remote sensing data and geologic maps, hiking overland to become familiar with the terrain, and examining previously-collected samples from other islands. In addition, the team members shared their projects and techniques with the entire team. We chose our "crew members" as volunteers from the team, all of whom had had moderate training in geologic fieldwork and became familiar with the general field setting. The first two tests were short, focused tests of our hypothesis. Test A was to obtain hydrothermal vugs; Test B was to obtain impact melt and intrusive rock as well as the contact between the two to check for contact metamorphism and age differences. In both cases, the test director had prior knowledge of the site geology and had developed a study-specific objective for sampling prior to deployment. Prior to the field deployment, the crewmember was briefed on the sampling objective and the laboratory techniques that would be used on the samples. At the field sites (Fig. 2), the crewmember was given 30 minutes to survey a small section of outcrop (10-15 m) and acquire a suite of three samples. The crewmember talked through his process and the test director kept track of the timeline in verbal cues to the crewmember. At the conclusion, the team member conducting the scientific study appraised the samples and train of thought. Test C was a 90-minute EVA simulation using two crewmembers working out of line-of-sight in communication with a science backroom. The science objectives were determined by the science backroom team in advance using a Gigapan image of the outcrop (Fig. 1). The science team formulated hypotheses for the outcrop units and created sampling objectives for impact-melt lithologies; the science team turned these into a science plan, which they communicated to the crew in camp prior to crew deployment. As part of the science plan, the science team also discussed their sample needs in depth with the crewmembers, including laboratory methods, objectives, and samples sizes needed. During the deployment, the two crewmembers relayed real-time information to the science backroom by radio with no time delay. Both the crew and science team re-evaluated their hypotheses and science plans in real-time. Discussion: Upon evaluation, we found that the focused tests (Tests A and B) were successful in meeting their scientific objectives. The crewmember used their knowledge of how the samples were to be used in further study (technique, sample size, and scientific need) to focus on the sampling task. The crewmember was comfortable spending minimal time describing and mapping the outcrop. The crewmember used all available time to get a good sample. The larger test was unsuccessful in meeting the sampling objectives. When the crewmembers began describing the lithologies, it was quickly apparent that the lithologies were not as the backroom expected and had communicated to the crew. When the outcrop wasn't as expected, the crew members instinctively switched to field characterization mode, taking significant time to characterize and map the outcrop. One crew member admitted that he "kind of lost track" of the sampling strategy as he focused on the basic outcrop characterization. This is the logical first step in a field geology campaign, that a significant amount of time must be spent by the crew and backroom to understand the outcrop and its significance. Basic field characterization of an outcrop is a focused activity that takes significant time and training [2, 3]. Sampling of representational lithologies can be added to this activity for little cost [4]. However, we have shown that identification of unusual or specific samples for laboratory study also takes significant time and knowledge. We suggest that sampling of this type be considered a separate activity from field characterization, and that crewmembers be trained in sampling needs for different kinds of studies (representative lithologies vs. specialized samples) to acquire a mindset for sampling similar to field mapping. Sampling activities should be given a significant amount of specifically allocated time in scheduling EVA activities; and in the better case, that sampling be done as a second activity to a previously studied outcrop where both crew and backroom are comfortable with its context and characteristics. Our hypothesis posited that crewmember knowledge of how the samples would be used upon return would aid them in choosing relevant samples. Our testing bore this hypothesis out to some extent. We therefore recommend that crewmember training should include exposure to the laboratory techniques and analyses that will be used on the samples to foster this knowledge. There is also the potential for increasing crewmember contextual knowledge real-time in the field through the introduction of in situ geochemical technologies such as field portable XRF. The presence of field portable geochemical technology could enable the astronauts to interrogate the samples for K abundance real-time, ensuring they could collect valuable and dateable samples [5]. Though simulations such as these can teach us a fair bit about decision making processes and timeline building, one EVA participant noted that when he wasn't collecting "real" samples, he wasn't at his best. This effect suggests that higher-fidelity studies involving truly remote participants conducting actual scientific studies merit further attention to capture lessons for application to future crew situations.

sample collection↗

ICE System: Interruptible control expert system

The Interruptible Control Expert (ICE) System is based on an architecture designed to provide a strong foundation for real-time production rule expert systems. Three principles are adopted to guide the development of ICE. A practical delivery platform must be provided, no specialized hardware can be used to solve deficiencies in the software design. Knowledge of the environment and the rule-base is exploited to improve the performance of a delivered system. The third principle of ICE is to respond to the most critical event, at the expense of the more trivial tasks. Minimal time is spent on classifying the potential importance of environmental events with the majority of the time used for finding the responses. A feature of the system, derived from all three principles, is the lack of working memory. By using a priori information, a fixed amount of memory can be specified for the hardware platform. The absence of working memory removes the dangers of garbage collection during the continuous operation of the controller.

Vezina, James M.↗