At least 37 records · Page 2

Recovery of Zr from ZrCl 4 by Electrolysis in Fused Salts and Ionic Liquids: Literature Review and Test Plan

This report reviewed the current status on the research and development of Zr electrodeposition in high temperature molten salts and room temperature ionic liquids from ZrCl 4 , which is the product of the chlorination process developed for recycling the Zr claddings of the spent nuclear fuels. Due to the pyrophoricity issue, the Zr metal product from the electrodeposition process is desired to be of coarse, dense crystalline or plates (instead of powder or loose, fine crystals) that are not to be easily oxidized. The findings based on the literature review are included in the report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends to Generate White Hydrogen

The objective of this DOE-funded project by the Electric Power Research Institute, Inc. (EPRI), Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), is to qualify coal, biomass, and plastic waste blends based on performance testing of selected pellet recipes in a pilot-scale updraft moving-bed gasifier. The testing will provide relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of the waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are a focus. The gasifier is Hamilton Mauer International, Inc. (HMI)’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips. However, mixtures of these fuels with plastic wastes have not been prepared and gasified together. The feedstocks will be prepared by California Pellet Mill (CPM) under contract to HMI. The technical tasks and current status for this two-year research project are: Feed Procurement and Preparation: Nine different feedstocks were prepared from varying compositions of PRB coal, corn stover biomass, and car fluff waste plastics. Fuel pellets were produced by California Pellet Mill and shipped to Sotacarbo’s test facility in Italy. Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different tests that were run, instrumentation used, extractive samples taken, and relevant figures of merit. Gasifier Testing: Tests are currently being performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstocks generated from varying mixtures of coal, biomass, and plastic wastes. The testing will provide information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design. This task will also include work to reassemble the gasifier at Sotacarbo and perform a baseline 100% coal run. Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results to be reported. The results will be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends. This paper will be summarize the pelletizing procedure that insures the viability of the tri-fuel pellets for the gasification runs that are being performed at Sotacarbo’s 30mm up draft moving bed gasifier. Initial gasification tests have been conducted, and all the lab scale tri-fuel pellet gasification runs will be completed by the fall of 2022. Performance data will enable modeling of a full-scale HMI industrial scale gasifier supporting both CHP and Hydrogen production.

01 COAL, LIGNITE, AND PEAT↗

Performance Testing of a Moving Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends to Generate White Hydrogen

The objective of this DOE-funded project by the Electric Power Research Institute, Inc. (EPRI), Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), is to qualify coal, biomass, and plastic waste blends based on performance testing of selected pellet recipes in a pilot-scale updraft moving-bed gasifier. The testing provides relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of the waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are a focus. The gasifier is Hamilton Mauer International, Inc. (HMI)’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips. However, mixtures of these fuels with plastic wastes had not yet been prepared and gasified together. The feedstocks were prepared by California Pellet Mill (CPM) under contract to HMI. The technical tasks for this research project included: • Feed Procurement and Preparation: Nine different feedstocks were prepared from varying compositions of PRB coal, corn stover biomass, and car fluff waste plastics. Fuel pellets were produced by California Pellet Mill (CPM) and shipped to Sotacarbo’s test facility in Italy. • Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different tests that were run, instrumentation used, extractive samples taken, and relevant figures of merit. • Gasifier Testing: Tests were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstocks generated from varying mixtures of coal, biomass, and plastic wastes. The testing provides information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design. This task will also included work to reassemble the gasifier at Sotacarbo and perform a baseline 100% coal run. • Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results was reported. The results can be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends. The tri-fuel pelletizing conducted at CPM and gasification testing results from Sotacarbo’s 30mm up draft moving bed gasifier are significant. Providing data for an established gasifier to help accelerate its updated design to be able to accommodate feedstocks composed of coal, biomass, and plastic waste. This should ultimately lead to development and commercialization of a lower cost, white hydrogen generation system.

01 COAL, LIGNITE, AND PEAT↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends to Generate White Hydrogen

The objective of this DOE-funded project by the Electric Power Research Institute, Inc. (EPRI), Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), is to qualify coal, biomass, and plastic waste blends based on performance testing of selected pellet recipes in a pilot-scale updraft moving-bed gasifier. The testing provides relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of the waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are a focus. The gasifier is Hamilton Mauer International, Inc. (HMI)’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips. However, mixtures of these fuels with plastic wastes had not yet been prepared and gasified together. The feedstocks were prepared by California Pellet Mill (CPM) under contract to HMI. The technical tasks for this research project included: • Feed Procurement and Preparation: Nine different feedstocks were prepared from varying compositions of PRB coal, corn stover biomass, and car fluff waste plastics. Fuel pellets were produced by California Pellet Mill (CPM) and shipped to Sotacarbo’s test facility in Italy. • Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different tests that were run, instrumentation used, extractive samples taken, and relevant figures of merit. • Gasifier Testing: Tests were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstocks generated from varying mixtures of coal, biomass, and plastic wastes. The testing provides information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design. This task will also included work to reassemble the gasifier at Sotacarbo and perform a baseline 100% coal run. • Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results was reported. The results can be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends. The tri-fuel pelletizing conducted at CPM and gasification testing results from Sotacarbo’s 30mm up draft moving bed gasifier are significant. Providing data for an established gasifier to help accelerate its updated design to be able to accommodate feedstocks composed of coal, biomass, and plastic waste. This should ultimately lead to development and commercialization of a lower cost, white hydrogen generation system.

01 COAL, LIGNITE, AND PEAT↗

Gasification of Mixed Blends of Coal, Biomass, and Plastic Waste

The objective of this DOE-funded project by the Electric Power Research Institute, Inc. (EPRI), Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), is to qualify coal, biomass, and plastic waste blends based on performance testing of selected pellet recipes in a pilot-scale updraft moving-bed gasifier. The testing provides relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of the waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are a focus. The gasifier is Hamilton Mauer International, Inc. (HMI)’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips. However, mixtures of these fuels with plastic wastes had not yet been prepared and gasified together. The feedstocks were prepared by California Pellet Mill (CPM) under contract to HMI. The technical tasks for this research project included: • Feed Procurement and Preparation: Nine different feedstocks were prepared from varying compositions of PRB coal, corn stover biomass, and car fluff waste plastics. Fuel pellets were produced by California Pellet Mill (CPM) and shipped to Sotacarbo’s test facility in Italy. • Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different tests that were run, instrumentation used, extractive samples taken, and relevant figures of merit. • Gasifier Testing: Tests were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstocks generated from varying mixtures of coal, biomass, and plastic wastes. The testing provides information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design. This task will also included work to reassemble the gasifier at Sotacarbo and perform a baseline 100% coal run. • Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results was reported. The results can be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends. The tri-fuel pelletizing conducted at CPM and gasification testing results from Sotacarbo’s 30mm up draft moving bed gasifier are significant. Providing data for an established gasifier to help accelerate its updated design to be able to accommodate feedstocks composed of coal, biomass, and plastic waste. This should ultimately lead to development and commercialization of a lower cost, white hydrogen generation system.

01 COAL, LIGNITE, AND PEAT↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends with Washed and Unwashed Legacy Coals and Other Waste Fuels to Generate White Hydrogen

The objective of this effort, primarily funded by the United States Department of Energy (DOE), and led by the Electric Power Research Institute, Inc. (EPRI), with support by Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), has been to qualify coal, biomass, and plastic waste blends based on performance testing of selected fuel pellet compositions in a pilot-scale updraft moving-bed (UDMB) gasifier. The testing provided relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are the focus. The gasifier used for testing is HMI’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips (biomass). However, mixtures of these fuels with plastic wastes have not been prepared and gasified together. The three feedstocks were densified and pelletized by California Pellet Mill (CPM) to meet the feedstock size required by Sotacarbo’s 30mm ID UDMB gasifier, under contract to HMI. The technical tasks and results from this two-year research project included: (1) Feed Procurement and Preparation: Nine different tri-fuel pellets were prepared from varying compositions of fresh mined PRB coal, corn stover biomass, and car fluff waste plastics. Tri-fuel pellets were produced by CPM and shipped to Sotacarbo’s test facility in Carbonia, Sardinia, Italy. (2) Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different UDMB gasification tests to be performed in Sotacarbo’s 12-inch ID pilot scale gasifier, the process monitoring instrumentation used, and the extractive samples recovered for analysis of the total gasification process mass and energy balance. (3) Gasifier Testing: Nine different gasification runs were performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstock compositions generated from varying mixtures of PRB coal, biomass, and plastic wastes. The testing generated performance data on gasification reaction efficiency and performance, yielding relevant data for models used to scale up the gasifier design. This task also included work to refurbish and reassemble the pilot gasifier at Sotacarbo and perform a baseline 100% PRB coal run. (4) Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results are reported in the project’s final report, published in March 2024. The results show that all tri-fuel pellets gasified well and maintained structural integrity throughout the gasification process. The syngas generated can be shifted to hydrogen by using commercial syngas shifting technologies. (5) High Fidelity computational fluid dynamics (CFD) Simulation: The National Energy Technology Laboratory (NETL) team performed CFD simulations of the UDMB gasifier for two of the tri-fuel pellets gasified in Sotacarbo’s pilot scale gasifier. The kinetic mechanisms for the pyrolysis of each constituent, PRB coal, corn stover biomass, and waste plastics are based on thermogravimetric analysis performed by Sotacarbo. The gasification model was validated by comparing the predicted syngas composition at the exit of the gasifier with the measured syngas composition. In addition, the reactor’s measured internal temperature profile agreed well with the predicted internal reactor temperature profile. These results validate that the model can be used to predict the performance of the updraft moving bed gasifier for different feedstocks and operating conditions. This paper summarizes the results of the completed work in which the pelletizing procedure was validated to ensure the viability of the tri-fuel pellets for the gasification runs performed at Sotacarbo’s 30 mm UDMB gasifier. The gasification performance data from this series of nine runs will enable modeling of a full-scale HMI industrial scale gasifier supporting both combined heat and power, and Hydrogen production from coal (both fresh mined and legacy) combined with various biomass and waste plastics. Additionally, plans and progress on a follow-up project, being executed by the same project team, will be presented. In this project, a total of twenty (20) different feedstocks are being prepared from varying compositions of biomass (both woody biomass and corn stover) with a mixture of legacy coal waste, plastic waste, and refuse-derived fuel (RDF). The testing will provide information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design to 50 megawatt electric (MWe) (equivalent hydrogen production). Tests will also be performed on a bench-scale fluidized-bed gasifier for comparison purposes. The results of this testing will be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends.

08 HYDROGEN↗

Engineering Scale Testing of Transformational Non-Aqueous Solvent-Based CO 2 Capture Process at Technology Center Mongstad

Progress is reported for the period from August 8, 2018 to June 30, 2023. This final report involves work performed under ten tasks spanning two budget periods. The tasks are Task 1 Project Management, Task 2 TCM EH&S Risk Evaluation and Permitting, Task 3 Solvent Qualification, Task 4 Preliminary Design of NAS Optimized System, Task 5 TCM Amine Plant Equipment Procurement, Modification and Commissioning, Task 6 Solvent Production, Task 7 NAS Modified Amine Plant Test Plan Development, Testing, and Data Analysis, Task 8 Decommissioning and Waste Handling, Task 9 Final Techno-Economic Assessment and EH&S Risk Assessment, and Task 10 Cost Benefit Analysis and Technology Maturation Planning.

01 COAL, LIGNITE, AND PEAT↗

THERMAL MODELING OF HANFORD CESIUM AND STRONTIUM CANISTERS DURING SIMULATED LOADING

A computational fluid dynamics (CFD) model was built to simulate planned testing of heater assemblies within a canister and overpack for the Hanford Lead Canister (HLC) project. The HLC is a canister storage system that will contain heaters to simulate the decay heat of nuclear material and provide the canister storage system with environmental conditions equivalent to the operating conditions on a dry storage pad. The HLC will be equipped with long-term data collection and monitoring systems to provide an early warning of corrosion, pitting, cracking, or other signs of canister degradation that might threaten the integrity of the containment boundary over the potentially long term of dry storage. An important part of the HLC development is to make pretest numerical predictions for the behavior of the heated canister during the simulated radiolytic decay heat testing, which simulates the dry storage system during loading operations. The simulated radiolytic decay heat test is planned for mid-2024 in a configuration that includes the heater assembly, overpack, and canister, but with the lids removed to allow loading cesium and strontium capsules into the canister. One of the goals of the test is to evaluate the thermal behavior of the canister and overpack assembly in the ambient air of the test facility, which will provide data critical to validating the thermal models and understanding how the HLC will perform as a system once deployed. To best approximate real-world conditions, the CFD model includes the full air volume of the mock-up truck bay the heated canister test will be performed in, enabling detailed investigation of how the heated canister affects airflow around it. Rigorous pre-deployment testing of the complete HLC cask and canister system is intended to be completed before the HLC is deployed in the 2028 timeframe. This study presents the pre-test temperature predictions of the simulated radiolytic decay heat test. A description of the heater assembly, canister, and overpack system is presented. The model was developed with the commercial CFD software STAR-CCM+. An uncertainty analysis was run with the CFD model to determine the uncertainty in the temperature predictions and provide a range over which the predicted temperatures are expected to vary. The uncertainty analysis was preformed by coupling STAR-CCM+ with the software Dakota, which provides advanced parametric analyses, including quantification of margins and uncertainty with computational models. This work is expected to provide insight into SNF canister behavior.

Carpenter-Graffy, Dina E.↗

Corrosion Testing of Bubbler Materials for LAW Vitrification (Rev. 0)

This work involved crucible-scale corrosion tests using coupons of selected materials in the baseline glass formulations for the seven LAW Sub-Envelopes. The tests were performed with Inconel 690 and MA 758; per the Test Plan, selected tests were also performed with a proprietary high temperature alloy supplied by SRTC. Coupons of these materials were tested for their corrosion resistance to LAW baseline glasses in two test series: the first series was with a baseline glass only, the second series was with a baseline glass and an added salt layer.

36 MATERIALS SCIENCE↗

Modeling and Analysis for Spent Nuclear Fuel Seismic Testing

Note: This is the final public release version of PNNL-31671 Draft, which was previously released to the sponsor for review. The intent is the public release version will be PNNL-31671. There are no significant changes from the earlier draft version. This unlimited distribution report is the deliverable for M3SF-21PN010202014: Modeling and Analysis for Spent Nuclear Fuel Seismic Testing. This report summarizes the modeling, analysis, and test plan support completed by Pacific Northwest National Laboratory for the spent nuclear fuel dry storage system seismic test plan through May of 2021. Test plan preparation is planned to continue until the seismic test is completed in July of 2022. This report covers preliminary structural dynamic model development and computer-aided design of test hardware. Based on preliminary modeling, the strongest earthquakes under consideration in this test program provide mechanical loading on the spent nuclear fuel that is comparable to the 30 cm cask drop scenario, although the loads do not appear to be strong enough to cause significant permanent deformation of the fuel assembly spacer grids. The potential for grid deformation during the test will be assessed when the proposed shake table motion becomes available. The weakest earthquakes considered in this test are expected to be comparable to the mechanical loads witnessed in the multimodal transportation test of 2017. The horizontal canister system is predicted to provide nearly-uniform loading condition on the fuel assemblies it contains, while the vertical cask system is predicted to cause non-uniform dynamic loads on the fuel assemblies. In the horizontal case, gravity keeps the fuel assemblies in contact with one basket wall surface unless the loads are strong enough to cause a separation. In the vertical case, the fuel assemblies are relatively long and slender, and seismic motion in the anticipated test range is predicted to cause the assemblies to lean, tilt, and impact the basket walls throughout the seismic event. These gap closures are a nonlinear force transmission condition, so the vertical system is expected to have more variation and variability than the horizontal system. While the horizontal system is expected to have a relatively more linear response than the vertical system, there is still the potential for nonlinear behavior in the horizontal system because the fuel assemblies are free to slide, bounce, and impact the basket walls if the seismic loads are strong enough. One major conclusion of this study is that the use of mixed fuel assemblies in the canister will be acceptable. There are differences in overall system response when the mass, center of gravity, or gaps are changed, but the changes in response are within the bounds of a system that contains completely homogeneous fuel assemblies. One important observation is that the loading for each individual fuel assembly within the vertical canister is expected to be different from that of the others because of nonlinearities in the system. The horizontal canister system is expected to have a more uniform and more predictable response than the vertical canister, making variations in fuel assembly characteristics easier to account for. One important recommendation that comes from this modeling work is to repeat some of the strongest shake tests at different angles, particularly for the vertical cask system. Modeling predicts that strong seismic motion will cause the fuel assemblies to close initial gaps and impact the fuel basket walls when the canister is in the vertical cask configuration. Each shake test will impose a pre-defined three-dimensional time history on the cask system.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

PLANNING FOR NUCLEAR TESTING AFTER CORE INTERNALS CHANGEOUT #6 IN THE ADVANCED TEST REACTOR

A series of physics tests were planned for the Advanced Test Reactor (ATR) after the sixth Core Internals Changeout (CIC) in 2021. These tests verify nuclear characteristics of the new reflector and shim mechanisms and are validation cases for core models. This work describes planning for these tests and compares the physics tests with those performed previously in ATR. This work also identifies unique characteristics of ATR that result in the need for unique tests.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Laboratory Evaluation of Commercial Utility Microgrid Controller Test Results

The functional requirements of many microgrid controllers (MGCs) are expanding and evolving to meet growing utility and community needs. At a high level, the utility microgrid controller serves resilience and reliability use cases by coordinating transitions between grid-connected and islanded states and by managing the system during island operations. This includes control scenarios that require the microgrid controller to use flexible microgrid boundaries, maintain energy balance, coordinate with peer systems, and manage grid-forming (GFM) and grid-following (GFL) distributed energy resources (DER). In order to evaluate these functional enhancements, microgrid controller test plans must also be developed to ensure that the implemented controllers provide adequate performance. This report provides MGC test plans for both island operation and transition functions. The functions covered in this report include feeder level energy management, island constraint management, secondary voltage and frequency control, black start, and synchronized reconnection. This second edition update also includes results from applying the tests to a commercial utility microgrid controller. These results evaluate the performance and reliability of the controller under various operational scenarios. It identifies specific areas where the controller excels and highlights gaps that need to be addressed for future enhancements. The application of these test plans on real-world system behavior provides insights on commercial equipment readiness for field deployment. These test cases can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; the tests also apply to third-party managed microgrid controllers that coordinate with utility- and customer-owned equipment. The report can also be used by technology developers and project developers in industry to evaluate control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ChargeX Prescribed Testing Program at CharIN June 2024 Testival: Outcomes & Future Recommendations

In June 2024, the ChargeX Consortium developed an optional prescribed testing program for electric vehicle (EV) and electric vehicle supply equipment (EVSE) manufacturers that attended the CharIN Testival as testers. There were two driving purposes of this program; to introduce a new hybrid approach to testing events with both ad-hoc and prescribed testing offered, and to demonstrate the test cases and structure effectiveness of the EV-EVSE Interoperability Test Plan (EEITP) document developed within the ChargeX Testing Task Force. This program contained eight test scenarios to be performed during the final 30-minutes of a 90-minute testing slot with details like purpose, setup, pass criteria, etc. included within a written test plan document. A $2,000 rebate was offered to those who participated, and a ChargeX moderation force was present to collect EV and EVSE meta data, testing meta data, and testing results.

33 ADVANCED PROPULSION SYSTEMS↗