Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

42 ENGINEERING↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly – 24139

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MULTI-MISSION THERMOELECTRIC GENERATOR ASSEMBLY TESTING AND LAUNCH OPERATIONS FOR MARS 2020

The Space Nuclear Power and Isotope Technologies (SNPIT) division at Idaho National Laboratory (INL) fuels, performs acceptance testing, and provides spacecraft integration support of Radioisotope Power Systems (RPS) in support of National Aeronautics and Space Administration (NASA) missions. Recently the SNPIT team completed assembly, testing and launch support of the Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) for the Mars 2020 Perseverance Rover mission.

07 ISOTOPE AND RADIATION SOURCES↗

MULTI-MISSION THERMOELECTRIC GENERATOR ASSEMBLY TESTING AND LAUNCH OPERATIONS FOR MARS 2020

The Space Nuclear Power and Isotope Technologies (SNPIT) division at Idaho National Laboratory (INL) fuels, performs acceptance testing, and provides spacecraft integration support of Radioisotope Power Systems (RPS) in support of National Aeronautics and Space Administration (NASA) missions. Recently the SNPIT team completed assembly, testing and launch support of the Multi-Mission Radioisotope Thermoelectric Generator (MMRTG) for the Mars 2020 Perseverance Rover mission.

07 ISOTOPE AND RADIATION SOURCES↗

Design, Manufacturing, Assembly, Testing, and Lessons Learned of the Prototype 650 MHz Couplers

Six 650 MHz high-power couplers will be integrated into the prototype High Beta 650 MHz (HB650) cryomodule for the PIP-II project at Fermilab. The design of the coupler is described, including design optimizations from the previous generation. This paper then describes the coupler life-cycle, including manufacturing, assembly, testing, conditioning and the lessons learned at each stage.

43 PARTICLE ACCELERATORS↗

Full Length Assembly Testing in PELICAN (Final Report)

In support of the development of the U.S. Department of Energy (DOE) Versatile Test Reactor (VTR), a thermal hydraulics test facility was constructed to generate experimental measurement of the pressure drop across a single full-scale assembly containing prototypic axial reflectors, fuel, and plena components. Constructed and operated at Argonne National Laboratory, the Pressure drop Experimental Loop for Investigations of Core Assemblies in Nuclear reactors (PELICAN) facility was designed to achieve hydraulic conditions identical to those anticipated for a full-scale fuel assembly located in the VTR core in the region with the highest flow rate. Using water as surrogate for liquid sodium, the flow loop was operated at elevated temperatures and pressures to match the thermophysical properties of liquid sodium and ensure matching Reynolds and Euler numbers. The measurement objectives for data generated from this test facility was driven primarily by the validation needs for code calculations and simulations of the reference VTR core. These objectives focused on the need to validate pressure drop results across the various segments of the fuel assembly as they relate directly to the pumping power and safety of the reactor. Presented in this report are experimental results and analytical comparisons based on testing of a full-length assembly in PELICAN. Housed within a hexagonal test section extending 3.4 m in length, the tested assembly features a prototypic lower reflector, grid plates, wire-wrapped rod bundle, upper reflector, and exit region. The rod bundle extends over 1.5 m in length and contains 217 individual wire-wrapped rods with dimensions that best reflect the reference VTR design. The as-tested bundle assembly was fabricated using 316 stainless steel 0.25-inch (6.35-mm) diameter rods wrapped with 0.04-inch (1.016-mm) diameter wire at a helical pitch of 10.51 inch (26.6 cm). Details of the method for in-house wire-wrapping, assembly, and installation are provided later in this report. Experimental measurements of pressure drop at 19 positions along the test assembly were recorded for a range of flow conditions, with special attention paid to key locations within the assembly, including component inlet and outlet, transition, and wire-wrapped rod bundle regions. Testing conditions were based on 110°C water with flow rates ranging from 50 to 450 GPM (3 to 27 kg/s) at the inlet of the test assembly generating Reynolds numbers and velocities up to ~8.0×10 4 and ~7.8 m/s, respectively, within the rod bundle region. Non-dimensional values for the friction factor were then calculated based on these experimental measurements and compared against those predicted by various analytical correlations available from open literature. Predictions by the upgraded Cheng and Todreas, Rehme, and Novendstern correlations fell within 4% to those values measured experimentally.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

IER 516 - Zirconium Test Assembly (ZTA) Preliminary Experimental Design [Slides]

Zirconium present in large quantities in criticality safety applications such as fuel manufacturing and processing facilities, and in commercial thermal nuclear reactors. ICSBEP lacks benchmarks optimized for zirconium sensitivity to validate zirconium evaluations. Evaluators lack isotopic differential nuclear data in regions of high importance to fission systems.

K-PSO 2.0↗

Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2021)

This report documents the operations and testing that was performed at the Mechanisms Engineering Test Loop (METL) during FY2021. The METL facility had a very successful third year of operations having logged about 944 days of operations with molten sodium either in a flowing or static condition. Operations were paused in April 20, 2021 to accommodate the refurbishing of building 308’s alkali metal passivation booth and scrubber (AMPB&S). METL is being prepared to support a second larger experiment, the Thermal Hydraulic Experimental Test Article (THETA) and expects to resume the Gear Test Assembly (GTA) testing. The technology development team is also developing two additional experiments, a gripper test article and a flow sensor test article that are expected to go into METL in late FY22 or early FY23.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Mechanisms Engineering Test Loop (METL) Operations and Testing Report (FY2022)

This report documents the operations, testing, maintenance, and improvements that were performed at the Mechanisms Engineering Test Loop (METL) during FY2022. The METL facility had a very successful fourth year of operations and went through some new experiences such as taking the facility from its frozen state in October 2021 and thawing the facility and also recovering from an oxide plug in one of the cold trap lines. After the facility was fully thawed, the METL staff maintained the facility in a continuous molten state – either flowing sodium or a static flow condition. METL facility continued supporting the Gear Test Assembly (GTA) testing and hosted its first 28” test vessel experiment, called the Thermal Hydraulic Experimental Test Article (THETA) which was inserted into Test Vessel 4. Work to accommodate two additional experiments, a gripper test article (GrTA) and a flow sensor test article (F-STAr) continued as they are expected to make their debut in FY2023. In addition, the steam piping for the B308 scrubber unit was replaced with stainless steel piping and controls and new parts for the scrubber were purchased – such as a new pump, new storage tank, and new blower and motor. These components will ultimately replace the existing scrubber components when those 1970’s era require replacement.

42 ENGINEERING↗

Mechanisms Engineering Test Loop (METL) Operations, Maintenance, and Testing - FY2025

This report documents the operations, maintenance, and improvements that were performed at the Mechanisms Engineering Test Loop (METL) and its supporting infrastructure during FY2024. The METL facility had a very successful seventh year of operations while supporting the testing of multiple test article experiments in the facility. The METL facility continued supporting the Gear Test Assembly (GTA) testing and the Thermal Hydraulic Experimental Test Article (THETA) with the full testing with both the primary and secondary systems. Work to accommodate two additional experiments, a flow sensor test article (F-STAr) gripper test and a fuel handling gripper test article (GrTA) continued as they are expected to undergo testing in METL in FY2025. In addition, a new 18” test article, the Sample Testing Basket (STB) was used a few times to provide screening tests for sodium service materials. A fifth test vessel was installed in the location of Test Vessel 6, and a wet vapor nitrogen sodium processing system was developed and initially tested.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Coupon Container Pressure Test

A total of six containers were tested to verify the Maximum Allowed Working Pressure (MAWP) rating of 100 psi. Three Inner Container Pressure Test Assemblies (1006759387-AA) and three Outer Container Pressure Test Assemblies (1006729168-AA) were tested. The container serial numbering is the drawing number followed by the serial number (i.e.,1006759387-###). The test procedure was performed as follows: 1. Pressurize to 50 psi and hold for 5 minutes. 2. Increase pressure to 100 psi and hold for 5 minutes. 3. Increase pressure to 150 psi and hold for a minimum of 20 minutes. A container is considered to pass if the pressure drops less than 1% at the end of the 20 minutes. All six containers passed the test.

42 ENGINEERING↗

Flow Sensor Test Article (F-STAr) - Assembly and Water Testing Report

The Flow Sensor Test Article (F-STAr) is a new test article under development for the Mechanisms Engineering Test Loop (METL) facility at Argonne National Laboratory. F-STAr’s purpose is to provide sodium submersible, high flowrate testing capabilities for the development of sensors, components, fluid studies and more. This report will provide a status update on the assembly and initial qualification testing of F-STAr. All components have been manufactured and received. Some modifications to these components were made to support minor changes in the test article design. Additionally, the power distribution, and data acquisition and control enclosures were designed, completed, and tested along with the control system software. Furthermore, initial qualification testing was completed in water. Finally, the F-STAr submersible Electromagnetic Flowmeter (EMFM) was completed and calibrated in flowing sodium.

42 ENGINEERING↗

Re-assembly and test of COMB dipole magnet with STAR® wires

Fermilab is developing the Conductor on Molded Barrel (COMB) magnet technology that works well with round REBCO conductors. COMB-STAR-1 magnet based on STAR wire by AMPeers was fabricated and tested in liquid nitrogen in 2023. The magnet demonstrated >90 Ic retention in the coils (before/after winding). Even though the magnet was not originally designed for operation at lower than 77 K temperatures, it was decided to test it in liquid helium to: - check the instrumentation and the DAQ system; - check the ability to detect resistive transitions or quenches and to protect the magnet; - gather the information on possible magnet design chances and upgrades of the test facility for future testing of HTS magnets. The magnet was re-assembled with a larger iron yoke and the axial supports and tested in liquid helium in 2024 at Fermilab s Vertical Magnet Test Facility (VMTF). It was the first HTS magnet test at that facility ever.

Kashikhin, Vadim↗

Re-Assembly and Test of a COMB Dipole Magnet With STAR Wires

Rare-Earth Barium Copper Oxide (REBCO) coated conductors are an attractive option for application in high field accelerator magnets due to their high critical field and the convenience of fabrication without heat treatment compared to some other superconductors. A small REBCO accelerator magnet was previously fabricated and tested in liquid nitrogen, demonstrating over 90% critical current retention in the coils. This paper describes the magnet re-assembly with a different support structure and its test in liquid helium at 1.8–4.5 K. The magnet quench history along with the instrumentation data is presented and discussed.

43 PARTICLE ACCELERATORS↗

Assembly and Testing of Scintillator Tile Modules for the CMS High-Granularity Calorimeter Upgrade

The High-Granularity Calorimeter (HGCAL), part of the upgrade to the Compact Muon Solenoid (CMS) experiment, employs silicon and scintillator tile modules in the endcaps to maintain detector performance during the High-Luminosity Large Hadron Collider (HL-LHC) era, scheduled to operate from 2030 to 2040. The upgraded calorimeter will provide highly segmented three-dimensional imaging, energy measurements, and precise timing for particle shower reconstruction. Approximately half of the HGCal plastic scintillator tile modules (1,834 total) will be assembled at Fermilab using an automated pick-and-place (PnP) machine. Following assembly, each tile module undergoes quality control (QC) procedures such as electrical validation, thermal testing, and physics validation using cosmic rays. This poster/talk presents the QC procedures and results from the tile module production in 2026, demonstrating the performance and quality of the assembled tile modules.

Bazimya, Jean Luc [Grambling State U.]↗