Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “terminal metering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 37 records · Page 2

Arrival Scheduling with Shortcut Path Options and Mixed Aircraft Performance

Previous work introduced the concept of using tactical shortcut options to improve schedule conformance in terminal airspace. When a scheduling point is congested, aircraft are scheduled to longer nominal paths, holding shortcut path options in reserve for tactical use if an aircraft is late, thereby improving the schedule conformance, reducing the required scheduling buffer, and increasing throughput. When the scheduling point is less congested, aircraft may be scheduled to the shorter path with original larger scheduling buffers. Previous work focused on a single generic merge point serving aircraft with uniform arrival precision. This paper extends the previous concept to enhance the performance of time-based arrival management and consider mixed aircraft performance. Aircraft equipped to achieve a high degree of schedule conformance may be scheduled to the shorter path under the same conditions that a less equipped aircraft would be scheduled to the longer path, giving the equipped aircraft an advantage that can be seamlessly integrated into the scheduler. The arrival scheduler with shortcut path options for mixed aircraft performance is applied to a model of first-come first-served terminal metering at Los Angeles International Airport. Whereas clear system benefits were found for tactical shortcut routing and higher percentages of equipped aircraft, very little advantage could be seen for equipped over unequipped aircraft that could be used to incentivize early equipage.

Equipage operations↗

ATS-6 description

The major design features of the sixth Applications Technology Satellite (ATS-6) are discussed. The three-axis stabilized, geostationary satellite, launched in May 1974, features a 9.1 meter parabolic antenna permitting the use of low cost 3 meter ground terminals for the reception of direct broadcast high quality color television programming. The communication subsystem is an integrated multifrequency RF repeater capable of receiving up to three signals in C, S, L, and VHF bands and retransmitting them at any commanded frequency in C, S, L, and UHF bands. A summary of the experiments carried aboard ATS-6 is provided, and early results from the GEOS Tracking and Data Relay Experiment are presented.

Redisch, W. N.↗

Research in ground-based near-terminal area 4D guidance and control

This paper describes work being done at NASA, Langley Research Center and at the Research Triangle Institute on advanced, ground-based guidance and control for the near terminal area. Large-scale computer traffic simulations in conjunction with flight experiments with a Boeing 737 aircraft will be used to evaluate various concepts for automated terminal area metering and spacing. The all-digital real-time air traffic simulation model is described. Facilities for aircraft tracking and for interfacing the aircraft with the digital simulation are discussed, along with possible application to other types of experiments.

Britt, C. L., Jr.↗

Evaluation of Microwave Landing System (MLS) effect on the delivery performance of a fixed-path metering and spacing system

Metering and spacing (M & S) system's algorithms described assume an aircraft two dimensional are navigation capability. The three navigation systems compared were: very high frequency omnidirectional range/distance measuring equipment (VOR/DME) and ILS, VOR/DME and + or - 40 MLS, and VOR/DME and + or - 60 MLS. Other factors studied were M & S tentative schedule point location, route geometry effects, and approach gate location effects. Summarized results are: the MLS offers some improvement over VOR/DME and ILS if all approach routes contain computer assisted turns; pilot reaction to moving the gate closer to the runway threshold may adversely affect M & S performance; and coupling en route metering to terminal scheduling transfers most of the terminal holding to more full efficient, higher altitude en route delay.

Credeur, L.↗

Joint NASA Ames/Langley Experimental Evaluation of Integrated Air/Ground Operations for En Route Free Maneuvering

In order to meet the anticipated future demand for air travel, the National Aeronautics and Space Administration (NASA) is investigating a new concept of operations known as Distributed Air-Ground Traffic Management (DAG-TM). Under the En Route Free Maneuvering component of DAG-TM, appropriately equipped autonomous aircraft self separate from other autonomous aircraft and from managed aircraft that continue to fly under today s Instrument Flight Rules (IFR). Controllers provide separation services between IFR aircraft and assign traffic flow management constraints to all aircraft. To address concept feasibility issues pertaining to integrated air/ground operations at various traffic levels, NASA Ames and Langley Research Centers conducted a joint human-in-the-loop experiment. Professional airline pilots and air traffic controllers flew a total of 16 scenarios under four conditions: mixed autonomous/managed operations at three traffic levels and a baseline all-managed condition at the lowest traffic level. These scenarios included en route flights and descents to a terminal area meter fix in airspace modeled after the Dallas Ft. Worth area. Pilots of autonomous aircraft met controller assigned meter fix constraints with high success. Separation violations by subject pilots did not appear to vary with traffic level and were mainly attributable to software errors and procedural lapses. Controller workload was lower for mixed flight conditions, even at higher traffic levels. Pilot workload was deemed acceptable under all conditions. Controllers raised several safety concerns, most of which pertained to the occurrence of near-term conflicts between autonomous and managed aircraft. These issues are being addressed through better compatibility between air and ground systems and refinements to air and ground procedures.

Barhydt, Richard↗

Terminal Sequencing and Spacing (TSS)

The Federal Aviation Administration's (FAA) Next Generation Air Transportation System (or NextGen) is being designed to support the predicted increases in traffic volume and to increase the capacity, efficiency and safety of the National Airspace System (NAS). The Federal Aviation Administration (FAA) identifies Performance-Based Navigation (PBN) as a key enabling capability of NextGen and is actively publishing PBN procedures at major airports throughout the United States. Standard Terminal Arrival Routes (STARs), procedures, and approaches are designed to facilitate fuel-efficient continuous descent operations. However, their use is limited during periods of high traffic demand due to the complexity of merging multiple streams of aircraft to the same airport. As a result, most arrivals in the Terminal Radar Approach Control (TRACON) area continue to be controlled using radar vectoring and step-down descents, resulting in high workload for controllers and diverting aircraft from efficient PBN trajectories. To address this issue, NASA developed the Terminal Sequencing and Spacing (TSS) system, an advanced arrival management technology that combines time-based scheduling and controller-based precision spacing tools. TSS is a ground-based controller automation tool that facilitates sequencing and merging arrivals on Performance-Based Navigation (PBN) routes, especially during highly congested demand periods. The two main components of TSS are: 1) a scheduler that de-conflicts merging arrivals in the terminal area by computing appropriate arrival times to the runway threshold and upstream terminal merge points, and 2) a set of Controller-Managed Spacing (CMS) decision support tools to efficiently assist schedule conformance. Sixteen high-fidelity human-in-the-loop simulations involving more than five hundred hours of evaluation time, were conducted to mature TSS from proof-of-concept design to a fully functional prototype. Results indicate high controller use and acceptability of the CMS tools as well as improved PBN route conformance (Figure 2). The TSS technology was transferred to the FAA in 2014, and it is targeted for deployment to several busy airports in the U.S. starting in 2018. Potential enhancements to TSS using DataComm will also be presented.

controller-managed spacing↗

Microcomputerized electric field meter diagnostic and calibration system

A computerized field meter calibration system which includes an apparatus for testing the calibration of field meters normally utilized for measuring electromagnetic field potentials is described. A reference voltage is applied to the field meter for causing signals to be produced on the output terminals thereof. A bank of relays is provided for selectively connecting output terminals of the field meter to a multiplexer by means of a digital voltmeter and an oscilloscope. A frequency-shift-keyed receiver is also connected to one of the terminals of the field meter for transmitting and converting a frequency shift keyed signal to a digital signal which is, subsequently, applied to the multiplexer.

Holley, L. D.↗

Strategic Time-Based Metering that Assures Separation for Integrated Operations in a Terminal Airspace

This paper reports an algorithm for strategic time-based metering of air traffic arriving and departing from a large ( tens of nautical miles) area (called here, the commitment region) around an airport or metroplex. The algorithm assures separation continuously in time and avoids a dictation of intent to an aircraft crew. This is accomplished by allowing an aircraft (specifically, its Flight Management System) to specify, and commit to, an intended route and ground speed profile along that route within the commitment region, and by supplying the time at which to enter the region to the aircraft crew. The airspace that comprises the commitment region need not be confined to the terminal airspace and can include some of the enroute space: the size and shape of the commitment region are parameters in the algorithm. An exact formula for including speed profile uncertainty in the algorithm is provided. The algorithm is applied to a number of data sets recorded during actual air traffic operations in the Southern California TRACON in July of 2014 and the Atlanta TRACON in November and December of 2013. The results of the numerical simulations indicate that the algorithm succeeds at keeping the aircraft separated, but introduces, in its current implementation, more separation than that observed in actual operations. This excess separation can be reduced by modeling more accurately the Visual Flight Rules separation practices, a direction for future research.

air traffic management↗

Arrival Metering Precision Study

This paper describes the background, method and results of the Arrival Metering Precision Study (AMPS) conducted in the Airspace Operations Laboratory at NASA Ames Research Center in May 2014. The simulation study measured delivery accuracy, flight efficiency, controller workload, and acceptability of time-based metering operations to a meter fix at the terminal area boundary for different resolution levels of metering delay times displayed to the air traffic controllers and different levels of airspeed information made available to the Time-Based Flow Management (TBFM) system computing the delay. The results show that the resolution of the delay countdown timer (DCT) on the controllers display has a significant impact on the delivery accuracy at the meter fix. Using the 10 seconds rounded and 1 minute rounded DCT resolutions resulted in more accurate delivery than 1 minute truncated and were preferred by the controllers. Using the speeds the controllers entered into the fourth line of the data tag to update the delay computation in TBFM in high and low altitude sectors increased air traffic control efficiency and reduced fuel burn for arriving aircraft during time based metering.

human/systems↗

Comparison of Different Control Schemes for Strategic Departure Metering

Airports and their terminal airspaces are key choke points in the air transportation system causing major delays and adding to pollution. A solution aimed at mitigating these chokepoints integrates the scheduling of runway operations, flight release from the gates and ramp into the airport movement area, and merging with other traffic competing for downstream airspace points. Within this integrated concept, we present a simulation-based analysis of the departure metering process, which delays the release of flights into the airport movement area while balancing two competing objectives: (1) maintaining large enough queues at the airport resources to maximize throughput and (2) absorbing excess delays at the gates or in ramp areas to save on fuel consumption, emissions, noise, and passenger discomfort. Three metering strategies are compared which respectively attempt to control the number of flights that (1) left the gate but did not take off, (2) left the ramp but did not take off, and (3) spent their unimpeded transit time to the runway but did not take off. It was observed that under deterministic and demand uncertainty conditions, the first strategy performed better than the other two strategies in terms of maintaining the runway throughput while transferring a significant average delay of two minutes to the gate. On the other hand, under uncertainties of flight transit time and runway service rate, all the strategies struggled to delay flights at the gate without a significant impact on the runway throughput.

air traffic management↗

Performance of an Automated System for Control of Traffic in Terminal Airspace

This paper examines the performance of a system that performs automated conflict resolution and arrival scheduling for aircraft in the terminal airspace around major airports. Such a system has the potential to perform separation assurance and arrival sequencing tasks that are currently handled manually by human controllers. The performance of the system is tested against several simulated traffic scenarios that are characterized by the rate at which air traffic is metered into the terminal airspace. For each traffic scenario, the levels of performance that are examined include: number of conflicts predicted to occur, types of resolution maneuver used to resolve predicted conflicts, and the amount of delay for all flights. The simulation results indicate that the percentage of arrivals that required a maneuver that changes the flight's horizontal route ranged between 11% and 15% in all traffic scenarios. That finding has certain implications if this automated system were to be implemented simply as a decision support tool. It is also found that arrival delay due to purely wake vortex separation requirements on final approach constituted only between 29% and 35% of total arrival delay, while the remaining major portion of it is mainly due to delay back propagation effects.

air traffic control↗

ATS-6 - A satellite for human needs

On May 30, 1974, NASA launched the ATS-6 experimental communications satellite into a geosynchronous orbit at a station centered over the United States. The 1400 kg satellite was designed to be body-stabilized with a 3-axis control system capable of precision offset pointing. It deployed a 9.1 meter (30 foot) parabolic reflector antenna with a transponder that covered a frequency range from VHF through C-band. The high RF gains obtained with the antenna were to be used for many dramatic communications experiments, one of which was the Health/Education Telecommunications Experiment (HET), a demonstration of direct broadcast of color television to low cost terminals in remote regions of the United States. More than 120 terminals with 3-meter antennas were deployed in Alaska, Washington, the Rocky Mountains, and Appalachia to provide educational and health services to selected community centers. After 11 months of nearly continuous service, the performance of both the satellite and the experiment have exceeded all expectations.

Whalen, A. A.↗

A New Acceptor (N-type) Polyphenylenevinylene Building Block: SF-PPV-I

A new sulfone derivatized acceptor (n-type) polyphenylenevinylene "SF-PPV" with nano meter sizes and functional terminals has been synthesized and characterized. The SF-PPV-I that contains hydrocarbon alkyl-sulfone moieties has a strong photoluminescence in both solution and in solid thin film states. In dichloromethane, the 5-10 nm sized SF-PPV has a maximum emission at about 530 nm with excitation maximum at about 490 nm. UV-VIS shows a absorption peak onsite at about 500 nm. Optical spectroscopy and electrochemical studies revealed that the SF-PPV-I has an LUMO level at about -3.6 eV (relative to vacuum), and an HOMO level at about -6.1 eV. The average size (length) of SF-PPV-I can be controlled on the nano meter scale via synthetic means. The SF-PPV has the potential in developing polymer based supramolecular opto-electronic semiconductor devices.

Wang, Yiqing↗

A description and evaluation of TIMER: A time-based terminal flow-control concept

A description of a time-based ATC concept called TIMER (Traffic Intelligence for the Management of Efficient Runway-scheduling) and the results of a fast time and real time computer evaluation are presented. The concept was designed to improve the efficiency of extended terminal area operations (en route approach, transition, and terminal flight to the runway). TIMER integrates en route metering, fuel efficient cruise and profile descents, terminal sequencing and spacing together with computer-generated controller aids, in order to fully use runway capacity and improve efficiency of delay absorption. The concept, by using simplified aircraft models, accommodates both 4-D and non 4-D equipped aircraft and is designed for integration into the manual, voice linked ATC system in an evolutionary manner and still be able to accommodate proposed system upgrade features such as data link and further ground automation. Fast time and real time computer simulation results identify and show the effects and interactions of such key variables as horizon of control, metering fix and final approach delivery time errors, aircraft separation requirements, delay discounting, wind, flight technical error, and knowledge of aircraft final approach speed. The current ATC system has a runway interarrival-error standard deviation of approx. 26 seconds. Simulation results indicate that, with computer aiding, the runway interarrival-error standard deviation for non 4-D equipped traffic can be reduced to the region of 8 to 12 seconds if expected final approach speed is known; however, the reduction is only in the region of 16 to 20 seconds if expected final approach speed is unknown. Another major finding is that en route metering fix delivery-error standard deviation should be kept to less than a number somewhere between 35 to 45 seconds to achieve full runway capacity. This requirement implies the need for either airborne automation or assistance to the controller since the current manual performance in today's en route metering environment is in the order of 1.5 minutes.

Credeur, Leonard↗

Assessment of Delivery Accuracy in an Operational-Like Environment

In order to enable arrival management concepts and solutions in a Next Generation Air Transportation System (NextGen) environment, ground-based sequencing and scheduling functions were developed to support metering operations in the National Airspace System. These sequencing and scheduling tools are designed to assist air traffic controllers in developing an overall arrival strategy, from enroute down to the terminal area boundary. NASA developed a ground system concept and protoype capability called Terminal Sequencing and Spacing (TSAS) to extend metering operations into the terminal area to the runway. To demonstrate the use of these scheduling and spacing tools in an operational-like environment, the FAA, NASA, and MITRE conducted an Operational Integration Assessment (OIA) of a prototype TSAS system at the FAA's William J. Hughes Technical Center (WJHTC). This paper presents an analysis of the arrival management strategies utilized and delivery accuracy achieved during the OIA. The analysis demonstrates how en route preconditioning, in various forms, and schedule disruptions impact delivery accuracy. As the simulation spanned both enroute and terminal airspace, the use of Ground Interval Management - Spacing (GIM-S) enroute speed advisories was investigated. Delivery accuracy was measured as the difference between the Scheduled Time of Arrival (STA) and the Actual Time of Arrival (ATA). The delivery accuracy was computed across all runs conducted during the OIA, which included deviations from nominal operations which are known to commonly occur in real operations, such as schedule changes and missed approaches. Overall, 83% of all flights were delivered into the terminal airspace within +/- 30 seconds of their STA and 94% of flights were delivered within +/- 60 seconds. The meter fix delivery accuracy standard deviation was found to be between 36 and 55 seconds across all arrival procedures. The data also showed when schedule disruptions were excluded, the percentage of aircraft delivered within +/- 30 seconds was between 85 and 90% across the various arrival procedures at the meter fix. This paper illustrates the ability to meet new delivery accuracy requirements in an operational-like environment using operational systems and NATCA controller participants, while also including common events that might cause disruptions to the schedule and overall system.

Air Traffic Scheduling↗

Direct Data Distribution From Low-Earth Orbit

NASA Lewis Research Center (LeRC) is developing the space and ground segment technologies necessary to demonstrate a direct data distribution (1)3) system for use in space-to-ground communication links from spacecraft in low-Earth orbit (LEO) to strategically located tracking ground terminals. The key space segment technologies include a K-band (19 GHz) MMIC-based transmit phased array antenna, and a multichannel bandwidth- and power-efficient digital encoder/modulate with an aggregate data rate of 622 Mb/s. Along with small (1.8 meter), low-cost tracking terminals on the ground, the D3 system enables affordable distribution of data to the end user or archive facility through interoperability with commercial terrestrial telecommunications networks. The D3 system is applicable to both government and commercial science and communications spacecraft in LEO. The features and benefits of the D3 system concept are described. Starting with typical orbital characteristics, a set of baseline requirements for representative applications is developed, including requirements for onboard storage and tracking terminals, and sample link budgets are presented. Characteristics of the transmit array antenna and digital encoder/modulator are described. The architecture and components of the tracking terminal are described, including technologies for the next generation terminal. Candidate flights of opportunity for risk mitigation and space demonstration of the D3 features are identified.

Budinger, James M.↗

Remote Measurement of Atmospheric Temperatures By Raman Lidar

The Raman shifted return of a lidar, or optical radar, system has been utilized to make atmospheric temperature measurements. These measurements were made along a horizontal path at temperatures between -20 C and +30 C and at ranges of about 100 meters. The temperature data were acquired by recording the intensity ratio of two portions of the Raman spectrum which were simultaneously sampled from a preset range. The lidar unit employed in this testing consisted of a 4 joule-10ppm laser operating at 694.3 nm, a 10-inch Schmidt-Cassegrain telescope, and a system of time-gated detection and signal processing electronics. The detection system processed three return signal wavelength intervals - two intervals along the rotational Raman scattered spectrum and one interval centered at the Rayleigh-Mie scattered wavelength. The wavelength intervals were resolved by using a pellicle beam splitter and three optical interference filters. Raman return samples were taken from one discrete range segment during each test shot and the signal intensities were displayed in digital format. The Rayleigh-Mie techniques. The test site utilized to evaluate this measurement technique encompassed a total path length of 200 meters. Major components of the test site included a trailer-van housing the lidar unit, a controlled environment test zone, and a beam terminator. The control zone which was located about 100 meters from the trailer was 12 meters in length, 2.4 meters in diameter, and was equipped with hinged doors at each end. The temperature of the air inside the zone could be either raised or lowered with respect to ambient air through the use of infrared heaters or a liquid-nitrogen cooling system. Conditions inside the zone were continuously monitored with a thermocouple rake assembly. The test path length was terminated by a 1.2 meter square array of energy absorbing cones and a flat black screen. Tests were initially conducted at strictly ambient conditions utilizing the normal outside air temperatures as a test parameter. These tests provided a calibration of the Raman intensity ratio as a function of' temperature for the particular optical-filter arrangement used in this system while also providing a test of' the theoretical prediction formulated in the design of the system. Later tests utilized zone temperatures above and below ambient to provide temperature gradient data. These tests indicate that ten shots, or one minute of' data acquisition, from a 100 meter range can provide absolute temperature measurements with an accuracy of + 30 C and a range resolution of about 5 meters. Because this measurement accuracy compares well with that predicted for this particular unit, it is suggested that a field-application system could be built with signif'icant improvements in both absolute accuracy and range.

Salzman, Jack A.↗

Performance of a ballute decelerator towed behind a jet airplane

An F-104B airplane was modified to investigate the drag and stability characteristics of a ballute decelerator in the wake of an asymmetrical airplane. Decelerator deployments were initiated at a Mach number of 1.3 and an altitude of 15,240 meters (50,000 feet) and terminated when the airplane had decelerated to a Mach number of 0.5. The flight tests indicated that the decelerator had a short inflation time with relatively small opening forces. The drag levels attained with the subject decelerator were less than those obtained with other high-speed decelerators behind a symmetrical tow vehicle. The ballute demonstrated good stability characteristics behind the testbed airplane.

Pyle, J. S.↗