Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “telecommunication security”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

20 records · Page 2

International Coordination and Cooperation on LunaNet Spectrum

LunaNet is planned to be the network of networks operated by a set of cooperating organizations to provide interoperable Communications, networking, Position, Navigation, and Timing (CPNT) services to users on and around the Moon based on a framework of mutually agreed-upon standards, protocols, frequency bands and interface requirements. LunaNet follows a service-oriented architecture that is agnostic about the types of organizations that provide services, e.g., government, industry, or academia. LunaNet is open, scalable, resilient, secure, and extensible. To achieve these goals, LunaNet Service Providers (LNSP) must coordinate with each other to define and develop the architecture, to plan initial and evolved capabilities, and to operate their networks. One of the central LunaNet tenets is the use of shared spectrum. For example, the Lunar Augmented Navigation Service (LANS) acts like a Global Navigation Satellite System (GNSS) such as the US Global Positioning System (GPS) or European Galileo but the LNSPs’ contributions to LunaNet must use the same frequency band (2483.5 MHz-2500.0 MHz) and transmit the same waveform synchronized by highly accurate clocks so that Users ‘see’ one virtual network and use the same multilateration algorithm to determine their positions. This necessitates a high degree of spectrum coordination. NASA’s Lunar and Human Spaceflight Spectrum Management Team has been actively supporting development of the LunaNet Interoperability Specification (LNIS), soliciting inputs from spectrum policy and planning experts across NASA, ESA and JAXA. Cislunar spectrum use considerations have been studied and adjudicated within the Space Frequency Coordination Group (SFCG) and inform the ongoing discussion of a lunar communication and navigation architecture within the existing radio regulatory framework of the International Telecommunication Union, leading to the 2027 World Radiocommunication Conference (WRC-27). The frequency plan contained in the publicly released draft of the LunaNet Interoperability Specification reflects the initial phase of exploration (roughly to 2030) defining an optimal set of radio frequencies in appropriately allocated services consistent with WRC-23 decisions for use by known or planned CPNT applications, while striving to maximize coexistence and compatibility amongst cislunar systems and other systems within the near-Earth regime (< 2 million km from Earth). Important considerations include: protection of extremely sensitive receive-only radio astronomy systems on the lunar far side, known as the Shielded Zone of the Moon (SZM); compatibility between Direct with Earth (DWE) communications links and links needed to support relay satellites in lunar orbit with their customer systems on orbit or on the lunar surface; compatibility between multiple lunar surface communications systems and capabilities over varied and challenging terrain and distances; as well as ensuring compatibility and interoperability between navigation systems which either leverage Earth-based or in-situ lunar systems. In addition, the lunar CPNT architecture is envisioned to be the basis – with adjustments – of the future Mars CPNT architecture as we expand into the solar system using Interplanetary Networking (IPN). The second phase of lunar spectrum definition will address planned international capabilities for the next decade that will require action at WRC-27 and beyond. This paper will discuss each of these considerations in more depth and how the current LunaNet frequency plan addresses them.

LunaNet↗

OSIRIS-REx, Returning the Asteroid Sample

This paper addresses the technical aspects of the sample return system for the upcoming Origins, Spectral Interpretation, Resource Identification, and Security-Regolith Explorer (OSIRIS-REx) asteroid sample return mission. The overall mission design and current implementation are presented as an overview to establish a context for the technical description of the reentry and landing segment of the mission.The prime objective of the OSIRIS-REx mission is to sample a primitive, carbonaceous asteroid and to return that sample to Earth in pristine condition for detailed laboratory analysis. Targeting the near-Earth asteroid Bennu, the mission launches in September 2016 with an Earth reentry date of September 24, 2023.OSIRIS-REx will thoroughly characterize asteroid Bennu providing knowledge of the nature of near-Earth asteroids that is fundamental to understanding planet formation and the origin of life. The return to Earth of pristine samples with known geologic context will enable precise analyses that cannot be duplicated by spacecraft-based instruments, revolutionizing our understanding of the early Solar System. Bennu is both the most accessible carbonaceous asteroid and one of the most potentially Earth-hazardous asteroids known. Study of Bennu addresses multiple NASA objectives to understand the origin of the Solar System and the origin of life and will provide a greater understanding of both the hazards and resources in near-Earth space, serving as a precursor to future human missions to asteroids.This paper focuses on the technical aspects of the Sample Return Capsule (SRC) design and concept of operations, including trajectory design and reentry retrieval. Highlights of the mission are included below.The OSIRIS-REx spacecraft provides the essential functions for an asteroid characterization and sample return mission: attitude control propulsion power thermal control telecommunications command and data handling structural support to ensure successful rendezvous with Bennu characterization of Bennus properties delivery of the sampler to the surface, and return of the spacecraft to the vicinity of the Earth sample collection, performed by the Touch-and-Go Sample Acquisition Mechanism (TAGSAM), to acquire a regolith sample from the surface Earth re-entry and SRC recovery. Following sample collection, OSIRIS-REx drifts away from Bennu until the Asteroid Departure Maneuver is commanded on March 4, 2021, sending OSIRIS-REx on a ballistic return cruise to Earth. No additional large deterministic maneuvers are required to return the SRC to Earth. During the cruise, tracking and trajectory correction maneuvers (TCMs) are performed as necessary to precisely target the entry corridor. As OSIRIS-REx approaches Earth, the reentry plans are reviewed starting about a year before arrival, and preparations begin. The spacecraft is targeted away from the Earth until 7 days before entry. The final two trajectory correction maneuvers bring the spacecraft on target toward the Utah Test and Training Range (UTTR), with sufficient time for contingency resolution. The SRC releases 4 hours prior to atmospheric entry interface and, using the Stardust capsule heritage design, employs a traditional drogue and main parachute descent system for a soft touchdown.

reentry↗